SlideShare a Scribd company logo
1 of 8
Page 1 of 7
Name: Hirak Jyoti Mazumdar
Mobile: +91 9632166619 / 9836596669
Email: hirak.jyoti.mazumdar@gmail.com
Career Level : Senior RF Planning, Designing & Optimisation Engineer
Experience Summary
• 6 Years 10 months of Experience in 2G/3G/M2M RF Planning and Optimization as well as
Technical Services in Telecom and Utility Sector
• Presently working as a part of RF Pre-Sales team for the RFPs and BIDs
• Done planning and designing for over 2000 2G & 2600 3G sites
• Worked in collaboration with the project team in radio planning, site roll-out, pre-launch
optimization and post integration analysis of the performance of the new 2G & 3G sites
• Planning the Node-Bs , defining their related parameters: site coordinates, antenna type,
antenna height, antenna tilt, antenna azimuth, CPICH power, propagation model parameters
• Expert in 2G/3G Optimization, KPI Analysis, Troubleshooting, Root cause Analysis
• Green Field Experience in 2 projects, Network Planning and Roll-Out Experience in 5 projects,
MS/MC Experience in 4 projects
• Exposure to multiple Network Planning and Optimisation projects not only in India but abroad too
• Expert in handling RF Optimization Tools
• Done Automatic Frequency Planning using TEMS CELL PLANNER & OPTIMI with considerable
KPI improvement
• HSDPA Data Throughput Optimization and related Parameter Audit for BSNL Caltel 3G,
Aircel Bihar 3G & Vodafone Kolkata 3G
• Good Knowledge in SQL Server 2008 with which I can maintain KPI database and automate KPI
extraction in a flexible way
Area of
Expertise
Experience in
Technology
GSM(mo
nths)
UMTS
(months)
CDMA2
000
(months
CDMA
EVDO
(months
WIMAX/LT
E (months)
M2M
(months)
RF Design and
Planning
6
18
RF
Optimization/Tuning of
12 12
KPI Monitoring 24 10
Work Experience:
Present Organisation : Aricent
Page 2 of 7
Location : Bangalore
Duration : 05-November-13 to Till Date
Previous Organisation 2 : Ericsson India Global Services Pvt. Ltd.
Location : Kolkata
Duration : 01-Jan-12 to 25-Oct-13
Previous Organisation 1 : Ericsson India Pvt. Ltd.
Location : Kolkata
Duration : 25-Jun-08 to 31-Dec-11
Technical Competencies/skills
Drive Test &
Analysis Tool TEMS INVESTIGATION (GSM+WCDMA),TEMS DISCOVERY 2.1.5,GLADIATOR
Planning Tool MAPINFO Professional, MCOM,MENTUM CELL PLANNER,PLANET,OPTIMI,GOOGLE
EARTH, EDX
Optimization
Tool
MAPINFO, MCOM,MIPT,GLADIATOR
Performance
Analysis Tool
Citrix-RNO,WMRR,WNCS,MRR,NCS,BUSINESS OBJECT,WINFIOL,SECURE
CRT,ESPA,GLADIATOR
Post Processing
Tools
STATICS,EXERT,NEXPLORER,GLADIATOR,TEMS DISCOVERY 2.1.5.5
Database
Maintenance
Tools
SQL Server 2008, Alteryx
RAN Equipment
vendors ERICSSON
Skills:
Skill Set 1:
Domain RF Planning and Designing
Duration 18 Months
Project
Highlights
• 2G and 3G RF Planning and Designing of Concentrators and Repeaters using Mentum Planet
in M2M Technology
• Small Cell Planning for filling up the Coverage holes
• 2G and 3G RF Designing and Planning for the Smart Grid products
• Optimising the RF Coverage, Number of Servers & Best Serving Sector of the Concentrators
and Repeaters to cover the Utility Energy Meters using 2G and 3G Technology
• Geocoding the addresses of the End Points
• Data extraction for the Utility Meters using SQL Database and MS Access
• RF Mesh Network Planning and Designing for the OpenWay & RIVA products using ZigBee
Mesh Technology and Cisco Grid Routers
• Working hand in hand with the Itron Sales team for acquiring the projects by handling the
technicalities in the bidding process and predicting the equipment counts required beforehand
• Preparing RFP for the projects
• Preparation of the Bid Sheet which will be used in the project for bidding
Page 3 of 7
• Working as a part of the Technical Pre-Sales team
• Testing and Studying the 2G and 3G propagation pattern of Sector Antenna used in
Concentrators and Repeaters for Utility Meter Coverage
Companies
worked for
Aricent
End
Customer
AT&T Inc., Verizon Wireless, T-Mobile, ITRON INC. USA
Skill Set 2:
Domain 3G Network Performance Monitoring and Optimization
