JOB SHOP SYSTEM
GRAPH THEORETICAL APPROACH
C.S.Gowsick (16MI31)
ME-Computer integrated manufacturing
Department of mechanical engineering
PSG College of Technology
11 C.S.Gowsick(16MI31) PSG college of technology
Agenda :
• Introduction
• Job shop scheduling
• Objective of Job shop scheduling
• Characteristics of Job shop
• Graphical Method-(Gantt chart )
• Milestone-Charts
• Line of Balance
Case Study:De-manufacturing
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Introduction
• Job shop productions are characterized by manufacturing of one or few
quantity of products designed and produced as per the specification of
customers within prefixed time and cost. (project centers, Engineering
works)
Fig:1.Job shop production (Merchant ricks)
4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
Job shop scheduling
• An important function of job shop scheduling is the coordination and
control of complex activities, both optimum resource allocation and
sequence in the performance of the activities.
• Approaches are classified into two types:
1.Analytical techniques: Mathematical approaches of assigning jobs
to machines are derived to optimize certain criteria. This gives exact
solution or near optimal solution .
2.Graphical Methods: This method do not provide optimal or near
optimal solution directly. These method is used to find the error before
they are occurring and takes the alternative plans.
4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
Objective of Job shop scheduling
1.The main objective is decrease the average in-process time of our work order
2.Also, we want to increase the degree of utilization of equipment.
• The first objective can be achieved by selecting the optimal processing
time, the transportation time, the waiting time, and the setup time.
• To achieve the second goal, we need to pick the schedule that maximizes
the utilization of existing capacity. this objective focuses on the machine
and sequence of jobs.
4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
Characteristics of Job shop
• At any time there is a large number of orders at various stage of
completion.
• Every order differs to some extend. It is difficult to predict accurately the
time required to complete operation.
• It is difficult to determine which order in the queue should have a priority.
• There are many changes resulting from scrap , rework, machine
breakdown, material shortage, engineering changes and rush orders
4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
Graphical Method-(Gantt chart )
Fig: 2.Gantt chart symbols (source:J.H.Greene,production control : system and decisions )
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Example of Gantt-chart
Fig: 3.Machine schedule chart (source:J.H.Greene,production control : system and decisions )
• The time scale is placed horizontally along the top of the chart.
• The row represents machines, departments, or whatever may be required to
accomplish a job.
• This time scale may be subdivided into calendar time or temporal units .
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Advantage and Disadvantage
• Advantage:
1. It is used as planning tool and as a control devices.
2.The progress of work is recorded and therefore the Gantt chart is instructive even
for the no specialist.
• Disadvantage:
1.There is no way of optimizing the operation or a sequence.
2.If the number of operation to be planned is high,it is impossible to maintain an
overview in a Gantt chart.
3.It does not give any information about the impacts of delay of single operation.
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Milestone-Charts
• The method of collecting and organizing data for milestone charts is similar
to the Gantt technique.
• The primary difference is the graphic display.
• The milestone system offers no basic improvement over the Gantt chart
expect to provide focus on the event to be achieved.
Fig: 4.Milestone chart(source:J.H.Greene,production control : system and decisions )
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Milestone-Charts
Fig: 5.Milestone summary(source:J.H.Greene,production control : system and decisions )
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Line of Balance
• Line of Balance is a method of showing the repetitive work that may exist
in a project as a single line on a graph.
Fig: 6.Line of Balance( source: www.mosaicprojects.com)
4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
Modeling and analysis of Manufacturing system
De-Manufacturing Systems
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Abstract
• De-Manufacturing can be defined as the “break down of a product into its
individual parts with the goal of reusing and remanufacturing parts, or
recycling the remainder of the components”
• This paper formulates the concept of De-Manufacturing systems, provides
example of the potential impact of these solutions in a growing sector, the
mechatronic component industry, and sets the framework for future
research in this area.
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
De-Manufacturing systems
• A De-Manufacturing System can be defined as the set of resources
(human and technological), organization, IT infrastructure and associated
business model to enable product De-Manufacturing.
Fig: 7.De-Manufacturing system( source: www.sciencedirect.com)
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
De-Manufacturing systems
• De-manufacturing processes typically include Disassembly,
Remanufacturing, Recycling and Recovery processes.
• Disassembly:(I) hazardous components that cannot enter the recycling
flow(ii) re-usable parts with high residual value(iii) parts that need to go
through a dedicated recycling process chain.
• Remanufacturing: Dismantling the unit or a component, inspecting these
components, repairing defective components or replacing them with new
ones, reassembling the units, readjusting as specification and sent it to the
inspection department.
• Recycling is mainly performed by mechanical processes or by thermal
processes.
• Recovery processes make use of chemical reactions to separate the target
materials at very high grade levels. They are typically performed in
batches.
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Mechatronic Components
• Mechatronic products can be defined as systems combining mechanics,
electronics and information technology.
De-Manufacturing pilot plant:
• De-Manufacturing process chain is the pilot plant recently installed at
ITIA-CNR, the Institute of Industrial Technologies and Automation of the
National Council for Research, in Milan, Italy.
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Multi-level integrated De-Manufacturing research
approach.
Fig: 8.Multi-level integrated De-Manufacturing research approach. ( source: www.sciencedirect.com)
4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
Layout of the De-manufacturing Pilot Plant
Fig: 9. Layout of the De-manufacturing Pilot Plant at ITIA CNR. ( source: www.sciencedirect.com)
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Layout of the De-manufacturing Pilot Plant
• The first cell is dedicated to the robotics disassembly of the mechatronic
components. Two cooperating robots and a lightweight robot assist the
operator in the disassembly operations.
• Second cell is dedicated to testing, repair and remanufacturing operations.
• Third cell is dedicated to assembly and final inspection to market.
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Research challenges
• Human-machine interaction:
All the industrial robots are designed to assemble the components not for
disassemble
• De-Manufacturing Process Models
• De-Manufacturing System Engineering: integrating all departments in a
demanufacturing company is so tough.
• Reconfigurability of De-Manufacturing Systems: De-Manufacturing
Systems should be reconfigurable to be able to process different types of
products over time
• Energy in De-Manufacturing systems :the energy consumption in De-
Manufacturing systems can be extremely high
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
Conclusion
• De-Manufacturing Systems can constitute the driver for sustainable
economy and sustainable growth in high-wage countries.
• However, major technological, methodological and business oriented
innovations need to be developed as enabler for this new concept, which
directly affects both the energy footprint and the raw material consumption
in manufacturing operations.
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology
References
• www.merchant ricks.com
• J . H. Greene, production control : system and decisions
• www.sciencedirect.com
• www.mosaicprojects.com
4/12/2017
C.S.Gowsick(16MI31) PSG college of
technology

