SlideShare a Scribd company logo
1 of 4
Adeel Ahmed
Adeel Ahmed
Cell: +971 558435310, +92 3045178146 Email: adeelahmed1990@yahoo.com
LTE RF Engineer
Objective
To work in a dynamic organization as a “LTE Telecommunication/Radio Planning & Optimization Engineer”
and achieve excellence through optimal utilization of my technical, interpersonal and creative skills.
Summary
1: Junior RF Engineer at Covennant ( Huawei-ETISALAT Moderenization Project)
( Dec 2014 ---Till now)
2: Post Processing Engineer at Covenant (Huawei –DU 2G, 3G and LTE MS Project)
( May 2014 ---Dec 2014)
3: Drive Test Engineer at LCC (Huawei –Mobilink 3G Rollout Project)
( Mar 2014 ---May 2014)
4: Drive Test Engineer at ZTE (ZTE –Zong 3G Rollout Project)
( Sep 2013 ---Mar 2014)
Educational Qualifications
BS Electronics Engineering
Mohammad Ai Jinnah University Islamabad, Pakistan Aug 2009– Aug 2013
CCNA
Corvit Systems Islamabad, Pakistan June 2013– Sep 2013
Internships
Huawei- Mobilink Pakistan 2G Rollout Project Aug 2013 – Sep 2013
 Conducted Pre/Post Drive test for Mobilink-Huawei site reduction project
 Resolved customer complaints for Mobilink-Huawei NPM project
 Conducted Pre/Post drive test for Mobilink-Huawei coverage enhancement project
 Prepared drive test reports for parameters RX-level (idle/Dedicated), RX-Qual, SQI, C/I worst using
MapInfo 10.5
 Supervised sites audits
 Prepared site audits reports
 Frequency Planning (BCCH,BSIC,HSN,MA-LIST)
Adeel Ahmed
Work Exposure
Covenant Tel LLC.
Huawei-Etisalat Modernization Project
Abu Dhabi,UAE
LTE RF Engineer Dec 2014 –present
 LTE RF Daily KPI review (RRC SR, E-RAB SR, Call Drop Rate, Inter/Intra eNB HO failure, I-RAT HO SR,
CSFB SR)
 LTE KPI degradation/ worst cell analysis
 Low throughput troubleshooting in various scenarios ( TXN, Single Antenna Interference, PCI conflicts, etc)
 Troubleshooting of CSFB, HO and other failures through layer 3 messages
 LTE RF stats monitoring (PRS & U2000)
 Troubleshooting issues like MOC, MTC, Reselection, Redirection, coverage, site overshooting, SINR
and throughput on IBS and outdoor sites.
 Customer experience enhancment by improving SINR in the area
 RSRP and RSRQ improvement by physical redesign
 Preparing Cell plan for swap, new and Carrier Agregation sites (800 & 1800)
 Checking the parameter consistency for new and swaped sites.
 Analysing the Pre/Post Logs of IBS and Macro sites using Probe and Assistant 3.14.
 Analysing the Post functionality logs to check the site working using Probe
 Preparing the Cluster, IBS and Macro Pre Post Benchmark reports using Probe and Assitant and
present to customer for acceptance.
 Handling VVIP customer complains for low throughput and other issues.
Covenant Tel LLC.
Huawei –DU 2G, 3G and LTE MS Project
DUBAI,UAE
RF Engineer May 2014 –Dec 2014
 Working with Optimization Team for trouble shooting of Outdoor and Indoor cell sites.
 Manging team of 5 drive testers and Report to the customer
 Preparing all kinds of DT Report using Probe and Assistant and Present it for customer approval
 Handling Customer Complaints for Coverage, Quality and Data issues and trouble shoot the problem
 Responsible for Drive Test (Pre Drive, Post Drive, Optimization) using Probe and Assistant
 Swap Sites Drive Testing (Partial as well as complete swap test, Coverage check, Intra and Inter site
handover checks) using Probe
 Perform Drive Test of Bad Patches after Pre Drive test and analyse that log files and give suggestions
on Bad Patches and Implement that suggestions before Post Drive
 Identification of faults and issues during the drive test e.g. sector swaps (complete & partial),
Handover failures, Call drops, bad Quality and level patches, missing neighbours, overshoots etc
 Traffic shifting and balancing to optimize resource utilization through physical redesign and
parameter fine tuning
 Data Testing: involves HSDPA/HSUPA/Edge Connection Stability
 Find out low coverage area & as per requirement suggests for new site
