According to  A Guide to the Project Management Body of Knowledge
(PMBOK® Guide) a project is “a temporary endeavor undertaken to create a
unique product, service or result”. Being that each project is unique it is
important to also understand that an organization's project management
processes will likely need to be tailored in order to ensure project success.
Project tailoring takes into consideration that project management
processes are not "one size fits all", meaning there will be many times when
processes need to be adjusted (added, removed, or revised) in order to
ensure project success.
pm-prepcast.com
Tailoring in project management can happen at any time and for any process
being applied to a project. Organizations often have a project methodology
in place and may realize that this methodology needs to allow for
adjustments to best manage a variety of projects. As a project manager, you
cannot blindly follow a methodology, you need to know how to assess a
project to determine what processes will need to be adjusted in order to
achieve a successful outcome for your project. Here we are going to look at a
very high-level method for process tailoring. This four-step method includes:
evaluating existing processes, assessing the project, documenting the
tailoring process, and re-evaluating.
pm-prepcast.com
Evaluate Existing Project Management Processes
Before you can even consider tailoring processes to meet the needs of your project you
need to fully understand the project management methodology and processes utilized
by your organization. Some organizations implement the philosophy of setting a base
list of processes that must be utilized for each project and allowing for adding processes
as long as the base requirements are met. Some organizations identify all possible
processes that may be utilized for a project and allow for the removal of some if not
most of the processes depending upon the project needs. Others may employ a strict
method that must be adhered to and may not be altered without prior approval. Prior to
doing any project tailoring it is best to fully understand the processes and know your
organization's stance on making adjustments in order to best tailor those processes for
your project.
pm-prepcast.com
Assess the Project Tailoring Needs
Assessing the project tailoring needs can be completed by asking questions
in regards to each of the project management knowledge areas to determine
which processes are required for project success and which may need to be
adjusted. Below is a small list of example questions a project manager may
want to ask when tailoring their project. Each project is unique, so you
should develop a list of questions to best fit your project.
pm-prepcast.com
Project Integration Management:
•  Is this a phased project and if so, how many phases will this project have?
• What is the size / complexity of the project and how will it impact the project
management plan?
Project Scope Management:
•   Will we use Agile or Waterfall?
•   Are the project requirements clearly or loosely defined?
Project Time Management:
•   How is time spent on the project logged by everyone?
•   Does the project need to be fast tracked?
pm-prepcast.com
Project Cost Management:
• What tools will be utilized to track actual spending?
• Is the project team managing finances or do we need to involve the finance
department?
Project Quality Management:
•   Does the organizational quality policy affect this project?
•   Are there any regulatory quality requirements that impact this project?
Project Human Resources Management:
• Are required skills available in-house to complete this project or will resources need to
be hired?
• Will the project team be co-located or virtual?
• Have they worked together previously?
pm-prepcast.com
Project Communications Management:
• Will project team members be allowed to directly communicate with stakeholders or
will all communication need to go through the project manager?
• What are the preferred communication methods of the project team and stakeholders?
Project Risk Management:
• What would be the impact to the organization if the project were to fail?
• How much risk management is “right” for the project?
pm-prepcast.com
Project Procurement Management:
• Will the project management team have the authority to sign contracts or will this be
done by a procurement or legal department?
• What level of approval will the project team have for purchases ($100, $1,000, $10,000,
etc.)?
Project Stakeholder Management:
•  Are the Stakeholders physically located near the project?
•  What is the anticipated involvement of the stakeholders?
pm-prepcast.com
Document the Project Tailoring Process
As part of the project you need to document the tailoring process approach in the
project management plan. As the processes are tailored you also need to document how
each process was tailored and why it was added, removed, or revised. This serves two
functions. One is to document all of the adjustments made as part of the tailoring
process to have a good record of the project for close out purposes. The second is to show
which tailored processes worked well, and which ones may need further adjustment for
future projects. By documenting the tailored processes, process tailoring guidelines and
project tailoring checklists can be developed (or improved upon if already existing) to
improve the process of tailoring for future projects within the organization.
pm-prepcast.com
Re-Evaluate Project Management Processes
Just as with many project management processes, you can't just tailor a process and
walk away. As the project progresses, it is vital to re-evaluate the processes being used
to determine if the tailoring is working as planned and if additional adjustments are
necessary. This can be completed formally at the start of a new phase if this is a phased
project or even informally as part of the project status meetings. No matter the method
you chose to re-evaluate, document the approach and the results both as part of your
project documentation.
pm-prepcast.com
Project process tailoring is a good project management practice that helps ensure a
successful project outcome. A project manager should not blindly apply a methodology,
but instead should evaluate the existing processes, assess the project to be completed,
document any process tailoring completed, and re-evaluate the tailoring process as the
project proceeds. Here we have provided a high level project process tailoring method
that you can apply to your projects.
pm-prepcast.com
It's 3 days left to
avail the 10% discount on
The PM PrepCast Elite and The
CAPM PrepCast Elite! Use these
codes to avail the 10% off:
The PM PrepCast Elite - Oct19pmp
The CAPM PrepCast Elite - Oct19capm
PMP and CAPM are registered mark of Project Management Institute, Inc.
Click here to avail...

