GREEN               LINE
An environmental linear park for sports, culture and recreation
Aguascalientes is located in the Mexican semi-desert, we depend on one
of the most overexploited aquifers in the country and it is considered a
high risk zone of climate change.

The East side of the City is the most densely populated and overcrowding
is a big problem here as is the lack of public recreational spaces.

There is a high rate of domestic violence and many of the young criminals
in the City come from these neighborhoods.

Eight out of twelve polygons of poverty of Aguascalientes are here.

This is why, this administraton created the Green Line Project.




                                                    2011-2013
                                                   CONCEPTS
The Green Line is the name we gave to
the underused land covering the 12”
duct that transports oil for PEMEX.

It is 15 kilómeters in lenght and
between 15 and 60 meters wide in
different sections. A total area of 50
hectars. Its construction will be divided in
three stages.

In 2011, 6 kilometers were built,
finishing the First Stage.




                   CONCEPTS
•With the Green Line the Municipal Governent:
    •Compensates the lack of public spaces for social gatherings that are
    urgently needed.
    •Triggers social development for our most vulnerable citizens.

•With the Green Line PEMEX:
    •Generates a replicable and scaleable model for the security of its
    installations.
    •Shows evidence of its commitment to the environment and society.




                                                  PEMEX-
                                              AGUASCALIENTES:
                                               SHARED VISION
To execute the project, the work
was divided in the following
layers.




            LAYERS
Parallel to the Green Line, the Hydraulic Recovery Plan “Purple Line” is
developing for the benefit of the entire City, with the rehabilitation of water
treatment plants to curve down water depletion from the aquifer.

To irrigate the new park, 3 existing water treatment plants plus a new one
with great capacity will be installed, covering 100% of the water
requirements of the Green Line.



                                                           WATER
                                                        INFRASTRUCTURE
Nowadays, the roads along the Green
                                    Line are heterogenic in quality; some
                                    paved segments, some unpaved and
                                    even vast amounts of non delineated
                                    streets.

                                    The Green Line will consolidate all roads
                                    and will complete the vial structure.

                                    In the most affluent street nodes,
                                    pedestrian, vehicle and bicycle bridges
                                    and underpasses will be built to preserve
                                    the park´s continuity.


The project includes the installation of
completely       new        illumination
infrastructure with more than 3,300                  ROADS AND
environmentally friendly street lamps,             PUBLIC LIGHTING
their source of energy will come from
14 solar panels.
Care for the environment is the base of this
project. With the inclusion of large grass areas
and the plantation of more than 5,000 trees of
considerable size and adaptable to local climate,
and the carful preservation of more than 210
existing trees, we will help slow down
desertification and metabolize CO2 into oxygen.




                         GREEN
                    INFRASTRUCTURE
Bicycle and jogging tracks are the bone
structure of the Green Line.

The tracks are built with permeable
concrete, allowing rainwater to be absorbed
into the ground.

With the support of the Federal
Government, a Sports Club with an Olympic
size pool is currently being built.

Courts for different sports and open air
gyms, bike stations and traditional gaming
areas are designed.



                     SPORTS
                 INFRASTRUCTURE
Playgrounds for children are placed all
along the Green Line.

Handicapped people and the elderly are
also considered in the design and
equipment of all installations.

Plazas and resting areas will be fully
equipped for family and community
integration and recreation.




                  RECREATIONAL
                INFRASTRUCTURE
The site´s new conditions will facilitate diverse cultural activities such as
dance, theatre events, music, visual arts, etc.

Open air forums, concert areas, and different urban elements to allow
street art are also part of the design.

The Green Line will foster a vast amount of community activities like
reading, crafts, workshops, programs for children and free film exhibitions.


