 Phases in production planning and control functions
 Main functions of production planning and control
 Level of production planning
 Production planning function
 Production control function
 Benefits of production planning and control functions
 Limitations of production planning and control department
11/16/2017 2
Phases in Production planning and control
function
1. Planning Phase :-
a. Pre-planning :- Pre-planning activity involves product planning
and development , demand forecasting , resource planning,
facilities planning , plant planning, plant location and plant
layout.
b. Active planning :- Active planning involves planning for
quantity , determination of product-mix routing, scheduling,
material planning, process planning, capacity planning and tool
planning.
11/16/2017 3
2. Action Phase :- Execution or implementation phase includes
the dispatching and progression function.
3. Control phase :- Includes status reporting , material control,
tool control, inventory control, quality control, labour output
control and cost control.
11/16/2017 4
Main Functions of Production planning and
control Department
 cProduction Planning and Control
Production Planning Production Control
1. Estimating
2. Routing
3. Scheduling
4. Loading
a) Dispatching
b) Follow-up
c) Inspection
d) Evaluation and
corrective action
11/16/2017 5
Production Planning
 Planning
 It is the first element of production planning and control. Planning
is deciding in advance what is to be done in future. An
organisational set up is created to prepare plans and policies.
Various charts, manuals and production budgets are also prepared.
Planning provides a sound base for control. A separate department
is set up for this work.
 Production planning may be defined as the technique of
foreseeing every step in a long series of separate operations, each
step to be taken at the right time and in the right place and each
operation to be performed in maximum efficiency.
11/16/2017 6
 It helps entrepreneur to work out the quantity
of material , manpower, machine and money
requires for producing predetermined level of
output in given period of time.
11/16/2017 7
Level of Production Planning
 Strategic Planning :- Strategic planning is process of thinking
through the pharmaceutical companies current production and
environment and then setting forth a guide for future decision and
result.
• Example- Choice of Appropriate machine and technology for the
long time horizon .
11/16/2017 8
 Tactical Planning :- Tactical planning is done over a intermediate
term or medium range time horizon , by the middle level
management . These plans focus on aggregate products rather than
individual specific products . These aggregate plans have a time
span of 6-18 months.
 They specify the employment plans and machinery and utility
plans, the sub-contractor and materials supply plans and facility
modification/expansion plans.
11/16/2017 9
 Operational Planning :- Operational planning is done over a
short-range of time span developed by the junior level
management. It is consider with utilization of existing facilities
rather than creation of new facilities it involves proper
utilization of key resources such as raw materials , machine
capacity and energy etc.
• Example – Example of short-range plan is master-production
schedule , together with material required planning and
capacity requirement planning.
• Short –range production scheduling and Area floor planning
involve the day to day issues and decisions related to operation
planning.
11/16/2017 10
Production Planning functions
1. Estimating :- Involves deciding the quality of the product to
be produced and cost involved in it on the basis of sale forecast.
 Estimating manpower, machine capacity and material required
to meet the plan production targets are the key activities before
budgeting for resources.
11/16/2017 11
2. Routing :- Routing is determining the exact path which will be
followed in production. It is the selection of the path from where each
unit have to pass before reaching the final stage. The stages from which
goods are to pass are decided in this process.
 Routing Procedure :-
 Deciding what part to be made or purchased
 Determining Materials required
 Determining Manufacturing Operations and Sequences
 Determining of Lot Sizes
 Determining of Scrap Factors
 Analysis of Cost of the Product
 Preparation of Production Control Forms
11/16/2017 12
3. Scheduling :- Scheduling is the determining of time and date when
each operation is to be commenced or completed. The time and date of
manufacturing each component is fixed in such a way that assembling for
final product is not delayed in any way.
 Types of scheduling :-
 Master Scheduling – It is the breakup of production requirements.
It is the start of scheduling. It is prepared by keeping in view the
order or likely sales order in near future.
 Manufacturing Scheduling – It is used where production process
is continuous. The order of preference for manufacture is also
mentioned in the schedule for a systematic production planning.
 Detail Operation Scheduling – It indicates the time required to
perform each and every detailed operations of a given process
11/16/2017 13
