Yasunori Kobayashi
General Manager, MES Solution Development Expert
Yokogawa
November 12, 2020
Asia NOC bridges
business-wide performance
objectives and KPIs through
advanced analytics system
Agenda
1. Challenges in Business Performance
Management
2. Business-wide, Bridged KPI Structure
3. Industrial KPI Templates
4. Real-time KPI Digitalization
5. Real-time KPI Dashboarding
6. KPI Analytics and Online Prediction
using AI ML
7. Profit Improvement Consulting
8. Typical Quick-win Benefits
9. Use Case -PTT GSP
Challenges in Business
Performance Management
Business Performance Management Challenges
■ KPI Disconnect – between C-level and Operators
■ Partial KPI Optimization – due to silos
■ Invisible KPI Trade-off – stability vs profitability
■ Ex-post Action – due to monthly review
■ Excess Safety Margin – on the plant floor
How can these challenges be addressed using
Industrial Best Practice and Disruptive Digital Technologies?
Think Yokogawa “Profit-driven Operation”
Good Strategy vs Bad Strategy
■ Good strategy involves coherence
between front line and top management
■ Critical to connect and cascade up/down
performance objectives and real-time
measurement
■ KPI structures must be:
◆ Dynamic / real-time
◆ Bridged (vertical)
◆ Business-wide
Tier 1
Top Managers
Tier 2
Business Unit
Tier 3
Front-Line
Yokogawa
Profit-driven Operation
Level / User KPI Usage Finance KPI Operations KPI HSSE KPI
Business/
C-level
Monthly review
Analysis
Prediction
Gross profit, EBITDA
Sales volume, Realized gross margin
OPEX, ROACE, CAPEX
Maintenance cost index
Unit cash cost
Plant utilization , Shutdown & slowdown
Throughput/Production volume
Operational availability, Mechanical availability
Energy intensity index, Gross margin asset performance
Feedstock supply & offtake
Major fire, Explosion, Major spill
Lost time injury frequency
Greenhouse gas emission
Loss of primary containment
Fire security incident
Management/
Staff
Real-time Control
(manual/auto)
Analysis
Prediction
Production KPI Profit KPI Energy KPI RAM KPI HSSE KPI
Plant utilization
Feed plan %
Products plan %
Raw/Additional material
High value product yield
Plant material loss
Energy consumption
Net heat absorbed
Heat recovered
Asset availability
Asset maintenance cost
Same as upper KPIs
Technical/
Engineers
Unit utilization max% Each product yield
Each material loss
Chemical consumption
Fuel consumption
Steam consumption
Electricity consumption
Heat absorbed
Quality giveaway
Furnace allowance
Quench water PH
Compressor turbine allowance
Compressor surge allowance
Column flooding %
TLE Uo/Duty, Dryer delta-P
Operational conditions causing
major fire or explosion
Critical Operation Parameter
(COP) causing plant shutdown
Emission
Operation/
Operators
Related
process variables
Related
process variables
Related
process variables
Related
process variables
Related
process variables
Business-wide
Bridged
Give Workforce a chance to drill down and optimize performance in their level
Business-wide, Bridged KPI Structures (Patent pending)
Upstream
■ Gas processing/separation
■ LNG liquefaction/regasification
■ Oil field
Downstream
■ Condensate refining
■ Oil refining
■ Ethylene
■ Aromatics
Terminal
■ Tank terminal
Chemical
■ Ammonia
■ Ammonium nitrate
■ Ethylene oxide
■ Ethylene glycol
■ Ethanol amine
■ Elastomer
■ Fiber spinning
■ MMA
■ Polyethylene
■ Polypropylene
■ Polycarbonate
■ PTA
■ PVC
■ SBR
■ VCM
Power
■ Coal fired
■ Combined cycle
SPI Objective
Production SPI
Profit SPI
Energy SPI
Reliability SPI
Safety SPI
Example of Ethylene 250KPIs
Others
■ Oleo
■ Gold mining
■ Sewage disposal
Help PDO user to achieve early ROI
by shortening engineering period
Industrial KPI Templates (Yokogawa IP)
Real-time KPI Digitalization (Patent pending)
Data Adaptors
Data Integration
Real-time KPI
Digitalization & Dashboarding
VnetI/P OPC UA OLE DB B2MML
SOAP
REST
Excel
Services
Specific Add-inns
Planning, Scheduling
Production Management
Accounting, etc.
KPI
Template & Builder
Procedural
Automation
Dashboard
Template & Builder
Guidance
Static Simulator KPI Limit & Alarm
Statistical Analysis Export
Multi-variables Analysis Reporting
AI Machine Learning Benchmarking
Regression Model Online Prediction
AI Model Software Sensor
Static Simulator Autonomous KPI Control
Data Analytics & Reporting Online Prediction
Cloud & On-premise
Available
Real-time KPI Dashboarding (Patent pending)
Actionable Dashboards based on Industrial Knowledge
Karaoke Dashboard visualizing KPI Trade-off Tree Dashboard indicating cause of KPI problem
Real-time KPI Dashboarding (Patent pending)
Actionable Dashboards based on Industrial Knowledge
Trend Dashboard conducting agile & right action
AI Procedural Automation
automating cause identification & measure
KPI Analytics and Online Prediction using AI ML
Data Adaptors
Data Integration
Real-time KPI
Digitalization & Visualization
VnetI/P OPC UA OLE DB B2MML
SOAP
REST
Excel
Services
Specific Add-inns
Planning, Scheduling
Production Management
Accounting, etc.
KPI
Template & Builder
Procedural
Automation
Dashboard
Template & Builder
Guidance
