SlideShare a Scribd company logo
1 of 7
Ousainou Demba, MBA
odemba@hotmail.com
919-798-1007
https://www.linkedin.com/in/ousainou-demba
Page 1
PROFESSIONAL SUMMARY
Senior RF Engineer experienced with both design and optimization. Over Fifteen years’ experience in engineering,
design cellular network for AMPS, TDMA and CDMA for both CDMA 850 and PCs 1900; includes 5 years’
experience in LTE, GSM and UMTS optimization.
PROFESSIONAL EXPERIENCE
CONSULTING ASSIGNMENTS RF Design & Optimization ( RF Deployment)
T-Mobile, Beltsville Maryland January 11th, 2016 – Present
• Cell Site Design visit for L1900 Overlay (Capacity Sites)
• Create Design Visit Site package to use for CD review
• Design review for LTE & UMTS using ASSET & ActiveOne
• Complete EME study for GSM, UMTS, and LTE sites
• Use ASSET to create coverage prediction for Work Orders
• Update the site database using SPOT tool
• Create Neighbors with New Neighbor Generation Tool for PSC & PCI request
• Review RFDS
• Build RFDS to the online RFDS Tool
• Create CIQ for the LTE modernization project
• Verify all the Golden parameters for the new site deployment
• Conduct Pre-Lunch drive test for the new site deployment
• Optimize the existing sites with the deployment of the new site
ERICSSON, PLANO TX 2010 - 2015
Sprint LTE 2ND
Carrier Deployment : July 2015 – November 2015
• RF Troubleshooting & Optimization team lead
• Optimization and Troubleshooting for Sprint ( Missouri, East Texas, Kansas, Kentucky Markets)
• Review and audit parameters for the 2nd carrier sites
• Run ENIQ & RF Synch tools to generate performance report for the KPIs
• Troubleshoot sites that does not meet the pre-deployment KPIs
• Run OSS commands to verify key parameter settings, alarms, etc
• Generate No Harm report and submit to customer
Sprint Multi-Band optimization : November 2014 – July 2015
• Post launch Activity for Sprint ( Missouri, Markets)
• Managed optimization team (12 Engineers and 3 drive teams) and served as interface between Ericsson
(RNAM) and the Sprint local RF team
• Manage/ Coach 12 engineers (4 contractors, 5 GSC, and 3 OEM) with 6 drive testers
• Evaluated every engineer and assigned them with task of their strength ( LTE, CDMA, EVDO, NSN, Reporting,
Windcatcher analysis, ENIQ, Cockpit etc)
• Schedule the drive testers for the clusters drive (30 clusters)
• Trained the GSC engineers to get them up to speed for LTE optimization (Most of them have only CDMA
background)
• Bridge the team with local Sprint RF team including the RF manager
• Communicated every proposed network changes to the Sprint local RF team for both approval and non
-approval request/task
• Work/support with the Solution Architect to implement all the parameter trails and generate performance
report
• Schedule weekly meetings with local RF team to provide updates for all our optimization activities
Ousainou Demba Page 2
Ericsson, Plano TX January 2013 to November 2014
LTE Lead RF Engineer for (LTE Tuning & Post Launch Optimization for Sprint Network Vision Project
Dallas Market)
• Reviewed final RF design and the initial data fill for any discrepancies
• Performed parameter audits using Bulk CM export from ERTT
• Set-up tuning KPIs with reference to design KPIs
• Created exclusion zones with the customer approval
• Prepared drive routes for cluster drives, co-ordinated and supervised Drive Test Engineers for effective cluster
drive to meet customer expectations
• Verified MTU settings of laptop and backhaul for the testing
• Performed site shakedown using TEMs Investigation and DRT scanner
• Collected drive data to verify handover between sectors
• Analyzed drive test data using TEMS discovery to verify Throughput (DL, UL, connections Setup time and
Handover success)
• Reviewed daily eUtran alarm reports, evaluated site performance using ENIQ, and troubleshot degrading site
performance using OSS Amos commands
• Troubleshot accessibility, retainability and handover related issues
• Performed cluster tuning by ensuring areas of poor RSRP, RSRQ,CINR, and throughputs are optimized
