1. Introduction
2. RM, KSM, Intermediate & API??
3. Steps involved in manufacturing & their terminologies
4. Legal Requirement
5. Green field Or Brown Field project
6. Land size required
7. Various Project Work
8. Various deptt. To be Build
9. Product List & Market
10. R&D Study of product
11. Pilot Plant Trials
12. Equipment Designing, procurement, Installation, Qualification & manufacturing
13. Scale up & Commercialization
14. Fund Required
15. Total Duration of plant set up
16. Money Back Cycle
17. Revenue Bottom Line
18. Third Party Manufacturing
18.1 What is it??
18.2 Why has to be done
18.3 Requirements
4. Green Field Project:
With Greenfield investing, a company will build its own,
brand new facilities from the ground up.
Brown Field Project:
Brownfield investment happens when a company
purchases or leases an existing facility
5. Green Or Brown Field Project:
Land Requirement: Minimum 5500 m2 – 10000 m2
Maximum: Not Limit
No total land size could be utilized for plant set up. 30-
40% of land size should be kept for green belt coverage.
6. Various Project:
Basic Engineering/ Process Engineering
Process Flow Diagram
Equipment List
P & ID
Block Diagram for Utility
Mechanical Engineering:
Concept Lay Out Showing Man/Material movement
Equipment Layout
Piping Drawing 2D
Structure Drawing for Piping & Equipment
Review of Vendor Equipment Drawing
7. Various Project:
Civil Engineering
Preparation of plans, elevations & sections
Preparation of architecture drawing with two options
R.C.C. structure design & drawing
HVAC System:
Basic Design Data Sheet
Drawing for Pressure Zoning
Drawing for AHU Zoning
8. Various Project:
Electrical Engineering
MCC room layout
Earthing design layout and specification
Lighting layout design and drawing
Instrumentation
Fire and Safety:
Layout for Fire Hydrant System
Location drawing for Fire Extinguisher
9. Various Departments Needed in Facility:
Research & Development Lab
Multi product Manufacturing Plant
Pilot Plant
PDL
QA & QC
WH & BSR
ETP & EHS
HR & ADMIN
Utility Plant
Engineering Deptt.
SRP
RA
Sales
OHC
Other Amenities
10. Product List & Marketing:
Product List & with full proof process Required
Product Technology might be from your end
Product Technology might be purchased to manufacture it
your facility.
Reciprocally you can investigate the market for most
demanding product & try grab the order from market.
11. Product List & Marketing:
Marketing, Sales & Getting Order:
By Links, we may get the orders
Directly sell our product to traders
Recruit our free lancer sales executive
12. R&D Trials :
Various R&D trials for process feasibility & stability studies
which will be utilized in DMF filing in various FDA i.e.
regulation to get their approvals to sell our product in that
country.
Pilot Plant Trial for scale up:
To understand the process capabilities at scale up and to over
come the lacks in commercial plant set up.
13. Equipment Designing, Quotation, Procurement, Qualification
& commercial Usage:
Equipment Like Reactors (SS | GLR), Filters, Dryers,
Tanks, Micronizer, Blender etc
Designs will be made based on product process requirement
or pilot plant trial batches studies.
Quotation & procurement
Qualification : DQ, IQ, OQ, PQ (Validation)
Commercial Usage & production start