More Related Content

What's hot

CNC Programmingmodifies examination 1
CNC Programmingmodifies examination 1CNC Programmingmodifies examination 1
CNC Programmingmodifies examination 1
Prof. S.Rajendiran
 

What's hot (20)

Curve and Surface
Curve and SurfaceCurve and Surface
Curve and Surface
 
Work sampling
Work samplingWork sampling
Work sampling
 
Value analysis and value engineering
Value  analysis and value engineeringValue  analysis and value engineering
Value analysis and value engineering
 
introduction to cnc machines
 introduction to cnc machines introduction to cnc machines
introduction to cnc machines
 
Line balancing
Line balancingLine balancing
Line balancing
 
Computer Aided Process Planning
Computer Aided Process PlanningComputer Aided Process Planning
Computer Aided Process Planning
 
Method study
Method studyMethod study
Method study
 
Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5Principles of Management (MG 6851) Unit 5
Principles of Management (MG 6851) Unit 5
 
CNC Programmingmodifies examination 1
CNC Programmingmodifies examination 1CNC Programmingmodifies examination 1
CNC Programmingmodifies examination 1
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 
Ppc New
Ppc NewPpc New
Ppc New
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
FORECASTING
FORECASTINGFORECASTING
FORECASTING
 
Time study
Time studyTime study
Time study
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
 
Automated Material Handling System
Automated Material Handling SystemAutomated Material Handling System
Automated Material Handling System
 
Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)Introduction to computer Integrated Manufacturing (CIM)
Introduction to computer Integrated Manufacturing (CIM)
 
Group technology
Group technologyGroup technology
Group technology
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 

