SlideShare a Scribd company logo
1 of 3
JAGDISH KUMAR
ADDRESS OF CORRESPONDENCE:-
STREET NO-7, F-94, IIIFLR, PANDAV NAGAR CONTACT AT: 09718007645
DELHI. E-MAIL:
rajput_eng003@yahoo.com
PROFESSIONAL SUMMARY
 More than 4.1 years of experience in Telecom industry. Capable and flexible to work under aggressive project time-
lines and able to work on all technical aspect of the project.
 Clear understanding of business requirements, ability to manage the team and also work well as part of a
team.
EDUCATION BACKGROUND
 Bachelor of Technology (Information Technology) from Uttar Pradesh Technical University
Lucknow, period 2003-2007.
TECHNICAL SKILLS
 Operating System: Win 2000, XP Professional, Vista, Office-7.
 FAMILIAR WITH TOOLS:
• Global Positioning System (GPS12, 72).
• RL Tool, Global Mapper for LOS Checking &Transmission.
• GENEX PROBE 1.52,3.15,3.16 GENEX ASISTENCE 1.51,3.15,3.16.
• Keynote SIGOS Site Solution & Global Roamer
• Testing for National & International Roaming
• Nemo Indoor/Outdoor, Nemo Handy.
• Altimeter, Path Loss, Goggle Earth, Atoll ,MS Word, MS-excel ,PowerPoint.
 Strong knowledge of different testing techniques
 Strong knowledge of test cases
WORK EXPERIENCE
Company Name: Mobilecomm Technologies (india)Pvt.Ltd. December 2015 to till
Project: Bharti Airtel SCFT KTK
Client:
Duration:
Huawei Telecommunication
December 2015 –to till
Location: JODHPUR(RAJSTHAN),SAHARANPUR(UP),CHENNAI,MADURAI(T.N)
BIHAR &JH. TELENOR, KARNATAKA. AIRTEL SCFT 2G.
Role: RF Engineer
Responsibilities:
Performed Drive tests and site migrations using Nemo Outdoor/Genex prove analysis of RF drive test data to determine
Network problems, poor coverage areas, interference, call drops and handover problems.
Optimization of the network by changing Cell parameters, Orientation & tilting of GSM Antennas for optimum coverage.
Providing appropriate tilts (Electrical + Mechanical) to reduce the interference or Improve coverage Penetration
Auditing of new sites and verifying the hardware, tilt, Antenna height and orientation according to the planning Database.
Implementation of Recommendation/Changes
PAGE 1 OF 3
Company Name: Tirumala seven hills Ltd. August 2010 to October 2011
Designation: RF Engineer(Pre Sales Engineer)
Client:
Duration:
Huawei Telecommunication
August 2010 – October 2011
Location: Delhi-NCR
Responsibilities:-
• Demonstration of planning and testing tools at customer premise
• Technical discussion on products with customers.
• Collect the feedback from different organizations (Telecom) to help sales and marketing
persons for new business opportunity.
• Collect the account balance of different telecom circles and report to corporate office of
customer.
• Helps in commercial preparation on various products.
• Coordination with customer, principles, sales & marketing team and participate in meetings
and events.
• Proper reporting to product head and update current status going with competitor,
customers.
• Presentation on technologies and products to sales & marketing team to help them to
interact with customers.
• Analysis of Drive Test log files, KPI’s and report generation.
• Prepare plots of drive test files and analyze them.
Company Name: Metric telecom network Ltd. October 2008 to July 2010
Project: IDEA CELLULAR LTD.
Client:
Duration:
Huawei Telecommunication
Oct 2008 - July 2010
Location: Chennai, Andhra Pradesh,kerala circle
Role: R F Engineer
Project Members: 12
Responsibilities:-
• Optimizing RF related parameters such as HSN, MAIO, BCCH, BSIC and Freq. retuning by analyzing Drive
• logs and site data
• Neighbors list analysis, Interference and Coverage Analysis and to suggest for changes to be made in
network to Optimize the given network.
• Handling all RF related customer complaints by checking / inspecting serving BTS site Planned additional
sites, if any. Performing hard optimization of the network so as to minimize coverage holes & interference
• RF surveys & Site Selection by visiting various site locations finding the optimal candidates for site
installation after analyzing various RF Parameters.
• Conduction of Acceptance testing procedure which includes submitting plots of C/I, RXQual, RxLevel and
call testing.
• Optimization and Performance testing of GSM network.
• Maintain the Whole Network as per Customer requirement from RF Side & Provide Proposal & Survey of Site
in Order to maintain Quality & Coverage.
• Studying Network Quality Report and analyzing them and making Changes in the Network accordingly.
• Taking necessary actions like giving Mechanical Tilt & Electrical Tilt, Re-orientation of the Antennas
wherever required for solving the coverage problem, for minimizing the Interference in the Network etc
PAGE 2 OF 3
• Proposing New Sites to Overcome Coverage Patches & filling Capacity areas
• Indoor Solutions – RF Survey of various Buildings
• Drive test analysis using Post processing Tools using MapInfo.
• Hands on Experience in Drive Testing, Optimization, Generating report.
• Auditing of New Sites and Verifying Hardware, Tilt, Antenna height & Orientation according to the Planning
Database.
Company Name: Broad vision telecom, Mar 2008 to Sep 2008
Project: IDEA CELLULAR LTD.
Duration: Mar 2008 - Sep 2008
Location: Lucknow (U.P)
Role: R F Engineer(Micro Wave LOS)
Project Members: 5
Responsibilities
• Experience on RF site survey
• Experience on Map source to plot and plan the cell sites
• Experience on Garmin GPS
• Good knowledge of Line-Of-Site survey.
• Height and bearing calculation to decide the appropriate M/W antenna height
• Plan the sites as per route and terrain for Line-of-Sight survey
• Report preparation on LOS survey and provide to network officer.
• Manage the candidates for acquisition of lands
• Take the Lat-Long of max three sites with pictures of sites, Locality and terrain.
• Observe all the obstructions like high tension supply, rivers, Mounty areas etc. which can
interrupt the site for its RF coverage.
• Prepare the documents of site-survey
• Collect Lat-Long of site and locate the site on Map-info
• Optimise the site according to terrain.
• Site survey for finalizing the Network expansion.
PERSONAL DETAILS
 Father’s Name : Mr. Jawahar lal
 Permanent Address : vpo: Bhilait-ramnagar, Aligarh(U.P)
 Date of Birth : July 01, 1983
 Language : English, Hindi
 Passport Number : H3406543
I hereby declare that all the information mentioned above is true to the best of my knowledge.
JAGDISH KUMAR
PAGE 3 OF 3