• Troubleshot VSWR,PCI Collision, Interference issues
Sprint NASCAR 2013
Lead the LTE deployment and Performance Optimization for the Sprint NASCAR Cows providing
coverage for the events.
Ericsson, Plano TX June 2011 to January 2012
RAN Engineering (LTE Tuning)
• Reviewing final RF design and the initial data fill for any discrepancies
• Set-up tuning KPIs with reference to design KPIs
• Created exclusion zones with the customer approval
• Created drive route for cluster drive
• Verified MTU settings of laptop and backhaul for the testing
• Performed site shakedown using TEMs Investigation and DRT scanner
• Analyzed drive test data using TEMS discovery and Windcatcher to verify Throughput (DL, UL, and Handover
success)
Ousainou Demba Page 3
Ericsson, Plano TX October 2010 _ May 2011
RAN Engineering (LTE Design)
• Reviewed Atoll parameter settings using Ericsson Link Curve and Atoll standard
• Used ATOLL to run Simulation for Baseline project
• Created ACP from the Baseline ATOLL project
• Ran ACP for initial KPIs of the Baseline Project
• Ran RSRP analysis to review the project/market coverage overview
• Selected antenna type, Down-Tilt, Azimuth, and Rad Center to meet the required KPIs
• Ran Simulation for RSRQ and SINR
• Optimized and designed to meet the require KPIs
• Created PICD for final project presentation/review
CONSULTING ASSIGNMENTS
LCC Consultant for Huawei Chantilly, VA September 13th – October 22nd, 2010
• Performing ATOLL Model Tuning for Nextel International in Mexico.
• Verifying CW drive test data and convert it to UTM Zones
• Import CW drive test data into Atoll
• Filter the clutter using filtering assistant in Atoll
• Calibrate the K value within the Forsk Atoll recommended ranges
LCC Consultant for AT&T Wireless, Pittsburgh, PA June 16th – August 9th
, 2010
• Sr. RF Engineer Work on CGSA project filing for FCC license
• Extensive use of ATOLL & 850 Engineering Data Reporting Toolkit
• Verifying the contours of the existing license and the new extension agreement using Atoll
• Create coverage plots for Extension Agreement using Atoll
• Identify all the down-tilt of the sectors included on the Extension Agreement.
• Create FCC Contours for the New CGSA using ATOLL
ZTE, Kansas, KS May 10th – June 14th
, 2010
RF Design Engineer
• Responsible for Sprint CDMA RFP design for Raleigh/Durham using Planet EV
• Create Rapid Planning, Traffic map, and Monte Carlo for the RFP
AT&T GSM and UMTS Network (Contractor), Hanover, MD Feb 2009 – May 7th 2010
RF Performance Engineer
• Responsible for the GSM and UMTS network in Washington and Baltimore areas
• Resolved customer complaint , regarding drops, no service, or slow connectivity
• Involve collecting drive test data using Tems
• Processed and Analyzed data in Actix
Ousainou Demba Page 4
• Monitored site in OSS for traffic, drop, and T1 issue using AT&T MML tool
• Create Trident for future sites using ATOLL, Trident Tool, and Topo Map
• Perform 911 test during switch upgrade and new site integration
• Conduct training for newly hired drive testers
CRICKET COMMUNICATIONS 20017 - 2009
CRICKET COMMUNICATIONS, CDMA EVDO & Voice Network Raleigh, NC Apr 2007 – Jan 2009
RF Design & Performance Engineer
• Managed, and support general contractors for the Raleigh and Burlington Networks build
• Attend antenna and line sweeps to verify proper connection
• Involve in the 2007 Cricket Raleigh market launch
• Conduct network baseline drive test and analyze the data for network optimization using Windcatcher
• Analyze daily network Statistic using Schema mentor tool
• Performance RF optimization analysis and change of parameter (MCTA, Handoff, PTO(power)) base on drive test
and site stats reports
• Provide daily and weekly report to management of the network performance
• Resolve customer complaint, regarding drops, no service, or site issue
• Developed PN offset plan for Raleigh market
• Daily update Siterra database with cell site information
• Monitor daily network statistics for dropped calls, ineffective attempts, fail hand down, and hard handoff
