OBJECTIVE
To understand the concept of Lean
Manufacturing and translate its philosophy to
Petrochemical plants.
LEAN MANUFACTURING
Page 3 of 21Presented by: Sh VRM
Elimination/Reduction of Waste within the system
WHAT IS LEAN MANUFACTURING ?
Identify
Eliminate/Reduce
Input OutputSystem
Waste
Page 4 of 21Presented by: Sh VRM
LEAN MANUFACTURING OVERVIEW
“Lean Manufacturing” incorporates tools and techniques to
Optimize time, human resources and assets
Improve productivity
Improve quality of products and services
Page 5 of 21Presented by: Sh VRM
Lean production focuses on
- Eliminating waste in processes
- Expanding capacity by reducing costs and shortening
cycle time
- Understanding what is important to the customer
Analyze the flow of information and materials for
continual improvement of the process
LEAN MANUFACTURING OVERVIEW
Page 6 of 21Presented by: Sh VRM
There are three types of operations in any process
Non-Value-Adding (NVA)
Necessary but Non-Value-Adding (NNVA)
Value-Adding (VA)
Focus on Value-Adding (VA) operations
WASTE REMOVAL
LEAN MANUFACTURING
Page 7 of 21Presented by: Sh VRM
Kaizen
Focus on eliminating waste, improving productivity and
achieving sustained continual improvement
• Six Sigma
A statistical process control and analytical tool to improve
productivity and quality.
Total Productive Maintenance (TPM)
Basket of Maintenance of Practices which helps in focusing
on elimination losses such as breakdowns, idling and minor
stoppages, reduced defects & rework, spills and process-upset
conditions
LEAN MANUFACTURING
TOOLS
Page 8 of 21Presented by: Sh VRM
Cellular Manufacturing/One-Piece Flow system
Process for connecting the manual and machine processes of
similar operations in order to eliminate non-value adding
activities.
Just-in-time (JIT) Production Systems / Kanban
Inventory strategy to reduce process inventory and it’s
associated costs.
Value Stream Mapping
Created a visual representation of all product and information
flows from raw material to shipping
LEAN MANUFACTURING
TOOLS
Page 9 of 21Presented by: Sh VRM
5S
Reduces waste and optimizes productivity through
maintaining an orderly workplace. Elements of 5S are
Seiri – Sort
Seiton – Set in Order
Seiso – Shine
Seiketsu – Standardize
Shitsuke – Sustain
Place for everything and everything in it’s place.
LEAN MANUFACTURING
TOOLS
Page 10 of 21Presented by: Sh VRM
2nd
Tier
1st
Tier
Toyota
Customer
Demand
Flow of
Information
Flow of
Production
2nd
Tier
1st
Tier
Assembler
Customer
Demand
Flow of
Information
Flow of
Production
Traditional “Buffered”
Supply Chain
Just-In-Time
Supply Chain
TOYOTA PRODUCTION SYSTEM
Page 11 of 21Presented by: Sh VRM
1. Faster Inventory updates
2. Shortening time for generating production forecast
3. Online reporting, cutting down paper
4. ERP
156% ROI
LEAN MANUFACTURING
APPLICATION IN CPC
Page 12 of 21Presented by: Sh VRM
Waste within the Toyota Production
System
Waste within the Petrochemical Plant
Overproduction
Waiting
Transportation
Inappropriate Processing
Unnecessary Inventory
Unnecessary Motion
Defects
Inappropriate feed stock
Lost by-product credit
Quality give away
Off spec generation/reprocessing
Equipment idling
High energy cost
LEAN MANUFACTURING
APPLICATION TO PETROCHEMICAL PLANT
Page 13 of 21Presented by: Sh VRM
1. Understanding waste in the form of loss of contribution at
