Coefficient of Thermal Expansion and their Importance.pptx
mechanical engineer resume
1. Adnan Alshater
PERSONAL INFORMATION
Date of Birth : 3thjun 1986
Degree : Bachelor of Mechanical engineering.
Sex : Male.
Marital Status : Single.
Languages Known : English (IELTS degree), Arabic “mother tongue “.
Nationality : Syrian.
Passport No : N006158073
Passport Validity : 2016/12/13
Iqama status : Transferable
Contact : +966532181396
Mail : adnan-alshater@hotmail.com
Designand development Engineer
5 year’ rich experience in delivering optimal results & business value in high-growth environment in the areas of Design, QC, R&D,
HVAC Project Designing and Execution.
SUMMARY
Industrial experiencemainly in Refrigeration and Air-Conditioning system, Product Design and HVAC Project Execution.
Proven expertise in Design Innovation Projects Specially Focused for Saudi Arabia and Egypt market.
Skilled in handling All Aspects of Core Development Life Cycle for New product Development[NPD]Which Includes
requirement analysis, Conceptualization, Design Finalization , Prototype development, Testing, Final Design Reviews, Tooling
Approvals-Local & Overseas ,Vendor Process Stabilization, In-house Assembly Line Process Stabilization & Tact Time
Optimization ,New Model In-house/Field FailureAnalysis& Improvements .
Expertise in boosting Vendor /In-house Line Productivity, Cost Optimization Thr’ New Design Concepts while ensuring
efficiency and quality benchmarks of operations.
Having good command on HVAC System Design, Load Calculation, Equipment selection, Testing and Commissioning of the Air
Conditioning units.
Capableof resolvingissues (both Technical and Non-Technical)
Exceptional communication, presentation & interpersonal skills with proficiency at grasping new concepts quickly & utilize the
same in a productive manner. Thrive in a deadline intensive environment, multi -task, perform under pressure and meet
deadline.Excellent man-management, time management, and analytical/leadership skills
Core Competencies
Planning& Execution/Scheduling
Core Design Review/Drawing Finalisation
Co-working with Global Counterparts
Direct Interaction with Internal & External Customers
Cost Reduction/Budgeting
Fault Analysis/TroubleshootManagement
Quality control skills
I.T. Skills / Software
Unigraphics NX5.0,7.5 (Master Belt from LG Korea Headquarter)
AutoCAD 2006
Solid Works.
2. Project Management tools: GERP, Primavera (P6).
Minitab for Six Sigma
MicrosoftOffice,Basics of Computer Hardwareand Software
Key Achievements
Six Sigma Green Belt certified by LG Electronics,Korea
Have had the opportunity to work with the most finest of Korean designers at LG Saudi Arabia, survived almost all possible
hurdles faced while New Product Developments. Learnt to streamline critical processes while co-working with Product Planning,
Production & Sourcingcounterparts...to bringgood business to LG.
Credited for Design Cost Innovation Projectin SplitOutdoor Unit.
Recognized as a hands-on, proactive professional who can rapidly identify problems, formulate tactical plans, initiate change
and implement effective programs in challengingand diverseenvironments
Three month Industrial trainingin shamcar company “Syria”
Three month trainingin architectureengineering house “Syria”
PROFESSIONAL EXPERIENCE AND ACCOMPLISHMENTS
1.) Syria construction company, Homs, Jan 2009 - APR 2011
Position: QA/QC Eng.
Re-check shop drawingand submitsiteclarification request (SCR’s)
Followup all mechanical subcontractors,all zones (internal work).
Coordinate site task to avoid any problem with civil works (beams , depressing levels , fire rated area, machines bases , gutter
drains ,roof insulation ….Etc.)
Pre-inspection for HVAC, plumping and firefightingaccordingto approved shop drawing,project specs,standards & codes.
Pre-inspection for (MIR) material inspection request, to be sure that the material delivered complied with consultant comments
and project specs.
2.) LG ELECTRONICS, (LG shaker company) “Riyadh Saudi Arabia”, Jun 2011- Present.
