How to “Mitigate” Flash Hazards in a Main Switchroom
Objective for this presentation 
To share examples of utilizing multiple high level risk controls to minimize flash hazards in a Switchroom to the point that special arc flash PPE is not required for many switching and isolating procedures. 
To create a safer work environment for operational and maintenance staff. 
Category 
4 PPE
Topics to be discussed in this presentation 
1. 
The project 
2. 
The Hazards and Risks in the Main Electrical Switchroom to take into consideration 
3. 
Planning and engineering philosophy for minimizing the Hazards 
4. 
Outcomes achieved and summarized conclusion
The Project 
The Customer: 
Hanson Construction Materials 
Location: 
East Guyong situated half way between Bathurst and Orange NSW. 
Scope of works included: 
Turnkey solution for the supply and installation of a fixed basalt crushing and screening plant with a capacity of 220 TPH. 
Design, engineering, supply, installation and commissioning LV electrical works including the Process Control System (PCS) and appropriate Switchroom and MCC’s.
1. 
2MVA Transformer 
2. 
Switchroom 
3. 
MCC and Control Panels 
4. 
Three Crushers 
5. 
Four Screens 
6. 
Six Feeders 
7. 
Eleven Conveyors 
8. 
Three Luffing and Radial Stackers 
9. 
Dust Extraction 
10. 
Lighting and general power 
11. 
Automation of plant 
The Project 
The key equipment:
The Hazards and Risks 
Generally Quarrying sites of this size do not have permanent electrical staff onsite 
A lot of contractors who do work on these sites generally do not do a lot of work on mining sites 
Therefore the primary hazard area’s the design team considered throughout engineering the Switchroom were as follows: 
1. 
Switching and isolation of Electrical devices. 
2. 
Resetting of overloads. 
3. 
Fault finding and testing.
1.Racking in or out Circuit Breakers. 
2.Removing or installing Circuit Breakers. 
3.Working on Control circuits with energized parts. 
4.Low Voltage testing and fault finding. 
5.Removing panels for inspections and other activities 
6.Testing for Dead 
The Hazards and Risks 
Examples of activities in a Switchroom which involve Arc Flash Risks
1. 
Dust 
2. 
Dropping tools 
3. 
Accidental touching 
4. 
Condensation 
5. 
Material failure 
6. 
Corrosion 
7. 
Faulty Installation 
8. 
Over-voltages across narrow gaps 
The Hazards and Risks 
Common causes of Arc Flash in a Switchroom
1. 
Proximity of the worker to the hazard 
2. 
Temperature 
3. 
Time for the circuit to break 
The Hazards and Risks 
Three main factors which determine the severity of an arc flash
What are your Risks 
1. 
Compliance – Failing the standards and the rules can delay project startup and can result in significant fines 
2. 
Injury/Death – Yourself, your co-workers, outside contractors and other third parties. Between 5 and 10 arc flash incidents happen every day 
3. 
Equipment damage – Costly to repair or replace 
4. 
Plant shutdown – reduced productivity, lost revenues, lost costumers, lost jobs 
5. 
Liability – Lawsuits, higher insurance premiums, out of pocket costs if self insured – a single incident can easily run in excess of $10M
Typical Results from an Arc Flash 
Pressure Waves 
Copper Vapor: 
Solid to Vapor 
Expands by 
67,000 times 
Molten Metal 
Intense Light 
Hot Air-Rapid Expansion 
Extreme Heat 
20,000 °C 
Shrapnel 
Sound Waves
Planning and Engineering for Minimizing Hazards 
Our principle for planning to minimize the hazards was to follow the Hierarchy of Hazard Control
1. 
Label Equipment & Train Personnel on Good Safety Practices 
2. 
Reduce Available Fault Current 
3. 
Shorten Clearing Time 
4. 
Move People Further Away 
5. 
Redirect Blast Energy 
6. 
Prevent Fault 
Methods/Technologies to Reduce Arc-Flash Energy, Protecting Personnel and Equipment 
Planning and Engineering for Minimizing Hazards 
Both work to 
Reduce Energy
Planning and Engineering for Minimizing Hazards 
Power Engineering Studies Required to move forward 
1. 
Load flow studies 
2. 
Protection coordination studies 
3. 
Arc Flash Analysis 
4. 
Touch and Step Potentials 
5. 
Earthing system design and features 
Gain a full understanding of the Fault levels in the installation.
Planning and Engineering for Minimizing Hazards 
Begin the Equipment Selection Process 
1. 
Create a working Single Line Diagram from the engineering studies to start designing the MSB 
2. 
Take into consideration the fault levels and Arc Flash Levels at each point 
3. 
Start the design on the MSB considering the area’s at which maintenance and operational staff will need to access 
4. 
Investigate switchboard manufactures who can best offer solutions to our designs and Arc Flash Hazard Reductions. 
5. 
Start adding features and new technology to the MSB to further enhance the safety of the MSB
Planning and Engineering for Minimizing Hazards 
Our Selection of the Main Switchboard 
Eaton xEnergy Low Voltage Main Distribution 
The Reasons for selection 
1. 
Type Tested Switchgear assemblies 
2. 
IP Rated to IP55 
3. 
The xEnergy system is modular and designed for increasing future requirements 
4. 
The Arc Fault Containment Features available 
5. 
The new Technology of Arc Flash Reduction Maintenance System available on Main Air Circuit Breakers 
6. 
Cost/ availability and proven product reliability
Planning and Engineering for Minimizing Hazards 
Switchboard Features 
The xEnergy switchboard system consists of IEC/EN 60439/61439 Type-Tested Function modules which provide compliance with AS3439.1 
Arc Fault Containment features: 
1. 
Arc Relief Valve directing gases and heat to a designated area away from personal 
2. 
Form 3b/4a segregation 
3. 
Internal penetration seals 
4. 
Insulation Arc Barriers 
5. 
Creation of Arc Free Zones through additional partition walls to allow true segregation to comply with the design
What is ARMS? 
Planning and Engineering for Minimizing Hazards 
Eaton Air Circuit Breakers Arc Flash Reduction Maintenance System 
Switchboard Features
Planning and Engineering for Minimizing Hazards 
Switchboard Features 
ARMS Technology TM Overview 