                                                       CULTURAL
                                                   INFRASTRUCTURE
56% of overall population of the City lives around the Green Line.
  They represent the following:
                                             Around the Green Line    Aguascalientes Municipality

Average age                                        21 years                    25 years

Less than 14 years of age                            40%                        29.36%

More than 60 years of age                             4%                        7.84%

Head of household is a woman                         21%                         20%

Lack of public medical coverage                      25%                         22%

Education                                           8 years                   10.1 years

Children between 6 and 14 years of age who          8.66%                       1.14%
don´t go to school




                                                                        SOCIAL
                                                                     INTEGRATION
With the Green Line, the
Municipality     pioneers     an
efficient and polyfacetic project
for social rescue that also
benefits the local environmental
conditions.

This is a public policy of
convivance and safety based
on the corresponsability of
government and citizens.




    SOCIAL INTEGRATION
The first stage of the Green Line, with a lenght of 6 kilometers will be concluded
by March 31st, 2012, impacting 31 neighborhoods directly.

                         FEDERACIÓN       ESTADO         MUNICIPIO
         CONAGUA         30.0 mdp                        11.7 mdp
         SEMARNAT        17.8 mdp                        1.3 mdp
         CONADE          35.5 mdp         6.6 mdp        26.6 mdp
         SEDESOL         9.14 mdp                        9.14 mdp
         SOPMA                                           10.0 mdp
         TOTAL           92.44 mdp        6.6 mdp        58.74 mdp




        A total investment of
       14 million US dollars for
                 2011.                                     FINANCIAL
                                                          COMPONENT
                                                           First Stage
CONCEPTO                         PROCEDENCIA
    AUDITORIO DE BOX Y CANCHA DE USOS MÚLTIPLES          CONADE


    CENTRO DE DESARROLLO COMUNITARIO (CEDECO)            SEDESOL


                   CASA DE CULTURA                      CONACULTA
                 ALUMBRADO PÚBLICO                      SEMARNAT
                   PASOS A DESNIVEL                        SCT
  PAVIMENTACIÓN (VILLERÍAS A VILLA DE N. SEÑORA DE LA      SCT
                     ASUNCIÓN)

          PUENTE SOBRE ARROYO DON PASCUAL               MUNICIPAL
          PUENTE SOBRE BORDO SANTA ELENA                MUNICIPAL
                    REFORESTACIÓN                       SEMARNAT




 For the second stage, there
     is already a secured
investment of 3 million USD.                                      FINANCIAL
                                                                 COMPONENT
                                                                 Second Stage
For the completion of the third and
last stage, the Green Line needs to
secure funding of 18 million USD.
This is why we reach to the
international community.



                            FINANCIAL
                           COMPONENT
                            Third Stage
With this project, we are improving
the life of almost 450 thousand
people in Aguascalientes that need it
the most, as we also contribute to
diminish       our    environmental
vulnerability.
      ……for our future in common,
       now that we still have time.

                             CONCLUSION
Thank You

More Related Content

What's hot

Harrison CV 3D Version
Harrison CV 3D VersionHarrison CV 3D Version
Harrison CV 3D Version
Harrison Kwach
 
Syracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant LandSyracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant Land
aslfadmin
 
Growing Power
Growing PowerGrowing Power
Growing Power
aslfadmin
 

What's hot (20)

2.6.1 slum case study mumbai
2.6.1 slum case study mumbai2.6.1 slum case study mumbai
2.6.1 slum case study mumbai
 
Harrison CV 3D Version
Harrison CV 3D VersionHarrison CV 3D Version
Harrison CV 3D Version
 
Tlp ravi forum
Tlp ravi forumTlp ravi forum
Tlp ravi forum
 
02 sectoral planning 02_
02 sectoral planning 02_02 sectoral planning 02_
02 sectoral planning 02_
 
Environment Sector by Rafia Kamal for TLP
Environment Sector by Rafia Kamal for TLPEnvironment Sector by Rafia Kamal for TLP
Environment Sector by Rafia Kamal for TLP
 
Sustainable Planning Fundamentals
Sustainable Planning FundamentalsSustainable Planning Fundamentals
Sustainable Planning Fundamentals
 
sewage infrastructure management
sewage infrastructure managementsewage infrastructure management
sewage infrastructure management
 