• Attend weekly meeting with regional manager
• Provide quarterly marketing maps to Sales & Marketing team
US Cellular 2000 – 2007
RF Design Engineer
• Involve in site design using Planet EV propagation tool
• Performed candidate analysis, site selection, field site visit, inspected construction drawings
• Calculated link budget for power balance
• Designing and optimizing new and existing cell sites in Washington and Oregon markets
• Projects include capacity forecasting, carrier deployment, capital budgeting, managing the construction of new
cell sites
• Design and optimization of CDMA repeater sites in coverage hole areas
• Performed neighbor list tuning array (NLTA) using CSVS logs
• Drive test analysis, propagation modeling, and site candidate Selection
• Performed CDMA RF optimization in rural and suburban morphologies
• Performed propagation model tuning for different morphologies
Ousainou Demba Page 5
• Performed capacity planning exercise to ensure effective resource allocation
• Performed FAA aeronautical obstruction clearance, FCC AM interference analysis and RF emissions health and
safety analysis
• Developed frequency plan and PN offset for WA4 RSA
• Designed and Optimized CDMA overlay of Idaho 5 and 6 RSA TDMA and AMPS networks
• Led USCC NW engineering team for E-911 implementation process
EDUCATION
Master’s in Business Administration (MBA), emphasis in General management, City University, Bellevue WA
Bachelor of Science in Electrical Engineering, emphasis in Wireless Communication, Washington State University,
Pullman WA
TRAINING/CERTIFICATION:
• PMI PMP Certification on going ( Project Certification 1/2016)
• Ericsson Customer Project Management Certification (CPM)
• Ericsson VOLTE Technology Certification
• Ericsson LTE Technology Certification
• Ericsson IP Technology Certification
• Ericsson LTE L11B Performance Management, Tuning and Optimization
• Ericsson LTE L11B Configuration and Functionality
• Windcatcher Plus
• Nortel CDMA Capacity & Traffic Engineering Course 1204
• Nortel CDMA Handoff Principles Course 1203
• Nortel CDMA design & optimization Course 1202
• Nortel CDMA Technology & IS-95 technology Course 1201
• Agilent CDMA Planning & Design Issues
• Agilent Drive test gear
• ZK Sam drive test gear
• Mentum Planet EV propagation model design tool
• Map Info, Unix, Exel, Microsoft Project
• Actix – Drive test data analysis tool
• Exceed - Windcatcher drive test analysis tool
• Nokia UMTS technology
• Ericsson – TEMs DriveTester CDMA V1.1
• US Cellular – Ethical Awareness and Decision
• Fred Pryor Seminars – How to deal with negativity in the workplace
• Fred Pryor Seminars – How to Handle People With Tact and Skill
• Fred Pryor Seminars – How to Be a Better Communicator
• Sitesafe – RF Hazard Awareness & Safety Training
• PMI PMP Certification on going ( Project Certification 1/2016)
• Ericsson Customer Project Management Certification (CPM)
• Ericsson VOLTE Technology Certification
• Ericsson LTE Technology Certification
• Ericsson IP Technology Certification
• Ericsson LTE L11B Performance Management, Tuning and Optimization
• Ericsson LTE L11B Configuration and Functionality
• Windcatcher Plus
• Nortel CDMA Capacity & Traffic Engineering Course 1204
• Nortel CDMA Handoff Principles Course 1203
• Nortel CDMA design & optimization Course 1202
• Nortel CDMA Technology & IS-95 technology Course 1201
• Agilent CDMA Planning & Design Issues
• Agilent Drive test gear
• ZK Sam drive test gear
• Mentum Planet EV propagation model design tool
• Map Info, Unix, Exel, Microsoft Project
• Actix – Drive test data analysis tool
• Exceed - Windcatcher drive test analysis tool
• Nokia UMTS technology
• Ericsson – TEMs DriveTester CDMA V1.1
• US Cellular – Ethical Awareness and Decision
• Fred Pryor Seminars – How to deal with negativity in the workplace
• Fred Pryor Seminars – How to Handle People With Tact and Skill
• Fred Pryor Seminars – How to Be a Better Communicator
• Sitesafe – RF Hazard Awareness & Safety Training