4. Loading :- The next step is the execution of the schedule plan
as per the route chalked out it includes the assignment of the
work to the operators at their machines or work places.
 So loading determines who will do the work as routing
determines where and scheduling determines when it shall be
done.
 Loading ensure maximum possible utilization of productive
facilities and avoids bottleneck in production. It is important to
avoid either over loading or under loading the facilities , work
centres or machines to ensure maximum utilization of resources.
11/16/2017 14
Production Control function
 Production control is the process of planning production in
advance of operations, establishing the exact route of each
individual item part or assembly, setting, starting and finishing
for each important item, assembly or the finishing production and
releasing the necessary orders as well as initiating the necessary
follow-up to have the smooth function of the enterprise.
11/16/2017 15
1. Despatching :- Despatching refers to the process of actually
ordering the work to be done. It involves putting the plan into
effect by issuing orders. It is concerned with starting the process
and operation on the basis of route sheets and schedule charts.
 Dispatching Procedure :-
 Centralised Despatching – Under this, orders are directly issued
to workmen and machines. It helps in exercising effective control.
 Decentralised Despatching – Under this procedure all work
orders are issued to the foreman or despatch clerk of the
department or section. It suffers from difficulties in achieving co-
ordination among different departments.
11/16/2017 16
2. Follow up :- Every production programme involves
determination of the progress of work, removing bottlenecks in
the flow of work and ensuring that the productive operations are
taking place in accordance with the plans.
 It spots delays or deviations from the production plans. It helps to
reveal defects in routing and scheduling, misunderstanding of
orders and instruction, under loading or overloading of work etc.
 All problems or deviations are investigated and remedial measurer
are undertaken to ensure the completion of work by the planned
date.
11/16/2017 17
3. Inspection :- This is mainly to ensure the quality of goods. It
can be required as effective agency of production control.
 Inspection is undertaken both of products and inputs. It is
carried on at various levels of production process so that pre-
determined standards of quality are achieved. Inspection
ensures the maintenance of predetermined quality of products.
11/16/2017 18
4. Corrective measures :-
 Corrective action may involve any of those activities of
 adjusting the route,
 rescheduling of work
 changing the workloads,
 repairs and maintenance of machinery or equipment,
 control over inventories of the cause of deviation is the poor
performance of the employees.
 Certain personnel decisions like training, transfer, demotion etc.
may have to be taken. Alternate methods may be suggested to
handle peak loads.
11/16/2017 19
Benefits of production planning and control
 Production planning and control function is the heart of the
production management function. An efficient production planning
control functions results in :-
 Higher quality
 Better utilizations of resources
 Reduce inventories
11/16/2017 20
 Reduce manufacturing cycle time
 Faster delivery
 Better customer service
 Low production cost and lower capital investment
 Higher customer satisfaction
 Minimize the break-down of machine
11/16/2017 21
 An efficient production planning and control system enables the
company to improve its sales turnover, market share and
profitability and provides a competitive advantage for the
company due to balanced inventory levels and higher quality ,
feasibility, and dependability and lower price which are the
performance factor for the company.
11/16/2017 22
Limitations of production planning and
control
 Based on Assumptions: - Production planning and control is
based on certain assumptions. In case the assumptions prove
correct then the planning and control will go smoothly, otherwise it
may not. The assumptions generally are about plant capacity,
orders, availability of raw materials and power etc. if these
assumptions go wrong then the process of planning and control
will go weak.
11/16/2017 23
 Rigidity: - Under production planning and control the things are
pre-decided and fixed. There is rigidity in the behaviour of
employees and it may not help in smoothening the flow of work.
 Difficult for Small Firms: - This process is time consuming and
small firms may not be able to make use of production planning
and control.
11/16/2017 24
 Costly: - It is a costly device as its implementation requires
separate persons to perform the functions of planning,
dispatching, expediting etc. Small firms cannot use the services
of specialists due to cost factor.
 Dependence on External Factors: - The external factors
sometimes reduce the effectiveness of production planning and
control. The factors like natural calamities, change in technology,
change in fashion, breakdown of power, government controls
etc. limit the use of production planning and control.
11/16/2017 25
11/16/2017 26