Renewing natural processes_in_an_urban_area
Renewing natural processes_in_an_urban_areaRenewing natural processes_in_an_urban_area
Renewing natural processes_in_an_urban_area
 
Policy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the PhilippinesPolicy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the Philippines
 
Mega Cebu - World Water Day 2016
Mega Cebu - World Water Day 2016Mega Cebu - World Water Day 2016
Mega Cebu - World Water Day 2016
 
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, IndiaSLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
SLUM REHABILITATION PROGRAMME (In Situ ) in Ahmedabad, India
 
Greening vacant lots in syracuse final
Greening vacant lots in syracuse finalGreening vacant lots in syracuse final
Greening vacant lots in syracuse final
 
Strategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront DevelopmentsStrategies and Guidelines for Waterfront Developments
Strategies and Guidelines for Waterfront Developments
 
Syracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant LandSyracuse COE Symposium Transforming Urban Vacant Land
Syracuse COE Symposium Transforming Urban Vacant Land
 
Sustainable Cities: Managing Urban Air Quality
Sustainable Cities: Managing Urban Air QualitySustainable Cities: Managing Urban Air Quality
Sustainable Cities: Managing Urban Air Quality
 
Creating the Waterfront City of the Future
Creating the Waterfront City of the FutureCreating the Waterfront City of the Future
Creating the Waterfront City of the Future
 
Growing Power
Growing PowerGrowing Power
Growing Power
 
dr. napalang
 dr. napalang dr. napalang
dr. napalang
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront development
 
Supporting people living around uranium tailings in Kyrgyzstan
Supporting people living around uranium tailings in KyrgyzstanSupporting people living around uranium tailings in Kyrgyzstan
Supporting people living around uranium tailings in Kyrgyzstan
 

Similar to Green Line Linear Park

Sustainable Curitiba
Sustainable CuritibaSustainable Curitiba
Sustainable Curitiba
Mr Cornish
 
Presentation2010 main street final
Presentation2010 main street finalPresentation2010 main street final
Presentation2010 main street final
Guy Kempe
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big booklet
GardinerEast
 

Similar to Green Line Linear Park (20)

Design alternatives -landscape integration (1).ppsx
Design alternatives -landscape integration (1).ppsxDesign alternatives -landscape integration (1).ppsx
Design alternatives -landscape integration (1).ppsx
 
Sustainable Curitiba
Sustainable CuritibaSustainable Curitiba
Sustainable Curitiba
 
Green city
Green cityGreen city
Green city
 
Ecological function in urban enivronment
Ecological function in urban enivronmentEcological function in urban enivronment
Ecological function in urban enivronment
 
Salt lake presentation
Salt lake presentationSalt lake presentation
Salt lake presentation
 
Urban Design for a Greener & Healthier City Antipolo City.pdf
Urban Design for a Greener & Healthier City Antipolo City.pdfUrban Design for a Greener & Healthier City Antipolo City.pdf
Urban Design for a Greener & Healthier City Antipolo City.pdf
 
Sustainable design, Site analysis
Sustainable design, Site analysisSustainable design, Site analysis
Sustainable design, Site analysis
 
Eco cities
Eco citiesEco cities
Eco cities
 
2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant program2013.dec.1314 318 e-green alleys grant program
2013.dec.1314 318 e-green alleys grant program
 
Space & Mobility through SDG 11
Space & Mobility through SDG 11 Space & Mobility through SDG 11
Space & Mobility through SDG 11
 
The Rise of Blue-Green Infrastructure
The Rise of Blue-Green InfrastructureThe Rise of Blue-Green Infrastructure
The Rise of Blue-Green Infrastructure
 
Presentation2010 main street final
Presentation2010 main street finalPresentation2010 main street final
Presentation2010 main street final
 
Presentation2010 main street final
Presentation2010 main street finalPresentation2010 main street final
Presentation2010 main street final
 
World Water Week 2011 Conferences report
World Water Week 2011 Conferences reportWorld Water Week 2011 Conferences report
World Water Week 2011 Conferences report
 