Duration 10 Months
Project
Highlights
• Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for troubleshooting
drop calls and other RF related issues concerned with the site
• Monitoring and maintaining Accessibility, Retainability, Integrity KPIs as a part of Network
Performance Management
• WMRR , WNCS recordings and result analysis
• Neighbor Relation Audit for addition of missing neighbour and deletion of unwanted neighbours
• Soft HO Tuning for optimising Soft Handover Factor
• Call Drop Rate Monitoring and Soft Tuning to optimise it
• HSPA Data Throughput Optimisation and related Parameter Tuning
• Parameter Tuning for optimising the KPI IRAT(RT+NRT)
• Conduct Network wide parameter audit aimed at improving performance
• Preparation of RCA for KPI Degradation on a daily basis
• Daily Network KPI monitoring and relevant counters. Suggest recommendations for
improvement
• Monitoring of Hardware Alarms, Transmission Issues and Faults
• Identification of VSWR Issue in sites and correlation with KPI Degradation
• Detection of Overshooting Cells and optimising them to combat congestion and interference in
the network
• Identify cells with CE congestion while propose solution for capacity management
• LAC Audit and Planning
• Monitor the growth of traffic & report for any availability issues
• Worst Cell Analysis done for each KPI on weekly basis
Companies
worked for
ERICSSON INDIA PRIVATE LIMITED, ERICSSON INDIA GLOBAL SERVICES PRIVATE
LIMITED
End
Customer
BSNL Caltel 3G,Aircel Bihar 3G,Vodafone Kolkata 3G
Page 4 of 7
Skill Set 3:
Domain 3G Radio Network Design, Planning & Initial Tuning
Duration 12 Months
Project
Highlights
• WCDMA Initial Radio Network Design viz. Link Budget, Site Selection, Propagation Models,
Prediction Plots etc. for 50 clusters of BSNL Caltel , 23 clusters of Vodafone Kolkata 3G &
91 3G sites of Airtel Rwanda
• Submission of coverage prediction plots and statistics for coverage polygons based on
area coverage probability
• Performed the Coverage based design of the 623 3G sites of Vodafone Kolkata
• Performed the Coverage based design of the 575 3G sites of BSNL Caltel
• Performed the Coverage based design & PSC Planning for 91 3G sites of Airtel Rwanda
• Optimising the Coverage of the 3G Clusters wrt the coverage prediction generated by the
TCPU Tool
• Nominal plan for infill and new coverage sites based on the customer proposed services
with offered traffic load (Population density map )
• Site Relocation Plan, Tilt changes, Azimuth changes for the new sites
• Creating RF datasheets (CCR ) for the sites as per the design outputs
• PSC, IRAT and Intra Frequency HO neighbor plan for new sites and optimization for
existing sites
• SCFT done in order to check the basic functionality of the 3G sites
• Physical optimization of 1st and 2nd layer neighbors in order to incorporate new planned
sites
• Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for initial tuning of
the 3G sites
Page 5 of 7
• Parameter Consistency Check of New 3G Sites
• KPI Monitoring and Optimisation after getting ON-AIRED
• Data Throughput Testing and Optimising for 3G sitesCompanies
worked for
ERICSSON INDIA PRIVATE LIMITED
End Customer BSNL Caltel 3G,Airtel Rwanda 3G,Vodafone Kolkata 3G
Skill Set 4:
Domain 2G Network Performance Monitoring and Optimization
Duration 24 Months
Project
Highlights
• Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for troubleshooting
drop calls and other RF related issues concerned with the site
• Monitoring and maintaining Accessibility, Retainability KPIs as a part of Network Performance
Management
• MRR , NCS recordings and result analysis
• Neighbor Audit done wrt the NCS recording and the neighbour relation statistics
• Parameter Audit of the Entire Network for removal of the inconsistencies
• Preparation of RCA for KPI Degradation on a daily basis
• Daily Network KPI monitoring and relevant counters. Suggest recommendations for
improvement
• Monitoring of Hardware Alarms, Transmission Issues ,Faults and ICM