Static Simulator KPI Limit & Alarm
Statistical Analysis Export
Multi-variables Analysis Reporting
AI Machine Learning Benchmarking
Regression Model Online Prediction
AI Model Software Sensor
Static Simulator Autonomous KPI Control
Data Analytics & Reporting Online Prediction
Cloud & On-premise
Available
Profit Improvement Consulting
Examples of Implemented Solution
Control
• Adjustment of performance trade-off
• New target setting
• Control parameter tuning
• APC model update
• LP vector update
• Control design modification
Plant/Process
• Capacity expansion
• HX rearrangement
• Catalyst replacement
Operational Strategy
• Load shift between compressors
• Cleaning timing optimization
Business/Human Resource
• Work process modification
• Product lineup change
• Workforce capability enhancement
DEFINE/DISCOVER
1-2 months
DEVELOP
3-6 months
DELIVER
6 months +
SUSTAIN
6 months +
▪ Senior management alignment
▪ Data collection & staff interviews
▪ Assessment of current situation,
initiatives & CAPEX plans
▪ Identification of opportunities
and benefits
▪ Benchmarking and gap analysis
▪ Solicit initial stakeholder
‘buy-in’
Activities
▪ Quick-win opportunities for rapid
implementation
▪ Initial set of opportunities and
estimated benefits
▪ Performance gaps and focus
area priorities
▪ Roadmap for ‘Develop’ phase
Deliverables
▪ Mid management alignment
▪ Integrated road map for
‘Deliver’ phase
▪ Individual opportunity delivery
plans and resource requirements
▪ Organizational changes/work
process upgrades to support
delivery of benefits and
continuous improvement
▪ Quick-win benefits capture
▪ Prioritized opportunity list with
potential benefits and KPIs
▪ Detailed implementation plan
▪ Organizational design/work
process documents
▪ Delivery via KBC on-site support
▪ Performance changes inclusions in
business forecast
▪ KPI implementation for benefits
▪ Implementation of org. changes and
job performance profiles
▪ Modification of work processes
▪ Update of tools and applications
▪ Preparation for ‘Sustain’ Phase
▪ Program benefit tracking tool
and template
▪ Financial and operational benefits
▪ PI tree for performance monitoring
and target setting
▪ Re-structured organization
▪ Manual of work processes
▪ Training materials
▪ Continuous improvement tool-kit
▪ Quarterly performance challenge by
visiting specialists
▪ Tuning of organizational structure
and work processes based on tam
feedback
▪ Maintenance/upgrade of tools and
applications
▪ Remote technical support and
hotline
▪ Financial and operational benefits
▪ Quarterly program ‘health check’
▪ Tool-kit upgrades
Typical Quick-win Benefits
Typical Quick-win Benefits: 1-3% of energy saving
Low High
Capacity Energy Cost Savings M$ / yFuel Price (LNG Price)
Low case is US price and high
case is Japan price,
respectively. Prices are based
on the trend from 2017 to 2019.
$/GJ 3.0 11.0
unit
Energy
Cosumption
GJ / ton
Low case (3.0 $ / GJ) High case (11.0 $ / GJ)$/ton 153.60 563.20
Coal Price
High and low price of coal
produced in Australia and South
Africa from 2017 to 2019 1% reduction 3% reduction 1% reduction 3% reduction$/GJ 1.93 4.62
$/ton 50.00 120.00
Refinery 230 kbbl/d 3.0 1.24 3.71 4.53 13.60
Ethylene (Naptha feed) 500,000 ton/y 19.0 0.29 0.86 1.05 3.14
Ethylene (Ethane feed) 500,000 ton/y 12.2 0.18 0.55 0.67 2.01
LDPE 500,000 ton/y 7.5 0.07 0.20 0.25 0.74
PP (Vapor phase process) 300,000 ton/y 6.0 0.05 0.16 0.20 0.59
Paraxylene 300,000 ton/y 10.3 0.09 0.28 0.34 1.02
Ethylene Glycol 300,000 ton/y 5.9 0.05 0.16 0.19 0.58
Stylene Monomer 300,000 ton/y 9.8 0.09 0.26 0.32 0.97
VCM 500,000 ton/y 4.1 0.06 0.18 0.23 0.68
Ammonia 500,000 ton/y 6.2 0.09 0.28 0.34 1.02
Urea 500,000 ton/y 3.7 0.06 0.17 0.20 0.61
LNG Combined Cycle Power Plant 500 MW 0.63 GJ/MWh 0.08 0.25 0.30 0.91
Coal Fired Power Plant 1,000 MW 1.42 GJ/MWh 0.24 0.72 0.57 1.72
LNG Production 5,000 kton/y 4.0 GJ/t 0.60 1.80 2.20 6.60
Oil Field 1,000 kbbl/d 51.1 GJ/kbbl 0.56 1.68
Use Case
PTT Gas Separation Plant
PTT Gas Separation Plant, Thailand
■ Yokogawa KPI template helped PTT to achieve early ROI
■ Production Division is happy to use PDO because PDO helps Operators to
understand how their KPIs impact Management KPIs, and helps to realize more
profitable operation with less support from Technical Division
■ Yokogawa SME discovered approx. USD5M improvements analyzing SPI
historian (quick-win opportunity was USD500K)
Profit-driven Operation Suite
Business KPI
Dashboard
Operation
KPI
Dashboard
Integrated KPI
Design
Procedural
Automation
for KPI Control
Advanced
Operation
Graphic
Online
Prediction
Data
Analytics
VR PDO
Training
Profit
Improvement
Program
Team
Effectivenes
s
CCR
Desig
n
Permit to Work
Work
Instruction
Shift Handover
Alarm
Mngm
t
Operation
Improvemen
t
■ Help the right person to make a right decision at the right time for
achieving profit-driven operation through the plant lifecycle
The names of corporations, organizations, products and logos herein are either registered trademarks or
trademarks of Yokogawa Electric Corporation and their respective holders.
Any questions?

