Organizational Influences on Project Management
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
An organization’s
culture, style, and
structure
influence how its
projects are
performed
Most organizations have developed unique cultures over time by practice
and common usage.
 Shared visions, mission, values, beliefs, and expectations;
 Regulations, policies, methods, and procedures; Motivation and reward systems.
 Risk tolerance;
 View of leadership, hierarchy, and authority relationships.
 Code of conduct, work ethic, and work hours; and Operating environments.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Cultures and styles
are develop over time
Its critical point
In defining project
success
 Different types of organizational structures will have a positive or negative effect on the
effectiveness of project management in your organization.
There are
• Functional
• Matrix (Weak, Balanced, Strong)
• Projectized
* Organizational structure is an enterprise environmental factor EEF
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Advantages
* Clearly defined career paths
* Familiar structure
* Direct supervisor reporting structure
* Employees are experts
• Disadvantages
* Employee’s job difficult to change
* Much contention for resources and project priority
* Performance reviews and promotions are functional
manager responsibility
* PM has little or no authority
* PM usually part time - no clearly defined career path for
the PM
The classic functional organization, shown in Figure 2-1, is a hierarchy where each employee has one clear superior. Staff members are
grouped by specialty, such as production, marketing, engineering, and accounting at the top level.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
• Weak matrix organizations maintain many of the characteristics of a functional organization, and the role of the project
manager is more of a coordinator or expediter.
* A project expediter works as staff assistant and communications coordinator.
* The expediter cannot personally make or enforce decisions.
* Project coordinators have power to make some decisions, have some authority, and report to a higher-level manager.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
project power and influence
is shared
Between the
project manager
and
the functional manager
• not provide the project manager with the full authority over the project
and project funding
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Strong matrix organizations have
many of the characteristics of the
projectized organization, and have
full-time project managers with
considerable authority and full-time
project administrative staff.
Advantages:
* Objectives remain visible
* Increased support from functional managers
* Increased control by project manager Improved flexibility
*Job remains after project is complete
*Multiple inputs on team members’ performance
Disadvantages:
*Multiple bosses
*Adds complexity
*Additional policies and procedures are necessary
*Different priorities or objectives may exist
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
• The project manager has ultimate authority over the project, including the timeline, the budget, the
resources, the scope, the quality and, ultimately, customer satisfaction
Advantages:
* Dedicated project focus
* Project loyalty
* Efficient project organization
* Efficient project communication
Disadvantages:
* Job is gone once project is complete
* NO HOME
* Job functions and facilities can be duplicated
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
The composite organization consists of
elements of functional, matrix, and
projectized organizations in that a project
can be approached using any one of the
three afore mentioned methods.
Depending on the complexity of the
project, the organization may use all
three approaches on the same project.
 EXAM QUESTION TYPES ???
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
 Influence of organizational structures on projects
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
.
 Exam Tip: you may see the term 'tight matrix' on an exam question. A tight matrix simply
means that the offices for the project team are co-located in the same room.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Organizational process assets are the plans, processes, policies, procedures, and knowledge
bases specific to and used by the performing organization.
Examples:-
* Procedures, Guidelines , policies , Specific organizational standards such as policies
(e.g., human resources policies, health safety policies, ethics policies, and project management policies),
product and project life cycles.
* Templates (e.g., risk register, work breakdown structure, project schedule network diagram,
and contract templates).
Exam Tip: * all of the above can be contained in the corporate knowledge base
* assets can include formal plans, informal plans, lessons learned,
historical information, completed schedules risk data and earned value data.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
conditions, not under the control of the project team, that influence ,
constrain, or direct the project.
Examples:-
 Organizational culture, structure, and governance;
 Geographic distribution of facilities and resources;
 Government or industry standards
 Infrastructure
 Existing human resources
 Personnel administration
 Company work authorization systems*****
 Marketplace conditions;
 Stakeholder risk tolerances
 Political climate
 Organization’s established communications channels
 Commercial databases
 Project management information system****
*Exam Tip: A work authorization system is designed to ensure that work is approved before it begins,
and to ensure the work is done at the right time and in the correct sequence. Use of a work
authorization system also helps to prevent scope creep as well as gold plating.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
*Project governance is an oversight function that is aligned with the organization’s governance model and that encompasses the project life
cycle.
Project governance framework provides the project manager and team with structure, processes, decision-making models
and tools for managing the project, while supporting and controlling the project for successful delivery.
*Organizations use governance to establish strategic direction and performance parameters. The strategic direction provides
the purpose, expectations, goals, and actions necessary to guide business pursuit and is aligned with business
objectives.
(( Project management activities should be aligned with top-level business direction
and if there is a change, then project objectives need to be realigned ))
project based organizations (PBO's) .
The general characteristics of a PBO are outlined below:
1 Can exist in functional, matrix, or projectized organizations
2 Can diminish hierarchy and bureaucracy inside the organization because work is measured by result rather than by position or politics
3 PBO's can reference the entire company, a multi-firm consortium, or a network
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Since projects are temporary in nature, the success of the project should be measured in terms of completing
the project within the constraints of scope, time, cost, quality, resources, and risk as approved between
the project managers and senior management.
*The project manager is responsible and accountable for setting realistic and achievable boundaries
for the project and to accomplish the project within the approved baselines.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
The project team includes the project manager and the resources who act together performing the work
of the project to achieve its objectives.
Include
• Project Management Staff • Business Partners or Business Partner Members
• Project Staff: team members • Supporting Experts User or Customer Representatives
• Sellers
• Dedicated: team is usually co-located and reports directly to the project manager
• Part-Time: the functional manager usually maintain control over the team members and the resources allocated
to the project. In this case, part-time team members may be assigned more than one project at a time
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
A project life cycle is the series of
phases that a project passes through
from its initiation to its closure.
•Cost are low at start
•Peak as the work is carried out
•Cost of changes is lowest at the
beginning of project
•Cost of changes and correcting
errors typically increases as
project approaches completion
•Stakeholder influences ,risk , uncertainty
are greatest at the start of the project
•Decrease over the life of the project
* Phase-to-Phase Relationships
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
A predictive lifecycle
is also known as a plan driven or 'waterfall' approach to
delivering the scope of the project. In this approach, the scope,
time, and cost required to deliver that scope are determined as
early in the project lifecycle
Iterative
With an iterative or incremental lifecycle, project phases are
intentionally repeated as the team's understanding of the product
increases.
The product is developed through a series of repeated cycles
while the product incrementally grows at the completion of each
iteration. Each iteration incrementally builds on the deliverables
from the previous iterations until the exit criteria for the project
are met.
As a result, the work required for a given set of deliverables may
vary in duration and effort.
This approach is similar to PMI's concept of rolling wave planning
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
Adaptive
The adaptive lifecycle, also known as 'change driven' or 'agile' is designed to address high levels of
change, risk, and/or uncertainty in a project. Agile projects are also incremental and iterative, but with
the singular difference that the iterations are generally very short term; usually 2 to 4 weeks.
One of the most effective agile methods currently used in the project
management space is known as Scrum.
Preparedby Presentedby:
Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®