More Related Content

What's hot

Consolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profileConsolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profile
Zahid1392
 

What's hot (20)

Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
 
Sales forcasting, budget and Cost control
Sales forcasting, budget and Cost controlSales forcasting, budget and Cost control
Sales forcasting, budget and Cost control
 
Cgmp & Industrial Management
Cgmp & Industrial ManagementCgmp & Industrial Management
Cgmp & Industrial Management
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Dosage form validation
Dosage form validationDosage form validation
Dosage form validation
 
MATERIAL HANDLING AND TRANSPORTATION
MATERIAL HANDLING AND TRANSPORTATION MATERIAL HANDLING AND TRANSPORTATION
MATERIAL HANDLING AND TRANSPORTATION
 
Current Goods Manufacturing Practice & Industrial Management
Current Goods Manufacturing Practice & Industrial ManagementCurrent Goods Manufacturing Practice & Industrial Management
Current Goods Manufacturing Practice & Industrial Management
 
Validation of dosages form
Validation of dosages formValidation of dosages form
Validation of dosages form
 
Consolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profileConsolidation, effect of friction, distribution of forces, compaction profile
Consolidation, effect of friction, distribution of forces, compaction profile
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Material Management
Material Management Material Management
Material Management
 
Budget and cost control
Budget and cost controlBudget and cost control
Budget and cost control
 
Compaction profiles
Compaction profilesCompaction profiles
Compaction profiles
 
Handling and transportation
Handling and transportationHandling and transportation
Handling and transportation
 
Outsourcing BA and BE to CRO
Outsourcing BA and BE to CROOutsourcing BA and BE to CRO
Outsourcing BA and BE to CRO
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Compression and compaction
Compression and compactionCompression and compaction
Compression and compaction
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 
Process validation of tablet compression
Process validation of tablet compressionProcess validation of tablet compression
Process validation of tablet compression
 
DATION OF EQUIPMENT ICH AND WHO GUIDELINES FOR CALIBRATION AND VALIDATION OF ...
DATION OF EQUIPMENT ICH AND WHO GUIDELINES FOR CALIBRATION AND VALIDATION OF ...DATION OF EQUIPMENT ICH AND WHO GUIDELINES FOR CALIBRATION AND VALIDATION OF ...
DATION OF EQUIPMENT ICH AND WHO GUIDELINES FOR CALIBRATION AND VALIDATION OF ...
 

Similar to Production and planning control

New text document
New text documentNew text document
New text document
salunkhev15
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2
Abu Bashar
 
76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme
felizmessiento2022
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
SrinuKN
 
Production planning
Production planningProduction planning
Production planning
Sarkar Jayo
 

Similar to Production and planning control (20)

Production planning and control (ala)
Production planning and control (ala)Production planning and control (ala)
Production planning and control (ala)
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
New text document
New text documentNew text document
New text document
 
Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)Production Planning and Control (Operations Management)
Production Planning and Control (Operations Management)
 
PPC 114.pptx
PPC 114.pptxPPC 114.pptx
PPC 114.pptx
 
production planning & control
production planning & controlproduction planning & control
production planning & control
 
Pom notes unit 2
Pom notes unit 2Pom notes unit 2
Pom notes unit 2
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
 
76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme76-production-planning-control.ppt implemme
76-production-planning-control.ppt implemme
 
Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02Productionplanningcontrol 121129043613-phpapp02
Productionplanningcontrol 121129043613-phpapp02
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
productionplanningcontrol-ppt.pptxb production engineer is not an expert in t...
 
PPC
PPCPPC
PPC
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
Production And Planning control.ppt
Production And Planning control.pptProduction And Planning control.ppt
Production And Planning control.ppt
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
production planning_ Engineering Management
production planning_ Engineering Managementproduction planning_ Engineering Management
production planning_ Engineering Management
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production planning
Production planningProduction planning
Production planning
 

Recently uploaded

Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...
Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...
Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...
Cara Menggugurkan Kandungan 087776558899
 
Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan 081901222272 Obat Penggugur Kandu...
Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan  081901222272 Obat Penggugur Kandu...Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan  081901222272 Obat Penggugur Kandu...
Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan 081901222272 Obat Penggugur Kandu...
Halo Docter
 

Recently uploaded (20)

Top 10 Most Beautiful Chinese Pornstars List 2024
Top 10 Most Beautiful Chinese Pornstars List 2024Top 10 Most Beautiful Chinese Pornstars List 2024
Top 10 Most Beautiful Chinese Pornstars List 2024
 
MOTION MANAGEMANT IN LUNG SBRT BY DR KANHU CHARAN PATRO
MOTION MANAGEMANT IN LUNG SBRT BY DR KANHU CHARAN PATROMOTION MANAGEMANT IN LUNG SBRT BY DR KANHU CHARAN PATRO
MOTION MANAGEMANT IN LUNG SBRT BY DR KANHU CHARAN PATRO
 