ARMS is a separate integral analog circuit that when enabled in the Maintenance Mode, ARMS TechnologiesTM provides an accelerated instantaneous trip to reduce arc flash (system can trip as fast as 18ms!) 
Local and remote enabling and indication capabilities are provided as well as consideration for Lock-out/Tag-out procedures
Planning and Engineering for Minimizing Hazards 
Benefits of the ARMS System 
Increased worker safety – when enabled, the Arc flash Reduction 
Maintenance System provides an accelerated instantaneous trip to reduce arc flash. 
Reduction in incident energy levels may allow reduced levels of 
PPE to be used, offering an improvement to worker comfort and 
mobility. 
When properly applied, the hazard risk category frequently can be 
lowered multiple categories permitting less PPE. 
PPE SHOULD ALWAYS BE THE LAST LINE OF DEFENCE
Planning and Engineering for Minimizing Hazards 
Disadvantages of the ARMS System 
Time- Current Curves 
Coordination is Lost 
Without ARMS 
With ARMS Activated 
We believe this is a small trade off during maintenance mode when you know you are exposing people to a higher level of RISK 
Once people are away from the risk and ARMS is switched off, all normal settings are back in place
Planning and Engineering for Minimizing Hazards 
How we implemented the ARMS System 
Elements associated with the ARMS system 
1. 
Airlock Room outside the Main Switchroom where the remote ARMS activation switch is located 
2. 
Remote indication inside Airlock room 
3. 
Motion Detectors inside the Main Switchroom 
4. 
Indication and Alarms through the SCADA System 
Airlock Room Segregated from Main Switchroom
Planning and Engineering for Minimizing Hazards 
How we implemented the ARMS System 
Remote Switch Activated 
ARMS Activated 
SCADA Messages and Alarms 
Motion Detector Activated 
SCADA MESSAGES 
1. 
Remote ARMS switch activated 
2. 
Remote ARMS switch de-activated 
3. 
Personnel in Main Switchroom 
SCADA ALARMS 
1. 
Personnel in Main Switchroom without activating ARMS switch 
2. 
Personnel in Main Switchroom and no movement detected
Planning and Engineering for Minimizing Hazards 
Maintenance Mode Schematic 
Remote mounted switch control 
Remote switching and indication via communications 
Remote mounted indication
Planning and Engineering for Minimizing Hazards 
SLD Overview
Layout of Main Switchboard 
Switchboard WITHOUT ARMS 
Cabinet Category levels 
Planning and Engineering for Minimizing Hazards 
CAT 0 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 4 
CAT 0 
CAT 0 
CA T 0 
CAT 0 
CAT 0 
CAT 0
Layout of Main Switchboard 
Switchboard WITH ARMS Cabinet Category levels 
Planning and Engineering for Minimizing Hazards 
CAT 0 
CAT 4 
CAT 4 
CAT 0 
CAT 0 
CA T 0 
CAT 0 
CAT 0 
CAT 0 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1 
CAT 1
Planning and Engineering for Minimizing Hazards 
Labelling- ACB WITHOUT ARMS Activated
Labelling- ACB WITH ARMS Activated 
Planning and Engineering for Minimizing Hazards
Planning and Engineering for Minimizing Hazards 
Eliminate the need for operators to enter the Main Switchroom 
The use of Electronic Thermal Overload Protection Devices on all “DOL” equipment allows the operators to reset motors in Overload conditions through the SCADA system. Magnetic Trips still require an Electrician to attend site and investigate this type of fault. 
We selected the use of the Allen Bradley “E3 Plus” Electronic TOL Devices 
The E3 Overload Relay is a multi-function solid-state microprocessor-based 
electronic overload relay for the protection of squirrel-cage induction motors 
rated from 0.4…5,000 A 
Overload Protection
Planning and Engineering for Minimizing Hazards 
E3 Plus Electronic TOL 
Magnetic Trips Electrician Required 
Thermal Trips Remotely Reset by Operator through SCADA System
Planning and Engineering for Minimizing Hazards 
Eliminate the need for operators to enter the Main Switchroom 
Remote Switching of all Circuits 800A and above with a remote switching panel in Air Lock Room outside of the Main Switchroom 
Eliminates the need for the operator or maintenance staff to put themselves in proximity to the Hazards 
Remote Switching
Eliminate the need for operators to enter the Main Switchroom 
Planning and Engineering for Minimizing Hazards 
Viewing Windows to all access doors to allow condition observation before entry 
Break Glass switches to all access doors to Trip the Main Switch and Activate the Fire Suppression System without entering the Main Switchroom 
Fire Suppression System Activation will also Trip the Main Switch without entering the Main Switchroom 
Switchroom Hazards
Administration for Minimizing Hazards 
Protect your Protection settings by sealing them once they are set in accordance to the engineered studies 
Administration 
Create good maintenance schedules for Plant and Equipment 
Training and Education to all Staff 
Specific training in regards to reading and understanding Arc Flash Labelling. There are still a lot of Electrical Staff out there who do not understand Arc Flash Labelling and the potential energy levels they are about put themselves at Risk to. 
Display the Current SLD in the Switchroom showing all protective settings and Arc Flash Levels so that they are always accessible. 
Create a culture of safety and assessing Risks.
PPE The Last Defense 
Arc Flash PPE labelling installed at all area’s of Risk 
Educate staff on PPE requirements 
Ensure all PPE is accessible at all times for all locations 
Reducing the Hazards will Reduce the level of PPE 
The higher the level of PPE required the more Hazards maybe introduced such as Heat Stress, Poor Visibility and Limited Body Movement
Summary 
In conclusion to this presentation we have shared examples of utilizing multiple high levels risk controls to minimize flash hazards in a Switchroom 
We have demonstrated through the use of “The Hierarchy of Hazard Control” how we have Eliminated, Substituted, Engineered and administrated Risk controls 
We have demonstrated how we have reduced the level of PPE required to work in and around our Switchboards
Thank You 
www.hitechelec.com.au