More Related Content

What's hot

Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management frameworkstefanhenry
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaGlobalSkillup
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
 
Project Management Professional (PMP)
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP) Ahmad Maharma, PMP,RMP
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
1 project management framework - Fifth edition
1  project management framework - Fifth edition1  project management framework - Fifth edition
1 project management framework - Fifth editionAhmed Hegazy ,PMP,MCTS
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionMnbianchi
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - FoundationShabbeer Zafar
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementBarun_agnihotri
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Logitrain: New Zealand
 
Project management 1
Project management 1Project management 1
Project management 1bnettel
 
Project Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalProject Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalТранслируем.бел
 
Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilisPanos Fitsilis
 

What's hot (20)

1 project management framework
1  project management framework1  project management framework
1 project management framework
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management framework
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
Project Management Professional (PMP)
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP)
 
Ch1 ch2
Ch1 ch2Ch1 ch2
Ch1 ch2
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
1 project management framework - Fifth edition
1  project management framework - Fifth edition1  project management framework - Fifth edition
1 project management framework - Fifth edition
 
Project management professional (pmi) study guide
Project management professional (pmi) study guideProject management professional (pmi) study guide
Project management professional (pmi) study guide
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th Edition
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - Foundation
 
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENTPROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
 
Project management 1
Project management 1Project management 1
Project management 1
 
Project Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalProject Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University Final
 
Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilis
 
Project management fundamentals
Project management fundamentalsProject management fundamentals
Project management fundamentals
 

Viewers also liked

PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource managementejlp12
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 
Dimensional Planning on Fixed Price Projects (XPDays 2008)
Dimensional Planning on Fixed Price Projects (XPDays 2008)Dimensional Planning on Fixed Price Projects (XPDays 2008)
Dimensional Planning on Fixed Price Projects (XPDays 2008)inxin
 
Project Management, Team Management Conference Jean-Antoine Moreau
Project Management, Team Management Conference  Jean-Antoine MoreauProject Management, Team Management Conference  Jean-Antoine Moreau
Project Management, Team Management Conference Jean-Antoine MoreauJean-Antoine Moreau
 
Overview of Role of Sponsor in Change
Overview of Role of Sponsor in ChangeOverview of Role of Sponsor in Change
Overview of Role of Sponsor in ChangeRadhia Benalia
 
Electrical Department Maintenance Management Vision
Electrical Department Maintenance Management VisionElectrical Department Maintenance Management Vision
Electrical Department Maintenance Management VisionFouad Ghoneim, PMP®, SSYB®
 
Sponsor Responsibilities ppt
Sponsor  Responsibilities pptSponsor  Responsibilities ppt
Sponsor Responsibilities pptSantosh Zarkariya
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality managementejlp12
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2ejlp12
 
PMP Training - 05 project scope management
PMP Training - 05 project scope managementPMP Training - 05 project scope management
PMP Training - 05 project scope managementejlp12
 
Project management communication
Project management communicationProject management communication
Project management communicationlaksha vijayaratnam
 
Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...
Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...
Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...Pisoni Vineyards & Winery
 

Viewers also liked (17)

05 project scope management
05 project scope management05 project scope management
05 project scope management
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource management
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
Dimensional Planning on Fixed Price Projects (XPDays 2008)
Dimensional Planning on Fixed Price Projects (XPDays 2008)Dimensional Planning on Fixed Price Projects (XPDays 2008)
Dimensional Planning on Fixed Price Projects (XPDays 2008)
 
Project Management, Team Management Conference Jean-Antoine Moreau
Project Management, Team Management Conference  Jean-Antoine MoreauProject Management, Team Management Conference  Jean-Antoine Moreau
Project Management, Team Management Conference Jean-Antoine Moreau
 
Overview of Role of Sponsor in Change
Overview of Role of Sponsor in ChangeOverview of Role of Sponsor in Change
Overview of Role of Sponsor in Change
 
Electrical Department Maintenance Management Vision
Electrical Department Maintenance Management VisionElectrical Department Maintenance Management Vision
Electrical Department Maintenance Management Vision
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Sponsor Responsibilities ppt
Sponsor  Responsibilities pptSponsor  Responsibilities ppt
Sponsor Responsibilities ppt
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
PMP Training - 08 project quality management
PMP Training - 08 project quality managementPMP Training - 08 project quality management
PMP Training - 08 project quality management
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
PMP Training - 05 project scope management
PMP Training - 05 project scope managementPMP Training - 05 project scope management
PMP Training - 05 project scope management
 
Project management communication
Project management communicationProject management communication
Project management communication
 
Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...
Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...
Lucia Vineyards, Spring 2015: Real Farming, Real Family, Real Wine. Pinot Noi...
 

Similar to Project management frame work part 2

PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project Management Academy
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmuhammadyasirsaeedqa
 
PMP selected topics and ideas
PMP selected topics and ideasPMP selected topics and ideas
PMP selected topics and ideasAhmad Hamid
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-maomao-osman73
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Managementhatemk
 
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...Egyptian Engineers Association
 
14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT ProjectsBhuWan Khadka
 
Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Lviv Startup Club
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframeworkDhamo daran
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkHossam Maghrabi
 

Similar to Project management frame work part 2 (20)

e-brochure_PMOME_Featured
e-brochure_PMOME_Featurede-brochure_PMOME_Featured
e-brochure_PMOME_Featured
 