More Related Content

What's hot

Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners
Shenin Hassan
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
Anand Bobade
 

What's hot (20)

Change Management Plan
Change Management PlanChange Management Plan
Change Management Plan
 
Program Management
Program ManagementProgram Management
Program Management
 
Project Management
Project ManagementProject Management
Project Management
 
The Agile PMO
The Agile PMOThe Agile PMO
The Agile PMO
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Release Train Engineer - the Master Scrum Master
Release Train Engineer  - the Master Scrum Master Release Train Engineer  - the Master Scrum Master
Release Train Engineer - the Master Scrum Master
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 
Project Planning Basics - Everything you need to start managing a project
Project Planning Basics - Everything you need to start managing a projectProject Planning Basics - Everything you need to start managing a project
Project Planning Basics - Everything you need to start managing a project
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management and Leadership
Project Management and Leadership Project Management and Leadership
Project Management and Leadership
 
PMI-ACP : PMI - Agile Certified Practitioner
PMI-ACP : PMI - Agile Certified PractitionerPMI-ACP : PMI - Agile Certified Practitioner
PMI-ACP : PMI - Agile Certified Practitioner
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
 
Earned value management for Beginners
Earned value management for Beginners Earned value management for Beginners
Earned value management for Beginners
 
Project Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge ManagementProject Management To Project Governance , Knowledge Management
Project Management To Project Governance , Knowledge Management
 
Project time management
Project time managementProject time management
Project time management
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Scrum in 15 Minutes
Scrum in 15 MinutesScrum in 15 Minutes
Scrum in 15 Minutes
 

Similar to Project And Process Tailoring For The PMP® Exam

Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
flexibleresources
 
Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”
Lviv Startup Club
 

Similar to Project And Process Tailoring For The PMP® Exam (20)

Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162
 
ePMBook.doc
ePMBook.docePMBook.doc
ePMBook.doc
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 
Managing Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentManaging Business Analysis for Agile Development
Managing Business Analysis for Agile Development
 
Part 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project ManagementPart 02 Connecting Business Strategy and Project Management
Part 02 Connecting Business Strategy and Project Management
 
14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects
 
Pm4 dev the_project_managment_processes
Pm4 dev the_project_managment_processesPm4 dev the_project_managment_processes
Pm4 dev the_project_managment_processes
 
PMP selected topics and ideas
PMP selected topics and ideasPMP selected topics and ideas
PMP selected topics and ideas
 
Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery project
 
The project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project successThe project manager and business analyst partnership - ensuring project success
The project manager and business analyst partnership - ensuring project success
 
Beyond PMP: Integration Management
Beyond PMP: Integration ManagementBeyond PMP: Integration Management
Beyond PMP: Integration Management
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
Understand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases IntroductionUnderstand the Project Cycle Management & Its Phases Introduction
Understand the Project Cycle Management & Its Phases Introduction
 