More Related Content

What's hot (20)

Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization Eng
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 
Resume
ResumeResume
Resume
 
KHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CVKHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CV
 
Uzair's CV
Uzair's CVUzair's CV
Uzair's CV
 
Subha Prasanna Das
Subha Prasanna DasSubha Prasanna Das
Subha Prasanna Das
 
Ashraf Ali
Ashraf AliAshraf Ali
Ashraf Ali
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
CV_Abhishek singh Parihar
CV_Abhishek singh PariharCV_Abhishek singh Parihar
CV_Abhishek singh Parihar
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
Usman khan Resume
Usman khan ResumeUsman khan Resume
Usman khan Resume
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
 
Naqash
NaqashNaqash
Naqash
 
Resume-Mohmmad Mahmood
Resume-Mohmmad MahmoodResume-Mohmmad Mahmood
Resume-Mohmmad Mahmood
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 

Viewers also liked

ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟
ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟
ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟Fateme Shamii
 
BestTriathlon pad
BestTriathlon pad BestTriathlon pad
BestTriathlon pad Hank Hsu
 
Best cheap and best competitive of Triathlon pad
Best cheap and best competitive of Triathlon pad Best cheap and best competitive of Triathlon pad
Best cheap and best competitive of Triathlon pad Hank Hsu
 
Presentacion de nticx
Presentacion de nticxPresentacion de nticx
Presentacion de nticxSabri Camargo
 
Sport seat of cycling pad for cycling wear or bib for cycling clothing
Sport seat of cycling pad for cycling wear or bib for cycling clothingSport seat of cycling pad for cycling wear or bib for cycling clothing
Sport seat of cycling pad for cycling wear or bib for cycling clothingHank Hsu
 
Yeni microsoft power point sunusu
Yeni microsoft power point sunusuYeni microsoft power point sunusu
Yeni microsoft power point sunusuGökhan Bilgi
 

Viewers also liked (10)

ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟
ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟
ورم پستان و اقتصاد،چقدر پول می توان با کاهش ورم پستان ذخیره کرد؟
 
BestTriathlon pad
BestTriathlon pad BestTriathlon pad
BestTriathlon pad
 
Best cheap and best competitive of Triathlon pad
Best cheap and best competitive of Triathlon pad Best cheap and best competitive of Triathlon pad
Best cheap and best competitive of Triathlon pad
 
CV RIAAN VAN EYK
CV RIAAN VAN EYKCV RIAAN VAN EYK
CV RIAAN VAN EYK
 
Edu555 week 1
Edu555 week 1Edu555 week 1
Edu555 week 1
 
Presentacion de nticx
Presentacion de nticxPresentacion de nticx
Presentacion de nticx
 
Sport seat of cycling pad for cycling wear or bib for cycling clothing
Sport seat of cycling pad for cycling wear or bib for cycling clothingSport seat of cycling pad for cycling wear or bib for cycling clothing
Sport seat of cycling pad for cycling wear or bib for cycling clothing
 
Ekran System Polska 3.2
Ekran System Polska 3.2Ekran System Polska 3.2
Ekran System Polska 3.2
 
SAP PP Certificate
SAP PP CertificateSAP PP Certificate
SAP PP Certificate
 
Yeni microsoft power point sunusu
Yeni microsoft power point sunusuYeni microsoft power point sunusu
Yeni microsoft power point sunusu
 

Similar to Ousainou Demba Resume_6142016

Joel Sedeski-Resume
Joel Sedeski-ResumeJoel Sedeski-Resume
Joel Sedeski-ResumeJoel Sedeski
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 AJzF
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015Girma Yilma
 
Resume_Hirak Jyoti Mazumdar_29-Apr-15
Resume_Hirak Jyoti Mazumdar_29-Apr-15Resume_Hirak Jyoti Mazumdar_29-Apr-15
Resume_Hirak Jyoti Mazumdar_29-Apr-15Hirak Jyoti Mazumdar
 
Gross, Alex
Gross, AlexGross, Alex
Gross, Alexalexzg
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
Sunsight Antenna Alignment intro
Sunsight Antenna Alignment introSunsight Antenna Alignment intro
Sunsight Antenna Alignment introJohn Vetter
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...Zafar Iqbal
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resumepankaj patel
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Butt
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
SENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSaroja Bhoi
 

Similar to Ousainou Demba Resume_6142016 (20)

Joel Sedeski-Resume
Joel Sedeski-ResumeJoel Sedeski-Resume
Joel Sedeski-Resume
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
JAGDISH Updated
JAGDISH UpdatedJAGDISH Updated
JAGDISH Updated
 
CV-Harith Zaidan
CV-Harith ZaidanCV-Harith Zaidan
CV-Harith Zaidan
 
Resume_Hirak Jyoti Mazumdar_29-Apr-15
Resume_Hirak Jyoti Mazumdar_29-Apr-15Resume_Hirak Jyoti Mazumdar_29-Apr-15
Resume_Hirak Jyoti Mazumdar_29-Apr-15
 