• Identification of VSWR Issue in sites and correlation with KPI Degradation
• Detection of Overshooting Cells and optimising them to improve the network quality,TCH
Drop and SDCCH Drop and Handover Performance
• LAC Audit and Planning
• Monitor the growth of traffic & report for any availability issues
• Capacity Audit done wrt the growing traffic of the network
• Identification of the faulty TRX resulting in degraded KPIs
• Recommendations for the improvement of the performance of the VIP Clusters on a weekly
basis
• AFP done to improve the BCCH Plan of 16 BSCs in Airtel Bangladesh
• AFP done to convert the 4/12 BCCH Plan to 3/9 BCCH Plan with considerable KPI
improvements
Page 6 of 7
• Implementation of New CGI Plan in Aircel Odisha Network
• Worst Cell Analysis done for TCH Drop in 558 SC cells with improvement in 390 cells
Companies
worked for
ERICSSON INDIA PRIVATE LIMITED,ERICSSON INDIA GLOBAL SERVICES PRIVATE
LIMITED
End
Customer
BSNL Caltel,Aircel WB,Aircel Bihar,Aircel Odisha,Airtel Nigeria,Airtel Bangladesh,Vodafone Netherland
2G
Skill Set 5:
Domain 2G Radio Network Design, Planning & Initial Tuning
Duration 18 Months
Project
Highlights
• Performed the Coverage based design & Frequency Planning for 80 2G of BSNL Caltel
• Performed the Coverage based design & AFP for 91 2G of Airtel Rwanda
• Optimising the Coverage of the 2G Clusters wrt the coverage prediction generated by the
TCPU Tool
• SCFT done in order to check the basic functionality of the 2G sites
• Neighbour List Preparation, Auditing and Tuning
• Prepared CDDs for several 2G sites
• Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for initial tuning of
the 2G sites
• Parameter Consistency Check of New 2G Sites
• KPI Monitoring and Optimisation after getting ON-AIRED
• Identification of the hardware issues and faults in the New 2G sites and getting them
rectified before Site & Cluster AT
Companies
worked for
ERICSSON INDIA PRIVATE LIMITED
End Customer
Aircel WB,BSNL Caltel,Airtel Rwanda,Vodafone Chandigarh,Uninor UP East,Uninor UP
West,Uninor Bihar
Achievements & Recognitions:
Page 7 of 7
• Elected Trainer for RTC Graduate Engineer Trainee – Radio, 2011 batch
• Co-mentor of Ericsson Mentorship Program- “CONNECT-2011”
• Involved in the very first Roll-out of WCDMA Network in India for BSNL Caltel
• Provided Customer Trainings on WCDMA Basics and HSDPA Basics
• Awarded the Best Performer of RTC East for Q1 of 2012
• Improved the IRAT(RT+NRT) KPI of Aircel Bihar 3G from 87% to 91%
• Improved the KPI “ % Cells having SHO Factor < 40% “ for Aircel Bihar from 92% to 96%
• Changed the BCCH Plan for the entire Network of Aircel WB from 4/12 to 3/9 with considerable
KPI improvement
• Involved in the BSNL CALTEL 2G Swap-out and Roll out Project with the swap of 128 sites from
Nortel to Ericsson and roll out of 280 sites
• Awarded the Best Team Player in my team in Q1 of 2014-15
Professional Qualifications/Education:
• Passed Bachelor of Technology in Electronics & Telecommunication Engineering from MCKV Institute of
Engineering with 90.9%
• Passed (10+2) Standard from Don Bosco School with 94%
• Passed 10th Standard from Don Bosco School with 91.6%
Professional Trainings & Certifications:
Classroom Trainings
• GSM Basics
• ENIQ
• Radio Network Optimization
• GSM Cell Planning Principles
• Radio Network Features
• Radio Network Statistics
• TEMS Cell Planner Universal User
• WCDMA Air Interface
• WCDMA RAN Functionality
• Introduction to Gladiator
• WCDMA Performance Monitoring and Optimization
• WCDMA HSPA System Techniques
• SQL Server 2008
• GSM RAN Signaling
• LTE Basics
• PERL Scripting Basics
Page 8 of 7
• Product Knowledge of CC100
• EDX Planning Tool Training
On Job Trainings
• WCDMA KPI Monitoring and NPI
• 2G and 3G RF Planning and Designing of Concentrators and Repeaters using Mentum Planet in
M2M Technology
• RF Mesh Planning and Designing for OpenWay & RIVA products using ZigBee Mesh
Technology and Cisco Grid Routers
Personal Information:
DOB: 26
th
May, 1986
PASSPORT NO: G1769730
VALID THRU: 10/05/2017