Module 3_Session 1.pptx
Module 3_Session 1.pptxModule 3_Session 1.pptx
Module 3_Session 1.pptx
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 

More from OSP International LLC

More from OSP International LLC (20)

Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the WeekFree CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the Week
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the WeekFree CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the Week
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the WeekFree CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the Week
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the WeekFree CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the Week
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the WeekFree CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the Week
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the WeekFree CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the Week
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 
Free CAPM Exam Sample Question of the Week!
Free CAPM Exam Sample Question of the Week!Free CAPM Exam Sample Question of the Week!
Free CAPM Exam Sample Question of the Week!
 
Free PMP Exam Sample Question of the Week!
Free PMP Exam Sample Question of the Week!Free PMP Exam Sample Question of the Week!
Free PMP Exam Sample Question of the Week!
 
Free CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the WeekFree CAPM Exam Sample Question of the Week
Free CAPM Exam Sample Question of the Week
 
Free PMP Exam Sample Question from the PM Exam Simulator
Free PMP Exam Sample Question from the PM Exam SimulatorFree PMP Exam Sample Question from the PM Exam Simulator
Free PMP Exam Sample Question from the PM Exam Simulator
 
Free CAPM Exam Sample Question from the PM Exam Simulator
Free CAPM Exam Sample Question from the PM Exam SimulatorFree CAPM Exam Sample Question from the PM Exam Simulator
Free CAPM Exam Sample Question from the PM Exam Simulator
 
Free PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the WeekFree PMP Exam Sample Question of the Week
Free PMP Exam Sample Question of the Week
 

Recently uploaded

Recently uploaded (12)

W.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out PackagingW.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
W.H.Bender Quote 63 You Must Plan T.O.P Take-Out Packaging
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Spring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical ReviewSpring-2024-Priesthoods of Augustus Yale Historical Review
Spring-2024-Priesthoods of Augustus Yale Historical Review
 
Internal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika GargInternal Reconstruction Corporate accounting by bhumika Garg
Internal Reconstruction Corporate accounting by bhumika Garg
 
Group work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and ImportanceGroup work -meaning and definitions- Characteristics and Importance
Group work -meaning and definitions- Characteristics and Importance
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
thesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholarsthesis-and-viva-voce preparation for research scholars
thesis-and-viva-voce preparation for research scholars
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Nurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdf
Nurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdfNurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdf
Nurturing Tomorrow’s Leaders_ The Emerging Leaders Institute.pdf
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 