More Related Content

What's hot

Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Sergey Mishin
 
IES Faculty - IESVE as a Design Application & Part L Clinic
IES Faculty - IESVE as a Design Application & Part L ClinicIES Faculty - IESVE as a Design Application & Part L Clinic
IES Faculty - IESVE as a Design Application & Part L ClinicIES VE
 
SESG Seminar Presentation
SESG Seminar PresentationSESG Seminar Presentation
SESG Seminar PresentationIES VE
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES VE
 
Case study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yieldCase study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yieldKBC (A Yokogawa Company)
 
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...Schneider Electric
 
Accelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability ProgramsAccelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability ProgramsSchneider Electric
 
Driving business performance through sustainability: From strategy to impleme...
Driving business performance through sustainability: From strategy to impleme...Driving business performance through sustainability: From strategy to impleme...
Driving business performance through sustainability: From strategy to impleme...Schneider Electric
 
Technology based energy management information system
Technology based energy management information system Technology based energy management information system
Technology based energy management information system KBC (A Yokogawa Company)
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryAdvisian
 
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)Schneider Electric
 
Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...
Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...
Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...IES VE
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best directionSchneider Electric
 
EMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMEX
 

What's hot (20)

Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
 
KBC unit monitoring Petro-SIM and PI-AF
KBC unit monitoring Petro-SIM and PI-AFKBC unit monitoring Petro-SIM and PI-AF
KBC unit monitoring Petro-SIM and PI-AF
 
IES Faculty - IESVE as a Design Application & Part L Clinic
IES Faculty - IESVE as a Design Application & Part L ClinicIES Faculty - IESVE as a Design Application & Part L Clinic
IES Faculty - IESVE as a Design Application & Part L Clinic
 
SESG Seminar Presentation
SESG Seminar PresentationSESG Seminar Presentation
SESG Seminar Presentation
 
Petro-SIM presentation
Petro-SIM presentationPetro-SIM presentation
Petro-SIM presentation
 
KBC scheduling hydrocarbon supply chain
KBC scheduling hydrocarbon supply chainKBC scheduling hydrocarbon supply chain
KBC scheduling hydrocarbon supply chain
 
Marathon Petro-SIM use at Marathon
Marathon Petro-SIM use at MarathonMarathon Petro-SIM use at Marathon
Marathon Petro-SIM use at Marathon
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance Gap
 
Case study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yieldCase study FCC model with integrated energy and yield
Case study FCC model with integrated energy and yield
 
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
[Oil & Gas White Paper] Getting Ahead of the Game: adopting best practices in...
 
Accelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability ProgramsAccelerating the Benefits of Food and Bev Sustainability Programs
Accelerating the Benefits of Food and Bev Sustainability Programs
 
Driving business performance through sustainability: From strategy to impleme...
Driving business performance through sustainability: From strategy to impleme...Driving business performance through sustainability: From strategy to impleme...
Driving business performance through sustainability: From strategy to impleme...
 
Technology based energy management information system
Technology based energy management information system Technology based energy management information system
Technology based energy management information system
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
[Infographic] 2013 U.S. Utility Grid Automation Survey (Part 2)
 
Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...
Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...
Synthesis and Refinement of Artificial HVAC Sensor Data Intended for Supervis...
 
Sustaining energy performance
Sustaining energy performanceSustaining energy performance
Sustaining energy performance
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best direction
 
Energy STEP
Energy STEPEnergy STEP
Energy STEP
 
EMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building ControlsEMA Energy Manager’s Guide to Building Controls
EMA Energy Manager’s Guide to Building Controls
 

Similar to Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Advanced Analytics System

Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultantbharat kumar
 
Resume of operation specialist - Copy
Resume of operation specialist - CopyResume of operation specialist - Copy
Resume of operation specialist - CopyBirendra Barnwal
 
EC plan 2014 Final Revision
EC  plan 2014 Final Revision EC  plan 2014 Final Revision
EC plan 2014 Final Revision Abiodun Toriola
 
ENVOGUE - Energy Trending!
ENVOGUE - Energy Trending!ENVOGUE - Energy Trending!
ENVOGUE - Energy Trending!Umesh Bhutoria
 
Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DGlobal CCS Institute
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Raja Ratnam
 
The economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenuesThe economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenuesSentient Science
 
PARESH KUMAR DASH-RESUME-BOILER (1)
PARESH KUMAR   DASH-RESUME-BOILER (1)PARESH KUMAR   DASH-RESUME-BOILER (1)
PARESH KUMAR DASH-RESUME-BOILER (1)PARESH DASH
 
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor ByteNASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor BytePriya Chawla
 
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...Gianmarco Rossi
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.Raheem Arif
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesGerard B. Hawkins
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementStork
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali
 
Clean coal technology for power plants
Clean coal technology for power plantsClean coal technology for power plants
Clean coal technology for power plantsMarcep Inc.
 
Reconciling Mass And Energy Balances In An Ethylene Complex
Reconciling Mass And Energy Balances In An Ethylene ComplexReconciling Mass And Energy Balances In An Ethylene Complex
Reconciling Mass And Energy Balances In An Ethylene ComplexJim Cahill
 
Optimising Energy Performance of Water Supplies
Optimising Energy Performance of Water SuppliesOptimising Energy Performance of Water Supplies
Optimising Energy Performance of Water SuppliesTipperary Energy Agency
 

Similar to Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Advanced Analytics System (20)

Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Resume of operation specialist - Copy
Resume of operation specialist - CopyResume of operation specialist - Copy
Resume of operation specialist - Copy
 
EC plan 2014 Final Revision
EC  plan 2014 Final Revision EC  plan 2014 Final Revision
EC plan 2014 Final Revision
 
ENVOGUE - Energy Trending!
ENVOGUE - Energy Trending!ENVOGUE - Energy Trending!
ENVOGUE - Energy Trending!
 
Overview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&DOverview of Current Directions in Carbon Capture R&D
Overview of Current Directions in Carbon Capture R&D
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Re con
Re conRe con
Re con
 
The economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenuesThe economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenues
 
Deck on consultancy, training and audits v0.1
Deck on consultancy, training and audits v0.1Deck on consultancy, training and audits v0.1
Deck on consultancy, training and audits v0.1
 
PARESH KUMAR DASH-RESUME-BOILER (1)
PARESH KUMAR   DASH-RESUME-BOILER (1)PARESH KUMAR   DASH-RESUME-BOILER (1)
PARESH KUMAR DASH-RESUME-BOILER (1)
 
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor ByteNASSCOM Design and Engineering Summit 2016: Session VI:  Disruptor Byte
NASSCOM Design and Engineering Summit 2016: Session VI: Disruptor Byte
 
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
eni_Rossi Gianmarco - Energy Management System for the Optimization of the Up...
 
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
PRODUCTIVITY IMPROVEMENT OF PRE-TREATMENTS & POWDER COATING PROCESS.
 
