Third IDMP CEE workshop: IDMP CEE progress and plans by Sabina Bokal

  1. 1. Overview of the progress (Apr – Sep 2014) & Plans (Oct 2014 – Mar 2015) Sabina Bokal, Programme Manager 3rd IDMP CEE Workshop Budapest, 2 – 4 October 20148
  2. 2. Increase the capacity of the CEE region to adapt to climatic variability by enhancing resilience to drought.
  3. 3. Task Deadline Development of the Questionnaire Draft report Collecting comments Final report Act. 1.2: Review of the current status of the implementation of DM plans and measures within RBMP according to EU WFD
  4. 4. Guidelines for preparation of the Drought Management Plans 1st National consultation dialouges Review of current status of drought planning review of exsisting Guidelines and legislative framework 2nd National consultation dialouges Testing the Guidelines in national conditions WP2: National planning process 2014 2013 Development of the draft Guidelines June October / November April 2015 Discussion: •completing the Guidelines with national experiences •2nd NCD (time, content, etc.)
  5. 5. Task Deadline Draft version of Implementation guide Survey on properties of available data Workshop List of available data sources and list of planned products to be included in the platform O1: Final version of the Implementation Guide May 2014 O2: Implementation Report December 2014 Act. 1.3: Drought information exchange Platform Main problem: limitation with providing the data (technical)
  6. 6. Act. 7.1: Good Practice Compendium Task Deadline Investigate possible outcome of IDMP CEE activities and who will be the users of the GPC Current status of existing DMPs and others policy and management documents across Europe analyzed Information, results and good practices from IDMP CEE activities included December 2014 Main problem: Demonstration projects – final outputs; what to include?
  7. 7. DEMONSTRATION PROJECTS
  8. 8. Act. 5.1: Increasing soil water holding capacity „Testing several approaches to agricultural practices which can improve conditions for soil water holding capacity.“ OUTPUT: Analysis and proposals of preventive measures as a tools for drought management in agricultural practices and technologies Act. 5.2: Drought impact on forest ecosystems „... identification of mitigation and adaptation measures for forest ecosystems.“ OUTPUT: Remedial measures for the forest ecosystems to mitigate negative effects of the drought
  9. 9. Act. 5.3: Natural small water retention measures „adaptation measures to mitigate negative impacts of extreme water situations“ OUTPUT: Guidelines on „Natural landscape retention – combining drought mitigation, flood protection and biodiversity conservation“ Act. 5.4: Drought Risk Management Scheme OUTPUT: Framework for integrated drought risk mapping that can be adjusted to a given drought context.
  10. 10. Act. 5.5: Remote sensing agricultural drought monitoring methods „... to upgrade data assessment and forecasting tools to support drought management and monitoring“. OUTPUTS: oToolbox with the concrete identification of remote sensing and GIS data tools for agricultural drought monitoring and forecast oGuidelines for national governments and local stakeholders to integrate the drought monitoring and intervention levels into national flood and drought protection plans
  11. 11. Act. 5.6: Upgrading agricultural drought monitoring and forecasting: the case of Ukraine and Moldova OUTPUTS: oUpgraded climate-zoning of Ukraine territory and Dniester River Basin territory & Drought risk maps for agro sector – identification of drought prone areas oUpgrading of forecasting models for identification of crop yield losses (UA) & proposals for the precipitation harvesting and practices for moisture conservation (MD) oPolicy makers and stakeholders awareness raising on droughts management/planning
  12. 12. oDrought Management Center for Southeastern Europe oCooperation with River Basin Organizations (ICPDR, ISRBC): •observer status •River Basin Management Expert Group (May, 2014 in Zagreb) oEuropean Drought Observatory (EDO) - platform for exchanging drought information Act. 1.1: Cooperation with international basin commissions and regional organizations
  13. 13. o 16th session of the WMO Commission of Agricultural Meteorology in Antay, Turkey (10-12 April 2014) oInternational Conference on Sustainability in the Water-Energy- Food Nexus in Bonn, Germany (19-20 May 2014) oInterreg IVC thematic capitalisation event “Policy sharing, policy learning” in Brussels (22 May 2014) o39th River Basin Management Expert Group Meeting, ICPDR in Zagreb, Croatia (5-6 May 2014) oGWP Regional Days and Consulting Partners Meeting in Port of Spain, Trinidad (23-28 June 2014) ... and participation
  14. 14. Act. 1.4: Development of GIS Based Communication Technology Platform for the Sustainable Management of Transboundary Water Resources in Lithuania, Poland and Kaliningrad Region to develop GIS based communication platform for the sustainable management of transboundary water resources in Lithuania, Poland, Belarus and Kaliningrad Region (Russia) OUTPUT: compilation of joint transboundary maps on surface water, groundwater, human pressures, including (where possible) drought elements
  15. 15. Workshops Date 1st workshop in Hodrusa Hamre, Slovakia 15 - 16 October 2013 2nd workshop in Ljubljana, Slovenia 8 - 9 April 2014 3rd IDMP CEE workshop & joint DMCSEE/GWP capcity buidling training 2 - 4 October 2014 4th workshop March/April 2015
  16. 16. oJanusz Kindler (Warsaw University of Technology, Poland) oSándor Szalai (Szent István University, Hungary) oHenny A.J. van Lanen (European Drought Centre, Wageningen University, the Netherlands oRobert Stefanski (World Meteorological Organization, Geneva, Switzerland) o1st Report (October 2013 – March 2014) o2nd Report (April – September 2014) Act. 6.3: Peer Review Group
  17. 17. Peer Review Group review process accepted accepted with modifications rejected Milestone progress report + Annexes PRG review - assessment Activity Leader – reply to PRG & updating annexes PRG Final confirmation payment
  18. 18. Milestone reports •quick insight into your activity STRUCTURE: •1. Basic information •2. Activity Report oShort summary of the milestone report oWhat have been done after the previous milestone report oDescribe the progress to the objectives of your activity oThe expected final output(s) oAt what stage you are now in the process of producing the final output(s) oHave you introduced any change in the original plan as outlined in the Activity List? oIdentify links with other IDMP CEE activities •3. Annexes - milestones / Outputs from Activity Lists
  19. 19. Timetable Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 1.3. Platforma Output 1 Output 2 1.4 Kaliningrad Output 1 Output 3 Output 4 Output 2 2.1 Guidelines 1st draft G Final Guidelines 5.1. Milestone 3 Output 5.2. Output 2 Output 3 Output 4 5.3. Milestone 3 Milestone 4 Milestone 5 Output 5.4. Output 2 Output 3 5.5. Output 2 Output 3 5.6. Milestone 3 Milestone 4 Milestone 5 7.1 Good practices Milestone 1 Draft Compendium Final Compendium Confusing – outputs, milestones
  20. 20. Main objectives of this workshop: oto get informed about the progress and plans till the end of the programme oto identify main problems and challenges and create solutions how to overcome them oto find connections between activities oto put activities in the overall context oto discuss continuation of the programme (which activities, funds, etc.)
  21. 21. Thank you for your attention! ...and let‘s start http://www.gwp.org/en/GWP-CEE/IDMPCEE/ http://www.gwp.org/en/GWP-CEE/IDMPCEE/for-Partners/

×