Project And Process Tailoring For The PMP® Exam

  • 1. Project and Process Tailoring for the PMP® Exam For Project Management Professional (PMP)® Exam using  A Guide to the Project Management Body of Knowledge (PMBOK® Guide) PMP is a registered mark of Project Management Institute, Inc.
  • 2. pm-prepcast.com According to  A Guide to the Project Management Body of Knowledge (PMBOK® Guide) a project is “a temporary endeavor undertaken to create a unique product, service or result”. Being that each project is unique it is important to also understand that an organization's project management processes will likely need to be tailored in order to ensure project success. Project tailoring takes into consideration that project management processes are not "one size fits all", meaning there will be many times when processes need to be adjusted (added, removed, or revised) in order to ensure project success.
  • 3. pm-prepcast.com Tailoring in project management can happen at any time and for any process being applied to a project. Organizations often have a project methodology in place and may realize that this methodology needs to allow for adjustments to best manage a variety of projects. As a project manager, you cannot blindly follow a methodology, you need to know how to assess a project to determine what processes will need to be adjusted in order to achieve a successful outcome for your project. Here we are going to look at a very high-level method for process tailoring. This four-step method includes: evaluating existing processes, assessing the project, documenting the tailoring process, and re-evaluating.
  • 4. pm-prepcast.com Evaluate Existing Project Management Processes Before you can even consider tailoring processes to meet the needs of your project you need to fully understand the project management methodology and processes utilized by your organization. Some organizations implement the philosophy of setting a base list of processes that must be utilized for each project and allowing for adding processes as long as the base requirements are met. Some organizations identify all possible processes that may be utilized for a project and allow for the removal of some if not most of the processes depending upon the project needs. Others may employ a strict method that must be adhered to and may not be altered without prior approval. Prior to doing any project tailoring it is best to fully understand the processes and know your organization's stance on making adjustments in order to best tailor those processes for your project.
  • 5. pm-prepcast.com Assess the Project Tailoring Needs Assessing the project tailoring needs can be completed by asking questions in regards to each of the project management knowledge areas to determine which processes are required for project success and which may need to be adjusted. Below is a small list of example questions a project manager may want to ask when tailoring their project. Each project is unique, so you should develop a list of questions to best fit your project.
  • 6. pm-prepcast.com Project Integration Management: •  Is this a phased project and if so, how many phases will this project have? • What is the size / complexity of the project and how will it impact the project management plan? Project Scope Management: •   Will we use Agile or Waterfall? •   Are the project requirements clearly or loosely defined? Project Time Management: •   How is time spent on the project logged by everyone? •   Does the project need to be fast tracked?
  • 7. pm-prepcast.com Project Cost Management: • What tools will be utilized to track actual spending? • Is the project team managing finances or do we need to involve the finance department? Project Quality Management: •   Does the organizational quality policy affect this project? •   Are there any regulatory quality requirements that impact this project? Project Human Resources Management: • Are required skills available in-house to complete this project or will resources need to be hired? • Will the project team be co-located or virtual? • Have they worked together previously?
  • 8. pm-prepcast.com Project Communications Management: • Will project team members be allowed to directly communicate with stakeholders or will all communication need to go through the project manager? • What are the preferred communication methods of the project team and stakeholders? Project Risk Management: • What would be the impact to the organization if the project were to fail? • How much risk management is “right” for the project?
  • 9. pm-prepcast.com Project Procurement Management: • Will the project management team have the authority to sign contracts or will this be done by a procurement or legal department? • What level of approval will the project team have for purchases ($100, $1,000, $10,000, etc.)? Project Stakeholder Management: •  Are the Stakeholders physically located near the project? •  What is the anticipated involvement of the stakeholders?
  • 10. pm-prepcast.com Document the Project Tailoring Process As part of the project you need to document the tailoring process approach in the project management plan. As the processes are tailored you also need to document how each process was tailored and why it was added, removed, or revised. This serves two functions. One is to document all of the adjustments made as part of the tailoring process to have a good record of the project for close out purposes. The second is to show which tailored processes worked well, and which ones may need further adjustment for future projects. By documenting the tailored processes, process tailoring guidelines and project tailoring checklists can be developed (or improved upon if already existing) to improve the process of tailoring for future projects within the organization.
  • 11. pm-prepcast.com Re-Evaluate Project Management Processes Just as with many project management processes, you can't just tailor a process and walk away. As the project progresses, it is vital to re-evaluate the processes being used to determine if the tailoring is working as planned and if additional adjustments are necessary. This can be completed formally at the start of a new phase if this is a phased project or even informally as part of the project status meetings. No matter the method you chose to re-evaluate, document the approach and the results both as part of your project documentation.
  • 12. pm-prepcast.com Project process tailoring is a good project management practice that helps ensure a successful project outcome. A project manager should not blindly apply a methodology, but instead should evaluate the existing processes, assess the project to be completed, document any process tailoring completed, and re-evaluate the tailoring process as the project proceeds. Here we have provided a high level project process tailoring method that you can apply to your projects.
  • 13. pm-prepcast.com It's 3 days left to avail the 10% discount on The PM PrepCast Elite and The CAPM PrepCast Elite! Use these codes to avail the 10% off: The PM PrepCast Elite - Oct19pmp The CAPM PrepCast Elite - Oct19capm PMP and CAPM are registered mark of Project Management Institute, Inc. Click here to avail...