Maintenance Head
Maintenance  HeadMaintenance  Head
Maintenance Head
 
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best PracticesCritical Variables in Catalytic Reforming and Unit Monitoring Best Practices
Critical Variables in Catalytic Reforming and Unit Monitoring Best Practices
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
 
Clean coal technology for power plants
Clean coal technology for power plantsClean coal technology for power plants
Clean coal technology for power plants
 
Reconciling Mass And Energy Balances In An Ethylene Complex
Reconciling Mass And Energy Balances In An Ethylene ComplexReconciling Mass And Energy Balances In An Ethylene Complex
Reconciling Mass And Energy Balances In An Ethylene Complex
 
Optimising Energy Performance of Water Supplies
Optimising Energy Performance of Water SuppliesOptimising Energy Performance of Water Supplies
Optimising Energy Performance of Water Supplies
 

More from Yokogawa1

Data, Data, Everywhere...GA10 Brings It All Together
Data, Data, Everywhere...GA10 Brings It All TogetherData, Data, Everywhere...GA10 Brings It All Together
Data, Data, Everywhere...GA10 Brings It All TogetherYokogawa1
 
202102 attaining proficiency in industrial pressure measurement r7
202102 attaining proficiency in industrial pressure measurement r7202102 attaining proficiency in industrial pressure measurement r7
202102 attaining proficiency in industrial pressure measurement r7Yokogawa1
 
Chromatography Basics 2021
Chromatography Basics 2021Chromatography Basics 2021
Chromatography Basics 2021Yokogawa1
 
An Economic X-ray of Digital Transformation
An Economic X-ray of Digital TransformationAn Economic X-ray of Digital Transformation
An Economic X-ray of Digital TransformationYokogawa1
 
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...Using A Unique, Next Generation APC Solution To Address Common Problems In Th...
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...Yokogawa1
 
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...Yokogawa1
 
The Value-driven Approach to Digitalizing Assets and their Supply Chains
The Value-driven Approach to Digitalizing Assets and their Supply ChainsThe Value-driven Approach to Digitalizing Assets and their Supply Chains
The Value-driven Approach to Digitalizing Assets and their Supply ChainsYokogawa1
 
The Role And Evolution Of Advanced Analytics In The Process Industries
The Role And Evolution Of Advanced Analytics In The Process IndustriesThe Role And Evolution Of Advanced Analytics In The Process Industries
The Role And Evolution Of Advanced Analytics In The Process IndustriesYokogawa1
 
The Digital Twin For Production Optimization
The Digital Twin For Production OptimizationThe Digital Twin For Production Optimization
The Digital Twin For Production OptimizationYokogawa1
 
Multi-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In ChevronMulti-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In ChevronYokogawa1
 
Keeping PACE with Advanced Process Control
Keeping PACE with Advanced Process ControlKeeping PACE with Advanced Process Control
Keeping PACE with Advanced Process ControlYokogawa1
 
Yokogawa’s DX and Smart Manufacturing Vision for Building our Future
Yokogawa’s DX and Smart Manufacturing Vision for Building our FutureYokogawa’s DX and Smart Manufacturing Vision for Building our Future
Yokogawa’s DX and Smart Manufacturing Vision for Building our FutureYokogawa1
 
Business Model Disruption - The Step-wise Transition to Remote Operations
Business Model Disruption - The Step-wise Transition to Remote OperationsBusiness Model Disruption - The Step-wise Transition to Remote Operations
Business Model Disruption - The Step-wise Transition to Remote OperationsYokogawa1
 
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...Yokogawa1
 
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...Yokogawa1
 
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...Yokogawa1
 
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...Yokogawa1
 
Transforming Decision Making in Scheduling of Terminal Operations
Transforming Decision Making in Scheduling of Terminal OperationsTransforming Decision Making in Scheduling of Terminal Operations
Transforming Decision Making in Scheduling of Terminal OperationsYokogawa1
 
Contributing to the Development and Application of Cybersecurity Standards
Contributing to the Development and Application of Cybersecurity StandardsContributing to the Development and Application of Cybersecurity Standards
Contributing to the Development and Application of Cybersecurity StandardsYokogawa1
 
Achieving the Autonomous Terminal
Achieving the Autonomous TerminalAchieving the Autonomous Terminal
Achieving the Autonomous TerminalYokogawa1
 

More from Yokogawa1 (20)

Data, Data, Everywhere...GA10 Brings It All Together
Data, Data, Everywhere...GA10 Brings It All TogetherData, Data, Everywhere...GA10 Brings It All Together
Data, Data, Everywhere...GA10 Brings It All Together
 
202102 attaining proficiency in industrial pressure measurement r7
202102 attaining proficiency in industrial pressure measurement r7202102 attaining proficiency in industrial pressure measurement r7
202102 attaining proficiency in industrial pressure measurement r7
 
Chromatography Basics 2021
Chromatography Basics 2021Chromatography Basics 2021
Chromatography Basics 2021
 
An Economic X-ray of Digital Transformation
An Economic X-ray of Digital TransformationAn Economic X-ray of Digital Transformation
An Economic X-ray of Digital Transformation
 
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...Using A Unique, Next Generation APC Solution To Address Common Problems In Th...
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...
 