More Related Content

What's hot

Webinar - Electrical Arc Flash Hazards - Is your company in compliance?
Webinar - Electrical Arc Flash Hazards - Is your company in compliance?Webinar - Electrical Arc Flash Hazards - Is your company in compliance?
Webinar - Electrical Arc Flash Hazards - Is your company in compliance?Leonardo ENERGY
 
Arc Blast Flash
Arc Blast FlashArc Blast Flash
Arc Blast Flashjboullemet
 
Arc flash calculation guide jim phillips
Arc flash calculation guide jim phillipsArc flash calculation guide jim phillips
Arc flash calculation guide jim phillipsWilma Valerio-Monje
 
Arc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanArc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanB Bhargav Reddy
 
Practical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsPractical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsLiving Online
 
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...Thorne & Derrick International
 
NFPA 70E Electrical Safety in the Workplace by Hortica
NFPA 70E  Electrical Safety in the Workplace by HorticaNFPA 70E  Electrical Safety in the Workplace by Hortica
NFPA 70E Electrical Safety in the Workplace by HorticaAtlantic Training, LLC.
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncAtlantic Training, LLC.
 
70 e ppt short 2012
70 e ppt short 201270 e ppt short 2012
70 e ppt short 2012dalerj
 
Arc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and IndusryArc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and IndusryAtlantic Training, LLC.
 
Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...
Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...
Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...Schneider Electric
 
2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modelingguestf8e1f7
 
Offshc nfpa 70 e
Offshc nfpa 70 eOffshc nfpa 70 e
Offshc nfpa 70 eOFFSHC
 
Arc Flash as it Relates to AC Drives
Arc Flash as it Relates to AC DrivesArc Flash as it Relates to AC Drives
Arc Flash as it Relates to AC DrivesFlow-Tech, Inc.
 
Electrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentationElectrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentationMichael Luffred
 

What's hot (20)

Webinar - Electrical Arc Flash Hazards - Is your company in compliance?
Webinar - Electrical Arc Flash Hazards - Is your company in compliance?Webinar - Electrical Arc Flash Hazards - Is your company in compliance?
Webinar - Electrical Arc Flash Hazards - Is your company in compliance?
 
Arc Blast Flash
Arc Blast FlashArc Blast Flash
Arc Blast Flash
 
Introduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical HazardsIntroduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical Hazards
 
Arc Flash Training
Arc Flash TrainingArc Flash Training
Arc Flash Training
 
Arc flash calculation guide jim phillips
Arc flash calculation guide jim phillipsArc flash calculation guide jim phillips
Arc flash calculation guide jim phillips
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flash
 
Arc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanArc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All Mean
 
Practical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsPractical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety Professionals
 
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
 
Arc Flash Training
Arc Flash TrainingArc Flash Training
Arc Flash Training
 
NFPA 70E Electrical Safety in the Workplace by Hortica
NFPA 70E  Electrical Safety in the Workplace by HorticaNFPA 70E  Electrical Safety in the Workplace by Hortica
NFPA 70E Electrical Safety in the Workplace by Hortica
 
Arc flash safety
Arc flash safetyArc flash safety
Arc flash safety
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, Inc
 
70 e ppt short 2012
70 e ppt short 201270 e ppt short 2012
70 e ppt short 2012
 
Arc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and IndusryArc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and Indusry
 
Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...
Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...
Mitigating Arc Flash Hazards - A Simple Graphic Helps Visualize Five Distinct...
 
2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling
 
Offshc nfpa 70 e
Offshc nfpa 70 eOffshc nfpa 70 e
Offshc nfpa 70 e
 
Arc Flash as it Relates to AC Drives
Arc Flash as it Relates to AC DrivesArc Flash as it Relates to AC Drives
Arc Flash as it Relates to AC Drives
 
Electrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentationElectrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentation
 

Viewers also liked

Copyright, Fair Use, And Creative Commons
Copyright, Fair Use, And Creative CommonsCopyright, Fair Use, And Creative Commons
Copyright, Fair Use, And Creative CommonsPatrick Woessner
 
Exploration in the House 2015: Reducing exploration risk under cover in the s...
Exploration in the House 2015: Reducing exploration risk under cover in the s...Exploration in the House 2015: Reducing exploration risk under cover in the s...
Exploration in the House 2015: Reducing exploration risk under cover in the s...NSW Environment and Planning
 
Blake aden ppp_slides
Blake aden ppp_slidesBlake aden ppp_slides
Blake aden ppp_slidesAden Blake
 
Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...
Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...
Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...NSW Environment and Planning
 
SmartCar-in-TomorrowsCity_
SmartCar-in-TomorrowsCity_SmartCar-in-TomorrowsCity_
SmartCar-in-TomorrowsCity_Mike Shehata
 
Mte sijil penghargaan
Mte sijil penghargaanMte sijil penghargaan
Mte sijil penghargaanfifiqmalindo
 
Sistema operativo
Sistema operativoSistema operativo
Sistema operativoDamarisK
 
Pure android aftermarket car stereo upgrade
Pure android aftermarket car stereo upgradePure android aftermarket car stereo upgrade
Pure android aftermarket car stereo upgradeseicanegps
 
Presentation
PresentationPresentation
Presentationncpepin
 
قلم وميدان فبراير 2017
قلم وميدان فبراير 2017قلم وميدان فبراير 2017
قلم وميدان فبراير 2017قلم وميدان
 
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDIILatest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDIIseicanegps
 

Viewers also liked (20)

Copyright, Fair Use, And Creative Commons
Copyright, Fair Use, And Creative CommonsCopyright, Fair Use, And Creative Commons
Copyright, Fair Use, And Creative Commons
 
Mte penghargaan
Mte penghargaanMte penghargaan
Mte penghargaan
 
Exploration in the House 2015: Reducing exploration risk under cover in the s...
Exploration in the House 2015: Reducing exploration risk under cover in the s...Exploration in the House 2015: Reducing exploration risk under cover in the s...
Exploration in the House 2015: Reducing exploration risk under cover in the s...
 
Blake aden ppp_slides
Blake aden ppp_slidesBlake aden ppp_slides
Blake aden ppp_slides
 
Limbajultrupului(cOp)
Limbajultrupului(cOp)Limbajultrupului(cOp)
Limbajultrupului(cOp)
 
Лабораторная работа №4
Лабораторная работа №4Лабораторная работа №4
Лабораторная работа №4
 
Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...
Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...
Exploration in the House 2015: High Precision Zircon Dating of Tuffs in the S...
 