More Related Content

What's hot

Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume GaneshGanesh S
 
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-DatacenterCV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-Datacenterneeladri kumar
 
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin Jain
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh
 
CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)Saravanan Mudaliar
 
CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)Rajneesh Mohan
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)vikrant tiwari
 
CV_PANKAJ KR JHA
CV_PANKAJ KR JHACV_PANKAJ KR JHA
CV_PANKAJ KR JHAPankaj Jha
 

What's hot (20)

Harshit Bhawsar Resume
Harshit Bhawsar ResumeHarshit Bhawsar Resume
Harshit Bhawsar Resume
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
KHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CVKHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CV
 
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-DatacenterCV_Neeladri Kumar-Packet Core-EPC-Datacenter
CV_Neeladri Kumar-Packet Core-EPC-Datacenter
 
Abhimanyu_Resume[1][1]
Abhimanyu_Resume[1][1]Abhimanyu_Resume[1][1]
Abhimanyu_Resume[1][1]
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
RF Engineer
RF EngineerRF Engineer
RF Engineer
 
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
 
Chandan Singh_22062015
Chandan Singh_22062015Chandan Singh_22062015
Chandan Singh_22062015
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)
 
CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)CV_Rajneesh Mohan(7.10 Year)
CV_Rajneesh Mohan(7.10 Year)
 
Brijmani_kumar
Brijmani_kumarBrijmani_kumar
Brijmani_kumar
 
Resume_Srinivas
Resume_SrinivasResume_Srinivas
Resume_Srinivas
 
Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)Vikrant Tiwari Resume(RNO)
Vikrant Tiwari Resume(RNO)
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
CV_PANKAJ KR JHA
CV_PANKAJ KR JHACV_PANKAJ KR JHA
CV_PANKAJ KR JHA
 
Chellappa Profile
Chellappa ProfileChellappa Profile
Chellappa Profile
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 

Viewers also liked

Παρουσίαση Πράσινη ενέργεια
Παρουσίαση Πράσινη ενέργειαΠαρουσίαση Πράσινη ενέργεια
Παρουσίαση Πράσινη ενέργειαvvars
 
Ibercom completa su ampliación de capital con una sobresuscripción del 350%
Ibercom completa su ampliación de capital con una sobresuscripción del 350%Ibercom completa su ampliación de capital con una sobresuscripción del 350%
Ibercom completa su ampliación de capital con una sobresuscripción del 350%Inversis Banco
 
Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...
Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...
Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...FUSADES
 
NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...
NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...
NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...European School of Oncology
 
Virginia Wine festival 2015 Final
Virginia Wine festival 2015 Final Virginia Wine festival 2015 Final
Virginia Wine festival 2015 Final Robert Moore
 
Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...
Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...
Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...Cairong Yang
 
大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐
大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐
大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐Yoshiyuki Imoo
 
Gartner's 'Nexus of Forces' and the future of collaboration
Gartner's 'Nexus of Forces' and the future of collaborationGartner's 'Nexus of Forces' and the future of collaboration
Gartner's 'Nexus of Forces' and the future of collaborationHighQ
 
Tema 4. la ciudad
Tema 4. la ciudadTema 4. la ciudad
Tema 4. la ciudadPablo Díaz
 
44 superdink 125i-abs_manual
44   superdink 125i-abs_manual44   superdink 125i-abs_manual
44 superdink 125i-abs_manualander cosi
 
resume
resumeresume
resumesydeys
 
Control of immune response by regulatory T cells
Control of immune response by regulatory T cellsControl of immune response by regulatory T cells
Control of immune response by regulatory T cellsVICTOR MAESTRE RAMIREZ
 
tecnología de la comunicación
tecnología de la comunicacióntecnología de la comunicación
tecnología de la comunicaciónmanitaskavaka
 