MPM Master Project Manager - contact sysenegacademy@gmail.com
MPM Master Project Manager - contact sysenegacademy@gmail.comMPM Master Project Manager - contact sysenegacademy@gmail.com
MPM Master Project Manager - contact sysenegacademy@gmail.com
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
PM SimulationConsulting v2.4
PM SimulationConsulting v2.4PM SimulationConsulting v2.4
PM SimulationConsulting v2.4
 
Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0Project review, assurance and governance support v1.0
Project review, assurance and governance support v1.0
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
0. project management framework (fundamentals)
0. project management framework (fundamentals)0. project management framework (fundamentals)
0. project management framework (fundamentals)
 
Pm training day 2
Pm training   day 2Pm training   day 2
Pm training day 2
 
PMP selected topics and ideas
PMP selected topics and ideasPMP selected topics and ideas
PMP selected topics and ideas
 
Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162Setting up a project framework phase 1 june 20162
Setting up a project framework phase 1 june 20162
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
 
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
 
14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects
 
Session 1 PMP 4th edition
Session 1 PMP 4th editionSession 1 PMP 4th edition
Session 1 PMP 4th edition
 
Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”Андрій Татчин “Будуючи ПМО з нуля”
Андрій Татчин “Будуючи ПМО з нуля”
 
Part (1 1)
Part (1 1)Part (1 1)
Part (1 1)
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
 