SmartCar-in-TomorrowsCity_
SmartCar-in-TomorrowsCity_SmartCar-in-TomorrowsCity_
SmartCar-in-TomorrowsCity_
 
Mte sijil penghargaan
Mte sijil penghargaanMte sijil penghargaan
Mte sijil penghargaan
 
Raheel Iqbal
Raheel IqbalRaheel Iqbal
Raheel Iqbal
 
Preview radar systems david howell
Preview radar systems   david howellPreview radar systems   david howell
Preview radar systems david howell
 
Sistema operativo
Sistema operativoSistema operativo
Sistema operativo
 
Pure android aftermarket car stereo upgrade
Pure android aftermarket car stereo upgradePure android aftermarket car stereo upgrade
Pure android aftermarket car stereo upgrade
 
Cooperative Drilling
Cooperative DrillingCooperative Drilling
Cooperative Drilling
 
Mte penyertaan
Mte penyertaanMte penyertaan
Mte penyertaan
 
Mte penyertaan
Mte penyertaanMte penyertaan
Mte penyertaan
 
Presentation
PresentationPresentation
Presentation
 
قلم وميدان فبراير 2017
قلم وميدان فبراير 2017قلم وميدان فبراير 2017
قلم وميدان فبراير 2017
 
Toolbox
ToolboxToolbox
Toolbox
 
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDIILatest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
Latest 2003 2011 VV Volkswagen Aftermarket GPS Navigation Stereos with OBDII
 

Similar to How to Mitigate Arc Flash Hazards in a Main Switchroom

Arc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev bArc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev bchabchoub Mohamed
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfssusera5c9a31
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapHimmelstern
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightHimmelstern
 
INTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOTINTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOTKirtimaan Srivastava
 
Trailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit BreakersTrailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit BreakersMarty Stevenson
 
Facilities Planning at KE
Facilities Planning at KEFacilities Planning at KE
Facilities Planning at KEHabib Ali Khan
 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectioAminu Bugaje
 
Industrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod applicationIndustrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod applicationAvinash Vemula
 
Practical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and TechniciansPractical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and TechniciansLiving Online
 
POC To Product: 8 Key Processes in Design Path
POC To Product: 8 Key Processes in Design PathPOC To Product: 8 Key Processes in Design Path
POC To Product: 8 Key Processes in Design Pathfuturewardcentral
 
Microwave and Radio Frequency Drying
Microwave and Radio Frequency DryingMicrowave and Radio Frequency Drying
Microwave and Radio Frequency DryingGerard B. Hawkins
 
Remediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazardRemediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazardIJAPEJOURNAL
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearMarty Stevenson
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordinationHimmelstern
 

Similar to How to Mitigate Arc Flash Hazards in a Main Switchroom (20)

Arc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev bArc Flas presentation doc 2 rev b
Arc Flas presentation doc 2 rev b
 
arc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdfarc-flash-analysis-done-right.pdf
arc-flash-analysis-done-right.pdf
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etap
 
ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done Right
 
INTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOTINTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOT
 
Manual tvoc 2
Manual tvoc 2Manual tvoc 2
Manual tvoc 2
 
Trailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit BreakersTrailblazers (Power) Install Substation Circuit Breakers
Trailblazers (Power) Install Substation Circuit Breakers
 
076 circuit breaker install 1.0
076 circuit breaker install 1.0076 circuit breaker install 1.0
076 circuit breaker install 1.0
 
Facilities Planning at KE
Facilities Planning at KEFacilities Planning at KE
Facilities Planning at KE
 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectio
 
Industrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod applicationIndustrial monitoring and control systems using andriod application
Industrial monitoring and control systems using andriod application
 
Practical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and TechniciansPractical Power System Protection for Engineers and Technicians
Practical Power System Protection for Engineers and Technicians
 
Surge Protection
Surge ProtectionSurge Protection
Surge Protection
 
POC To Product: 8 Key Processes in Design Path
POC To Product: 8 Key Processes in Design PathPOC To Product: 8 Key Processes in Design Path
POC To Product: 8 Key Processes in Design Path
 
Microwave and Radio Frequency Drying
Microwave and Radio Frequency DryingMicrowave and Radio Frequency Drying
Microwave and Radio Frequency Drying
 
Remediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazardRemediation of Old Substations for Arc Flash hazard
Remediation of Old Substations for Arc Flash hazard
 
FAAST SYSTEM
FAAST SYSTEMFAAST SYSTEM
FAAST SYSTEM
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
 

More from NSW Environment and Planning

06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industryNSW Environment and Planning
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)NSW Environment and Planning
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)NSW Environment and Planning
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)NSW Environment and Planning
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...NSW Environment and Planning
 

More from NSW Environment and Planning (20)

12 Small mines report card 2020
12 Small mines report card 202012 Small mines report card 2020
12 Small mines report card 2020
 