every stage of operation.
2. Understanding the impact of HSE incidence on
contribution.
3. Understanding all components of cost of production.
4. Understanding of value added activities and non-value
added activities.
5. Understanding Process intensification.
6. Understanding EPS and Marketing functions.
LEAN MANUFACTURING
APPLICATION TO PETROCHEMICAL PLANT
Page 14 of 21Presented by: Sh VRM
Best Lean Manufacturing Practices:
Kaizan
Epsilon/Depsilon reports
Daily contribution reports
Daily feed stock & by-product analysis
Daily energy consumption report
Daily stream analysis for quality give away
E-mfg Practices
Structural Capital
5S for Safe work place
LEAN MANUFACTURING
Aromatics Plant
Page 15 of 21Presented by: Sh VRM
5°C increase in Platformer feed EP – loss 16.5 MUSD/yr
1% lowering of PX/C8A – loss is 12 MUSD/yr
High RVP of ED Raffinate – 10 MUSD/yr
200MTD C8A blending in Gasoline – Loss is 5.6 MUSD/yr
2% loss in heater efficiency – loss is 3.2 MUSD/yr
C10A conversion in Tatoray vs blend in Diesel/Gasoline – 2.1 MUSD/yr
1% reduction in PX recovery – Loss is 7 MUSD/yr
LEAN MANUFACTURING
Aromatics Plant - Opportunities
Page 16 of 21Presented by: Sh VRM
71.0
27.2
0.2 1.4
0.2
Net RM Cat Chem Utilities Manpower Maint
LEAN MANUFACTURING
PARAXYLENE COST STRUCTURE
•By product credit is 60% of Raw Material cost
•Conversion cost is 27% of operating cost
Page 17 of 21Presented by: Sh VRM
By Product Value
Maximization
 Maximize production of OX, BZ, Hydrogen
 Recovery of Hydrogen from gases to Sat/Unsat header
 Recovery of BZ from low value streams
 Up-gradation of low value streams to high value streams (ED raffinate)
BYPRODUCT
Yield
(wt% Plat feed)
Price
HIGH VALUE
H2 2.17 44259
OX 10.36 26818
BZ 11.12 29351
HAR 2.29 22109
LPG 4.24 17075
LOW VALUE
ED Raffinate 9.68 15573
Fuel Gas 14.05 10050
AHE 1.16 9137
FEED STOCK ANALYSIS
LEAN MANUFACTURING
Page 18 of 21Presented by: Sh VRM
• Conversion cost for Aromatic plant at Jamnagar is 27% of the
operating cost.
• 60% of conversion cost is fuel cost.
• Optimize Heater and Columns operation
28.9
12.3
58.8
Power Fuel Net Steam
LEAN MANUFACTURING
CONVERSION COST
Page 19 of 21Presented by: Sh VRM
• Business Case: 1
Market Interface: Based on Market scenario HASC production is
optimized
• Business Case: 2
Product Development: Renine was introduced in market which won
Golden Peacock Award for Techno-commercial innovation
• Business Case: 3
Byproduct Optimization: C10A conversion across Tatoray
• Business Case: 4
Opportunity in Adversity: Blending of C7A, Mix Xylene, C10A in
Gasoline
LEAN MANUFACTURING
EXAMPLES OF BUSINESS CASES
Page 20 of 21Presented by: Sh VRM
• Business Case: 5
Waste Elimination: Recovering Hydrogen going to Sat/Unsat
• Business Case: 6
Waste Elimination/Change in mindset: Reduction of BZ drag
• Business Case: 7
Quality giveaway: C2 loading in LPG product
• Business Case: 8
Human Resource : Enhancing Human Skill – Prepare for
tomorrow. Eliminate positions.
LEAN MANUFACTURING
EXAMPLES OF BUSINESS CASES
Page 21 of 21Presented by: Sh VRM
We are what we repeatedly do,
Excellence then is not an Act but
A Habit
THANKING YOU
Page 22 of 21Presented by: Sh VRM
Innovation
Knowledge
Known Things -
Productivity
Unknown Things -
Page 23 of 21Presented by: Sh VRM
KAIZEN
Plant Manager
Production mgr
Worker
Normal operation
Innovation
Supervisor