Gross, Alex
Gross, AlexGross, Alex
Gross, Alex
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Sunsight Antenna Alignment intro
Sunsight Antenna Alignment introSunsight Antenna Alignment intro
Sunsight Antenna Alignment intro
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CV
 
Resume_Srinivas
Resume_SrinivasResume_Srinivas
Resume_Srinivas
 
CV_Sanjay Kanzariya
CV_Sanjay KanzariyaCV_Sanjay Kanzariya
CV_Sanjay Kanzariya
 
CV_Sanjay Kanzariya
CV_Sanjay KanzariyaCV_Sanjay Kanzariya
CV_Sanjay Kanzariya
 
R Masangkay Resume v17
R Masangkay Resume v17R Masangkay Resume v17
R Masangkay Resume v17
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
SENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSENIOR ENGINEER_Saroj
SENIOR ENGINEER_Saroj
 

Ousainou Demba Resume_6142016

  • 1. Ousainou Demba, MBA odemba@hotmail.com 919-798-1007 https://www.linkedin.com/in/ousainou-demba Page 1 PROFESSIONAL SUMMARY Senior RF Engineer experienced with both design and optimization. Over Fifteen years’ experience in engineering, design cellular network for AMPS, TDMA and CDMA for both CDMA 850 and PCs 1900; includes 5 years’ experience in LTE, GSM and UMTS optimization. PROFESSIONAL EXPERIENCE CONSULTING ASSIGNMENTS RF Design & Optimization ( RF Deployment) T-Mobile, Beltsville Maryland January 11th, 2016 – Present • Cell Site Design visit for L1900 Overlay (Capacity Sites) • Create Design Visit Site package to use for CD review • Design review for LTE & UMTS using ASSET & ActiveOne • Complete EME study for GSM, UMTS, and LTE sites • Use ASSET to create coverage prediction for Work Orders • Update the site database using SPOT tool • Create Neighbors with New Neighbor Generation Tool for PSC & PCI request • Review RFDS • Build RFDS to the online RFDS Tool • Create CIQ for the LTE modernization project • Verify all the Golden parameters for the new site deployment • Conduct Pre-Lunch drive test for the new site deployment • Optimize the existing sites with the deployment of the new site ERICSSON, PLANO TX 2010 - 2015 Sprint LTE 2ND Carrier Deployment : July 2015 – November 2015 • RF Troubleshooting & Optimization team lead • Optimization and Troubleshooting for Sprint ( Missouri, East Texas, Kansas, Kentucky Markets) • Review and audit parameters for the 2nd carrier sites • Run ENIQ & RF Synch tools to generate performance report for the KPIs • Troubleshoot sites that does not meet the pre-deployment KPIs • Run OSS commands to verify key parameter settings, alarms, etc
  • 2. • Generate No Harm report and submit to customer Sprint Multi-Band optimization : November 2014 – July 2015 • Post launch Activity for Sprint ( Missouri, Markets) • Managed optimization team (12 Engineers and 3 drive teams) and served as interface between Ericsson (RNAM) and the Sprint local RF team • Manage/ Coach 12 engineers (4 contractors, 5 GSC, and 3 OEM) with 6 drive testers • Evaluated every engineer and assigned them with task of their strength ( LTE, CDMA, EVDO, NSN, Reporting, Windcatcher analysis, ENIQ, Cockpit etc) • Schedule the drive testers for the clusters drive (30 clusters) • Trained the GSC engineers to get them up to speed for LTE optimization (Most of them have only CDMA background) • Bridge the team with local Sprint RF team including the RF manager • Communicated every proposed network changes to the Sprint local RF team for both approval and non -approval request/task • Work/support with the Solution Architect to implement all the parameter trails and generate performance report • Schedule weekly meetings with local RF team to provide updates for all our optimization activities Ousainou Demba Page 2 Ericsson, Plano TX January 2013 to November 2014 LTE Lead RF Engineer for (LTE Tuning & Post Launch Optimization for Sprint Network Vision Project Dallas Market) • Reviewed final RF design and the initial data fill for any discrepancies • Performed parameter audits using Bulk CM export from ERTT • Set-up tuning KPIs with reference to design KPIs • Created exclusion zones with the customer approval • Prepared drive routes for cluster drives, co-ordinated and supervised Drive Test Engineers for effective cluster drive to meet customer expectations • Verified MTU settings of laptop and backhaul for the testing • Performed site shakedown using TEMs Investigation and DRT scanner • Collected drive data to verify handover between sectors • Analyzed drive test data using TEMS discovery to verify Throughput (DL, UL, connections Setup time and Handover success) • Reviewed daily eUtran alarm reports, evaluated site performance using ENIQ, and troubleshot degrading site performance using OSS Amos commands