Wastewater for 21st century resilient cities
Wastewater for 21st century resilient citiesWastewater for 21st century resilient cities
Wastewater for 21st century resilient cities
 
Improve kpmb+big booklet
Improve kpmb+big bookletImprove kpmb+big booklet
Improve kpmb+big booklet
 
Apresentação Lance Brown
Apresentação Lance BrownApresentação Lance Brown
Apresentação Lance Brown
 
THE CONCEPT OF SUSTAINABLE DEVELOPMENT
THE CONCEPT OF SUSTAINABLE DEVELOPMENTTHE CONCEPT OF SUSTAINABLE DEVELOPMENT
THE CONCEPT OF SUSTAINABLE DEVELOPMENT
 
AWRA_AWP_POSTER
AWRA_AWP_POSTERAWRA_AWP_POSTER
AWRA_AWP_POSTER
 
malmo climate proof
malmo climate proofmalmo climate proof
malmo climate proof
 

More from Global Infrastructure Basel Foundation

More from Global Infrastructure Basel Foundation (20)

GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD PanelGIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
 
GIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_RoosGIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_Roos
 
GIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_RuijieGIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_Ruijie
 
GIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-KornmannGIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-Kornmann
 
GIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_GeorgouliasGIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_Georgoulias
 
GIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_BaillonGIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_Baillon
 
GIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_HughesGIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_Hughes
 
GIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_GrantGIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_Grant
 
GIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_GonzalezGIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_Gonzalez
 
GIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_BustinduyGIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_Bustinduy
 
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_ValahuGIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
 
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_BarbenGIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
 
GIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_ZhangGIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_Zhang
 
GIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von GuntenGIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von Gunten
 
GIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_FischerGIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_Fischer
 
GIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_AlexanderGIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_Alexander
 
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_ChangshengGIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
 
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_JianzhongGIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_PretelGIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_BreschGIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
 

