5D BIM cost estimation links 3D models to cost databases to allow preconstruction cost estimation. This helps project stakeholders better understand costs and collaborate efficiently. Integrating design and cost estimation provides deeper project insight and avoids rework by transferring data across project lifecycles.
5D BIM cost estimation enhances AEC industry collaboration and ROI
1. THE BENEFITS OF 5D BIM COST ESTIMATION HAVE
BEEN HIGHLY RECOGNIZED IN THE AEC INDUSTRY
www.nibt.education
+91 7350255855
2. With The Adop on Of Level 3 BIM, Cost Es ma on Can Be Adopted Through 5D
This Is Possible By Linking The 3D Model To An Es ma on Library Or Database
5D Es ma on Helps Project Stakeholders Understand The Project Be er,
And Collaborate Efficiently
This Preconstruc on Es ma on Data Is Used By Designers, Engineers, And Other
Project Team Members To Make Informed Decisions In Terms Of Project Planning,
Cost Management,Purchase, Quality, Etc.
ABSTRACT
3. INTRODUCTION
The benefits of 5D BIM cost es ma on have been highly recognized in the AEC industry
It is undoubtedly helping project owners and stakeholders leverage faster project delivery,
minimize cost, enhance produc vity, and project quality
The integra on of design and cost-es ma on in preconstruc on provides deeper analysis and
project insight
The effec ve use and transference of data across the various project lifecycle creates a robust
pla orm to avoid project rework, data loss, etc
4. It also helps project stakeholders build be er bidding proposals, efficiently handle project
execu on, and ensure posi ve project delivery
Robust es ma ng so ware can augment the complete process through data transparency,
mi gate errors & risks, etc.
All this and more to ensure owners and project stakeholders can leverage be er ROI
5. Good Hiring Managers Are
Hard To Find, But It Is
Something You Will Have
To Work On
If You’re Looking For
Them, They Are Looking
Out For You As Well
01
04
03
06
6. BUILD BESPOKE INTERVIEW PITCHES FOR
DIFFERENT EMPLOYERS
01
01
ADVANTAGES OF A FULLY CONNECTED BIM WORKFLOW
BASEDON 5D COST ESTIMATION
Helps Es mators Work More Efficiently
Leverage Unprecedented Levels Of Informa on To Enhance Collabora on
Enhance Overall Project Performance Through Design & Construc on Linking
Be er Project Visualiza on Based On Accurate Es ma on
Augment Quan fica on Of Modeled Materials
Find Op mal Accuracy And Solu on In Calcula ng Costs And Planning
The Highly Visual Process Makes It Easier For Es mators To Understand New Processes And Technology
Generate Greater Cost Es mates At Quick Rates
Create & Deliver Precise Data For Planning And Field Implementa on
7. BUILD BESPOKE INTERVIEW PITCHES FOR
DIFFERENT EMPLOYERS
02 0301
ALONG THESE LINES, ACCURATE ESTIMATION THROUGH HIGH-END SOFTWARE HELPS
CREATE SEAMLESS WORKFLOWS ACROSS ALL THE PROJECT LIFECYCLES
THIS IS ACHIEVED THROUGH
Template
building
Validating
data
Built-in cost
libraries
Data filters
Information
reuse
8. 03
HOW DOES 5D COST ESTIMATION WORK?
Build Automated Es ma ons Based On Access From 3D Models – Accuracy Eliminates Errors And Rework
Increase In Overall Accuracy Based On Automated Data Processing
Leverage Historical Cost Data Based On 3D Takeoffs
Connect Data Across Various Systems For Project Planning, Cost Management, Etc.
Cost Management Tools Can Be Used To Verify 5D Es ma on Data Based On Comparisons Between
Budgeted Data And The Actual Amount
Gain Greater Insight Into The Project Through Accurate 5D Cost Es ma on
On-Site Personnel Has The Ability To Leverage Building Strategies And Gain Insights Through
Real-Time Informa on On Materials, Costs, Etc.