More Related Content

What's hot (20)

CV_ANUPAM MONDAL
CV_ANUPAM MONDALCV_ANUPAM MONDAL
CV_ANUPAM MONDAL
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
CV(M.Javed )
CV(M.Javed )CV(M.Javed )
CV(M.Javed )
 
Resume
ResumeResume
Resume
 
AJITKUMARSHARMACV
AJITKUMARSHARMACVAJITKUMARSHARMACV
AJITKUMARSHARMACV
 
Venkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and OptimizationVenkatesan Thirunavukarasu-RF Planning and Optimization
Venkatesan Thirunavukarasu-RF Planning and Optimization
 
NeerajKumarGupta_CV
NeerajKumarGupta_CVNeerajKumarGupta_CV
NeerajKumarGupta_CV
 
CV Exp khus nw
CV Exp khus nwCV Exp khus nw
CV Exp khus nw
 
Abhishek CV
Abhishek CVAbhishek CV
Abhishek CV
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 
Resume_Srinivas
Resume_SrinivasResume_Srinivas
Resume_Srinivas
 
Hacker Resume IBM
Hacker Resume IBMHacker Resume IBM
Hacker Resume IBM
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_Resume
 
Adeel Ahmed-CV
Adeel Ahmed-CVAdeel Ahmed-CV
Adeel Ahmed-CV
 
ASHWANI KUMAR
ASHWANI KUMARASHWANI KUMAR
ASHWANI KUMAR
 
Navin kumar
Navin kumarNavin kumar
Navin kumar
 
RF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docxRF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docx
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 

Viewers also liked

Increasing your productivity
Increasing your productivityIncreasing your productivity
Increasing your productivitynestorcastillero
 
EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...
EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...
EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...Dženan Ćelić
 
TRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONS
TRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONSTRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONS
TRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONSDženan Ćelić
 
Parallel connection of power traction substations for peak power reduction an...
Parallel connection of power traction substations for peak power reduction an...Parallel connection of power traction substations for peak power reduction an...
Parallel connection of power traction substations for peak power reduction an...Dženan Ćelić
 
CV_MOHAMED NASLY- 18.09.2016
CV_MOHAMED NASLY- 18.09.2016CV_MOHAMED NASLY- 18.09.2016
CV_MOHAMED NASLY- 18.09.2016Mohamed Nasly
 
USAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYS
USAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYSUSAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYS
USAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYSDženan Ćelić
 
Prevention of Ureteral Injury 2014 - En'wezoh
Prevention of Ureteral Injury 2014 - En'wezohPrevention of Ureteral Injury 2014 - En'wezoh
Prevention of Ureteral Injury 2014 - En'wezohDerick En'Wezoh
 
CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...
CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...
CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...Dženan Ćelić
 
Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph
 

Viewers also liked (11)

Increasing your productivity
Increasing your productivityIncreasing your productivity
Increasing your productivity
 
CV of BE
CV of BECV of BE
CV of BE
 
EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...
EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...
EFFICIENT ENERGY USAGE AND MEASUREMENT OF PEAK POWER-SUGGESTIONS FOR REDUCING...
 
TRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONS
TRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONSTRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONS
TRACK OVERHAUL AND IMPACT OF USING OF UIC 60 RAILS ON ELECTRICAL CALCULATIONS
 
Parallel connection of power traction substations for peak power reduction an...
Parallel connection of power traction substations for peak power reduction an...Parallel connection of power traction substations for peak power reduction an...
Parallel connection of power traction substations for peak power reduction an...
 
party pad aus
party pad ausparty pad aus
party pad aus
 
CV_MOHAMED NASLY- 18.09.2016
CV_MOHAMED NASLY- 18.09.2016CV_MOHAMED NASLY- 18.09.2016
CV_MOHAMED NASLY- 18.09.2016
 
USAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYS
USAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYSUSAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYS
USAGE AND ADJUSTMENT OF AUTOMATICS AND PROTECTIVE RELAYS ON RAILWAYS
 
Prevention of Ureteral Injury 2014 - En'wezoh
Prevention of Ureteral Injury 2014 - En'wezohPrevention of Ureteral Injury 2014 - En'wezoh
Prevention of Ureteral Injury 2014 - En'wezoh
 
CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...
CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...
CALCULATION OF MAGNETIC AND ELECTRIC FIELDS OF A SINGLE RAIL TRACK AND INFLUE...
 
Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )Amgad Joseph Labeb ( CV )
Amgad Joseph Labeb ( CV )
 

Similar to Jagdish Kumar's RF Engineering Experience and Skills

Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorHisham Zahoor
 
Cv rf 8 years experience sridhar
Cv rf 8 years experience sridharCv rf 8 years experience sridhar
Cv rf 8 years experience sridharKoteshwar Sairam
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...Zafar Iqbal
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 AJzF
 
CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_HanifNajmudin Hanif
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle Labadan
 
Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singhlelin singh
 
Resume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF EngineerResume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF Engineerrahul singh
 
Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba
 

Similar to Jagdish Kumar's RF Engineering Experience and Skills (20)

Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
Cv rf 8 years experience sridhar
Cv rf 8 years experience sridharCv rf 8 years experience sridhar
Cv rf 8 years experience sridhar
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
 
CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_Hanif
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDM
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
Ahmed AbdelRady
Ahmed AbdelRadyAhmed AbdelRady
Ahmed AbdelRady
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
sanjeev_cv_updated
sanjeev_cv_updatedsanjeev_cv_updated
sanjeev_cv_updated
 
Resume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF EngineerResume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF Engineer
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
KHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CVKHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CV
 