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...
 
The Value-driven Approach to Digitalizing Assets and their Supply Chains
The Value-driven Approach to Digitalizing Assets and their Supply ChainsThe Value-driven Approach to Digitalizing Assets and their Supply Chains
The Value-driven Approach to Digitalizing Assets and their Supply Chains
 
The Role And Evolution Of Advanced Analytics In The Process Industries
The Role And Evolution Of Advanced Analytics In The Process IndustriesThe Role And Evolution Of Advanced Analytics In The Process Industries
The Role And Evolution Of Advanced Analytics In The Process Industries
 
The Digital Twin For Production Optimization
The Digital Twin For Production OptimizationThe Digital Twin For Production Optimization
The Digital Twin For Production Optimization
 
Multi-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In ChevronMulti-Site Optimization To Drive Value Creation In Chevron
Multi-Site Optimization To Drive Value Creation In Chevron
 
Keeping PACE with Advanced Process Control
Keeping PACE with Advanced Process ControlKeeping PACE with Advanced Process Control
Keeping PACE with Advanced Process Control
 
Yokogawa’s DX and Smart Manufacturing Vision for Building our Future
Yokogawa’s DX and Smart Manufacturing Vision for Building our FutureYokogawa’s DX and Smart Manufacturing Vision for Building our Future
Yokogawa’s DX and Smart Manufacturing Vision for Building our Future
 
Business Model Disruption - The Step-wise Transition to Remote Operations
Business Model Disruption - The Step-wise Transition to Remote OperationsBusiness Model Disruption - The Step-wise Transition to Remote Operations
Business Model Disruption - The Step-wise Transition to Remote Operations
 
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...
 
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
 
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...
 
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
 
Transforming Decision Making in Scheduling of Terminal Operations
Transforming Decision Making in Scheduling of Terminal OperationsTransforming Decision Making in Scheduling of Terminal Operations
Transforming Decision Making in Scheduling of Terminal Operations
 
Contributing to the Development and Application of Cybersecurity Standards
Contributing to the Development and Application of Cybersecurity StandardsContributing to the Development and Application of Cybersecurity Standards
Contributing to the Development and Application of Cybersecurity Standards
 
Achieving the Autonomous Terminal
Achieving the Autonomous TerminalAchieving the Autonomous Terminal
Achieving the Autonomous Terminal
 

Recently uploaded

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 

Recently uploaded (20)

Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 

Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Advanced Analytics System

  • 1. Yasunori Kobayashi General Manager, MES Solution Development Expert Yokogawa November 12, 2020 Asia NOC bridges business-wide performance objectives and KPIs through advanced analytics system
  • 2. Agenda 1. Challenges in Business Performance Management 2. Business-wide, Bridged KPI Structure 3. Industrial KPI Templates 4. Real-time KPI Digitalization 5. Real-time KPI Dashboarding 6. KPI Analytics and Online Prediction using AI ML 7. Profit Improvement Consulting 8. Typical Quick-win Benefits 9. Use Case -PTT GSP
  • 4. Business Performance Management Challenges ■ KPI Disconnect – between C-level and Operators ■ Partial KPI Optimization – due to silos ■ Invisible KPI Trade-off – stability vs profitability ■ Ex-post Action – due to monthly review ■ Excess Safety Margin – on the plant floor How can these challenges be addressed using Industrial Best Practice and Disruptive Digital Technologies? Think Yokogawa “Profit-driven Operation”
  • 5. Good Strategy vs Bad Strategy ■ Good strategy involves coherence between front line and top management ■ Critical to connect and cascade up/down performance objectives and real-time measurement ■ KPI structures must be: ◆ Dynamic / real-time ◆ Bridged (vertical) ◆ Business-wide Tier 1 Top Managers Tier 2 Business Unit Tier 3 Front-Line
  • 7. Level / User KPI Usage Finance KPI Operations KPI HSSE KPI Business/ C-level Monthly review Analysis Prediction Gross profit, EBITDA Sales volume, Realized gross margin OPEX, ROACE, CAPEX Maintenance cost index Unit cash cost Plant utilization , Shutdown & slowdown Throughput/Production volume Operational availability, Mechanical availability Energy intensity index, Gross margin asset performance Feedstock supply & offtake Major fire, Explosion, Major spill Lost time injury frequency Greenhouse gas emission Loss of primary containment Fire security incident Management/ Staff Real-time Control (manual/auto) Analysis Prediction Production KPI Profit KPI Energy KPI RAM KPI HSSE KPI Plant utilization Feed plan % Products plan % Raw/Additional material High value product yield Plant material loss Energy consumption Net heat absorbed Heat recovered Asset availability Asset maintenance cost Same as upper KPIs Technical/ Engineers Unit utilization max% Each product yield Each material loss Chemical consumption Fuel consumption Steam consumption Electricity consumption Heat absorbed Quality giveaway Furnace allowance Quench water PH Compressor turbine allowance Compressor surge allowance Column flooding % TLE Uo/Duty, Dryer delta-P Operational conditions causing major fire or explosion Critical Operation Parameter (COP) causing plant shutdown Emission Operation/ Operators Related process variables Related process variables Related process variables Related process variables Related process variables Business-wide Bridged Give Workforce a chance to drill down and optimize performance in their level Business-wide, Bridged KPI Structures (Patent pending)
  • 8. Upstream ■ Gas processing/separation ■ LNG liquefaction/regasification ■ Oil field Downstream ■ Condensate refining ■ Oil refining ■ Ethylene ■ Aromatics Terminal ■ Tank terminal Chemical ■ Ammonia ■ Ammonium nitrate ■ Ethylene oxide ■ Ethylene glycol ■ Ethanol amine ■ Elastomer ■ Fiber spinning ■ MMA ■ Polyethylene ■ Polypropylene ■ Polycarbonate ■ PTA ■ PVC ■ SBR ■ VCM Power ■ Coal fired ■ Combined cycle SPI Objective Production SPI Profit SPI Energy SPI Reliability SPI Safety SPI Example of Ethylene 250KPIs Others ■ Oleo ■ Gold mining ■ Sewage disposal Help PDO user to achieve early ROI by shortening engineering period Industrial KPI Templates (Yokogawa IP)
  • 9. Real-time KPI Digitalization (Patent pending) Data Adaptors Data Integration Real-time KPI Digitalization & Dashboarding VnetI/P OPC UA OLE DB B2MML SOAP REST Excel Services Specific Add-inns Planning, Scheduling Production Management Accounting, etc. KPI Template & Builder Procedural Automation Dashboard Template & Builder Guidance Static Simulator KPI Limit & Alarm Statistical Analysis Export Multi-variables Analysis Reporting AI Machine Learning Benchmarking Regression Model Online Prediction AI Model Software Sensor Static Simulator Autonomous KPI Control Data Analytics & Reporting Online Prediction Cloud & On-premise Available
  • 10. Real-time KPI Dashboarding (Patent pending) Actionable Dashboards based on Industrial Knowledge Karaoke Dashboard visualizing KPI Trade-off Tree Dashboard indicating cause of KPI problem
  • 11. Real-time KPI Dashboarding (Patent pending) Actionable Dashboards based on Industrial Knowledge Trend Dashboard conducting agile & right action AI Procedural Automation automating cause identification & measure
