SlideShare a Scribd company logo
1 of 5
Download to read offline
Sept. 2012
to Jun 2014
WHY ME?
Management by objectives
Working as maintenance manager and factory- expansion project
manager for marble processing and manufacturing plant.
 The availability of the machines increased from 60% to 90-
96% according to measured KPIs in short time.
 The quality and productivity of the production had a
significant improvement.
 Made a capital repairs for all the important machines and
lines.
 New technical experience in marbles processing lines and
machines (CNC tiles and slabs processing lines, gang saw,
block cutter, CNC bridge sawing machines and gantry cranes)
 Established a new system for different types of maintenance
according to ISO 9001.
 Transported two tiles lines from their old place to a new area.
 Installed two new lines (slab lines) on the old tiles line area.
Leading a lean manufacturing project and Company SOPs (quality
manual construction) according to ISO 9001.
WORK EXPERIENCE
MAINTENANCE MANAGER
At Logix Stone Free Zone
New Cairo
MECHANICAL ENGINEER
Mechanical maintenance
Maintenance management
Projects management
 Production and maintenance manager.
 Measuring production performance by specifying the suitable
objectives and KPIs for performance improvement.
 Significant improvement in production rates within short time.
 Worked on lean manufacturing program implementation.
 Managing large number of workers, technicians, engineers and
dealing with different and difficult personalities.
 Shared in company strategic planning.
 Management of development Projects
Jun 2014 to
March 2016
Aside my technical competencies, I have
a long track record of consistently
making the right decisions,
My leadership style involves good
judgement, integrity, ingenuity, and
personal professionalism at all times.
I am participate,profeesstional manger
results focused.Progressive organizing
and managing installation projects .
At Aboelyazeed Group
	