More Related Content

What's hot

lean management- case study on jaguar
lean management- case study on jaguarlean management- case study on jaguar
lean management- case study on jaguarRachita Kochhar
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPSPrakash Prakash
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production Systemjasonhian
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...sanobar77
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing toolsIshmam Ahmed
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Exampleshekhar619
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...shreyas desai
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean ManagementRuhi Beri
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 

What's hot (20)

lean management- case study on jaguar
lean management- case study on jaguarlean management- case study on jaguar
lean management- case study on jaguar
 
Lean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production SystemLean Manufacturing - Toyota Production System
Lean Manufacturing - Toyota Production System
 
0201B Lean Production
0201B Lean Production0201B Lean Production
0201B Lean Production
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 
Lean Production
Lean ProductionLean Production
Lean Production
 
lean production
lean productionlean production
lean production
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...IMPROVEMENT OF MANUFACTURING OPERATIONS  THROUGH A LEAN MANAGEMENT APPROACH A...
IMPROVEMENT OF MANUFACTURING OPERATIONS THROUGH A LEAN MANAGEMENT APPROACH A...
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
LEAN MANUFACTURING
LEAN MANUFACTURINGLEAN MANUFACTURING
LEAN MANUFACTURING
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
Lean manufacturing ppt download link: http://www.vpresentationslides.com/lean...
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 

Similar to Lean manufacturing

Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...Yokogawa1
 
BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20 BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20 Gary Wilde
 
Digitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellDigitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellKBC (A Yokogawa Company)
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costsICV_eV
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costsICV_eV
 
How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?Sanderson Group
 
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...IRJET Journal
 
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC Advisory Group
 
BQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 RudyBQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 RudyRudy Shainer
 
Just in time Manufacturing
Just in time ManufacturingJust in time Manufacturing
Just in time ManufacturingKiran Girase
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultantbharat kumar
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...Yokogawa1
 

Similar to Lean manufacturing (20)

Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
Real-time Data, Site wide Digital Twin, and Proprietary Analytics Cuts into P...
 
Supply Chain Basic
Supply Chain BasicSupply Chain Basic
Supply Chain Basic
 
BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20 BPMA Buyers Guide 2019-20
BPMA Buyers Guide 2019-20
 
Digitalization of Engineering Silos Howell
Digitalization of Engineering Silos HowellDigitalization of Engineering Silos Howell
Digitalization of Engineering Silos Howell
 
Ch08
Ch08Ch08
Ch08
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
WCM LOGISTICS
WCM LOGISTICSWCM LOGISTICS
WCM LOGISTICS
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs
 
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning MillsProductivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
 
How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?How Productive Are Your Manufacturing Competitors?
How Productive Are Your Manufacturing Competitors?
 
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
APPLICATION OF LEAN PRACTICES FOR IDENTIFICATION OF SOLUTIONS IN REDUCING FUR...
 
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
 
BQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 RudyBQR's apmOptimizer 4_ 2017 Rudy
BQR's apmOptimizer 4_ 2017 Rudy
 
Just in time Manufacturing
Just in time ManufacturingJust in time Manufacturing
Just in time Manufacturing
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
 

More from Prem kumar

Safe use of hydra
Safe use of hydraSafe use of hydra
Safe use of hydraPrem kumar
 
Control valve presentation
Control valve presentationControl valve presentation
Control valve presentationPrem kumar
 
Tool box talk work at height on scaffold presentation
Tool box talk  work at height on scaffold presentationTool box talk  work at height on scaffold presentation
Tool box talk work at height on scaffold presentationPrem kumar
 
Presentation on slings
Presentation on slingsPresentation on slings
Presentation on slingsPrem kumar
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidentsPrem kumar
 
Basics of crane
Basics of craneBasics of crane
Basics of cranePrem kumar
 
Const statutory
Const statutoryConst statutory
Const statutoryPrem kumar
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting weldingPrem kumar
 
Behavior based safety
Behavior based safetyBehavior based safety
Behavior based safetyPrem kumar
 
Personal protective equipment
Personal protective equipmentPersonal protective equipment
Personal protective equipmentPrem kumar
 
Pnematic tools
Pnematic toolsPnematic tools
Pnematic toolsPrem kumar
 
Grinding machine
Grinding machineGrinding machine
Grinding machinePrem kumar
 
Electrical safety
Electrical safetyElectrical safety
Electrical safetyPrem kumar
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting weldingPrem kumar
 
Fabrication calculation
Fabrication calculationFabrication calculation
Fabrication calculationPrem kumar
 
Man riding basket
Man riding basketMan riding basket
Man riding basketPrem kumar
 

More from Prem kumar (20)

Safe use of hydra
Safe use of hydraSafe use of hydra
Safe use of hydra
 
Control valve presentation
Control valve presentationControl valve presentation
Control valve presentation
 
Crane safety
Crane safetyCrane safety
Crane safety
 
Tool box talk work at height on scaffold presentation
Tool box talk  work at height on scaffold presentationTool box talk  work at height on scaffold presentation
Tool box talk work at height on scaffold presentation
 
Presentation on slings
Presentation on slingsPresentation on slings
Presentation on slings
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidents
 
