Boost Fertility New Invention Ups Success Rates.pdf
Implementation of the quality system
1. Implementation of the Quality System, Measuring Cost of Quality
&Implementing SPC Tools for Quality Improvements.
Background:
COQ isnot the cost of producinggoodproducts,itisthe “Costof producingbad products” and repairing
or reproducingit again.To provide the customerswithqualityatlow prices,the costof achievingquality
needtobe reduced.Thiscanbe done, only if the quality system procedures executed are streamlined
and if the Cost of Quality is identified and measured. Therefore, it is very important for the
organizations to measure the Cost of Quality. Measuring Cost of Quality is not the solution to the
problem. One needstoreduce the costas well to achieve the goal of quality at low price. Reduction in
COQ can be achieved by various methods. One such method is to use SPC tools.
Objective:
PART I: Benchmarking Quality Systems for the organization.
PART II:Measuringcost of qualityandQualityImprovementsbySPCtoolsandto devise aframeworkfor
the further measurement of COQ for the factory
Research Methodology:
2. Conclusion:
COQ reporting system will definitely bring benefits to the organization. However in India, the
implementation process is not that easy and every organization has to encounter various difficulties
duringthe implementationperiod. Thisresearchrevealed that COQ reporting can lead the company to
achieve higher levels product and service quality, ultimately higher levels of customer satisfaction.
The first step was to get an overall idea of the entire production process and deduce the
process flow of quality checkpoints
To define Quality Systems for the factory in a manual.
Literature review on COQ , SPC. Identifying the cost centres& defects types of all the
departments contributing to COQ
Time Study for various Internal Failure activities & Development of the formulae for the
calculation of the COQ& format for plotting control charts
Calculation of COQ Analysis of COQ for2 months Defects Analysis by SPC for 1 month
Development of Corrective Action Plan to reduce the COQ
Benchmarking the Quality Manual
Development of the Quality Circle & TQMTeam