Recently uploaded

ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 

Project management frame work part 2

  • 1. Project Management Frame Work Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 2. Project Management frame work Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 3. Organizational Influences on Project Management Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® An organization’s culture, style, and structure influence how its projects are performed
  • 4. Most organizations have developed unique cultures over time by practice and common usage.  Shared visions, mission, values, beliefs, and expectations;  Regulations, policies, methods, and procedures; Motivation and reward systems.  Risk tolerance;  View of leadership, hierarchy, and authority relationships.  Code of conduct, work ethic, and work hours; and Operating environments. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® Cultures and styles are develop over time Its critical point In defining project success
  • 5.  Different types of organizational structures will have a positive or negative effect on the effectiveness of project management in your organization. There are • Functional • Matrix (Weak, Balanced, Strong) • Projectized * Organizational structure is an enterprise environmental factor EEF Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 6. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® Advantages * Clearly defined career paths * Familiar structure * Direct supervisor reporting structure * Employees are experts • Disadvantages * Employee’s job difficult to change * Much contention for resources and project priority * Performance reviews and promotions are functional manager responsibility * PM has little or no authority * PM usually part time - no clearly defined career path for the PM The classic functional organization, shown in Figure 2-1, is a hierarchy where each employee has one clear superior. Staff members are grouped by specialty, such as production, marketing, engineering, and accounting at the top level.
  • 7. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® • Weak matrix organizations maintain many of the characteristics of a functional organization, and the role of the project manager is more of a coordinator or expediter. * A project expediter works as staff assistant and communications coordinator. * The expediter cannot personally make or enforce decisions. * Project coordinators have power to make some decisions, have some authority, and report to a higher-level manager.
  • 8. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® project power and influence is shared Between the project manager and the functional manager • not provide the project manager with the full authority over the project and project funding
  • 9. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® Strong matrix organizations have many of the characteristics of the projectized organization, and have full-time project managers with considerable authority and full-time project administrative staff.
  • 10. Advantages: * Objectives remain visible * Increased support from functional managers * Increased control by project manager Improved flexibility *Job remains after project is complete *Multiple inputs on team members’ performance Disadvantages: *Multiple bosses *Adds complexity *Additional policies and procedures are necessary *Different priorities or objectives may exist Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 11. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® • The project manager has ultimate authority over the project, including the timeline, the budget, the resources, the scope, the quality and, ultimately, customer satisfaction
  • 12. Advantages: * Dedicated project focus * Project loyalty * Efficient project organization * Efficient project communication Disadvantages: * Job is gone once project is complete * NO HOME * Job functions and facilities can be duplicated Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 13. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® The composite organization consists of elements of functional, matrix, and projectized organizations in that a project can be approached using any one of the three afore mentioned methods. Depending on the complexity of the project, the organization may use all three approaches on the same project.
  • 14.  EXAM QUESTION TYPES ??? Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 15. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 16.  Influence of organizational structures on projects Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 17. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® .
