Neel Engineers and Contractors

1,665 views

Published on

NEEL Engineers and Contractors (NEEL) is a contracting firm started by young professional technocrats having more than 10 years of professional experience in the field of project design, selection, project management, project planning, project execution, qualification and validation. We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector.

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,665
On SlideShare
0
From Embeds
0
Number of Embeds
62
Actions
Shares
0
Downloads
14
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Neel Engineers and Contractors

  1. 1. We are a contracting firm started by young professional technocrats. We are taking project on the basis of Cost+ and Design & build concept. More than 11 years of professional experience in the field of project design, selection, project management, project planning, project execution, qualification and validationWe as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector.
  2. 2. Established in March 2011 Within 8 months we are worked with 2 MNC clients. M/s Aptar Pharma and M/s Sandoz & working with 2 Indian clients M/s Celogen Pharma Pvt. Ltd. and M/s Zeiss Pharmaceuticals Pvt. Ltd. Orders of more than `. 24 million First Two projects commissioning & Validation completed and client hasofficially inaugurated facility and started production. Other Two projects are under design stage.We are also providing design services to 1 MNC FMCG client i.e. M/s PepsiCo, Punjab for Electrical and Mechanical discipline.
  3. 3. We understand the requirements of present market of Asian Continent and Worldwide We believe in timely execution of project with Quality Started three verticals in the firm:Electrical, HVAC and Mechanical Piping & Erection to take project on turnkey basis.We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector Planning to start two more disciplines: Instrumentation and Validation
  4. 4. An incisive professional with over 11 years of rich experience in Project activities like design, selection, Erection Commissioning and MaintenanceBachelor’s Degree in Mechanical Engineering from Nagpur University with 2nd Rank in University with excellent academic background Work Experience: President of Social Organization HOPE (Help Our People for Education) since June 2008 for Development of Rural India
  5. 5. Engineering Professional with an experience of 10 years in Pharmaceutical and FMCG green field projects Work experience: Cipla Ltd, Ajanta Pharma, Titan Lab, B. Mehtalia Consultants Pvt. Ltd. Projects managed:
  6. 6. Energetic engineer having B. Tech in Mechanical, 9 years of experience in the field of Marketing and Project Management Experience in marketing industrial projects and machineries Exhibit products and review competitor’s products in trade shows Executed clean room projects for:
  7. 7. Strength in terms of Expertise :Mechanical Engineer – 3 Nos.Electrical Engineer – 3 Nos.Mechanical Piping & HVAC Draftsman – 1 No.Electrical draftsman – 1 No.Clean room panel expert – 1 No.Accounts / Planning – 1 No.
  8. 8. HVAC ElectricalContracting Contracting Mechanical TURNKEY Piping andSolutions to Erection Project Contracting
  9. 9. Integrated provider of engineering services Design Construction Process Procurement Value EngineeringMechanical Time Schedule Electrical Commissioning and Validation Civil HVAC As-built drawings Control Engineering Project Construction management Process Architecture Utilities InstrumentationBuilding Management System Clean room Validation
  10. 10. Liquid Dose Manufacturing Solid Dose Manufacturing Small and Large Volume Sterile ProductsNovel Product Delivery Systems Vaccines Production Facilities Potent Products and CytotoxicPackaging API FMCG Chemical Industry
  11. 11. One point solution for all your project needsBeing experienced and professional technocrats, we understand your project requirements in detailWe provides project planning, monitoring and execution with latest project planning tools We provide cost effective and quality solutions for all your requirements We provide solutions by understanding guidelines like Schedule M, cGMP, cGLP, USFDA, ISO, ASHRAE, ISME, OSHA and all regulatory authorities
  12. 12. Project Value : `. 16 Million, Duration : 4 Months. Project Value : `. 2 Million, Duration : 2 Months.Project Value : `. 1.2 Million, Duration : 2 Months.
  13. 13. Z
  14. 14. Double Skin Air Handling Unit’s and Ventilations Systems Room Data Sheet & Heat load calculations for the system High side HVAC – Chiller, Cooling tower, Pumps and its control system Filters: 20µ, 10µ, 5µ, 3µ, 0.3µ as per EU or ISO standards Design of areas as per Grade D, C , B or Dehumidifier with heat ISO 8, 7 & 5 as per international guidelines recovery wheel & Humidifier Air distribution i.e. ducting, insulation, damper, fire damper, diffusers & grills Chilled water, hot water, condenser and refrigerant piping Duct able and Hi Wall Split air conditioning unit Qualification andHVAC Power & Control panel, cabling and instrumentation validation work Execution of Total low side and high side HVAC projects
  15. 15. HT Work with two pole or four pole structure with CTPT, HT Breaker, Transformer Power distribution panel i.e. LTPCC, MCC, MPDB, MLDB, PDB, LDB HT & LT Cable Schedule and Cable Selection Lighting calculation and light fixture selection Earthing and lightening arrester grid Street light and external lighting Power, LAN, Telephone distribution network Installation and Commissioning of equipment i.e. Transformer, DG set, UPS etc Liasoning with Electricity board for load sanction and charging of Transformer, DG Set and other equipment Execution of Total HT and LT Electrical projects
  16. 16. P & ID, Piping Distribution plan, Isometric view and MTO External and internal pipe rack fabrication and erection Fabrication and erection of IBR and Non IBR Piping Fabrication and installation of fire hydrant network Equipment rigging and installation Painting to Structure and piping as per Code Positioning & Installation of Instrumentation Cold and Hot Insulation with or without claddingLiasoning with IBR authorities, CCOE approval for tank forms and Fire Inspector approvals Execution of Total Mechanical piping and erection projects

×