Brijmani_kumar
Brijmani_kumarBrijmani_kumar
Brijmani_kumar
 
Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016
 

Jagdish Kumar's RF Engineering Experience and Skills

  • 1. JAGDISH KUMAR ADDRESS OF CORRESPONDENCE:- STREET NO-7, F-94, IIIFLR, PANDAV NAGAR CONTACT AT: 09718007645 DELHI. E-MAIL: rajput_eng003@yahoo.com PROFESSIONAL SUMMARY  More than 4.1 years of experience in Telecom industry. Capable and flexible to work under aggressive project time- lines and able to work on all technical aspect of the project.  Clear understanding of business requirements, ability to manage the team and also work well as part of a team. EDUCATION BACKGROUND  Bachelor of Technology (Information Technology) from Uttar Pradesh Technical University Lucknow, period 2003-2007. TECHNICAL SKILLS  Operating System: Win 2000, XP Professional, Vista, Office-7.  FAMILIAR WITH TOOLS: • Global Positioning System (GPS12, 72). • RL Tool, Global Mapper for LOS Checking &Transmission. • GENEX PROBE 1.52,3.15,3.16 GENEX ASISTENCE 1.51,3.15,3.16. • Keynote SIGOS Site Solution & Global Roamer • Testing for National & International Roaming • Nemo Indoor/Outdoor, Nemo Handy. • Altimeter, Path Loss, Goggle Earth, Atoll ,MS Word, MS-excel ,PowerPoint.  Strong knowledge of different testing techniques  Strong knowledge of test cases WORK EXPERIENCE Company Name: Mobilecomm Technologies (india)Pvt.Ltd. December 2015 to till Project: Bharti Airtel SCFT KTK Client: Duration: Huawei Telecommunication December 2015 –to till Location: JODHPUR(RAJSTHAN),SAHARANPUR(UP),CHENNAI,MADURAI(T.N) BIHAR &JH. TELENOR, KARNATAKA. AIRTEL SCFT 2G. Role: RF Engineer Responsibilities: Performed Drive tests and site migrations using Nemo Outdoor/Genex prove analysis of RF drive test data to determine Network problems, poor coverage areas, interference, call drops and handover problems. Optimization of the network by changing Cell parameters, Orientation & tilting of GSM Antennas for optimum coverage. Providing appropriate tilts (Electrical + Mechanical) to reduce the interference or Improve coverage Penetration Auditing of new sites and verifying the hardware, tilt, Antenna height and orientation according to the planning Database. Implementation of Recommendation/Changes PAGE 1 OF 3
  • 2. Company Name: Tirumala seven hills Ltd. August 2010 to October 2011 Designation: RF Engineer(Pre Sales Engineer) Client: Duration: Huawei Telecommunication August 2010 – October 2011 Location: Delhi-NCR Responsibilities:- • Demonstration of planning and testing tools at customer premise • Technical discussion on products with customers. • Collect the feedback from different organizations (Telecom) to help sales and marketing persons for new business opportunity. • Collect the account balance of different telecom circles and report to corporate office of customer. • Helps in commercial preparation on various products. • Coordination with customer, principles, sales & marketing team and participate in meetings and events. • Proper reporting to product head and update current status going with competitor, customers. • Presentation on technologies and products to sales & marketing team to help them to interact with customers. • Analysis of Drive Test log files, KPI’s and report generation. • Prepare plots of drive test files and analyze them. Company Name: Metric telecom network Ltd. October 2008 to July 2010 Project: IDEA CELLULAR LTD. Client: Duration: Huawei Telecommunication Oct 2008 - July 2010 Location: Chennai, Andhra Pradesh,kerala circle Role: R F Engineer Project Members: 12 Responsibilities:- • Optimizing RF related parameters such as HSN, MAIO, BCCH, BSIC and Freq. retuning by analyzing Drive • logs and site data • Neighbors list analysis, Interference and Coverage Analysis and to suggest for changes to be made in network to Optimize the given network. • Handling all RF related customer complaints by checking / inspecting serving BTS site Planned additional sites, if any. Performing hard optimization of the network so as to minimize coverage holes & interference • RF surveys & Site Selection by visiting various site locations finding the optimal candidates for site installation after analyzing various RF Parameters. • Conduction of Acceptance testing procedure which includes submitting plots of C/I, RXQual, RxLevel and call testing. • Optimization and Performance testing of GSM network. • Maintain the Whole Network as per Customer requirement from RF Side & Provide Proposal & Survey of Site in Order to maintain Quality & Coverage. • Studying Network Quality Report and analyzing them and making Changes in the Network accordingly. • Taking necessary actions like giving Mechanical Tilt & Electrical Tilt, Re-orientation of the Antennas wherever required for solving the coverage problem, for minimizing the Interference in the Network etc PAGE 2 OF 3
  • 3. • Proposing New Sites to Overcome Coverage Patches & filling Capacity areas • Indoor Solutions – RF Survey of various Buildings • Drive test analysis using Post processing Tools using MapInfo. • Hands on Experience in Drive Testing, Optimization, Generating report. • Auditing of New Sites and Verifying Hardware, Tilt, Antenna height & Orientation according to the Planning Database. Company Name: Broad vision telecom, Mar 2008 to Sep 2008 Project: IDEA CELLULAR LTD. Duration: Mar 2008 - Sep 2008 Location: Lucknow (U.P) Role: R F Engineer(Micro Wave LOS) Project Members: 5 Responsibilities • Experience on RF site survey • Experience on Map source to plot and plan the cell sites • Experience on Garmin GPS • Good knowledge of Line-Of-Site survey. • Height and bearing calculation to decide the appropriate M/W antenna height • Plan the sites as per route and terrain for Line-of-Sight survey • Report preparation on LOS survey and provide to network officer. • Manage the candidates for acquisition of lands • Take the Lat-Long of max three sites with pictures of sites, Locality and terrain. • Observe all the obstructions like high tension supply, rivers, Mounty areas etc. which can interrupt the site for its RF coverage. • Prepare the documents of site-survey • Collect Lat-Long of site and locate the site on Map-info • Optimise the site according to terrain. • Site survey for finalizing the Network expansion. PERSONAL DETAILS  Father’s Name : Mr. Jawahar lal  Permanent Address : vpo: Bhilait-ramnagar, Aligarh(U.P)  Date of Birth : July 01, 1983  Language : English, Hindi  Passport Number : H3406543 I hereby declare that all the information mentioned above is true to the best of my knowledge. JAGDISH KUMAR PAGE 3 OF 3