Viewers also liked (14)

Παρουσίαση Πράσινη ενέργεια
Παρουσίαση Πράσινη ενέργειαΠαρουσίαση Πράσινη ενέργεια
Παρουσίαση Πράσινη ενέργεια
 
Ibercom completa su ampliación de capital con una sobresuscripción del 350%
Ibercom completa su ampliación de capital con una sobresuscripción del 350%Ibercom completa su ampliación de capital con una sobresuscripción del 350%
Ibercom completa su ampliación de capital con una sobresuscripción del 350%
 
Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...
Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...
Comunicado: sala admite demanda de inconstitucionalidad y suspende entrada en...
 
NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...
NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...
NY Prostate Cancer Conference - V.E. Reuter - Session 2: Upgrading/downgradin...
 
Virginia Wine festival 2015 Final
Virginia Wine festival 2015 Final Virginia Wine festival 2015 Final
Virginia Wine festival 2015 Final
 
Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...
Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...
Embryonic poly(A)-binding protein (EPAB) is required for granulosa cell EGF s...
 
大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐
大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐
大学トップレベルラグビー選手における頚椎退行性変化‐頚部傷害やポジションとの関連性‐
 
Gartner's 'Nexus of Forces' and the future of collaboration
Gartner's 'Nexus of Forces' and the future of collaborationGartner's 'Nexus of Forces' and the future of collaboration
Gartner's 'Nexus of Forces' and the future of collaboration
 
Tema 4. la ciudad
Tema 4. la ciudadTema 4. la ciudad
Tema 4. la ciudad
 
44 superdink 125i-abs_manual
44   superdink 125i-abs_manual44   superdink 125i-abs_manual
44 superdink 125i-abs_manual
 
resume
resumeresume
resume
 
Control of immune response by regulatory T cells
Control of immune response by regulatory T cellsControl of immune response by regulatory T cells
Control of immune response by regulatory T cells
 
FAISAL ABDULKHADER KUNJU CV1 - Copy
FAISAL ABDULKHADER KUNJU CV1 - CopyFAISAL ABDULKHADER KUNJU CV1 - Copy
FAISAL ABDULKHADER KUNJU CV1 - Copy
 
tecnología de la comunicación
tecnología de la comunicacióntecnología de la comunicación
tecnología de la comunicación
 

Similar to Resume_Hirak Jyoti Mazumdar_29-Apr-15

Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016Tushar Srivastava
 
Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorHisham Zahoor
 
SENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSaroja Bhoi
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 AJzF
 
Birendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_ResumeBirendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_ResumeBirendra Yadav
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 

Similar to Resume_Hirak Jyoti Mazumdar_29-Apr-15 (20)

Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization Eng
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDM
 
CV_ANUPAM MONDAL
CV_ANUPAM MONDALCV_ANUPAM MONDAL
CV_ANUPAM MONDAL
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 
Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
SENIOR ENGINEER_Saroj
SENIOR ENGINEER_SarojSENIOR ENGINEER_Saroj
SENIOR ENGINEER_Saroj
 
NeerajKumarGupta_CV
NeerajKumarGupta_CVNeerajKumarGupta_CV
NeerajKumarGupta_CV
 
John Z Farhat Cv Sept 30th 2010 A
John Z Farhat Cv  Sept 30th 2010 AJohn Z Farhat Cv  Sept 30th 2010 A
John Z Farhat Cv Sept 30th 2010 A
 
CV_Abhishek singh Parihar
CV_Abhishek singh PariharCV_Abhishek singh Parihar
CV_Abhishek singh Parihar
 
CV_Shrikant
CV_ShrikantCV_Shrikant
CV_Shrikant
 
Hadi Tohidlou-CV
Hadi Tohidlou-CVHadi Tohidlou-CV
Hadi Tohidlou-CV
 
JAGDISH Updated
JAGDISH UpdatedJAGDISH Updated
JAGDISH Updated
 
sahil_resume
sahil_resumesahil_resume
sahil_resume
 
Birendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_ResumeBirendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_Resume
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 