 Neighbour audit to rectify discrepancies of HO relationships and parameters
 Frequency audit to improve BCCH, BSIC, HSN & MAIO plan and improve quality
Adeel Ahmed
LCC
Huawei- Mobilink 3G Rollout Project
Islamabad, Pakistan
Drive Test Engineer March 2014 – May 2014
 Preparing indoor/outdoor testing reports for parameters RSCP (idle/Dedicated), Ec/No, PSC, HSDPA,
HSUPA using Tems Investigation and MapInfo 10.5 and Present it for customer approval
 Handling Customer Complaints for RSCP, Ec/No and Data issues and trouble shoot the problem
 Responsible for Drive Test (Pre Drive, Post Drive, Optimization) using Tems Investigation
 Swap Sites Drive Testing (Partial as well as complete swap test, Coverage check, Intra and Inter site
handover checks) using Tems Investigation
 Perform Drive Test of Bad Patches after Pre Drive test and analyse that log files and give suggestions
on Bad Patches and Implement that suggestions before Post Drive
 Identification of faults and issues during the drive test e.g. sector swaps (complete & partial),
Handover failures, Call drops, Ec/No and RSCP patches, missing neighbours, pilot Plusion etc
 Data Testing: involves HSDPA/HSUPA/R99 Connection Stability
 Find out low coverage area & as per requirement suggests for new site
 Knowledge of Spectrum analyser usage to locate the interference and mobile jammer
 Neighbour audit to rectify discrepancies of HO relationships and parameters
 Conducting Pre/Post cluster Drives for HUAWEI-MOBILINK 3G Project
LCC
ZTE- Zong 3G Rollout Project
Lahore, Pakistan
Drive Test Engineer Sep 2013 – Mar 2014
 Conducted Pre/Post Drive test for Mobilink-Huawei site reduction project
 Resolved customer complaints for Mobilink-Huawei NPM project
 Conducted Pre/Post drive test for Mobilink-Huawei coverage enhancement project
 Prepared drive test reports for parameters RX-level (idle/Dedicated), RX-Qual, SQI, C/I worst using
MapInfo 10.5
 Preparing indoor/outdoor testing reports for parameters RSCP (idle/Dedicated), Ec/No, PSC, HSDPA,
HSUPA using Tems Investigation and MapInfo 10.5 and Present it for customer approval
 Perform call, data and SMS Testing to check the functionality of new sites
 Responsible for Drive Test (Pre Drive, Post Drive, Optimization) using Tems Investigation
 Swap Sites Drive Testing (Partial as well as complete swap test, Coverage check, Intra and Inter site
handover checks) using Tems Investigation
 Perform Drive Test of Bad Patches after Pre Drive test and analyse that log files and give suggestions
on Bad Patches and Implement that suggestions before Post Drive
 Identification of faults and issues during the drive test e.g. sector swaps (complete & partial),
Handover failures, Call drops, Ec/No and RSCP patches, missing neighbours, pilot Plusion etc
 Data Testing: involves HSDPA/HSUPA/R99 Connection Stability
 Find out low coverage area & as per requirement suggests for new site
Adeel Ahmed
 Neighbour audit to rectify discrepancies of HO relationships and parameters
 Conducting Pre/Post cluster Drives and identifying the bad Ec/No and RSCP patches
 Supervising sites audits
Software Skills
 Tems Investigation
 Actix Analyser
 MapInfo Professional
 Global Mapper
 M2000
 U200 PRS
 Probe
 Assistant
 Matlab
 Autocad
 Proficient in MS Word, Excel, Power Point, and Outlook.
Academic Projects
Land Mine Detection Robot:
The main purpose of this project is to make an intelligent robot that can detect mines and can avoid the
obstacles and also tells us the location of affected area. The project is Pic Controller based which takes
input from the IR sensors for collision avoidance and a metal detector is used to detect the mines with the
help of robotic arm. As soon as it detects the mine it spot the area by using spray paint
And it will tell the location of affected area.
Interests
 Event Mangement
 Outdoor games
Bio Data
Date of Birth : 13th Mar, 1991
Place of Birth : Islamabad, Pakistan
Marital Status : Single
Nationality : Pakistani
Passport Number : DY1164361
References
To be Provided on request