Part I - Anticipatory Grief: Experiencing grief before the loss has happened
Part I - Anticipatory Grief: Experiencing grief before the loss has happenedPart I - Anticipatory Grief: Experiencing grief before the loss has happened
Part I - Anticipatory Grief: Experiencing grief before the loss has happened
 
VIP ℂall Girls Arekere Bangalore 6378878445 WhatsApp: Me All Time Serviℂe Ava...
VIP ℂall Girls Arekere Bangalore 6378878445 WhatsApp: Me All Time Serviℂe Ava...VIP ℂall Girls Arekere Bangalore 6378878445 WhatsApp: Me All Time Serviℂe Ava...
VIP ℂall Girls Arekere Bangalore 6378878445 WhatsApp: Me All Time Serviℂe Ava...
 
Top 10 Most Beautiful Russian Pornstars List 2024
Top 10 Most Beautiful Russian Pornstars List 2024Top 10 Most Beautiful Russian Pornstars List 2024
Top 10 Most Beautiful Russian Pornstars List 2024
 
Test bank for critical care nursing a holistic approach 11th edition morton f...
Test bank for critical care nursing a holistic approach 11th edition morton f...Test bank for critical care nursing a holistic approach 11th edition morton f...
Test bank for critical care nursing a holistic approach 11th edition morton f...
 
Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...
Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...
Cara Menggugurkan Kandungan Dengan Cepat Selesai Dalam 24 Jam Secara Alami Bu...
 
Circulatory Shock, types and stages, compensatory mechanisms
Circulatory Shock, types and stages, compensatory mechanismsCirculatory Shock, types and stages, compensatory mechanisms
Circulatory Shock, types and stages, compensatory mechanisms
 
Creeping Stroke - Venous thrombosis presenting with pc-stroke.pptx
Creeping Stroke - Venous thrombosis presenting with pc-stroke.pptxCreeping Stroke - Venous thrombosis presenting with pc-stroke.pptx
Creeping Stroke - Venous thrombosis presenting with pc-stroke.pptx
 
HISTORY, CONCEPT AND ITS IMPORTANCE IN DRUG DEVELOPMENT.pptx
HISTORY, CONCEPT AND ITS IMPORTANCE IN DRUG DEVELOPMENT.pptxHISTORY, CONCEPT AND ITS IMPORTANCE IN DRUG DEVELOPMENT.pptx
HISTORY, CONCEPT AND ITS IMPORTANCE IN DRUG DEVELOPMENT.pptx
 
ABO Blood grouping in-compatibility in pregnancy
ABO Blood grouping in-compatibility in pregnancyABO Blood grouping in-compatibility in pregnancy
ABO Blood grouping in-compatibility in pregnancy
 
Intro to disinformation and public health
Intro to disinformation and public healthIntro to disinformation and public health
Intro to disinformation and public health
 
The Clean Living Project Episode 23 - Journaling
The Clean Living Project Episode 23 - JournalingThe Clean Living Project Episode 23 - Journaling
The Clean Living Project Episode 23 - Journaling
 
7 steps How to prevent Thalassemia : Dr Sharda Jain & Vandana Gupta
7 steps How to prevent Thalassemia : Dr Sharda Jain & Vandana Gupta7 steps How to prevent Thalassemia : Dr Sharda Jain & Vandana Gupta
7 steps How to prevent Thalassemia : Dr Sharda Jain & Vandana Gupta
 
Drug development life cycle indepth overview.pptx
Drug development life cycle indepth overview.pptxDrug development life cycle indepth overview.pptx
Drug development life cycle indepth overview.pptx
 
TEST BANK For Guyton and Hall Textbook of Medical Physiology, 14th Edition by...
TEST BANK For Guyton and Hall Textbook of Medical Physiology, 14th Edition by...TEST BANK For Guyton and Hall Textbook of Medical Physiology, 14th Edition by...
TEST BANK For Guyton and Hall Textbook of Medical Physiology, 14th Edition by...
 
Shazia Iqbal 2024 - Bioorganic Chemistry.pdf
Shazia Iqbal 2024 - Bioorganic Chemistry.pdfShazia Iqbal 2024 - Bioorganic Chemistry.pdf
Shazia Iqbal 2024 - Bioorganic Chemistry.pdf
 
Face and Muscles of facial expression.pptx
Face and Muscles of facial expression.pptxFace and Muscles of facial expression.pptx
Face and Muscles of facial expression.pptx
 
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptxANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
ANATOMY AND PHYSIOLOGY OF RESPIRATORY SYSTEM.pptx
 
Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan 081901222272 Obat Penggugur Kandu...
Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan  081901222272 Obat Penggugur Kandu...Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan  081901222272 Obat Penggugur Kandu...
Obat Aborsi Ampuh Usia 1,2,3,4,5,6,7 Bulan 081901222272 Obat Penggugur Kandu...
 