Maintenance
Management
Projects
management
6th
OCTOBER
SKILLS
CONTACTS
hossadeniro@hotmail.com
ABDELHAMID
HOSSAM
Lean and TPM
Hydraulics and pneumatics
Leadership
MS Office
AutoCAD
Web search
LANGUAGES
Arabic
English writing
English speaking
01227213580 - 0643220961
https://eg.linkedin.com/in/hossam-abdelhamed-383a5058
OPERATION MANAGER
PLANT MANAGER
At Logix Stone Free Zone New Cairo
March 2016
to Present
 Leading Production, maintenance, quality and supply chain.
 At this time the company was in financial problems because the
expansion cost was not covered by increase in sales.
 The company also had difficulties with the customers due to quality
problems.
 I worked with the company team in a limited resource to improve
the production and quality performance by focusing on the root
causes.
 We had gradual improvement in quality and productivity within six
months which resulted in improvement in financial situation.
 Focus on strategic planning for the company to had a clear road
map.
 Managing subordinates who were not getting used to system or
discipline to a better attitude although they were very difficult
personalities.
 Management of development Projects to improve the performance.
 Implementation of SAP (ERP) system to improve the plant
ABDELHAMID
o Painting booths and lines.
o Electrostatic painting furnace and booths.
o Reciprocating compressors maintenance.
o Compressed air and CO2 (welding gas) Networks
redesign, modification and maintenance.
 Machines parts design, development and manufacturing:
o Hydraulic presses.
o Tubes expansion and reduction machines.
o Special tools manufacturing (design and
manufacturing special handling machines).
o Design and maintenance of pneumatic circuits for
special purposes.
 Machines installation:
o Changing production layout to improve productivity
and decrease waste.
o New plant facility planning and installation.
o Large Press installation (1200-ton huge hydraulic
press - 4x2.5m press bed).
o Automatic welding machines and welding
positioners’ transportation.
o Hydraulic seaming machines transportation.
o New compressed air Networks planning, design and
implementation.
o Two ABB welding robots and work piece
positioners, installation and operation.
2. Maintenance planning and management:
 Create maintenance system and TPM application:
o Planned and unplanned preventive and corrective
maintenance scheduling and planning.
o Management of four sections to achieve the
department’s objectives.
o Ensuring performance continual improvement
through setting SMART goals and KPIs (MBO)
 Maintenance Projects managements and planning:
o Management of a mega project for 1200-ton large
press installation in a new plant including all the
facility planning and the civil works in large
foundation area.
Mechanical engineer
HOSSAM 
PERSONAL SKILLS:
 Leadership
 Team synergy
 Communication
 Discipline
 Results focused
 Lifelong Learner
 Passion
 Self-motivated
 Practical
 Reliable
 Honest
 Independent
 Hard worker
 Realistic
 Enthusiastic
 Initiative
 Flexible
 Professional
MAINTENANCE MANAGERJun. 2008 to
Sept. 2012
6th
OCTOBERAt Aboelyazeed Group
1. Mechanical and hydraulic maintenance:
 Stationery hydraulic systems:
Troubleshooting, overhauling, designing new hydraulic circuits
and exchanging old circuits by simpler updated ones.
 Machines & networks maintenance:
o Hydraulic, mechanical (eccentric) and screw presses.
o Sheet metal shearing machines (hydraulic and
mechanical) from 3mm to 15 mm thickness.
o Press brakes.
o Automatic seaming machines and seaming production
lines.
o Tube benders (traditional ones and CNC).
o Traditional workshop machines (lathes, milling
machines, shapers, grinding, disc and band saws,
electric hacksaws and drilling machines).
o Handling equipment overhead cranes, forklifts repairs
and overhauling.
o Welding machines and automatic welding machines.
o CNC wire forming machines.
ABDELHAMID
Mechanical engineer
HOSSAM 
Cairo
MAINTENANCE SEVICES MANAGERSept.2005 to
May 2008
At Best Choice
Cairo
Working in the field of decoration design and implementation.
My experience was in the following:
 Maintenance of woodworking machinery.
 Design and implementation of wooden kitchens and their
mechanisms.
 Manufacturing of custom made wooden furniture.
 Operation of wood router machines.
 Working in some construction and building finishing
works.
July 2003 to
Sept. 2005
Established my own business, which has included a small maintenance
company and a small workshop for repairing and overhauling mechanical
equipment, machines, trucks and any kinds of engines.
My experience was in the following:
 Mobile hydraulics.
 Some Diesel engines overhauls.
 Mechanical equipment, transmission circuits
troubleshooting, repairs and overhauling.
 Working through government rules like taxes accounting
and legal problems.  
At Harmony for Engineering Works
MANGER DEPUTY
Cairo
OFFICER ENGINEERJuly 1993 to
July 2003
Worked as an officer engineer in the Egyptian army, my experience
was in:
 Construction and small buildings.
 Maintenance and operation of mechanical equipment.
 Road construction.
 Roads mechanical equipment and transportation vehicles
operation, maintenance, troubleshooting, repair and overhauling.
That contains all its components such as:
 Engines
 Power transmission clutches gearboxes, torque converters,
hydraulic circuits, final drive and steering mechanisms for crawler
and tired equipment.
 Brake circuits with all its components (pneumatic and hydraulic
servo systems).
 Undercarriage.
Management and Dealing with different kinds of people, and learning
many styles of military leadership from different kinds of leaders.
Egyptian Army-Combat Engineering
ABB WELDING ROBOTS STATION
Maintenance manager at Abouelyazeed
Design and manufacturing of two robots welding stations, installing
robots inside it, and operation.
ABDELHAMID
PROJECTS AND EXPERIENCE:
ESTABLISHING AND DEVELOPING MAINTENANCE WORK
SYSTEMS:
Maintenance manager at Abouelyazeed – Logix Stone
REPAIRING AND OVERHAULING ROAD CONSTRUCTION
EQUIPMENT
Officer engineer at Egyptian army- Maintenance service manager at Harmony
Mechanical engineer
Redesigning and overhauling machines hydraulic circuits:
Maintenance manager at Abouelyazeed
 15mm hydraulic sheet metal shearing machine overhauling.
 Redesigned hydraulic circuit for 100-ton old Muller hydraulic press.
 Redesigned old hydraulic press 140 ton – into two speeds hydraulic
circuit.
 Planning, scheduling and implementation of preventive maintenance
and procedure development according to ISO 9001 requirements.
 Establishing new work system for maintenance in Logix Stone and
KPIs for measuring performance according to ISO 9001
requirements.
HOSSAM 
HD 1200 TON HYDRAULIC PRESS INSTALLATION
Maintenance manager at Abouelyazeed
Repairing and overhauling many types of mechanical equipment in
the army and becoming more professional in hydraulic transmissions
and mobile hydraulic circuits.
(Very huge hydraulic press 4m x 2.5m press bed – Two moving
bolsters – 9.7m height) installation project planning, management and
implementation.
LEAN MANUFACTURING PROJECT:
Maintenance manager at Logix Stone
Working as a project manager for lean manufacturing project in Logix Stone
SAP ERP SYSTEM IMPLEMENTATION:
Plant manager at Logix Stone.
Working with the company team and the consulting company to implement the
system.
Changing the basics that the company worked with in warehousing, planning
and production to meet the Sap requirements.
Leading natural stone processing factory expansion
project:
Maintenance manager at Logix Stone
 Transported two tiles lines from their old place to a new area after
planning and implementation of the utilities and foundation.
 Installed two new lines (slab lines) on the old tiles line area
cooperating with Italian technicians after planning and
implementation of the utilities and foundation.
EDUCATION, TRAINING AND CERTIFICATION
The course contained
 Organizational behavior
 Advanced Management and Leadership
 Strategic management
 Business finance
 Principles of Project Management
MINI MBA IN MANAGEMENT:
Knowledge institute
February 2009
December 2012
Re-allocate two old marble tile lines from old place to a new place, planning
works for the sub-contractor and supervising the civil works - then transporting
the lines making the necessary modifications on the machines.
 Installation of two new CNC marble slab lines starting from civil
works supervising and receiving then supervising the installation
works by Italian technicians the receiving and testing the lines.
Installation of overhead crane 10 tons, four columns cranes (jib cranes), two edge
cutting machines, two tumbling machines.
MECHANICAL ENGINEER
OVERHAULING MANY MACHINES AND RESTORING IT TO
VERY CLOSER TO ITS ORIGINAL STATE:
Maintenance manager at Abouelyazeed – Logix Stone
GLOBAL MAINTENANCE MANAGEMENT:
AUC, Cairo.
ABDELHAMID
HOSSAM
 Overhauling, repair of screw compressors.
 Overhauling 250 tons mechanical (eccentric) press.
 Overhauling 100 tons screw press.
 Overhauling three marble automatic tile lines.
PLANNING AND IMPLEMENTATION A PROJECT OF
MARBLE FACTORY EXPANSION:
Maintenance manager at Abouelyazeed – Logix Stone
TRAINING COURSE IN TPM:
Ministry of industry.
TRAINING COURSE IN ADVANCED HYDRAULICS:
Kimenil industrial consulting.
PRE-INTERMEDIATE BUSINESS ENGLISH COURSE:
British Tutors.
APPLIED WELDING TECHNOLOGY
(GMAW/ MIG -MAQ / TIG)
Egyptian welding technology center.
MANAGEMENT SKILLS SHORT TRAINING COURSES:
British Tutors.
 Training course in problem solving and Decision making
skills.| British Tutors.
 Training course in Leadership skills.
 Training course in creative thinking skills.
 Training course in Presentation skills.
 Training course in time management.
November 2009
B.S.C DEGREE IN MECHANICAL ENGINEERING:
(MTC) military technical college, Cairo, Egypt.
July 1993
September 2010
December 2010
February 2012
September 2015