Similar to Graphical method of job shop scheduling

Recent trends in rapid product development 2-3-4
Recent trends in rapid product development 2-3-4Recent trends in rapid product development 2-3-4
Recent trends in rapid product development 2-3-4
IAEME Publication
 
A parts assembly station on a production line exhibits a severe vibra.pdf
A parts assembly station on a production line exhibits a severe vibra.pdfA parts assembly station on a production line exhibits a severe vibra.pdf
A parts assembly station on a production line exhibits a severe vibra.pdf
shalins6
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
yashchotaliyael21
 

Similar to Graphical method of job shop scheduling (20)

Job Shop Layout Design Using Group Technology
Job Shop Layout Design Using Group TechnologyJob Shop Layout Design Using Group Technology
Job Shop Layout Design Using Group Technology
 
Job shop
Job shopJob shop
Job shop
 
Improving 3D Printing Laboratory Operations: A Case Study of Lean Six Sigma I...
Improving 3D Printing Laboratory Operations: A Case Study of Lean Six Sigma I...Improving 3D Printing Laboratory Operations: A Case Study of Lean Six Sigma I...
Improving 3D Printing Laboratory Operations: A Case Study of Lean Six Sigma I...
 
Analysis of Data Center to quantify the performance in terms of Thermal distr...
Analysis of Data Center to quantify the performance in terms of Thermal distr...Analysis of Data Center to quantify the performance in terms of Thermal distr...
Analysis of Data Center to quantify the performance in terms of Thermal distr...
 
IRJET- Literature Review on Manufacturing System Performance Improvement ...
IRJET-  	  Literature Review on Manufacturing System Performance Improvement ...IRJET-  	  Literature Review on Manufacturing System Performance Improvement ...
IRJET- Literature Review on Manufacturing System Performance Improvement ...
 
Rapid prototyping
Rapid prototypingRapid prototyping
Rapid prototyping
 
Pci journal 2005
Pci journal 2005Pci journal 2005
Pci journal 2005
 
Software_effort_estimation for Software engineering.pdf
Software_effort_estimation for Software engineering.pdfSoftware_effort_estimation for Software engineering.pdf
Software_effort_estimation for Software engineering.pdf
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planning
 
IRJET- Simulation and Analysis of Step Light Mid Part using Mold Flow Analysis
IRJET- Simulation and Analysis of Step Light Mid Part using Mold Flow AnalysisIRJET- Simulation and Analysis of Step Light Mid Part using Mold Flow Analysis
IRJET- Simulation and Analysis of Step Light Mid Part using Mold Flow Analysis
 
Recent trends in rapid product development 2-3-4
Recent trends in rapid product development 2-3-4Recent trends in rapid product development 2-3-4
Recent trends in rapid product development 2-3-4
 
A parts assembly station on a production line exhibits a severe vibra.pdf
A parts assembly station on a production line exhibits a severe vibra.pdfA parts assembly station on a production line exhibits a severe vibra.pdf
A parts assembly station on a production line exhibits a severe vibra.pdf
 
Project Manufacturing
Project ManufacturingProject Manufacturing
Project Manufacturing
 
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design SoftwareIRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
 
CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
ME6501 Unit 1 introduction to cad
ME6501 Unit 1 introduction to cadME6501 Unit 1 introduction to cad
ME6501 Unit 1 introduction to cad
 
Bj33356362
Bj33356362Bj33356362
Bj33356362
 
Bj33356362
Bj33356362Bj33356362
Bj33356362
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
 

More from Gowsick Subramaniam (8)

Smart garbage monitoring system using internet of things
Smart garbage monitoring system using internet of thingsSmart garbage monitoring system using internet of things
Smart garbage monitoring system using internet of things
 
Vision system for robotics and servo controller
Vision system for robotics and servo controllerVision system for robotics and servo controller
Vision system for robotics and servo controller
 
Laser beam welding
Laser beam weldingLaser beam welding
Laser beam welding
 
Comparison between erp software
Comparison between erp softwareComparison between erp software
Comparison between erp software
 
Dfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineeringDfma as the tool for concurrent engineering
Dfma as the tool for concurrent engineering
 
Axis symmetric
Axis symmetricAxis symmetric
Axis symmetric
 
Robotics and machine vision system
Robotics and machine vision systemRobotics and machine vision system
Robotics and machine vision system
 