Production and planning control

  • 1. Production And Planning control Saran Kumar Das 1st M.Pharm Dept of Pharmaceutics Al-Ameen College of Pharmacy 11/16/2017 1
  • 2. Topics to be cover....  Phases in production planning and control functions  Main functions of production planning and control  Level of production planning  Production planning function  Production control function  Benefits of production planning and control functions  Limitations of production planning and control department 11/16/2017 2
  • 3. Phases in Production planning and control function 1. Planning Phase :- a. Pre-planning :- Pre-planning activity involves product planning and development , demand forecasting , resource planning, facilities planning , plant planning, plant location and plant layout. b. Active planning :- Active planning involves planning for quantity , determination of product-mix routing, scheduling, material planning, process planning, capacity planning and tool planning. 11/16/2017 3
  • 4. 2. Action Phase :- Execution or implementation phase includes the dispatching and progression function. 3. Control phase :- Includes status reporting , material control, tool control, inventory control, quality control, labour output control and cost control. 11/16/2017 4
  • 5. Main Functions of Production planning and control Department  cProduction Planning and Control Production Planning Production Control 1. Estimating 2. Routing 3. Scheduling 4. Loading a) Dispatching b) Follow-up c) Inspection d) Evaluation and corrective action 11/16/2017 5
  • 6. Production Planning  Planning  It is the first element of production planning and control. Planning is deciding in advance what is to be done in future. An organisational set up is created to prepare plans and policies. Various charts, manuals and production budgets are also prepared. Planning provides a sound base for control. A separate department is set up for this work.  Production planning may be defined as the technique of foreseeing every step in a long series of separate operations, each step to be taken at the right time and in the right place and each operation to be performed in maximum efficiency. 11/16/2017 6
  • 7.  It helps entrepreneur to work out the quantity of material , manpower, machine and money requires for producing predetermined level of output in given period of time. 11/16/2017 7
  • 8. Level of Production Planning  Strategic Planning :- Strategic planning is process of thinking through the pharmaceutical companies current production and environment and then setting forth a guide for future decision and result. • Example- Choice of Appropriate machine and technology for the long time horizon . 11/16/2017 8
  • 9.  Tactical Planning :- Tactical planning is done over a intermediate term or medium range time horizon , by the middle level management . These plans focus on aggregate products rather than individual specific products . These aggregate plans have a time span of 6-18 months.  They specify the employment plans and machinery and utility plans, the sub-contractor and materials supply plans and facility modification/expansion plans. 11/16/2017 9
  • 10.  Operational Planning :- Operational planning is done over a short-range of time span developed by the junior level management. It is consider with utilization of existing facilities rather than creation of new facilities it involves proper utilization of key resources such as raw materials , machine capacity and energy etc. • Example – Example of short-range plan is master-production schedule , together with material required planning and capacity requirement planning. • Short –range production scheduling and Area floor planning involve the day to day issues and decisions related to operation planning. 11/16/2017 10
  • 11. Production Planning functions 1. Estimating :- Involves deciding the quality of the product to be produced and cost involved in it on the basis of sale forecast.  Estimating manpower, machine capacity and material required to meet the plan production targets are the key activities before budgeting for resources. 11/16/2017 11
  • 12. 2. Routing :- Routing is determining the exact path which will be followed in production. It is the selection of the path from where each unit have to pass before reaching the final stage. The stages from which goods are to pass are decided in this process.  Routing Procedure :-  Deciding what part to be made or purchased  Determining Materials required  Determining Manufacturing Operations and Sequences  Determining of Lot Sizes  Determining of Scrap Factors  Analysis of Cost of the Product  Preparation of Production Control Forms 11/16/2017 12
  • 13. 3. Scheduling :- Scheduling is the determining of time and date when each operation is to be commenced or completed. The time and date of manufacturing each component is fixed in such a way that assembling for final product is not delayed in any way.  Types of scheduling :-  Master Scheduling – It is the breakup of production requirements. It is the start of scheduling. It is prepared by keeping in view the order or likely sales order in near future.  Manufacturing Scheduling – It is used where production process is continuous. The order of preference for manufacture is also mentioned in the schedule for a systematic production planning.  Detail Operation Scheduling – It indicates the time required to perform each and every detailed operations of a given process 11/16/2017 13