Resume_Hirak Jyoti Mazumdar_29-Apr-15

  • 1. Page 1 of 7 Name: Hirak Jyoti Mazumdar Mobile: +91 9632166619 / 9836596669 Email: hirak.jyoti.mazumdar@gmail.com Career Level : Senior RF Planning, Designing & Optimisation Engineer Experience Summary • 6 Years 10 months of Experience in 2G/3G/M2M RF Planning and Optimization as well as Technical Services in Telecom and Utility Sector • Presently working as a part of RF Pre-Sales team for the RFPs and BIDs • Done planning and designing for over 2000 2G & 2600 3G sites • Worked in collaboration with the project team in radio planning, site roll-out, pre-launch optimization and post integration analysis of the performance of the new 2G & 3G sites • Planning the Node-Bs , defining their related parameters: site coordinates, antenna type, antenna height, antenna tilt, antenna azimuth, CPICH power, propagation model parameters • Expert in 2G/3G Optimization, KPI Analysis, Troubleshooting, Root cause Analysis • Green Field Experience in 2 projects, Network Planning and Roll-Out Experience in 5 projects, MS/MC Experience in 4 projects • Exposure to multiple Network Planning and Optimisation projects not only in India but abroad too • Expert in handling RF Optimization Tools • Done Automatic Frequency Planning using TEMS CELL PLANNER & OPTIMI with considerable KPI improvement • HSDPA Data Throughput Optimization and related Parameter Audit for BSNL Caltel 3G, Aircel Bihar 3G & Vodafone Kolkata 3G • Good Knowledge in SQL Server 2008 with which I can maintain KPI database and automate KPI extraction in a flexible way Area of Expertise Experience in Technology GSM(mo nths) UMTS (months) CDMA2 000 (months CDMA EVDO (months WIMAX/LT E (months) M2M (months) RF Design and Planning 6 18 RF Optimization/Tuning of 12 12 KPI Monitoring 24 10 Work Experience: Present Organisation : Aricent
  • 2. Page 2 of 7 Location : Bangalore Duration : 05-November-13 to Till Date Previous Organisation 2 : Ericsson India Global Services Pvt. Ltd. Location : Kolkata Duration : 01-Jan-12 to 25-Oct-13 Previous Organisation 1 : Ericsson India Pvt. Ltd. Location : Kolkata Duration : 25-Jun-08 to 31-Dec-11 Technical Competencies/skills Drive Test & Analysis Tool TEMS INVESTIGATION (GSM+WCDMA),TEMS DISCOVERY 2.1.5,GLADIATOR Planning Tool MAPINFO Professional, MCOM,MENTUM CELL PLANNER,PLANET,OPTIMI,GOOGLE EARTH, EDX Optimization Tool MAPINFO, MCOM,MIPT,GLADIATOR Performance Analysis Tool Citrix-RNO,WMRR,WNCS,MRR,NCS,BUSINESS OBJECT,WINFIOL,SECURE CRT,ESPA,GLADIATOR Post Processing Tools STATICS,EXERT,NEXPLORER,GLADIATOR,TEMS DISCOVERY 2.1.5.5 Database Maintenance Tools SQL Server 2008, Alteryx RAN Equipment vendors ERICSSON Skills: Skill Set 1: Domain RF Planning and Designing Duration 18 Months Project Highlights • 2G and 3G RF Planning and Designing of Concentrators and Repeaters using Mentum Planet in M2M Technology • Small Cell Planning for filling up the Coverage holes • 2G and 3G RF Designing and Planning for the Smart Grid products • Optimising the RF Coverage, Number of Servers & Best Serving Sector of the Concentrators and Repeaters to cover the Utility Energy Meters using 2G and 3G Technology • Geocoding the addresses of the End Points • Data extraction for the Utility Meters using SQL Database and MS Access • RF Mesh Network Planning and Designing for the OpenWay & RIVA products using ZigBee Mesh Technology and Cisco Grid Routers • Working hand in hand with the Itron Sales team for acquiring the projects by handling the technicalities in the bidding process and predicting the equipment counts required beforehand • Preparing RFP for the projects • Preparation of the Bid Sheet which will be used in the project for bidding