More Related Content

What's hot (20)

Yan zhang resume
Yan zhang resumeYan zhang resume
Yan zhang resume
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
Naveed RF Engineer
Naveed RF EngineerNaveed RF Engineer
Naveed RF Engineer
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 
Ahmet_Ondortoglu Resume
Ahmet_Ondortoglu ResumeAhmet_Ondortoglu Resume
Ahmet_Ondortoglu Resume
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
Brijmani_kumar
Brijmani_kumarBrijmani_kumar
Brijmani_kumar
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
ABRAR_ RF
ABRAR_ RFABRAR_ RF
ABRAR_ RF
 
WORK EXPERIENCE
WORK EXPERIENCEWORK EXPERIENCE
WORK EXPERIENCE
 
Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016
 
updated resume (1)
updated resume (1)updated resume (1)
updated resume (1)
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
CV_Abhishek singh Parihar
CV_Abhishek singh PariharCV_Abhishek singh Parihar
CV_Abhishek singh Parihar
 
CV
CVCV
CV
 
Harshit resume
Harshit resumeHarshit resume
Harshit resume
 
Abhishek CV
Abhishek CVAbhishek CV
Abhishek CV
 
syed mohsin ali Resume.
syed mohsin ali Resume.syed mohsin ali Resume.
syed mohsin ali Resume.
 
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
 

Viewers also liked

Tasca 1.5.instal·lació de periferics els controladors o drivers
Tasca 1.5.instal·lació de periferics els controladors o driversTasca 1.5.instal·lació de periferics els controladors o drivers
Tasca 1.5.instal·lació de periferics els controladors o driversRafael Alvarez Alonso
 
Resume of Morgan Turner
Resume of Morgan TurnerResume of Morgan Turner
Resume of Morgan TurnerMorgan Turner
 
Postgraduate programmesnonmanagementsgs2013
Postgraduate programmesnonmanagementsgs2013Postgraduate programmesnonmanagementsgs2013
Postgraduate programmesnonmanagementsgs2013merry mezzaluna
 
IIM-B Wants Retirement Age Raised to 70
IIM-B Wants Retirement Age Raised to 70 IIM-B Wants Retirement Age Raised to 70
IIM-B Wants Retirement Age Raised to 70 Kiran Shaw
 
Cara membuat blog di idhostinger
Cara membuat blog di idhostingerCara membuat blog di idhostinger
Cara membuat blog di idhostingeriraseptiani
 
Toledovaca.moyanoperez.01
Toledovaca.moyanoperez.01Toledovaca.moyanoperez.01
Toledovaca.moyanoperez.01Frantole97
 

Viewers also liked (14)

Leyenda fundacion roma
Leyenda fundacion romaLeyenda fundacion roma
Leyenda fundacion roma
 
Tasca 1.5.instal·lació de periferics els controladors o drivers
Tasca 1.5.instal·lació de periferics els controladors o driversTasca 1.5.instal·lació de periferics els controladors o drivers
Tasca 1.5.instal·lació de periferics els controladors o drivers
 
Resume of Morgan Turner
Resume of Morgan TurnerResume of Morgan Turner
Resume of Morgan Turner
 
Smart audio feature
Smart audio featureSmart audio feature
Smart audio feature
 
Postgraduate programmesnonmanagementsgs2013
Postgraduate programmesnonmanagementsgs2013Postgraduate programmesnonmanagementsgs2013
Postgraduate programmesnonmanagementsgs2013
 
Presentación1
Presentación1Presentación1
Presentación1
 
Ilusiones opticas
Ilusiones opticasIlusiones opticas
Ilusiones opticas
 
CV School
CV SchoolCV School
CV School
 
Anthony May-Smith CV
Anthony May-Smith CVAnthony May-Smith CV
Anthony May-Smith CV
 
IIM-B Wants Retirement Age Raised to 70
IIM-B Wants Retirement Age Raised to 70 IIM-B Wants Retirement Age Raised to 70
IIM-B Wants Retirement Age Raised to 70
 
Cara membuat blog di idhostinger
Cara membuat blog di idhostingerCara membuat blog di idhostinger
Cara membuat blog di idhostinger
 
Toledovaca.moyanoperez.01
Toledovaca.moyanoperez.01Toledovaca.moyanoperez.01
Toledovaca.moyanoperez.01
 
Cuerpo humano
Cuerpo humanoCuerpo humano
Cuerpo humano
 
Como me siento hoy
Como me siento hoyComo me siento hoy
Como me siento hoy
 

Similar to Adeel Ahmed-CV

Similar to Adeel Ahmed-CV (20)

Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Yan zhang resume
Yan zhang   resumeYan zhang   resume
Yan zhang resume
 
SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016
 
Munendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE OptimizationMunendra Singh Jadon LTE Optimization
Munendra Singh Jadon LTE Optimization
 
Updated
UpdatedUpdated
Updated
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)
 
AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CV
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)
 
telecom engineer
telecom engineertelecom engineer
telecom engineer
 
Nitesh_CV
Nitesh_CVNitesh_CV
Nitesh_CV
 
Sumeet (Resume)
Sumeet (Resume)Sumeet (Resume)
Sumeet (Resume)
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 

Adeel Ahmed-CV

  • 1. Adeel Ahmed Adeel Ahmed Cell: +971 558435310, +92 3045178146 Email: adeelahmed1990@yahoo.com LTE RF Engineer Objective To work in a dynamic organization as a “LTE Telecommunication/Radio Planning & Optimization Engineer” and achieve excellence through optimal utilization of my technical, interpersonal and creative skills. Summary 1: Junior RF Engineer at Covennant ( Huawei-ETISALAT Moderenization Project) ( Dec 2014 ---Till now) 2: Post Processing Engineer at Covenant (Huawei –DU 2G, 3G and LTE MS Project) ( May 2014 ---Dec 2014) 3: Drive Test Engineer at LCC (Huawei –Mobilink 3G Rollout Project) ( Mar 2014 ---May 2014) 4: Drive Test Engineer at ZTE (ZTE –Zong 3G Rollout Project) ( Sep 2013 ---Mar 2014) Educational Qualifications BS Electronics Engineering Mohammad Ai Jinnah University Islamabad, Pakistan Aug 2009– Aug 2013 CCNA Corvit Systems Islamabad, Pakistan June 2013– Sep 2013 Internships Huawei- Mobilink Pakistan 2G Rollout Project Aug 2013 – Sep 2013  Conducted Pre/Post Drive test for Mobilink-Huawei site reduction project  Resolved customer complaints for Mobilink-Huawei NPM project  Conducted Pre/Post drive test for Mobilink-Huawei coverage enhancement project  Prepared drive test reports for parameters RX-level (idle/Dedicated), RX-Qual, SQI, C/I worst using MapInfo 10.5  Supervised sites audits  Prepared site audits reports  Frequency Planning (BCCH,BSIC,HSN,MA-LIST)
  • 2. Adeel Ahmed Work Exposure Covenant Tel LLC. Huawei-Etisalat Modernization Project Abu Dhabi,UAE LTE RF Engineer Dec 2014 –present  LTE RF Daily KPI review (RRC SR, E-RAB SR, Call Drop Rate, Inter/Intra eNB HO failure, I-RAT HO SR, CSFB SR)  LTE KPI degradation/ worst cell analysis  Low throughput troubleshooting in various scenarios ( TXN, Single Antenna Interference, PCI conflicts, etc)  Troubleshooting of CSFB, HO and other failures through layer 3 messages  LTE RF stats monitoring (PRS & U2000)  Troubleshooting issues like MOC, MTC, Reselection, Redirection, coverage, site overshooting, SINR and throughput on IBS and outdoor sites.  Customer experience enhancment by improving SINR in the area  RSRP and RSRQ improvement by physical redesign  Preparing Cell plan for swap, new and Carrier Agregation sites (800 & 1800)  Checking the parameter consistency for new and swaped sites.  Analysing the Pre/Post Logs of IBS and Macro sites using Probe and Assistant 3.14.  Analysing the Post functionality logs to check the site working using Probe  Preparing the Cluster, IBS and Macro Pre Post Benchmark reports using Probe and Assitant and present to customer for acceptance.  Handling VVIP customer complains for low throughput and other issues. Covenant Tel LLC. Huawei –DU 2G, 3G and LTE MS Project DUBAI,UAE RF Engineer May 2014 –Dec 2014  Working with Optimization Team for trouble shooting of Outdoor and Indoor cell sites.  Manging team of 5 drive testers and Report to the customer  Preparing all kinds of DT Report using Probe and Assistant and Present it for customer approval  Handling Customer Complaints for Coverage, Quality and Data issues and trouble shoot the problem  Responsible for Drive Test (Pre Drive, Post Drive, Optimization) using Probe and Assistant  Swap Sites Drive Testing (Partial as well as complete swap test, Coverage check, Intra and Inter site handover checks) using Probe  Perform Drive Test of Bad Patches after Pre Drive test and analyse that log files and give suggestions on Bad Patches and Implement that suggestions before Post Drive  Identification of faults and issues during the drive test e.g. sector swaps (complete & partial), Handover failures, Call drops, bad Quality and level patches, missing neighbours, overshoots etc  Traffic shifting and balancing to optimize resource utilization through physical redesign and parameter fine tuning  Data Testing: involves HSDPA/HSUPA/Edge Connection Stability  Find out low coverage area & as per requirement suggests for new site  Neighbour audit to rectify discrepancies of HO relationships and parameters  Frequency audit to improve BCCH, BSIC, HSN & MAIO plan and improve quality