  • 3. • Troubleshot accessibility, retainability and handover related issues • Performed cluster tuning by ensuring areas of poor RSRP, RSRQ,CINR, and throughputs are optimized • Troubleshot VSWR,PCI Collision, Interference issues Sprint NASCAR 2013 Lead the LTE deployment and Performance Optimization for the Sprint NASCAR Cows providing coverage for the events. Ericsson, Plano TX June 2011 to January 2012 RAN Engineering (LTE Tuning) • Reviewing final RF design and the initial data fill for any discrepancies • Set-up tuning KPIs with reference to design KPIs • Created exclusion zones with the customer approval • Created drive route for cluster drive • Verified MTU settings of laptop and backhaul for the testing • Performed site shakedown using TEMs Investigation and DRT scanner • Analyzed drive test data using TEMS discovery and Windcatcher to verify Throughput (DL, UL, and Handover success) Ousainou Demba Page 3 Ericsson, Plano TX October 2010 _ May 2011 RAN Engineering (LTE Design) • Reviewed Atoll parameter settings using Ericsson Link Curve and Atoll standard • Used ATOLL to run Simulation for Baseline project • Created ACP from the Baseline ATOLL project • Ran ACP for initial KPIs of the Baseline Project • Ran RSRP analysis to review the project/market coverage overview • Selected antenna type, Down-Tilt, Azimuth, and Rad Center to meet the required KPIs • Ran Simulation for RSRQ and SINR • Optimized and designed to meet the require KPIs • Created PICD for final project presentation/review CONSULTING ASSIGNMENTS LCC Consultant for Huawei Chantilly, VA September 13th – October 22nd, 2010 • Performing ATOLL Model Tuning for Nextel International in Mexico. • Verifying CW drive test data and convert it to UTM Zones
  • 4. • Import CW drive test data into Atoll • Filter the clutter using filtering assistant in Atoll • Calibrate the K value within the Forsk Atoll recommended ranges LCC Consultant for AT&T Wireless, Pittsburgh, PA June 16th – August 9th , 2010 • Sr. RF Engineer Work on CGSA project filing for FCC license • Extensive use of ATOLL & 850 Engineering Data Reporting Toolkit • Verifying the contours of the existing license and the new extension agreement using Atoll • Create coverage plots for Extension Agreement using Atoll • Identify all the down-tilt of the sectors included on the Extension Agreement. • Create FCC Contours for the New CGSA using ATOLL ZTE, Kansas, KS May 10th – June 14th , 2010 RF Design Engineer • Responsible for Sprint CDMA RFP design for Raleigh/Durham using Planet EV • Create Rapid Planning, Traffic map, and Monte Carlo for the RFP AT&T GSM and UMTS Network (Contractor), Hanover, MD Feb 2009 – May 7th 2010 RF Performance Engineer • Responsible for the GSM and UMTS network in Washington and Baltimore areas • Resolved customer complaint , regarding drops, no service, or slow connectivity • Involve collecting drive test data using Tems • Processed and Analyzed data in Actix Ousainou Demba Page 4 • Monitored site in OSS for traffic, drop, and T1 issue using AT&T MML tool • Create Trident for future sites using ATOLL, Trident Tool, and Topo Map • Perform 911 test during switch upgrade and new site integration • Conduct training for newly hired drive testers CRICKET COMMUNICATIONS 20017 - 2009 CRICKET COMMUNICATIONS, CDMA EVDO & Voice Network Raleigh, NC Apr 2007 – Jan 2009 RF Design & Performance Engineer • Managed, and support general contractors for the Raleigh and Burlington Networks build • Attend antenna and line sweeps to verify proper connection • Involve in the 2007 Cricket Raleigh market launch • Conduct network baseline drive test and analyze the data for network optimization using Windcatcher • Analyze daily network Statistic using Schema mentor tool • Performance RF optimization analysis and change of parameter (MCTA, Handoff, PTO(power)) base on drive test and site stats reports • Provide daily and weekly report to management of the network performance