  • 3. Page 3 of 7 • Working as a part of the Technical Pre-Sales team • Testing and Studying the 2G and 3G propagation pattern of Sector Antenna used in Concentrators and Repeaters for Utility Meter Coverage Companies worked for Aricent End Customer AT&T Inc., Verizon Wireless, T-Mobile, ITRON INC. USA Skill Set 2: Domain 3G Network Performance Monitoring and Optimization Duration 10 Months Project Highlights • Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for troubleshooting drop calls and other RF related issues concerned with the site • Monitoring and maintaining Accessibility, Retainability, Integrity KPIs as a part of Network Performance Management • WMRR , WNCS recordings and result analysis • Neighbor Relation Audit for addition of missing neighbour and deletion of unwanted neighbours • Soft HO Tuning for optimising Soft Handover Factor • Call Drop Rate Monitoring and Soft Tuning to optimise it • HSPA Data Throughput Optimisation and related Parameter Tuning • Parameter Tuning for optimising the KPI IRAT(RT+NRT) • Conduct Network wide parameter audit aimed at improving performance • Preparation of RCA for KPI Degradation on a daily basis • Daily Network KPI monitoring and relevant counters. Suggest recommendations for improvement • Monitoring of Hardware Alarms, Transmission Issues and Faults • Identification of VSWR Issue in sites and correlation with KPI Degradation • Detection of Overshooting Cells and optimising them to combat congestion and interference in the network • Identify cells with CE congestion while propose solution for capacity management • LAC Audit and Planning • Monitor the growth of traffic & report for any availability issues • Worst Cell Analysis done for each KPI on weekly basis Companies worked for ERICSSON INDIA PRIVATE LIMITED, ERICSSON INDIA GLOBAL SERVICES PRIVATE LIMITED End Customer BSNL Caltel 3G,Aircel Bihar 3G,Vodafone Kolkata 3G
  • 4. Page 4 of 7 Skill Set 3: Domain 3G Radio Network Design, Planning & Initial Tuning Duration 12 Months Project Highlights • WCDMA Initial Radio Network Design viz. Link Budget, Site Selection, Propagation Models, Prediction Plots etc. for 50 clusters of BSNL Caltel , 23 clusters of Vodafone Kolkata 3G & 91 3G sites of Airtel Rwanda • Submission of coverage prediction plots and statistics for coverage polygons based on area coverage probability • Performed the Coverage based design of the 623 3G sites of Vodafone Kolkata • Performed the Coverage based design of the 575 3G sites of BSNL Caltel • Performed the Coverage based design & PSC Planning for 91 3G sites of Airtel Rwanda • Optimising the Coverage of the 3G Clusters wrt the coverage prediction generated by the TCPU Tool • Nominal plan for infill and new coverage sites based on the customer proposed services with offered traffic load (Population density map ) • Site Relocation Plan, Tilt changes, Azimuth changes for the new sites • Creating RF datasheets (CCR ) for the sites as per the design outputs • PSC, IRAT and Intra Frequency HO neighbor plan for new sites and optimization for existing sites • SCFT done in order to check the basic functionality of the 3G sites • Physical optimization of 1st and 2nd layer neighbors in order to incorporate new planned sites • Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for initial tuning of the 3G sites
  • 5. Page 5 of 7 • Parameter Consistency Check of New 3G Sites • KPI Monitoring and Optimisation after getting ON-AIRED • Data Throughput Testing and Optimising for 3G sitesCompanies worked for ERICSSON INDIA PRIVATE LIMITED End Customer BSNL Caltel 3G,Airtel Rwanda 3G,Vodafone Kolkata 3G Skill Set 4: Domain 2G Network Performance Monitoring and Optimization Duration 24 Months Project Highlights • Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for troubleshooting drop calls and other RF related issues concerned with the site • Monitoring and maintaining Accessibility, Retainability KPIs as a part of Network Performance Management • MRR , NCS recordings and result analysis • Neighbor Audit done wrt the NCS recording and the neighbour relation statistics • Parameter Audit of the Entire Network for removal of the inconsistencies • Preparation of RCA for KPI Degradation on a daily basis • Daily Network KPI monitoring and relevant counters. Suggest recommendations for improvement • Monitoring of Hardware Alarms, Transmission Issues ,Faults and ICM • Identification of VSWR