SlideShare a Scribd company logo
1 of 22
Download to read offline
Dr. Walied A. Elsaigh
welsaigh@ksu.edu.sa
Asst. Prof. of Civil Engineering
Jumada’-I 1437H
CE 435
Railway Engineering
RailsFoot
Web
Head
Flat Foot Rail
Text Book
Railway Engineering,
Satish and Agarwal,
2nd edition, 2013
Chapter 6
Page 81-105
Functions of Rails
Types of Rails
Standard Rail Sections
Branding and Stamping
Common section codes
RE: American Railway Engineering Maintenance of Way Association (AREMA).
REHF: AREMA “head free” section.
ARA-A: American Railway Association, “A” section.
ARA-B: American Railway Association, “B” section.
ASCE: American Society of Civil Engineers.
Cont. Standard Rail Sections
HT = Height
BW = Width of Head
HW = Width of Head
W = Web (at center point)
HD = Depth of Head
FD = Fishing
BD =Depth of Base
E =Bolt Hole Elevation
X-Section of Rail
Cont. Standard Rail Sections
Cont. Standard Rail Sections
The rail is designated by its weight per unit length.
52 kg/m rail denotes that it has a
weight of 52 kg per metre length
Factors affecting choice of appropriate rail section:
Heaviest axle load
Maximum permissible speed
Depth of ballast cushion
Type and spacing of sleepers
Selection of Rail Section
Rule of Thumb (Relationship between
maximum axle load and weight of rail section)
Maximum axle load = 560 × sectional weight of rail
Example #1: Determine the maximum axle load for 90 lb/yard rail section
Maximum axle load = 560 × 90 lbs = 50,400 lbs or 22.5 t
Example #2: Determine the suitable rail section weight (kg/ m) to carry a
maximum axle load of 29 ton? (ans: 52kg/m)
Sectional weight of rail in lbs per yard or kg per metre
Lack of facilities for transport of longer rails, particularly on curves.
Difficulties in manufacturing very long rails.
Difficulties in acquiring bigger expansion joints for long rails.
Heavy internal thermal stresses in long rails.
Rail Length
Theoretically, the longer rails are preferred, why?
Reduces number of joints less cost (construction & maintenance)
Provides smooth and comfortable rides.
Length of a rail is limited, Why?
Find out the following: Rail section and length used in KSA
Rail Tests Falling Weight Test
[Tup Test]
A rail piece of 1.5 m (5 ft) is cut. The rail is supported between the bearers
at a prescribed distance. A tup of specified weight (see table) is dropped
from a height of 7.2 m on the centre of the test piece.
One falling weight test is done for
every cast of 100 metric tonnes.
The rail specimen should withstand
the blow without any fracture.
Rail Tests
Tensile Test
A test piece is taken from the head of a rail section and subjected to
the tensile test.
The tensile strength of the rail should not be less than 720 N/mm2,
minimum elongation of 12%
Rail Tests
Hammer Test
No fracture should occur or a lap be disclosed,
otherwise the batch is rejected.
The foot of the test rail piece is rigidly gripped in a vertical position
and the head of the rail is struck with a 4.5 kg hammer. Sufficient number
of blows are given till the web bends and the dimensional value of A given
in the Table below
Rail Defects
Rail Wear
Due to the passage of moving loads and friction between the rail
and the wheel, the rail head gets worn out in the course of service.
The impact of moving loads,
Forces due to acceleration, deceleration, and braking of wheels,
The abrasion due to rail–wheel interaction,
 Effects of weather conditions (i.e. temperature, rains, presence of sand).
Why wear occurs ? (causes of rail-head wear)
Rail Defects
Types of
Rail Wear
Where in the rail wear occurs ?
on top of the rail head (vertical wear)
on the sides of the rail head (lateral wear)
on the ends of the rail (battering of rail ends)
Rail Defects Locations
of Rail Wear
Where in the track wear occurs ?
on sharp curves, due to centrifugal forces
on steep gradients, due to the extra force applied by the engine
on approaches to railway stations, due to acceleration and deceleration
in tunnels and coastal areas, due to humidity and weather effects
Rail Defects
How to Reduce Rail Wear ?
Better maintenance of the track to ensure good packing
as well as proper alignment and use of the correct gauge
Reduction in the number of joints by welding
Lubricating the gauge face of the outer rail in case of curves
Providing check rails in the case of sharp curves
Rail Defects
 By weighing the rail
 By profiling the rail section (Special instruments are available)
incorporates the latest laser and video camera technology to provide accurate and
immediate report on the profile and wear condition of the rail whilst travelling at
track speeds. The video cameras capture full cross-sectional rail profiles from the
base/web fillet area up to the top-of-rail surface to allow comprehensive and
accurate rail measurements.
http://www.mermecgroup.com/diagnostics/tr
ackin%20specti-on/60/1/rail-profile.php
Adapted from:
How to Measure
Rail Wear ?
Rail Defects Rail End Batter
The hammering action of moving loads on rail
joints batters the rail ends in due course of time.
Batter = Beat (hit)
How measured?
If the batter is up to 2 mm, it is classified ‘average’,
If it is between 2 and 3 mm, it is classified as ‘severe’.
Rail Defects Rail End Batter
Adapted from: http://www.bitlanders.com/blogs/corrugation-wear-of-rails-
failure-of-rails-and-rails-welding/441935
Rail Defects Hogging Rail
Rail ends get hogged due to poor maintenance of the
rail joint, yielding formation, loose and faulty fastenings.
Remedial action? (1) Replace joint, (2) Welding joint,
(3) Dehogging, (4) Cropping
Hogged rails: Due to worn out of
rail ends due to load repetition,
the rail gets bent down at its
ends, creating what is termed as
“hogged rails”.
Consequence ? Rough riding, more vibration leading to more defects.
Causes? loose packing under joints and loose fish plate.
Rail Defects Corrugated Rail
Corrugated or Roaring rails: The heads of rails corrugate (fine
depressions on the surface of rails). Causes roaring sounds when
wheels pass over it.
Causes? Found at places where trains brakes or starts its journey, other
reasons such as: composition of steel used to manufacture rails.
Consequences? (1) Unpleasant roaring sound which cause discomfort
to passengers and residents along side the rail track
(2) Vibration causes further deterioration to other track
elements.
Remedial action? (1) Replace rail if corrugation is severe and the defect is
limited to small number of rails
(2) Grind top surface of rail, a grinding train moving at
3 km per hour can be used (as in Germany).