9. 03
UNDERSTANDING DESIGN AND CONSTRUCTION
AS AN INTEGRATED SYSTEM
It Is Important To Iden fy A Very Strong Rela onship Between Design & Construc on, It Can Be Best
Viewed As An Integrated System
That Said, The Design Creates A Highly Detailed Descrip on Of A Building, Facility, Infrastructure, Etc Based
On Models, Plans, Etc.
Whereas, Construc on Planning Involves The Iden fica on Of Ac vi es And Resources
To Make These Projects A Reality
10. 03
VARIOUS CHARACTERISTICS NEED TO BE CONSIDERED
BASED ON DESIGN AND CONSTRUCTION
Every building, infrastructure, or facility is unique and requires custom designing
Every project takes a specific me to complete
Design & construc on for a specific project need to sa sfy certain condi ons
The service life or sustainability of a building, infrastructure, or facility is long
Project complexi es can cause changes in designs during the construc on phase
The integra on of 5D cost-es ma on at the design and construc on phase
creates a robust design and construc on workflow and mi gates most of
the challenges based on rework, budget and me overruns, etc.
11. 03
THE COST –ESTIMATION WORKFLOW
Manage your
estimates
Create an
estimate
Enhance the
estimation
technique
Prepare a plan
to begin
the estimation
01 02
03 04
12.
13.
14. 03
PREPARE A PLAN TO BEGIN THE ESTIMATION
01 02
The Primary Objec ve Of The Project Team Would Be Se ng A Defini on Through
A Broad Vision
Iden fy Resources To Begin The Es ma on
Iden fy Any Kind Of Constraint
Build A Project Charter Or Ini a on Document
Iden fy People For Budget Management & Approval
15. 03
PREPARE AN ESTIMATE
01 02Use Various Cost Es ma on Techniques To Create And Maintain A Budget
Leverage Policies, Market Condi ons, Templates, Etc., To Build An Es mate
Build Es mates Based On Parametric And Analogous Es ma on
Use WBS Or Work Breakdown Structure Using The Scope And Dura on
Cost Baselines Are The Approved Time-Phased Budget And Will Be Leveraged
By The Project Manager To Manage The Complete Es ma on Process
16. 03
THE COST –ESTIMATION WORKFLOW
01 02
The Project Manager Is Responsible To Oversee Various Phases Of The Cost
Es ma on Process
Specific Cost Es mates Can Be Factored In The Project Execu on Phase Based On
Specific Costs From Vendors, Required Resources, Etc.
This Helps Project Managers Convey Transparent Informa on And Manage Be er
Stakeholder Communica on
- Manage your estimate –
17. 03
VARIOUS COST ESTIMATION TECHNIQUES
01 02
5D Cost Estimation can be achieved through various techniques viz.
Analogous Estimation
Use Historical Data To Determine
Project Costs In The Early Stages Of
The Project
01
Three-Point Estimation
Determine Es ma on
Based On 3 Techniques Viz.Op mis c,
Most Likely, And Pessimis c
04
Statistical Estimation
Determine Es ma on Based
On Parametric Calcula ons
02
Bottom-Up Estimation
Determine Es ma on Based On
Individual Work Or Tasks
03
Reserve Analysis
Determine Es ma on Based On
Reserves That Need To
Be Kept Aside Or Allocated
06
Cost of Quality
Determine Es ma on Based On Expenses
Duringthe Project To Prevent Failures
And Expenses Done A er The Project To
Focus On Failures
05
18. CONCLUSION
Using 5D Cost Es ma on Across The En re Project Lifecycle, Es mators Or Es ma on Companies
Can Save On Valuable Time And Cost
The BIM Es ma on Advantage Lets Stakeholders View The Model Along With The Necessary Schedules
This Ensures All The Teams Get A Clear Grasp Of How Changes Can Affect The Cost Cycle And Vice-Versa
Based On Invaluable Informa on
BIM Es ma on From Design To Construc on Always Works Towards Owner And Stakeholder Advantage