Issue in sites and correlation with KPI Degradation • Detection of Overshooting Cells and optimising them to improve the network quality,TCH Drop and SDCCH Drop and Handover Performance • LAC Audit and Planning • Monitor the growth of traffic & report for any availability issues • Capacity Audit done wrt the growing traffic of the network • Identification of the faulty TRX resulting in degraded KPIs • Recommendations for the improvement of the performance of the VIP Clusters on a weekly basis • AFP done to improve the BCCH Plan of 16 BSCs in Airtel Bangladesh • AFP done to convert the 4/12 BCCH Plan to 3/9 BCCH Plan with considerable KPI improvements
  • 6. Page 6 of 7 • Implementation of New CGI Plan in Aircel Odisha Network • Worst Cell Analysis done for TCH Drop in 558 SC cells with improvement in 390 cells Companies worked for ERICSSON INDIA PRIVATE LIMITED,ERICSSON INDIA GLOBAL SERVICES PRIVATE LIMITED End Customer BSNL Caltel,Aircel WB,Aircel Bihar,Aircel Odisha,Airtel Nigeria,Airtel Bangladesh,Vodafone Netherland 2G Skill Set 5: Domain 2G Radio Network Design, Planning & Initial Tuning Duration 18 Months Project Highlights • Performed the Coverage based design & Frequency Planning for 80 2G of BSNL Caltel • Performed the Coverage based design & AFP for 91 2G of Airtel Rwanda • Optimising the Coverage of the 2G Clusters wrt the coverage prediction generated by the TCPU Tool • SCFT done in order to check the basic functionality of the 2G sites • Neighbour List Preparation, Auditing and Tuning • Prepared CDDs for several 2G sites • Drive Log Analysis in Gladiator, TEMS Discovery and TEMS Investigation for initial tuning of the 2G sites • Parameter Consistency Check of New 2G Sites • KPI Monitoring and Optimisation after getting ON-AIRED • Identification of the hardware issues and faults in the New 2G sites and getting them rectified before Site & Cluster AT Companies worked for ERICSSON INDIA PRIVATE LIMITED End Customer Aircel WB,BSNL Caltel,Airtel Rwanda,Vodafone Chandigarh,Uninor UP East,Uninor UP West,Uninor Bihar Achievements & Recognitions:
  • 7. Page 7 of 7 • Elected Trainer for RTC Graduate Engineer Trainee – Radio, 2011 batch • Co-mentor of Ericsson Mentorship Program- “CONNECT-2011” • Involved in the very first Roll-out of WCDMA Network in India for BSNL Caltel • Provided Customer Trainings on WCDMA Basics and HSDPA Basics • Awarded the Best Performer of RTC East for Q1 of 2012 • Improved the IRAT(RT+NRT) KPI of Aircel Bihar 3G from 87% to 91% • Improved the KPI “ % Cells having SHO Factor < 40% “ for Aircel Bihar from 92% to 96% • Changed the BCCH Plan for the entire Network of Aircel WB from 4/12 to 3/9 with considerable KPI improvement • Involved in the BSNL CALTEL 2G Swap-out and Roll out Project with the swap of 128 sites from Nortel to Ericsson and roll out of 280 sites • Awarded the Best Team Player in my team in Q1 of 2014-15 Professional Qualifications/Education: • Passed Bachelor of Technology in Electronics & Telecommunication Engineering from MCKV Institute of Engineering with 90.9% • Passed (10+2) Standard from Don Bosco School with 94% • Passed 10th Standard from Don Bosco School with 91.6% Professional Trainings & Certifications: Classroom Trainings • GSM Basics • ENIQ • Radio Network Optimization • GSM Cell Planning Principles • Radio Network Features • Radio Network Statistics • TEMS Cell Planner Universal User • WCDMA Air Interface • WCDMA RAN Functionality • Introduction to Gladiator • WCDMA Performance Monitoring and Optimization • WCDMA HSPA System Techniques • SQL Server 2008 • GSM RAN Signaling • LTE Basics • PERL Scripting Basics
  • 8. Page 8 of 7 • Product Knowledge of CC100 • EDX Planning Tool Training On Job Trainings • WCDMA KPI Monitoring and NPI • 2G and 3G RF Planning and Designing of Concentrators and Repeaters using Mentum Planet in M2M Technology • RF Mesh Planning and Designing for OpenWay & RIVA products using ZigBee Mesh Technology and Cisco Grid Routers Personal Information: DOB: 26 th May, 1986 PASSPORT NO: G1769730 VALID THRU: 10/05/2017