  • 12. KPI Analytics and Online Prediction using AI ML Data Adaptors Data Integration Real-time KPI Digitalization & Visualization VnetI/P OPC UA OLE DB B2MML SOAP REST Excel Services Specific Add-inns Planning, Scheduling Production Management Accounting, etc. KPI Template & Builder Procedural Automation Dashboard Template & Builder Guidance Static Simulator KPI Limit & Alarm Statistical Analysis Export Multi-variables Analysis Reporting AI Machine Learning Benchmarking Regression Model Online Prediction AI Model Software Sensor Static Simulator Autonomous KPI Control Data Analytics & Reporting Online Prediction Cloud & On-premise Available
  • 13. Profit Improvement Consulting Examples of Implemented Solution Control • Adjustment of performance trade-off • New target setting • Control parameter tuning • APC model update • LP vector update • Control design modification Plant/Process • Capacity expansion • HX rearrangement • Catalyst replacement Operational Strategy • Load shift between compressors • Cleaning timing optimization Business/Human Resource • Work process modification • Product lineup change • Workforce capability enhancement DEFINE/DISCOVER 1-2 months DEVELOP 3-6 months DELIVER 6 months + SUSTAIN 6 months + ▪ Senior management alignment ▪ Data collection & staff interviews ▪ Assessment of current situation, initiatives & CAPEX plans ▪ Identification of opportunities and benefits ▪ Benchmarking and gap analysis ▪ Solicit initial stakeholder ‘buy-in’ Activities ▪ Quick-win opportunities for rapid implementation ▪ Initial set of opportunities and estimated benefits ▪ Performance gaps and focus area priorities ▪ Roadmap for ‘Develop’ phase Deliverables ▪ Mid management alignment ▪ Integrated road map for ‘Deliver’ phase ▪ Individual opportunity delivery plans and resource requirements ▪ Organizational changes/work process upgrades to support delivery of benefits and continuous improvement ▪ Quick-win benefits capture ▪ Prioritized opportunity list with potential benefits and KPIs ▪ Detailed implementation plan ▪ Organizational design/work process documents ▪ Delivery via KBC on-site support ▪ Performance changes inclusions in business forecast ▪ KPI implementation for benefits ▪ Implementation of org. changes and job performance profiles ▪ Modification of work processes ▪ Update of tools and applications ▪ Preparation for ‘Sustain’ Phase ▪ Program benefit tracking tool and template ▪ Financial and operational benefits ▪ PI tree for performance monitoring and target setting ▪ Re-structured organization ▪ Manual of work processes ▪ Training materials ▪ Continuous improvement tool-kit ▪ Quarterly performance challenge by visiting specialists ▪ Tuning of organizational structure and work processes based on tam feedback ▪ Maintenance/upgrade of tools and applications ▪ Remote technical support and hotline ▪ Financial and operational benefits ▪ Quarterly program ‘health check’ ▪ Tool-kit upgrades
  • 15. Typical Quick-win Benefits: 1-3% of energy saving Low High Capacity Energy Cost Savings M$ / yFuel Price (LNG Price) Low case is US price and high case is Japan price, respectively. Prices are based on the trend from 2017 to 2019. $/GJ 3.0 11.0 unit Energy Cosumption GJ / ton Low case (3.0 $ / GJ) High case (11.0 $ / GJ)$/ton 153.60 563.20 Coal Price High and low price of coal produced in Australia and South Africa from 2017 to 2019 1% reduction 3% reduction 1% reduction 3% reduction$/GJ 1.93 4.62 $/ton 50.00 120.00 Refinery 230 kbbl/d 3.0 1.24 3.71 4.53 13.60 Ethylene (Naptha feed) 500,000 ton/y 19.0 0.29 0.86 1.05 3.14 Ethylene (Ethane feed) 500,000 ton/y 12.2 0.18 0.55 0.67 2.01 LDPE 500,000 ton/y 7.5 0.07 0.20 0.25 0.74 PP (Vapor phase process) 300,000 ton/y 6.0 0.05 0.16 0.20 0.59 Paraxylene 300,000 ton/y 10.3 0.09 0.28 0.34 1.02 Ethylene Glycol 300,000 ton/y 5.9 0.05 0.16 0.19 0.58 Stylene Monomer 300,000 ton/y 9.8 0.09 0.26 0.32 0.97 VCM 500,000 ton/y 4.1 0.06 0.18 0.23 0.68 Ammonia 500,000 ton/y 6.2 0.09 0.28 0.34 1.02 Urea 500,000 ton/y 3.7 0.06 0.17 0.20 0.61 LNG Combined Cycle Power Plant 500 MW 0.63 GJ/MWh 0.08 0.25 0.30 0.91 Coal Fired Power Plant 1,000 MW 1.42 GJ/MWh 0.24 0.72 0.57 1.72 LNG Production 5,000 kton/y 4.0 GJ/t 0.60 1.80 2.20 6.60 Oil Field 1,000 kbbl/d 51.1 GJ/kbbl 0.56 1.68
  • 16. Use Case PTT Gas Separation Plant
  • 17. PTT Gas Separation Plant, Thailand ■ Yokogawa KPI template helped PTT to achieve early ROI ■ Production Division is happy to use PDO because PDO helps Operators to understand how their KPIs impact Management KPIs, and helps to realize more profitable operation with less support from Technical Division ■ Yokogawa SME discovered approx. USD5M improvements analyzing SPI historian (quick-win opportunity was USD500K)
  • 18. Profit-driven Operation Suite Business KPI Dashboard Operation KPI Dashboard Integrated KPI Design Procedural Automation for KPI Control Advanced Operation Graphic Online Prediction Data Analytics VR PDO Training Profit Improvement Program Team Effectivenes s CCR Desig n Permit to Work Work Instruction Shift Handover Alarm Mngm t Operation Improvemen t ■ Help the right person to make a right decision at the right time for achieving profit-driven operation through the plant lifecycle
  • 19. The names of corporations, organizations, products and logos herein are either registered trademarks or trademarks of Yokogawa Electric Corporation and their respective holders. Any questions?