Basics of crane
Basics of craneBasics of crane
Basics of crane
 
Earth pit
Earth pitEarth pit
Earth pit
 
Const statutory
Const statutoryConst statutory
Const statutory
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting welding
 
Behavior based safety
Behavior based safetyBehavior based safety
Behavior based safety
 
Personal protective equipment
Personal protective equipmentPersonal protective equipment
Personal protective equipment
 
Pnematic tools
Pnematic toolsPnematic tools
Pnematic tools
 
Grinding machine
Grinding machineGrinding machine
Grinding machine
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Gas cutting welding
Gas cutting weldingGas cutting welding
Gas cutting welding
 
Fabrication calculation
Fabrication calculationFabrication calculation
Fabrication calculation
 
Man riding basket
Man riding basketMan riding basket
Man riding basket
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Lean manufacturing

  • 1. Page 1 of 21Presented by: Sh VRM
  • 2. Page 2 of 21Presented by: Sh VRM OBJECTIVE To understand the concept of Lean Manufacturing and translate its philosophy to Petrochemical plants. LEAN MANUFACTURING
  • 3. Page 3 of 21Presented by: Sh VRM Elimination/Reduction of Waste within the system WHAT IS LEAN MANUFACTURING ? Identify Eliminate/Reduce Input OutputSystem Waste
  • 4. Page 4 of 21Presented by: Sh VRM LEAN MANUFACTURING OVERVIEW “Lean Manufacturing” incorporates tools and techniques to Optimize time, human resources and assets Improve productivity Improve quality of products and services
  • 5. Page 5 of 21Presented by: Sh VRM Lean production focuses on - Eliminating waste in processes - Expanding capacity by reducing costs and shortening cycle time - Understanding what is important to the customer Analyze the flow of information and materials for continual improvement of the process LEAN MANUFACTURING OVERVIEW
  • 6. Page 6 of 21Presented by: Sh VRM There are three types of operations in any process Non-Value-Adding (NVA) Necessary but Non-Value-Adding (NNVA) Value-Adding (VA) Focus on Value-Adding (VA) operations WASTE REMOVAL LEAN MANUFACTURING
  • 7. Page 7 of 21Presented by: Sh VRM Kaizen Focus on eliminating waste, improving productivity and achieving sustained continual improvement • Six Sigma A statistical process control and analytical tool to improve productivity and quality. Total Productive Maintenance (TPM) Basket of Maintenance of Practices which helps in focusing on elimination losses such as breakdowns, idling and minor stoppages, reduced defects & rework, spills and process-upset conditions LEAN MANUFACTURING TOOLS
  • 8. Page 8 of 21Presented by: Sh VRM Cellular Manufacturing/One-Piece Flow system Process for connecting the manual and machine processes of similar operations in order to eliminate non-value adding activities. Just-in-time (JIT) Production Systems / Kanban Inventory strategy to reduce process inventory and it’s associated costs. Value Stream Mapping Created a visual representation of all product and information flows from raw material to shipping LEAN MANUFACTURING TOOLS
  • 9. Page 9 of 21Presented by: Sh VRM 5S Reduces waste and optimizes productivity through maintaining an orderly workplace. Elements of 5S are Seiri – Sort Seiton – Set in Order Seiso – Shine Seiketsu – Standardize Shitsuke – Sustain Place for everything and everything in it’s place. LEAN MANUFACTURING TOOLS
  • 10. Page 10 of 21Presented by: Sh VRM 2nd Tier 1st Tier Toyota Customer Demand Flow of Information Flow of Production 2nd Tier 1st Tier Assembler Customer Demand Flow of Information Flow of Production Traditional “Buffered” Supply Chain Just-In-Time Supply Chain TOYOTA PRODUCTION SYSTEM
  • 11. Page 11 of 21Presented by: Sh VRM 1. Faster Inventory updates 2. Shortening time for generating production forecast 3. Online reporting, cutting down paper 4. ERP 156% ROI LEAN MANUFACTURING APPLICATION IN CPC