11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust11 occupational hygiene monitoring of dust
11 occupational hygiene monitoring of dust
 
09 learning from disasters
09 learning from disasters09 learning from disasters
09 learning from disasters
 
13 explosives awareness
13 explosives awareness13 explosives awareness
13 explosives awareness
 
10 incident reporting to the regulator 2020
10 incident reporting to the regulator 202010 incident reporting to the regulator 2020
10 incident reporting to the regulator 2020
 
08 dust safety and health surveillance
08 dust safety and health surveillance08 dust safety and health surveillance
08 dust safety and health surveillance
 
07 feedback and consultation
07 feedback and consultation07 feedback and consultation
07 feedback and consultation
 
06. how the regulator communicates with the industry
06. how the regulator communicates with the industry06. how the regulator communicates with the industry
06. how the regulator communicates with the industry
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 
04. slinging and lifting equipment
04. slinging and lifting equipment04. slinging and lifting equipment
04. slinging and lifting equipment
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)Autonomous mining equipment (Owen Barry)
Autonomous mining equipment (Owen Barry)
 
Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)Fires on mobile plant refuelling (Ross Stutchbury)
Fires on mobile plant refuelling (Ross Stutchbury)
 
Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)Mobile plant rollovers and collisions (Bill McGlynn)
Mobile plant rollovers and collisions (Bill McGlynn)
 
Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)Metropolitan colliery gas (Dave Gordon)
Metropolitan colliery gas (Dave Gordon)
 
Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)Airborne dust update (Mark Shepherd)
Airborne dust update (Mark Shepherd)
 
Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)Emergency planning (Matt U'Brien)
Emergency planning (Matt U'Brien)
 
Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)Electrical performance presentation (Craig Harris)
Electrical performance presentation (Craig Harris)
 
Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...Where do I stand for fire protection on mobile and transportable equipment an...
Where do I stand for fire protection on mobile and transportable equipment an...
 

Recently uploaded

call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhellokittymaearciaga
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Christina Parmionova
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfCharlynTorres1
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Servicenarwatsonia7
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleSERUDS INDIA
 

Recently uploaded (20)

call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMadurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Madurai Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
history of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptxhistory of 1935 philippine constitution.pptx
history of 1935 philippine constitution.pptx
 
Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.Take action for a healthier planet and brighter future.
Take action for a healthier planet and brighter future.
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls ServiceCall Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
Call Girls Service AECS Layout Just Call 7001305949 Enjoy College Girls Service
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
Start Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor PeopleStart Donating your Old Clothes to Poor People
Start Donating your Old Clothes to Poor People
 