More Related Content

What's hot

English cv general
English cv  generalEnglish cv  general
English cv generalengay
 
RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016ravi randham
 
HMC internship report
 HMC internship report HMC internship report
HMC internship reportZia ur rahman
 
mohammed ahmed awaad final
mohammed ahmed awaad finalmohammed ahmed awaad final
mohammed ahmed awaad finalmohamed awaad
 
ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)Ahmed Besar
 
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...Arun Chowdhury
 
Farshid Khakpour-Linkedin resume
Farshid Khakpour-Linkedin resumeFarshid Khakpour-Linkedin resume
Farshid Khakpour-Linkedin resumeFarshid Khakpour
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Dipak Kumar Banerjee
 
Eckroate, William management 07.13.15
Eckroate, William management 07.13.15Eckroate, William management 07.13.15
Eckroate, William management 07.13.15Bill Eckroate
 

What's hot (20)

English cv general
English cv  generalEnglish cv  general
English cv general
 
Mr G Bridger CV
Mr G Bridger CVMr G Bridger CV
Mr G Bridger CV
 
G.McMORRAN - CV
G.McMORRAN - CV G.McMORRAN - CV
G.McMORRAN - CV
 
RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016
 
Resume skb_1
Resume skb_1Resume skb_1
Resume skb_1
 
HMC internship report
 HMC internship report HMC internship report
HMC internship report
 
mohammed ahmed awaad final
mohammed ahmed awaad finalmohammed ahmed awaad final
mohammed ahmed awaad final
 
CV
CVCV
CV
 
ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)
 
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
CV - 19 yrs exp at HOT ROLLING MILL operation with DME & MBA in Operation Man...
 