Research Engineer– Structure Designand Development
Responsiblefor all Aspects of Core Development life cycle.
Interface & coordinatewith Product planningand industrial Design teams to create the Right product presence & design.
Creating Master Design Using Top-Down Assembly Methodology & Developing 3D models of the Individual components of the
Whole Assembly & Sub-Assemblies.
Oversaw all phases of project execution; approved engineering/design changes, troubleshoot and resolved complex technical
problems, consistently meeting project deadlines and highestpossiblequality standards.
Efficiently liaisewith Korea Design Department for toolingdesign review, development follow-ups,firstpartapprovals.
Meticulously ensurethat design quality & design directives arefollowed.
Project Schedule Development, Tracking& ProactiveRisk Identification to meeting the established Deadlines.
Budgeting Control for New Project Investments & Expense Summary.
Spearhead new product development projects with final accountability to launch new variants and monitor market feedback.
Competitor Comparisons for Benchmarking their Products for Quality & Cost.
Details of major projects executed are placed at Annexure – ‘A’
EDUCATIONAL CREDENTIALS
BACHELOR OF ENGINEERING IN MECHANICAL, 2010 with FIRST CLASS
Albaath University Syria.
ANNEXURE – ‘A’
MAJOR PROJECTS HANDLED IN “LG”
Project # 1
3. Project Split 18 k cooling for Egypt (New Development)
Description Achieve highestair flowand capacity as customer demand.
New CycleDesign in both Indoor and Outdoor unit.
New pipe designs improve the efficiency of cycle with Low Noise and Vibration,
Using4Way DC valvefor reduction of Power Consumption.
Compressor (rotary): High grade, High CoolingCapacity with Low cost.
High groove Condenser Outdoor path(4-2) with Φ7.0*T0.25
Outdoor PCB with Standby Power, Sic Diode, High efficiency reactor, DC 4-Way
Sub PCB, and change in EPROM and Micomprogram.
Co-working with Korea design team for part design review & S1 parts final
approval
After launchingthis Model in market, FFR (Field Failure) is very less.
Project # 2
Project 18K H/P for Saudi Arabia.
Description Cost Competitiveness H/P Model with constant speed to target the High zone
market by reducingmaterial cost.
Indoor and Outdoor Heat Exchangers change: Cu Hex to AL Hex ($83.1 to 44.9$)
Outdoor Controller:Capacity changes from 2.5kw to 2kw ($70.4 to $45.7)
Indoor PCB: 80 Pin to 64 pin (reduce in Cost)
Outdoor ChassisUEto UL2 (reduce in overall sizeand cost)
Outdoor cycle: EEV (Electronic Expansion valve) to Capillary tube( reduce in cost)
Project # 3
Project New 24 k cooling Saudi Arabia.
Description Cycle related: Rated Efficiency,Capacity, and Good Defrost Performance.
Structured design of Panel to reduce the Noise and Vibration for increasing the
performance and efficiency.
Base Panel new design concept to bear the load of whole assembly, specially
Compressor, which reduces vibration.
Fan and DischargeGrillenew design to give high Air flowperformance.
New design concept of Mount Motor, to reduce the vibration when assemble Fan
and Motor.
Project # 4
Project Parts Standardization (3S) and Cost Innovation
Description Fan and Discharge Grille (Outdoor unit) new design to give high Air flow
performance with cost reduction.
Service ValveStandardization for Egypt , all pipedesign modified
With LG pipe Standards.
Outdoor Unit Panels Luster change from 80% to 40% for costreduction.
Many Parts redesign and modify after problem arisein Assembly line.
Standardization of Drain Hosewith improved design and Cost reduction.
Compressor Accumulator size(Height ) reduction after doing all respectivetesting
and analyzing for particular Outdoor chassisfor costreduction.
Project #5
Project Quality process control.
Description Checking IQC, LQC, and OQC defects and create countermeasure for each R&D
Department concern.
Weekly discuses aboutquality process regardingto checking the new parts and
Compare itwith our drawingalso the FPA process.
Improve cyclestructure to reduce manufacturingprocesses at our production line.