More Related Content

What's hot

Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlockingsrinivas2036
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...Hossam Shafiq I
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfTVijayaGowri
 
Track training 03082013
Track training   03082013Track training   03082013
Track training 03082013guernica0131
 
Railway points, crossings and components
Railway points, crossings and componentsRailway points, crossings and components
Railway points, crossings and componentsSunil Kumar Meena
 
Points and crossings.ppt
Points and crossings.pptPoints and crossings.ppt
Points and crossings.pptsamatha6
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
Railway engineering
Railway engineeringRailway engineering
Railway engineeringjmaghade99
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )hiranrathva
 
Defects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptxDefects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptxSuhasR37
 

What's hot (20)

Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
 
Unit 1 gauge creep
Unit 1 gauge creepUnit 1 gauge creep
Unit 1 gauge creep
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Track training 03082013
Track training   03082013Track training   03082013
Track training 03082013
 
Railway points, crossings and components
Railway points, crossings and componentsRailway points, crossings and components
Railway points, crossings and components
 
Points and crossings.ppt
Points and crossings.pptPoints and crossings.ppt
Points and crossings.ppt
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Railway track
Railway trackRailway track
Railway track
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )
 
Defects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptxDefects in a Railway Track & their maintenance.pptx
Defects in a Railway Track & their maintenance.pptx
 
P.way
P.wayP.way
P.way
 

Similar to 05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh)

Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
lecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdflecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdfssuser75acc8
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionBathla Tuition Centre
 
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...Hossam Shafiq I
 
chapter-3 Track Stracture.pptx
chapter-3  Track Stracture.pptxchapter-3  Track Stracture.pptx
chapter-3 Track Stracture.pptxMamushLeta
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineeringDnyaneshwar More
 
UNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.pptUNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.pptSwapnilGorade1
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway EngineeringIrfan Nasir
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in ServiceAndrea Bracciali
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGEAELC
 
Fatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element methodFatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element methodeSAT Journals
 
Fatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element methodFatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element methodeSAT Publishing House
 
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed BridgeIRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed BridgeIRJET Journal
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its typeYash Patel
 

Similar to 05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh) (20)

Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
3rd unit
3rd unit3rd unit
3rd unit
 
lecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdflecturenote_1888016911chapter-3 track.pdf
lecturenote_1888016911chapter-3 track.pdf
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
 
chapter-3 Track Stracture.pptx
chapter-3  Track Stracture.pptxchapter-3  Track Stracture.pptx
chapter-3 Track Stracture.pptx
 
Project Report
Project ReportProject Report
Project Report
 
Introduction railway engineering
Introduction railway engineeringIntroduction railway engineering
Introduction railway engineering
 
UNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.pptUNIT 2 Railway Engg.ppt
UNIT 2 Railway Engg.ppt
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 
089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service089 CC2011 Crete (2011) Rail Straightness Control in Service
089 CC2011 Crete (2011) Rail Straightness Control in Service
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
 
Rail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysisRail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysis
 
Fatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element methodFatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element method
 
Fatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element methodFatigue analysis of rail joint using finite element method
Fatigue analysis of rail joint using finite element method
 
5. wire rope and sample problem
5. wire rope and sample problem5. wire rope and sample problem
5. wire rope and sample problem
 
5. wire rope and sample problem
5. wire rope and sample problem5. wire rope and sample problem
5. wire rope and sample problem
 
Sleeper
Sleeper Sleeper
Sleeper
 
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed BridgeIRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
 
railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 

More from Hossam Shafiq I

13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...Hossam Shafiq I
 
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...Hossam Shafiq I
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...Hossam Shafiq I
 
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...Hossam Shafiq I
 
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...Hossam Shafiq I
 
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...Hossam Shafiq I
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...Hossam Shafiq I
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...Hossam Shafiq I
 
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...Hossam Shafiq I
 
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....Hossam Shafiq I
 
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...Hossam Shafiq I
 
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...Hossam Shafiq I
 
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...Hossam Shafiq I
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...Hossam Shafiq I
 
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...Hossam Shafiq I
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...Hossam Shafiq I
 
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...Hossam Shafiq I
 
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...Hossam Shafiq I
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...Hossam Shafiq I
 
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...Hossam Shafiq I
 

More from Hossam Shafiq I (20)

13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
 
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
 
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
 
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
 
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
 
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
 
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
 
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
 
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
 
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
 
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
14 Analysis of Signalized Intersections (Traffic Engineering هندسة المرور & P...
 
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
13 Fundamentals of Signal Timing and Design: Pretimed Signal (Traffic Enginee...
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
 
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
11 Traffic Signal Control Overview (Traffic Engineering هندسة المرور & Prof. ...
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 

05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. Elsaigh)