Farshid Khakpour-Linkedin resume
Farshid Khakpour-Linkedin resumeFarshid Khakpour-Linkedin resume
Farshid Khakpour-Linkedin resume
 
Muhammad irfan
Muhammad irfanMuhammad irfan
Muhammad irfan
 
Fahmy Elmorsy C.V
Fahmy Elmorsy C.VFahmy Elmorsy C.V
Fahmy Elmorsy C.V
 
naukri resume
naukri resumenaukri resume
naukri resume
 
Yousef_Hammad_(C.V)
Yousef_Hammad_(C.V)Yousef_Hammad_(C.V)
Yousef_Hammad_(C.V)
 
RAJESH CV
RAJESH CVRAJESH CV
RAJESH CV
 
Sachin Vaze2
Sachin Vaze2Sachin Vaze2
Sachin Vaze2
 
Taha -C.V
Taha -C.VTaha -C.V
Taha -C.V
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).
 
Eckroate, William management 07.13.15
Eckroate, William management 07.13.15Eckroate, William management 07.13.15
Eckroate, William management 07.13.15
 

Viewers also liked

Daftar asisten praktikum
Daftar asisten praktikumDaftar asisten praktikum
Daftar asisten praktikumsyamfikry
 
Polskie blogi podróżnicze - raport
Polskie blogi podróżnicze - raportPolskie blogi podróżnicze - raport
Polskie blogi podróżnicze - raportTanie Loty
 
Intel·ligències múltiples
Intel·ligències múltiplesIntel·ligències múltiples
Intel·ligències múltiplesCristina Padilla
 
Sezon zimowy 2014/2015 - tanie loty z Polski - raport
Sezon zimowy 2014/2015 - tanie loty z Polski - raportSezon zimowy 2014/2015 - tanie loty z Polski - raport
Sezon zimowy 2014/2015 - tanie loty z Polski - raportTanie Loty
 
AP for Medical Applications
AP for Medical ApplicationsAP for Medical Applications
AP for Medical ApplicationsPaul Melnyk
 
Filosofia resumen 2015
Filosofia resumen 2015Filosofia resumen 2015
Filosofia resumen 2015Victor Sheryl
 
Persentasi b.inggris
Persentasi b.inggrisPersentasi b.inggris
Persentasi b.inggrisicha marissa
 

Viewers also liked (13)

Daftar asisten praktikum
Daftar asisten praktikumDaftar asisten praktikum
Daftar asisten praktikum
 
Cabo san lucas
Cabo san lucasCabo san lucas
Cabo san lucas
 
Polskie blogi podróżnicze - raport
Polskie blogi podróżnicze - raportPolskie blogi podróżnicze - raport
Polskie blogi podróżnicze - raport
 
Intel·ligències múltiples
Intel·ligències múltiplesIntel·ligències múltiples
Intel·ligències múltiples
 
Sezon zimowy 2014/2015 - tanie loty z Polski - raport
Sezon zimowy 2014/2015 - tanie loty z Polski - raportSezon zimowy 2014/2015 - tanie loty z Polski - raport
Sezon zimowy 2014/2015 - tanie loty z Polski - raport
 
LFVN Presentation Booklet - Small
LFVN Presentation Booklet - SmallLFVN Presentation Booklet - Small
LFVN Presentation Booklet - Small
 
Matriz y sucursales
Matriz y sucursalesMatriz y sucursales
Matriz y sucursales
 
LFVN Presentation Booklet
LFVN Presentation BookletLFVN Presentation Booklet
LFVN Presentation Booklet
 
AP for Medical Applications
AP for Medical ApplicationsAP for Medical Applications
AP for Medical Applications
 