How to Mitigate Arc Flash Hazards in a Main Switchroom

  • 1. BY DANIEL HALL HITECH ELECTRICAL AUTOMATION How to “Mitigate” Flash Hazards in a Main Switchroom
  • 2. Objective for this presentation To share examples of utilizing multiple high level risk controls to minimize flash hazards in a Switchroom to the point that special arc flash PPE is not required for many switching and isolating procedures. To create a safer work environment for operational and maintenance staff. Category 4 PPE
  • 3. Topics to be discussed in this presentation 1. The project 2. The Hazards and Risks in the Main Electrical Switchroom to take into consideration 3. Planning and engineering philosophy for minimizing the Hazards 4. Outcomes achieved and summarized conclusion
  • 4. The Project The Customer: Hanson Construction Materials Location: East Guyong situated half way between Bathurst and Orange NSW. Scope of works included: Turnkey solution for the supply and installation of a fixed basalt crushing and screening plant with a capacity of 220 TPH. Design, engineering, supply, installation and commissioning LV electrical works including the Process Control System (PCS) and appropriate Switchroom and MCC’s.
  • 5. 1. 2MVA Transformer 2. Switchroom 3. MCC and Control Panels 4. Three Crushers 5. Four Screens 6. Six Feeders 7. Eleven Conveyors 8. Three Luffing and Radial Stackers 9. Dust Extraction 10. Lighting and general power 11. Automation of plant The Project The key equipment:
  • 6. The Hazards and Risks Generally Quarrying sites of this size do not have permanent electrical staff onsite A lot of contractors who do work on these sites generally do not do a lot of work on mining sites Therefore the primary hazard area’s the design team considered throughout engineering the Switchroom were as follows: 1. Switching and isolation of Electrical devices. 2. Resetting of overloads. 3. Fault finding and testing.
  • 7. 1.Racking in or out Circuit Breakers. 2.Removing or installing Circuit Breakers. 3.Working on Control circuits with energized parts. 4.Low Voltage testing and fault finding. 5.Removing panels for inspections and other activities 6.Testing for Dead The Hazards and Risks Examples of activities in a Switchroom which involve Arc Flash Risks
  • 8. 1. Dust 2. Dropping tools 3. Accidental touching 4. Condensation 5. Material failure 6. Corrosion 7. Faulty Installation 8. Over-voltages across narrow gaps The Hazards and Risks Common causes of Arc Flash in a Switchroom
  • 9. 1. Proximity of the worker to the hazard 2. Temperature 3. Time for the circuit to break The Hazards and Risks Three main factors which determine the severity of an arc flash
  • 10. What are your Risks 1. Compliance – Failing the standards and the rules can delay project startup and can result in significant fines 2. Injury/Death – Yourself, your co-workers, outside contractors and other third parties. Between 5 and 10 arc flash incidents happen every day 3. Equipment damage – Costly to repair or replace 4. Plant shutdown – reduced productivity, lost revenues, lost costumers, lost jobs 5. Liability – Lawsuits, higher insurance premiums, out of pocket costs if self insured – a single incident can easily run in excess of $10M
  • 11. Typical Results from an Arc Flash Pressure Waves Copper Vapor: Solid to Vapor Expands by 67,000 times Molten Metal Intense Light Hot Air-Rapid Expansion Extreme Heat 20,000 °C Shrapnel Sound Waves
  • 12. Planning and Engineering for Minimizing Hazards Our principle for planning to minimize the hazards was to follow the Hierarchy of Hazard Control
  • 13. 1. Label Equipment & Train Personnel on Good Safety Practices 2. Reduce Available Fault Current 3. Shorten Clearing Time 4. Move People Further Away 5. Redirect Blast Energy 6. Prevent Fault Methods/Technologies to Reduce Arc-Flash Energy, Protecting Personnel and Equipment Planning and Engineering for Minimizing Hazards Both work to Reduce Energy
  • 14. Planning and Engineering for Minimizing Hazards Power Engineering Studies Required to move forward 1. Load flow studies 2. Protection coordination studies 3. Arc Flash Analysis 4. Touch and Step Potentials 5. Earthing system design and features Gain a full understanding of the Fault levels in the installation.
  • 15. Planning and Engineering for Minimizing Hazards Begin the Equipment Selection Process 1. Create a working Single Line Diagram from the engineering studies to start designing the MSB 2. Take into consideration the fault levels and Arc Flash Levels at each point 3. Start the design on the MSB considering the area’s at which maintenance and operational staff will need to access 4. Investigate switchboard manufactures who can best offer solutions to our designs and Arc Flash Hazard Reductions. 5. Start adding features and new technology to the MSB to further enhance the safety of the MSB
  • 16. Planning and Engineering for Minimizing Hazards Our Selection of the Main Switchboard Eaton xEnergy Low Voltage Main Distribution The Reasons for selection 1. Type Tested Switchgear assemblies 2. IP Rated to IP55 3. The xEnergy system is modular and designed for increasing future requirements 4. The Arc Fault Containment Features available 5. The new Technology of Arc Flash Reduction Maintenance System available on Main Air Circuit Breakers 6. Cost/ availability and proven product reliability
  • 17. Planning and Engineering for Minimizing Hazards Switchboard Features The xEnergy switchboard system consists of IEC/EN 60439/61439 Type-Tested Function modules which provide compliance with AS3439.1 Arc Fault Containment features: 1. Arc Relief Valve directing gases and heat to a designated area away from personal 2. Form 3b/4a segregation 3. Internal penetration seals 4. Insulation Arc Barriers 5. Creation of Arc Free Zones through additional partition walls to allow true segregation to comply with the design
  • 18. What is ARMS? Planning and Engineering for Minimizing Hazards Eaton Air Circuit Breakers Arc Flash Reduction Maintenance System Switchboard Features