  • 14. 4. Loading :- The next step is the execution of the schedule plan as per the route chalked out it includes the assignment of the work to the operators at their machines or work places.  So loading determines who will do the work as routing determines where and scheduling determines when it shall be done.  Loading ensure maximum possible utilization of productive facilities and avoids bottleneck in production. It is important to avoid either over loading or under loading the facilities , work centres or machines to ensure maximum utilization of resources. 11/16/2017 14
  • 15. Production Control function  Production control is the process of planning production in advance of operations, establishing the exact route of each individual item part or assembly, setting, starting and finishing for each important item, assembly or the finishing production and releasing the necessary orders as well as initiating the necessary follow-up to have the smooth function of the enterprise. 11/16/2017 15
  • 16. 1. Despatching :- Despatching refers to the process of actually ordering the work to be done. It involves putting the plan into effect by issuing orders. It is concerned with starting the process and operation on the basis of route sheets and schedule charts.  Dispatching Procedure :-  Centralised Despatching – Under this, orders are directly issued to workmen and machines. It helps in exercising effective control.  Decentralised Despatching – Under this procedure all work orders are issued to the foreman or despatch clerk of the department or section. It suffers from difficulties in achieving co- ordination among different departments. 11/16/2017 16
  • 17. 2. Follow up :- Every production programme involves determination of the progress of work, removing bottlenecks in the flow of work and ensuring that the productive operations are taking place in accordance with the plans.  It spots delays or deviations from the production plans. It helps to reveal defects in routing and scheduling, misunderstanding of orders and instruction, under loading or overloading of work etc.  All problems or deviations are investigated and remedial measurer are undertaken to ensure the completion of work by the planned date. 11/16/2017 17
  • 18. 3. Inspection :- This is mainly to ensure the quality of goods. It can be required as effective agency of production control.  Inspection is undertaken both of products and inputs. It is carried on at various levels of production process so that pre- determined standards of quality are achieved. Inspection ensures the maintenance of predetermined quality of products. 11/16/2017 18
  • 19. 4. Corrective measures :-  Corrective action may involve any of those activities of  adjusting the route,  rescheduling of work  changing the workloads,  repairs and maintenance of machinery or equipment,  control over inventories of the cause of deviation is the poor performance of the employees.  Certain personnel decisions like training, transfer, demotion etc. may have to be taken. Alternate methods may be suggested to handle peak loads. 11/16/2017 19
  • 20. Benefits of production planning and control  Production planning and control function is the heart of the production management function. An efficient production planning control functions results in :-  Higher quality  Better utilizations of resources  Reduce inventories 11/16/2017 20
  • 21.  Reduce manufacturing cycle time  Faster delivery  Better customer service  Low production cost and lower capital investment  Higher customer satisfaction  Minimize the break-down of machine 11/16/2017 21
  • 22.  An efficient production planning and control system enables the company to improve its sales turnover, market share and profitability and provides a competitive advantage for the company due to balanced inventory levels and higher quality , feasibility, and dependability and lower price which are the performance factor for the company. 11/16/2017 22
  • 23. Limitations of production planning and control  Based on Assumptions: - Production planning and control is based on certain assumptions. In case the assumptions prove correct then the planning and control will go smoothly, otherwise it may not. The assumptions generally are about plant capacity, orders, availability of raw materials and power etc. if these assumptions go wrong then the process of planning and control will go weak. 11/16/2017 23
  • 24.  Rigidity: - Under production planning and control the things are pre-decided and fixed. There is rigidity in the behaviour of employees and it may not help in smoothening the flow of work.  Difficult for Small Firms: - This process is time consuming and small firms may not be able to make use of production planning and control. 11/16/2017 24
  • 25.  Costly: - It is a costly device as its implementation requires separate persons to perform the functions of planning, dispatching, expediting etc. Small firms cannot use the services of specialists due to cost factor.  Dependence on External Factors: - The external factors sometimes reduce the effectiveness of production planning and control. The factors like natural calamities, change in technology, change in fashion, breakdown of power, government controls etc. limit the use of production planning and control. 11/16/2017 25