Marissa xi ipa 4
Marissa xi ipa 4Marissa xi ipa 4
Marissa xi ipa 4
 
Filosofia resumen 2015
Filosofia resumen 2015Filosofia resumen 2015
Filosofia resumen 2015
 
Pft
PftPft
Pft
 
Persentasi b.inggris
Persentasi b.inggrisPersentasi b.inggris
Persentasi b.inggris
 

Similar to Resume_hossam 10-2016

Resume Production
Resume ProductionResume Production
Resume ProductionKeyur Modi
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenanceDivyeshVasvelia
 
ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)Ahmed Besar
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumeGassim Al-gassim
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa
 
design of simple hydraulic lifting machine by Alemnew and Molla
design of simple hydraulic lifting machine by Alemnew and Molladesign of simple hydraulic lifting machine by Alemnew and Molla
design of simple hydraulic lifting machine by Alemnew and MollaALEMNEW DESALEGN
 
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...Alaa abdelkader
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumeGassim Al-gassim
 
resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015sanjay mahapadi
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateMohamed Zawam
 

Similar to Resume_hossam 10-2016 (20)

mohamed alaa C V
mohamed alaa C Vmohamed alaa C V
mohamed alaa C V
 
Resume - Manoj
Resume - ManojResume - Manoj
Resume - Manoj
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
Resume Production
Resume ProductionResume Production
Resume Production
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenance
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resume
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
design of simple hydraulic lifting machine by Alemnew and Molla
design of simple hydraulic lifting machine by Alemnew and Molladesign of simple hydraulic lifting machine by Alemnew and Molla
design of simple hydraulic lifting machine by Alemnew and Molla
 
mohy CV UPDATED
mohy CV UPDATEDmohy CV UPDATED
mohy CV UPDATED
 
Mars
Mars Mars
Mars
 
mars_(1)_(1) (1) (1)
mars_(1)_(1) (1) (1)mars_(1)_(1) (1) (1)
mars_(1)_(1) (1) (1)
 