  • 5. • Resolve customer complaint, regarding drops, no service, or site issue • Developed PN offset plan for Raleigh market • Daily update Siterra database with cell site information • Monitor daily network statistics for dropped calls, ineffective attempts, fail hand down, and hard handoff • Attend weekly meeting with regional manager • Provide quarterly marketing maps to Sales & Marketing team US Cellular 2000 – 2007 RF Design Engineer • Involve in site design using Planet EV propagation tool • Performed candidate analysis, site selection, field site visit, inspected construction drawings • Calculated link budget for power balance • Designing and optimizing new and existing cell sites in Washington and Oregon markets • Projects include capacity forecasting, carrier deployment, capital budgeting, managing the construction of new cell sites • Design and optimization of CDMA repeater sites in coverage hole areas • Performed neighbor list tuning array (NLTA) using CSVS logs • Drive test analysis, propagation modeling, and site candidate Selection • Performed CDMA RF optimization in rural and suburban morphologies • Performed propagation model tuning for different morphologies Ousainou Demba Page 5 • Performed capacity planning exercise to ensure effective resource allocation • Performed FAA aeronautical obstruction clearance, FCC AM interference analysis and RF emissions health and safety analysis • Developed frequency plan and PN offset for WA4 RSA • Designed and Optimized CDMA overlay of Idaho 5 and 6 RSA TDMA and AMPS networks • Led USCC NW engineering team for E-911 implementation process EDUCATION Master’s in Business Administration (MBA), emphasis in General management, City University, Bellevue WA Bachelor of Science in Electrical Engineering, emphasis in Wireless Communication, Washington State University, Pullman WA TRAINING/CERTIFICATION:
  • 6. • PMI PMP Certification on going ( Project Certification 1/2016) • Ericsson Customer Project Management Certification (CPM) • Ericsson VOLTE Technology Certification • Ericsson LTE Technology Certification • Ericsson IP Technology Certification • Ericsson LTE L11B Performance Management, Tuning and Optimization • Ericsson LTE L11B Configuration and Functionality • Windcatcher Plus • Nortel CDMA Capacity & Traffic Engineering Course 1204 • Nortel CDMA Handoff Principles Course 1203 • Nortel CDMA design & optimization Course 1202 • Nortel CDMA Technology & IS-95 technology Course 1201 • Agilent CDMA Planning & Design Issues • Agilent Drive test gear • ZK Sam drive test gear • Mentum Planet EV propagation model design tool • Map Info, Unix, Exel, Microsoft Project • Actix – Drive test data analysis tool • Exceed - Windcatcher drive test analysis tool • Nokia UMTS technology • Ericsson – TEMs DriveTester CDMA V1.1 • US Cellular – Ethical Awareness and Decision • Fred Pryor Seminars – How to deal with negativity in the workplace • Fred Pryor Seminars – How to Handle People With Tact and Skill • Fred Pryor Seminars – How to Be a Better Communicator • Sitesafe – RF Hazard Awareness & Safety Training
  • 7. • PMI PMP Certification on going ( Project Certification 1/2016) • Ericsson Customer Project Management Certification (CPM) • Ericsson VOLTE Technology Certification • Ericsson LTE Technology Certification • Ericsson IP Technology Certification • Ericsson LTE L11B Performance Management, Tuning and Optimization • Ericsson LTE L11B Configuration and Functionality • Windcatcher Plus • Nortel CDMA Capacity & Traffic Engineering Course 1204 • Nortel CDMA Handoff Principles Course 1203 • Nortel CDMA design & optimization Course 1202 • Nortel CDMA Technology & IS-95 technology Course 1201 • Agilent CDMA Planning & Design Issues • Agilent Drive test gear • ZK Sam drive test gear • Mentum Planet EV propagation model design tool • Map Info, Unix, Exel, Microsoft Project • Actix – Drive test data analysis tool • Exceed - Windcatcher drive test analysis tool • Nokia UMTS technology • Ericsson – TEMs DriveTester CDMA V1.1 • US Cellular – Ethical Awareness and Decision • Fred Pryor Seminars – How to deal with negativity in the workplace • Fred Pryor Seminars – How to Handle People With Tact and Skill • Fred Pryor Seminars – How to Be a Better Communicator • Sitesafe – RF Hazard Awareness & Safety Training