  • 19. Planning and Engineering for Minimizing Hazards Switchboard Features ARMS Technology TM Overview ARMS is a separate integral analog circuit that when enabled in the Maintenance Mode, ARMS TechnologiesTM provides an accelerated instantaneous trip to reduce arc flash (system can trip as fast as 18ms!) Local and remote enabling and indication capabilities are provided as well as consideration for Lock-out/Tag-out procedures
  • 20. Planning and Engineering for Minimizing Hazards Benefits of the ARMS System Increased worker safety – when enabled, the Arc flash Reduction Maintenance System provides an accelerated instantaneous trip to reduce arc flash. Reduction in incident energy levels may allow reduced levels of PPE to be used, offering an improvement to worker comfort and mobility. When properly applied, the hazard risk category frequently can be lowered multiple categories permitting less PPE. PPE SHOULD ALWAYS BE THE LAST LINE OF DEFENCE
  • 21. Planning and Engineering for Minimizing Hazards Disadvantages of the ARMS System Time- Current Curves Coordination is Lost Without ARMS With ARMS Activated We believe this is a small trade off during maintenance mode when you know you are exposing people to a higher level of RISK Once people are away from the risk and ARMS is switched off, all normal settings are back in place
  • 22. Planning and Engineering for Minimizing Hazards How we implemented the ARMS System Elements associated with the ARMS system 1. Airlock Room outside the Main Switchroom where the remote ARMS activation switch is located 2. Remote indication inside Airlock room 3. Motion Detectors inside the Main Switchroom 4. Indication and Alarms through the SCADA System Airlock Room Segregated from Main Switchroom
  • 23. Planning and Engineering for Minimizing Hazards How we implemented the ARMS System Remote Switch Activated ARMS Activated SCADA Messages and Alarms Motion Detector Activated SCADA MESSAGES 1. Remote ARMS switch activated 2. Remote ARMS switch de-activated 3. Personnel in Main Switchroom SCADA ALARMS 1. Personnel in Main Switchroom without activating ARMS switch 2. Personnel in Main Switchroom and no movement detected
  • 24. Planning and Engineering for Minimizing Hazards Maintenance Mode Schematic Remote mounted switch control Remote switching and indication via communications Remote mounted indication
  • 25. Planning and Engineering for Minimizing Hazards SLD Overview
  • 26. Layout of Main Switchboard Switchboard WITHOUT ARMS Cabinet Category levels Planning and Engineering for Minimizing Hazards CAT 0 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 4 CAT 0 CAT 0 CA T 0 CAT 0 CAT 0 CAT 0
  • 27. Layout of Main Switchboard Switchboard WITH ARMS Cabinet Category levels Planning and Engineering for Minimizing Hazards CAT 0 CAT 4 CAT 4 CAT 0 CAT 0 CA T 0 CAT 0 CAT 0 CAT 0 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1 CAT 1
  • 28. Planning and Engineering for Minimizing Hazards Labelling- ACB WITHOUT ARMS Activated
  • 29. Labelling- ACB WITH ARMS Activated Planning and Engineering for Minimizing Hazards
  • 30. Planning and Engineering for Minimizing Hazards Eliminate the need for operators to enter the Main Switchroom The use of Electronic Thermal Overload Protection Devices on all “DOL” equipment allows the operators to reset motors in Overload conditions through the SCADA system. Magnetic Trips still require an Electrician to attend site and investigate this type of fault. We selected the use of the Allen Bradley “E3 Plus” Electronic TOL Devices The E3 Overload Relay is a multi-function solid-state microprocessor-based electronic overload relay for the protection of squirrel-cage induction motors rated from 0.4…5,000 A Overload Protection
  • 31. Planning and Engineering for Minimizing Hazards E3 Plus Electronic TOL Magnetic Trips Electrician Required Thermal Trips Remotely Reset by Operator through SCADA System
  • 32. Planning and Engineering for Minimizing Hazards Eliminate the need for operators to enter the Main Switchroom Remote Switching of all Circuits 800A and above with a remote switching panel in Air Lock Room outside of the Main Switchroom Eliminates the need for the operator or maintenance staff to put themselves in proximity to the Hazards Remote Switching
  • 33. Eliminate the need for operators to enter the Main Switchroom Planning and Engineering for Minimizing Hazards Viewing Windows to all access doors to allow condition observation before entry Break Glass switches to all access doors to Trip the Main Switch and Activate the Fire Suppression System without entering the Main Switchroom Fire Suppression System Activation will also Trip the Main Switch without entering the Main Switchroom Switchroom Hazards
  • 34. Administration for Minimizing Hazards Protect your Protection settings by sealing them once they are set in accordance to the engineered studies Administration Create good maintenance schedules for Plant and Equipment Training and Education to all Staff Specific training in regards to reading and understanding Arc Flash Labelling. There are still a lot of Electrical Staff out there who do not understand Arc Flash Labelling and the potential energy levels they are about put themselves at Risk to. Display the Current SLD in the Switchroom showing all protective settings and Arc Flash Levels so that they are always accessible. Create a culture of safety and assessing Risks.
  • 35. PPE The Last Defense Arc Flash PPE labelling installed at all area’s of Risk Educate staff on PPE requirements Ensure all PPE is accessible at all times for all locations Reducing the Hazards will Reduce the level of PPE The higher the level of PPE required the more Hazards maybe introduced such as Heat Stress, Poor Visibility and Limited Body Movement
  • 36. Summary In conclusion to this presentation we have shared examples of utilizing multiple high levels risk controls to minimize flash hazards in a Switchroom We have demonstrated through the use of “The Hierarchy of Hazard Control” how we have Eliminated, Substituted, Engineered and administrated Risk controls We have demonstrated how we have reduced the level of PPE required to work in and around our Switchboards