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resume
 
resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 

Resume_hossam 10-2016

  • 1. Sept. 2012 to Jun 2014 WHY ME? Management by objectives Working as maintenance manager and factory- expansion project manager for marble processing and manufacturing plant.  The availability of the machines increased from 60% to 90- 96% according to measured KPIs in short time.  The quality and productivity of the production had a significant improvement.  Made a capital repairs for all the important machines and lines.  New technical experience in marbles processing lines and machines (CNC tiles and slabs processing lines, gang saw, block cutter, CNC bridge sawing machines and gantry cranes)  Established a new system for different types of maintenance according to ISO 9001.  Transported two tiles lines from their old place to a new area.  Installed two new lines (slab lines) on the old tiles line area. Leading a lean manufacturing project and Company SOPs (quality manual construction) according to ISO 9001. WORK EXPERIENCE MAINTENANCE MANAGER At Logix Stone Free Zone New Cairo MECHANICAL ENGINEER Mechanical maintenance Maintenance management Projects management  Production and maintenance manager.  Measuring production performance by specifying the suitable objectives and KPIs for performance improvement.  Significant improvement in production rates within short time.  Worked on lean manufacturing program implementation.  Managing large number of workers, technicians, engineers and dealing with different and difficult personalities.  Shared in company strategic planning.  Management of development Projects Jun 2014 to March 2016 Aside my technical competencies, I have a long track record of consistently making the right decisions, My leadership style involves good judgement, integrity, ingenuity, and personal professionalism at all times. I am participate,profeesstional manger results focused.Progressive organizing and managing installation projects . At Aboelyazeed Group Maintenance Management Projects management 6th OCTOBER SKILLS CONTACTS hossadeniro@hotmail.com ABDELHAMID HOSSAM Lean and TPM Hydraulics and pneumatics Leadership MS Office AutoCAD Web search LANGUAGES Arabic English writing English speaking 01227213580 - 0643220961 https://eg.linkedin.com/in/hossam-abdelhamed-383a5058 OPERATION MANAGER PLANT MANAGER At Logix Stone Free Zone New Cairo March 2016 to Present  Leading Production, maintenance, quality and supply chain.  At this time the company was in financial problems because the expansion cost was not covered by increase in sales.  The company also had difficulties with the customers due to quality problems.  I worked with the company team in a limited resource to improve the production and quality performance by focusing on the root causes.  We had gradual improvement in quality and productivity within six months which resulted in improvement in financial situation.  Focus on strategic planning for the company to had a clear road map.  Managing subordinates who were not getting used to system or discipline to a better attitude although they were very difficult personalities.  Management of development Projects to improve the performance.  Implementation of SAP (ERP) system to improve the plant
  • 2. ABDELHAMID o Painting booths and lines. o Electrostatic painting furnace and booths. o Reciprocating compressors maintenance. o Compressed air and CO2 (welding gas) Networks redesign, modification and maintenance.  Machines parts design, development and manufacturing: o Hydraulic presses. o Tubes expansion and reduction machines. o Special tools manufacturing (design and manufacturing special handling machines). o Design and maintenance of pneumatic circuits for special purposes.  Machines installation: o Changing production layout to improve productivity and decrease waste. o New plant facility planning and installation. o Large Press installation (1200-ton huge hydraulic press - 4x2.5m press bed). o Automatic welding machines and welding positioners’ transportation. o Hydraulic seaming machines transportation. o New compressed air Networks planning, design and implementation. o Two ABB welding robots and work piece positioners, installation and operation. 2. Maintenance planning and management:  Create maintenance system and TPM application: o Planned and unplanned preventive and corrective maintenance scheduling and planning. o Management of four sections to achieve the department’s objectives. o Ensuring performance continual improvement through setting SMART goals and KPIs (MBO)  Maintenance Projects managements and planning: o Management of a mega project for 1200-ton large press installation in a new plant including all the facility planning and the civil works in large foundation area. Mechanical engineer HOSSAM  PERSONAL SKILLS:  Leadership  Team synergy  Communication  Discipline  Results focused  Lifelong Learner  Passion  Self-motivated  Practical  Reliable  Honest  Independent  Hard worker  Realistic  Enthusiastic  Initiative  Flexible  Professional MAINTENANCE MANAGERJun. 2008 to Sept. 2012 6th OCTOBERAt Aboelyazeed Group 1. Mechanical and hydraulic maintenance:  Stationery hydraulic systems: Troubleshooting, overhauling, designing new hydraulic circuits and exchanging old circuits by simpler updated ones.  Machines & networks maintenance: o Hydraulic, mechanical (eccentric) and screw presses. o Sheet metal shearing machines (hydraulic and mechanical) from 3mm to 15 mm thickness. o Press brakes. o Automatic seaming machines and seaming production lines. o Tube benders (traditional ones and CNC). o Traditional workshop machines (lathes, milling machines, shapers, grinding, disc and band saws, electric hacksaws and drilling machines). o Handling equipment overhead cranes, forklifts repairs and overhauling. o Welding machines and automatic welding machines. o CNC wire forming machines.