  • 3. Adeel Ahmed LCC Huawei- Mobilink 3G Rollout Project Islamabad, Pakistan Drive Test Engineer March 2014 – May 2014  Preparing indoor/outdoor testing reports for parameters RSCP (idle/Dedicated), Ec/No, PSC, HSDPA, HSUPA using Tems Investigation and MapInfo 10.5 and Present it for customer approval  Handling Customer Complaints for RSCP, Ec/No and Data issues and trouble shoot the problem  Responsible for Drive Test (Pre Drive, Post Drive, Optimization) using Tems Investigation  Swap Sites Drive Testing (Partial as well as complete swap test, Coverage check, Intra and Inter site handover checks) using Tems Investigation  Perform Drive Test of Bad Patches after Pre Drive test and analyse that log files and give suggestions on Bad Patches and Implement that suggestions before Post Drive  Identification of faults and issues during the drive test e.g. sector swaps (complete & partial), Handover failures, Call drops, Ec/No and RSCP patches, missing neighbours, pilot Plusion etc  Data Testing: involves HSDPA/HSUPA/R99 Connection Stability  Find out low coverage area & as per requirement suggests for new site  Knowledge of Spectrum analyser usage to locate the interference and mobile jammer  Neighbour audit to rectify discrepancies of HO relationships and parameters  Conducting Pre/Post cluster Drives for HUAWEI-MOBILINK 3G Project LCC ZTE- Zong 3G Rollout Project Lahore, Pakistan Drive Test Engineer Sep 2013 – Mar 2014  Conducted Pre/Post Drive test for Mobilink-Huawei site reduction project  Resolved customer complaints for Mobilink-Huawei NPM project  Conducted Pre/Post drive test for Mobilink-Huawei coverage enhancement project  Prepared drive test reports for parameters RX-level (idle/Dedicated), RX-Qual, SQI, C/I worst using MapInfo 10.5  Preparing indoor/outdoor testing reports for parameters RSCP (idle/Dedicated), Ec/No, PSC, HSDPA, HSUPA using Tems Investigation and MapInfo 10.5 and Present it for customer approval  Perform call, data and SMS Testing to check the functionality of new sites  Responsible for Drive Test (Pre Drive, Post Drive, Optimization) using Tems Investigation  Swap Sites Drive Testing (Partial as well as complete swap test, Coverage check, Intra and Inter site handover checks) using Tems Investigation  Perform Drive Test of Bad Patches after Pre Drive test and analyse that log files and give suggestions on Bad Patches and Implement that suggestions before Post Drive  Identification of faults and issues during the drive test e.g. sector swaps (complete & partial), Handover failures, Call drops, Ec/No and RSCP patches, missing neighbours, pilot Plusion etc  Data Testing: involves HSDPA/HSUPA/R99 Connection Stability  Find out low coverage area & as per requirement suggests for new site
  • 4. Adeel Ahmed  Neighbour audit to rectify discrepancies of HO relationships and parameters  Conducting Pre/Post cluster Drives and identifying the bad Ec/No and RSCP patches  Supervising sites audits Software Skills  Tems Investigation  Actix Analyser  MapInfo Professional  Global Mapper  M2000  U200 PRS  Probe  Assistant  Matlab  Autocad  Proficient in MS Word, Excel, Power Point, and Outlook. Academic Projects Land Mine Detection Robot: The main purpose of this project is to make an intelligent robot that can detect mines and can avoid the obstacles and also tells us the location of affected area. The project is Pic Controller based which takes input from the IR sensors for collision avoidance and a metal detector is used to detect the mines with the help of robotic arm. As soon as it detects the mine it spot the area by using spray paint And it will tell the location of affected area. Interests  Event Mangement  Outdoor games Bio Data Date of Birth : 13th Mar, 1991 Place of Birth : Islamabad, Pakistan Marital Status : Single Nationality : Pakistani Passport Number : DY1164361 References To be Provided on request