  • 12. Page 12 of 21Presented by: Sh VRM Waste within the Toyota Production System Waste within the Petrochemical Plant Overproduction Waiting Transportation Inappropriate Processing Unnecessary Inventory Unnecessary Motion Defects Inappropriate feed stock Lost by-product credit Quality give away Off spec generation/reprocessing Equipment idling High energy cost LEAN MANUFACTURING APPLICATION TO PETROCHEMICAL PLANT
  • 13. Page 13 of 21Presented by: Sh VRM 1. Understanding waste in the form of loss of contribution at every stage of operation. 2. Understanding the impact of HSE incidence on contribution. 3. Understanding all components of cost of production. 4. Understanding of value added activities and non-value added activities. 5. Understanding Process intensification. 6. Understanding EPS and Marketing functions. LEAN MANUFACTURING APPLICATION TO PETROCHEMICAL PLANT
  • 14. Page 14 of 21Presented by: Sh VRM Best Lean Manufacturing Practices: Kaizan Epsilon/Depsilon reports Daily contribution reports Daily feed stock & by-product analysis Daily energy consumption report Daily stream analysis for quality give away E-mfg Practices Structural Capital 5S for Safe work place LEAN MANUFACTURING Aromatics Plant
  • 15. Page 15 of 21Presented by: Sh VRM 5°C increase in Platformer feed EP – loss 16.5 MUSD/yr 1% lowering of PX/C8A – loss is 12 MUSD/yr High RVP of ED Raffinate – 10 MUSD/yr 200MTD C8A blending in Gasoline – Loss is 5.6 MUSD/yr 2% loss in heater efficiency – loss is 3.2 MUSD/yr C10A conversion in Tatoray vs blend in Diesel/Gasoline – 2.1 MUSD/yr 1% reduction in PX recovery – Loss is 7 MUSD/yr LEAN MANUFACTURING Aromatics Plant - Opportunities
  • 16. Page 16 of 21Presented by: Sh VRM 71.0 27.2 0.2 1.4 0.2 Net RM Cat Chem Utilities Manpower Maint LEAN MANUFACTURING PARAXYLENE COST STRUCTURE •By product credit is 60% of Raw Material cost •Conversion cost is 27% of operating cost
  • 17. Page 17 of 21Presented by: Sh VRM By Product Value Maximization  Maximize production of OX, BZ, Hydrogen  Recovery of Hydrogen from gases to Sat/Unsat header  Recovery of BZ from low value streams  Up-gradation of low value streams to high value streams (ED raffinate) BYPRODUCT Yield (wt% Plat feed) Price HIGH VALUE H2 2.17 44259 OX 10.36 26818 BZ 11.12 29351 HAR 2.29 22109 LPG 4.24 17075 LOW VALUE ED Raffinate 9.68 15573 Fuel Gas 14.05 10050 AHE 1.16 9137 FEED STOCK ANALYSIS LEAN MANUFACTURING
  • 18. Page 18 of 21Presented by: Sh VRM • Conversion cost for Aromatic plant at Jamnagar is 27% of the operating cost. • 60% of conversion cost is fuel cost. • Optimize Heater and Columns operation 28.9 12.3 58.8 Power Fuel Net Steam LEAN MANUFACTURING CONVERSION COST
  • 19. Page 19 of 21Presented by: Sh VRM • Business Case: 1 Market Interface: Based on Market scenario HASC production is optimized • Business Case: 2 Product Development: Renine was introduced in market which won Golden Peacock Award for Techno-commercial innovation • Business Case: 3 Byproduct Optimization: C10A conversion across Tatoray • Business Case: 4 Opportunity in Adversity: Blending of C7A, Mix Xylene, C10A in Gasoline LEAN MANUFACTURING EXAMPLES OF BUSINESS CASES
  • 20. Page 20 of 21Presented by: Sh VRM • Business Case: 5 Waste Elimination: Recovering Hydrogen going to Sat/Unsat • Business Case: 6 Waste Elimination/Change in mindset: Reduction of BZ drag • Business Case: 7 Quality giveaway: C2 loading in LPG product • Business Case: 8 Human Resource : Enhancing Human Skill – Prepare for tomorrow. Eliminate positions. LEAN MANUFACTURING EXAMPLES OF BUSINESS CASES
  • 21. Page 21 of 21Presented by: Sh VRM We are what we repeatedly do, Excellence then is not an Act but A Habit THANKING YOU
  • 22. Page 22 of 21Presented by: Sh VRM Innovation Knowledge Known Things - Productivity Unknown Things -
  • 23. Page 23 of 21Presented by: Sh VRM KAIZEN Plant Manager Production mgr Worker Normal operation Innovation Supervisor