Recently uploaded

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 

Green Line Linear Park

  • 1.
  • 2. GREEN LINE An environmental linear park for sports, culture and recreation
  • 3. Aguascalientes is located in the Mexican semi-desert, we depend on one of the most overexploited aquifers in the country and it is considered a high risk zone of climate change. The East side of the City is the most densely populated and overcrowding is a big problem here as is the lack of public recreational spaces. There is a high rate of domestic violence and many of the young criminals in the City come from these neighborhoods. Eight out of twelve polygons of poverty of Aguascalientes are here. This is why, this administraton created the Green Line Project. 2011-2013 CONCEPTS
  • 4. The Green Line is the name we gave to the underused land covering the 12” duct that transports oil for PEMEX. It is 15 kilómeters in lenght and between 15 and 60 meters wide in different sections. A total area of 50 hectars. Its construction will be divided in three stages. In 2011, 6 kilometers were built, finishing the First Stage. CONCEPTS
  • 5. •With the Green Line the Municipal Governent: •Compensates the lack of public spaces for social gatherings that are urgently needed. •Triggers social development for our most vulnerable citizens. •With the Green Line PEMEX: •Generates a replicable and scaleable model for the security of its installations. •Shows evidence of its commitment to the environment and society. PEMEX- AGUASCALIENTES: SHARED VISION
  • 6. To execute the project, the work was divided in the following layers. LAYERS
  • 7. Parallel to the Green Line, the Hydraulic Recovery Plan “Purple Line” is developing for the benefit of the entire City, with the rehabilitation of water treatment plants to curve down water depletion from the aquifer. To irrigate the new park, 3 existing water treatment plants plus a new one with great capacity will be installed, covering 100% of the water requirements of the Green Line. WATER INFRASTRUCTURE
  • 8. Nowadays, the roads along the Green Line are heterogenic in quality; some paved segments, some unpaved and even vast amounts of non delineated streets. The Green Line will consolidate all roads and will complete the vial structure. In the most affluent street nodes, pedestrian, vehicle and bicycle bridges and underpasses will be built to preserve the park´s continuity. The project includes the installation of completely new illumination infrastructure with more than 3,300 ROADS AND environmentally friendly street lamps, PUBLIC LIGHTING their source of energy will come from 14 solar panels.
  • 9. Care for the environment is the base of this project. With the inclusion of large grass areas and the plantation of more than 5,000 trees of considerable size and adaptable to local climate, and the carful preservation of more than 210 existing trees, we will help slow down desertification and metabolize CO2 into oxygen. GREEN INFRASTRUCTURE
  • 10. Bicycle and jogging tracks are the bone structure of the Green Line. The tracks are built with permeable concrete, allowing rainwater to be absorbed into the ground. With the support of the Federal Government, a Sports Club with an Olympic size pool is currently being built. Courts for different sports and open air gyms, bike stations and traditional gaming areas are designed. SPORTS INFRASTRUCTURE
  • 11. Playgrounds for children are placed all along the Green Line. Handicapped people and the elderly are also considered in the design and equipment of all installations. Plazas and resting areas will be fully equipped for family and community integration and recreation. RECREATIONAL INFRASTRUCTURE
  • 12. The site´s new conditions will facilitate diverse cultural activities such as dance, theatre events, music, visual arts, etc. Open air forums, concert areas, and different urban elements to allow street art are also part of the design. The Green Line will foster a vast amount of community activities like reading, crafts, workshops, programs for children and free film exhibitions. CULTURAL INFRASTRUCTURE
  • 13. 56% of overall population of the City lives around the Green Line. They represent the following: Around the Green Line Aguascalientes Municipality Average age 21 years 25 years Less than 14 years of age 40% 29.36% More than 60 years of age 4% 7.84% Head of household is a woman 21% 20% Lack of public medical coverage 25% 22% Education 8 years 10.1 years Children between 6 and 14 years of age who 8.66% 1.14% don´t go to school SOCIAL INTEGRATION
  • 14. With the Green Line, the Municipality pioneers an efficient and polyfacetic project for social rescue that also benefits the local environmental conditions. This is a public policy of convivance and safety based on the corresponsability of government and citizens. SOCIAL INTEGRATION
  • 15. The first stage of the Green Line, with a lenght of 6 kilometers will be concluded by March 31st, 2012, impacting 31 neighborhoods directly. FEDERACIÓN ESTADO MUNICIPIO CONAGUA 30.0 mdp 11.7 mdp SEMARNAT 17.8 mdp 1.3 mdp CONADE 35.5 mdp 6.6 mdp 26.6 mdp SEDESOL 9.14 mdp 9.14 mdp SOPMA 10.0 mdp TOTAL 92.44 mdp 6.6 mdp 58.74 mdp A total investment of 14 million US dollars for 2011. FINANCIAL COMPONENT First Stage
  • 16. CONCEPTO PROCEDENCIA AUDITORIO DE BOX Y CANCHA DE USOS MÚLTIPLES CONADE CENTRO DE DESARROLLO COMUNITARIO (CEDECO) SEDESOL CASA DE CULTURA CONACULTA ALUMBRADO PÚBLICO SEMARNAT PASOS A DESNIVEL SCT PAVIMENTACIÓN (VILLERÍAS A VILLA DE N. SEÑORA DE LA SCT ASUNCIÓN) PUENTE SOBRE ARROYO DON PASCUAL MUNICIPAL PUENTE SOBRE BORDO SANTA ELENA MUNICIPAL REFORESTACIÓN SEMARNAT For the second stage, there is already a secured investment of 3 million USD. FINANCIAL COMPONENT Second Stage
  • 17. For the completion of the third and last stage, the Green Line needs to secure funding of 18 million USD. This is why we reach to the international community. FINANCIAL COMPONENT Third Stage
  • 18. With this project, we are improving the life of almost 450 thousand people in Aguascalientes that need it the most, as we also contribute to diminish our environmental vulnerability. ……for our future in common, now that we still have time. CONCLUSION