  • 1. Dr. Walied A. Elsaigh welsaigh@ksu.edu.sa Asst. Prof. of Civil Engineering Jumada’-I 1437H CE 435 Railway Engineering RailsFoot Web Head Flat Foot Rail
  • 2. Text Book Railway Engineering, Satish and Agarwal, 2nd edition, 2013 Chapter 6 Page 81-105
  • 5. Standard Rail Sections Branding and Stamping Common section codes RE: American Railway Engineering Maintenance of Way Association (AREMA). REHF: AREMA “head free” section. ARA-A: American Railway Association, “A” section. ARA-B: American Railway Association, “B” section. ASCE: American Society of Civil Engineers.
  • 7. HT = Height BW = Width of Head HW = Width of Head W = Web (at center point) HD = Depth of Head FD = Fishing BD =Depth of Base E =Bolt Hole Elevation X-Section of Rail Cont. Standard Rail Sections
  • 8. Cont. Standard Rail Sections The rail is designated by its weight per unit length. 52 kg/m rail denotes that it has a weight of 52 kg per metre length
  • 9. Factors affecting choice of appropriate rail section: Heaviest axle load Maximum permissible speed Depth of ballast cushion Type and spacing of sleepers Selection of Rail Section Rule of Thumb (Relationship between maximum axle load and weight of rail section) Maximum axle load = 560 × sectional weight of rail Example #1: Determine the maximum axle load for 90 lb/yard rail section Maximum axle load = 560 × 90 lbs = 50,400 lbs or 22.5 t Example #2: Determine the suitable rail section weight (kg/ m) to carry a maximum axle load of 29 ton? (ans: 52kg/m) Sectional weight of rail in lbs per yard or kg per metre
  • 10. Lack of facilities for transport of longer rails, particularly on curves. Difficulties in manufacturing very long rails. Difficulties in acquiring bigger expansion joints for long rails. Heavy internal thermal stresses in long rails. Rail Length Theoretically, the longer rails are preferred, why? Reduces number of joints less cost (construction & maintenance) Provides smooth and comfortable rides. Length of a rail is limited, Why? Find out the following: Rail section and length used in KSA
  • 11. Rail Tests Falling Weight Test [Tup Test] A rail piece of 1.5 m (5 ft) is cut. The rail is supported between the bearers at a prescribed distance. A tup of specified weight (see table) is dropped from a height of 7.2 m on the centre of the test piece. One falling weight test is done for every cast of 100 metric tonnes. The rail specimen should withstand the blow without any fracture.
  • 12. Rail Tests Tensile Test A test piece is taken from the head of a rail section and subjected to the tensile test. The tensile strength of the rail should not be less than 720 N/mm2, minimum elongation of 12%
  • 13. Rail Tests Hammer Test No fracture should occur or a lap be disclosed, otherwise the batch is rejected. The foot of the test rail piece is rigidly gripped in a vertical position and the head of the rail is struck with a 4.5 kg hammer. Sufficient number of blows are given till the web bends and the dimensional value of A given in the Table below
  • 14. Rail Defects Rail Wear Due to the passage of moving loads and friction between the rail and the wheel, the rail head gets worn out in the course of service. The impact of moving loads, Forces due to acceleration, deceleration, and braking of wheels, The abrasion due to rail–wheel interaction,  Effects of weather conditions (i.e. temperature, rains, presence of sand). Why wear occurs ? (causes of rail-head wear)
  • 15. Rail Defects Types of Rail Wear Where in the rail wear occurs ? on top of the rail head (vertical wear) on the sides of the rail head (lateral wear) on the ends of the rail (battering of rail ends)
  • 16. Rail Defects Locations of Rail Wear Where in the track wear occurs ? on sharp curves, due to centrifugal forces on steep gradients, due to the extra force applied by the engine on approaches to railway stations, due to acceleration and deceleration in tunnels and coastal areas, due to humidity and weather effects
  • 17. Rail Defects How to Reduce Rail Wear ? Better maintenance of the track to ensure good packing as well as proper alignment and use of the correct gauge Reduction in the number of joints by welding Lubricating the gauge face of the outer rail in case of curves Providing check rails in the case of sharp curves
  • 18. Rail Defects  By weighing the rail  By profiling the rail section (Special instruments are available) incorporates the latest laser and video camera technology to provide accurate and immediate report on the profile and wear condition of the rail whilst travelling at track speeds. The video cameras capture full cross-sectional rail profiles from the base/web fillet area up to the top-of-rail surface to allow comprehensive and accurate rail measurements. http://www.mermecgroup.com/diagnostics/tr ackin%20specti-on/60/1/rail-profile.php Adapted from: How to Measure Rail Wear ?
  • 19. Rail Defects Rail End Batter The hammering action of moving loads on rail joints batters the rail ends in due course of time. Batter = Beat (hit) How measured? If the batter is up to 2 mm, it is classified ‘average’, If it is between 2 and 3 mm, it is classified as ‘severe’.
  • 20. Rail Defects Rail End Batter Adapted from: http://www.bitlanders.com/blogs/corrugation-wear-of-rails- failure-of-rails-and-rails-welding/441935
  • 21. Rail Defects Hogging Rail Rail ends get hogged due to poor maintenance of the rail joint, yielding formation, loose and faulty fastenings. Remedial action? (1) Replace joint, (2) Welding joint, (3) Dehogging, (4) Cropping Hogged rails: Due to worn out of rail ends due to load repetition, the rail gets bent down at its ends, creating what is termed as “hogged rails”. Consequence ? Rough riding, more vibration leading to more defects. Causes? loose packing under joints and loose fish plate.
  • 22. Rail Defects Corrugated Rail Corrugated or Roaring rails: The heads of rails corrugate (fine depressions on the surface of rails). Causes roaring sounds when wheels pass over it. Causes? Found at places where trains brakes or starts its journey, other reasons such as: composition of steel used to manufacture rails. Consequences? (1) Unpleasant roaring sound which cause discomfort to passengers and residents along side the rail track (2) Vibration causes further deterioration to other track elements. Remedial action? (1) Replace rail if corrugation is severe and the defect is limited to small number of rails (2) Grind top surface of rail, a grinding train moving at 3 km per hour can be used (as in Germany).