  • 18.  Exam Tip: you may see the term 'tight matrix' on an exam question. A tight matrix simply means that the offices for the project team are co-located in the same room. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 19. Organizational process assets are the plans, processes, policies, procedures, and knowledge bases specific to and used by the performing organization. Examples:- * Procedures, Guidelines , policies , Specific organizational standards such as policies (e.g., human resources policies, health safety policies, ethics policies, and project management policies), product and project life cycles. * Templates (e.g., risk register, work breakdown structure, project schedule network diagram, and contract templates). Exam Tip: * all of the above can be contained in the corporate knowledge base * assets can include formal plans, informal plans, lessons learned, historical information, completed schedules risk data and earned value data. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 20. conditions, not under the control of the project team, that influence , constrain, or direct the project. Examples:-  Organizational culture, structure, and governance;  Geographic distribution of facilities and resources;  Government or industry standards  Infrastructure  Existing human resources  Personnel administration  Company work authorization systems*****  Marketplace conditions;  Stakeholder risk tolerances  Political climate  Organization’s established communications channels  Commercial databases  Project management information system**** *Exam Tip: A work authorization system is designed to ensure that work is approved before it begins, and to ensure the work is done at the right time and in the correct sequence. Use of a work authorization system also helps to prevent scope creep as well as gold plating. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 21. *Project governance is an oversight function that is aligned with the organization’s governance model and that encompasses the project life cycle. Project governance framework provides the project manager and team with structure, processes, decision-making models and tools for managing the project, while supporting and controlling the project for successful delivery. *Organizations use governance to establish strategic direction and performance parameters. The strategic direction provides the purpose, expectations, goals, and actions necessary to guide business pursuit and is aligned with business objectives. (( Project management activities should be aligned with top-level business direction and if there is a change, then project objectives need to be realigned )) project based organizations (PBO's) . The general characteristics of a PBO are outlined below: 1 Can exist in functional, matrix, or projectized organizations 2 Can diminish hierarchy and bureaucracy inside the organization because work is measured by result rather than by position or politics 3 PBO's can reference the entire company, a multi-firm consortium, or a network Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 22. Since projects are temporary in nature, the success of the project should be measured in terms of completing the project within the constraints of scope, time, cost, quality, resources, and risk as approved between the project managers and senior management. *The project manager is responsible and accountable for setting realistic and achievable boundaries for the project and to accomplish the project within the approved baselines. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 23. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® The project team includes the project manager and the resources who act together performing the work of the project to achieve its objectives. Include • Project Management Staff • Business Partners or Business Partner Members • Project Staff: team members • Supporting Experts User or Customer Representatives • Sellers • Dedicated: team is usually co-located and reports directly to the project manager • Part-Time: the functional manager usually maintain control over the team members and the resources allocated to the project. In this case, part-time team members may be assigned more than one project at a time
  • 24. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP® A project life cycle is the series of phases that a project passes through from its initiation to its closure.
  • 25. •Cost are low at start •Peak as the work is carried out •Cost of changes is lowest at the beginning of project •Cost of changes and correcting errors typically increases as project approaches completion •Stakeholder influences ,risk , uncertainty are greatest at the start of the project •Decrease over the life of the project
  • 26. * Phase-to-Phase Relationships Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 27. A predictive lifecycle is also known as a plan driven or 'waterfall' approach to delivering the scope of the project. In this approach, the scope, time, and cost required to deliver that scope are determined as early in the project lifecycle Iterative With an iterative or incremental lifecycle, project phases are intentionally repeated as the team's understanding of the product increases. The product is developed through a series of repeated cycles while the product incrementally grows at the completion of each iteration. Each iteration incrementally builds on the deliverables from the previous iterations until the exit criteria for the project are met. As a result, the work required for a given set of deliverables may vary in duration and effort. This approach is similar to PMI's concept of rolling wave planning Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®
  • 28. Adaptive The adaptive lifecycle, also known as 'change driven' or 'agile' is designed to address high levels of change, risk, and/or uncertainty in a project. Agile projects are also incremental and iterative, but with the singular difference that the iterations are generally very short term; usually 2 to 4 weeks. One of the most effective agile methods currently used in the project management space is known as Scrum. Preparedby Presentedby: Engr. Mohamed Eid , PMP® Engr. Mohamed Abdulhaq , PMP®