  • 3. ABDELHAMID Mechanical engineer HOSSAM  Cairo MAINTENANCE SEVICES MANAGERSept.2005 to May 2008 At Best Choice Cairo Working in the field of decoration design and implementation. My experience was in the following:  Maintenance of woodworking machinery.  Design and implementation of wooden kitchens and their mechanisms.  Manufacturing of custom made wooden furniture.  Operation of wood router machines.  Working in some construction and building finishing works. July 2003 to Sept. 2005 Established my own business, which has included a small maintenance company and a small workshop for repairing and overhauling mechanical equipment, machines, trucks and any kinds of engines. My experience was in the following:  Mobile hydraulics.  Some Diesel engines overhauls.  Mechanical equipment, transmission circuits troubleshooting, repairs and overhauling.  Working through government rules like taxes accounting and legal problems.   At Harmony for Engineering Works MANGER DEPUTY Cairo OFFICER ENGINEERJuly 1993 to July 2003 Worked as an officer engineer in the Egyptian army, my experience was in:  Construction and small buildings.  Maintenance and operation of mechanical equipment.  Road construction.  Roads mechanical equipment and transportation vehicles operation, maintenance, troubleshooting, repair and overhauling. That contains all its components such as:  Engines  Power transmission clutches gearboxes, torque converters, hydraulic circuits, final drive and steering mechanisms for crawler and tired equipment.  Brake circuits with all its components (pneumatic and hydraulic servo systems).  Undercarriage. Management and Dealing with different kinds of people, and learning many styles of military leadership from different kinds of leaders. Egyptian Army-Combat Engineering
  • 4. ABB WELDING ROBOTS STATION Maintenance manager at Abouelyazeed Design and manufacturing of two robots welding stations, installing robots inside it, and operation. ABDELHAMID PROJECTS AND EXPERIENCE: ESTABLISHING AND DEVELOPING MAINTENANCE WORK SYSTEMS: Maintenance manager at Abouelyazeed – Logix Stone REPAIRING AND OVERHAULING ROAD CONSTRUCTION EQUIPMENT Officer engineer at Egyptian army- Maintenance service manager at Harmony Mechanical engineer Redesigning and overhauling machines hydraulic circuits: Maintenance manager at Abouelyazeed  15mm hydraulic sheet metal shearing machine overhauling.  Redesigned hydraulic circuit for 100-ton old Muller hydraulic press.  Redesigned old hydraulic press 140 ton – into two speeds hydraulic circuit.  Planning, scheduling and implementation of preventive maintenance and procedure development according to ISO 9001 requirements.  Establishing new work system for maintenance in Logix Stone and KPIs for measuring performance according to ISO 9001 requirements. HOSSAM  HD 1200 TON HYDRAULIC PRESS INSTALLATION Maintenance manager at Abouelyazeed Repairing and overhauling many types of mechanical equipment in the army and becoming more professional in hydraulic transmissions and mobile hydraulic circuits. (Very huge hydraulic press 4m x 2.5m press bed – Two moving bolsters – 9.7m height) installation project planning, management and implementation. LEAN MANUFACTURING PROJECT: Maintenance manager at Logix Stone Working as a project manager for lean manufacturing project in Logix Stone SAP ERP SYSTEM IMPLEMENTATION: Plant manager at Logix Stone. Working with the company team and the consulting company to implement the system. Changing the basics that the company worked with in warehousing, planning and production to meet the Sap requirements. Leading natural stone processing factory expansion project: Maintenance manager at Logix Stone  Transported two tiles lines from their old place to a new area after planning and implementation of the utilities and foundation.  Installed two new lines (slab lines) on the old tiles line area cooperating with Italian technicians after planning and implementation of the utilities and foundation.
  • 5. EDUCATION, TRAINING AND CERTIFICATION The course contained  Organizational behavior  Advanced Management and Leadership  Strategic management  Business finance  Principles of Project Management MINI MBA IN MANAGEMENT: Knowledge institute February 2009 December 2012 Re-allocate two old marble tile lines from old place to a new place, planning works for the sub-contractor and supervising the civil works - then transporting the lines making the necessary modifications on the machines.  Installation of two new CNC marble slab lines starting from civil works supervising and receiving then supervising the installation works by Italian technicians the receiving and testing the lines. Installation of overhead crane 10 tons, four columns cranes (jib cranes), two edge cutting machines, two tumbling machines. MECHANICAL ENGINEER OVERHAULING MANY MACHINES AND RESTORING IT TO VERY CLOSER TO ITS ORIGINAL STATE: Maintenance manager at Abouelyazeed – Logix Stone GLOBAL MAINTENANCE MANAGEMENT: AUC, Cairo. ABDELHAMID HOSSAM  Overhauling, repair of screw compressors.  Overhauling 250 tons mechanical (eccentric) press.  Overhauling 100 tons screw press.  Overhauling three marble automatic tile lines. PLANNING AND IMPLEMENTATION A PROJECT OF MARBLE FACTORY EXPANSION: Maintenance manager at Abouelyazeed – Logix Stone TRAINING COURSE IN TPM: Ministry of industry. TRAINING COURSE IN ADVANCED HYDRAULICS: Kimenil industrial consulting. PRE-INTERMEDIATE BUSINESS ENGLISH COURSE: British Tutors. APPLIED WELDING TECHNOLOGY (GMAW/ MIG -MAQ / TIG) Egyptian welding technology center. MANAGEMENT SKILLS SHORT TRAINING COURSES: British Tutors.  Training course in problem solving and Decision making skills.| British Tutors.  Training course in Leadership skills.  Training course in creative thinking skills.  Training course in Presentation skills.  Training course in time management. November 2009 B.S.C DEGREE IN MECHANICAL ENGINEERING: (MTC) military technical college, Cairo, Egypt. July 1993 September 2010 December 2010 February 2012 September 2015