Intro to green chemistry
Intro to green chemistryIntro to green chemistry
Intro to green chemistry
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Graphical method of job shop scheduling

  • 1. JOB SHOP SYSTEM GRAPH THEORETICAL APPROACH C.S.Gowsick (16MI31) ME-Computer integrated manufacturing Department of mechanical engineering PSG College of Technology 11 C.S.Gowsick(16MI31) PSG college of technology
  • 2. Agenda : • Introduction • Job shop scheduling • Objective of Job shop scheduling • Characteristics of Job shop • Graphical Method-(Gantt chart ) • Milestone-Charts • Line of Balance Case Study:De-manufacturing 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 3. Introduction • Job shop productions are characterized by manufacturing of one or few quantity of products designed and produced as per the specification of customers within prefixed time and cost. (project centers, Engineering works) Fig:1.Job shop production (Merchant ricks) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 4. Job shop scheduling • An important function of job shop scheduling is the coordination and control of complex activities, both optimum resource allocation and sequence in the performance of the activities. • Approaches are classified into two types: 1.Analytical techniques: Mathematical approaches of assigning jobs to machines are derived to optimize certain criteria. This gives exact solution or near optimal solution . 2.Graphical Methods: This method do not provide optimal or near optimal solution directly. These method is used to find the error before they are occurring and takes the alternative plans. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 5. Objective of Job shop scheduling 1.The main objective is decrease the average in-process time of our work order 2.Also, we want to increase the degree of utilization of equipment. • The first objective can be achieved by selecting the optimal processing time, the transportation time, the waiting time, and the setup time. • To achieve the second goal, we need to pick the schedule that maximizes the utilization of existing capacity. this objective focuses on the machine and sequence of jobs. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 6. Characteristics of Job shop • At any time there is a large number of orders at various stage of completion. • Every order differs to some extend. It is difficult to predict accurately the time required to complete operation. • It is difficult to determine which order in the queue should have a priority. • There are many changes resulting from scrap , rework, machine breakdown, material shortage, engineering changes and rush orders 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 7. Graphical Method-(Gantt chart ) Fig: 2.Gantt chart symbols (source:J.H.Greene,production control : system and decisions ) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 8. Example of Gantt-chart Fig: 3.Machine schedule chart (source:J.H.Greene,production control : system and decisions ) • The time scale is placed horizontally along the top of the chart. • The row represents machines, departments, or whatever may be required to accomplish a job. • This time scale may be subdivided into calendar time or temporal units . 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 9. Advantage and Disadvantage • Advantage: 1. It is used as planning tool and as a control devices. 2.The progress of work is recorded and therefore the Gantt chart is instructive even for the no specialist. • Disadvantage: 1.There is no way of optimizing the operation or a sequence. 2.If the number of operation to be planned is high,it is impossible to maintain an overview in a Gantt chart. 3.It does not give any information about the impacts of delay of single operation. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 10. Milestone-Charts • The method of collecting and organizing data for milestone charts is similar to the Gantt technique. • The primary difference is the graphic display. • The milestone system offers no basic improvement over the Gantt chart expect to provide focus on the event to be achieved. Fig: 4.Milestone chart(source:J.H.Greene,production control : system and decisions ) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 11. Milestone-Charts Fig: 5.Milestone summary(source:J.H.Greene,production control : system and decisions ) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 12. Line of Balance • Line of Balance is a method of showing the repetitive work that may exist in a project as a single line on a graph. Fig: 6.Line of Balance( source: www.mosaicprojects.com) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 13. Modeling and analysis of Manufacturing system De-Manufacturing Systems 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 14. Abstract • De-Manufacturing can be defined as the “break down of a product into its individual parts with the goal of reusing and remanufacturing parts, or recycling the remainder of the components” • This paper formulates the concept of De-Manufacturing systems, provides example of the potential impact of these solutions in a growing sector, the mechatronic component industry, and sets the framework for future research in this area. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 15. De-Manufacturing systems • A De-Manufacturing System can be defined as the set of resources (human and technological), organization, IT infrastructure and associated business model to enable product De-Manufacturing. Fig: 7.De-Manufacturing system( source: www.sciencedirect.com) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 16. De-Manufacturing systems • De-manufacturing processes typically include Disassembly, Remanufacturing, Recycling and Recovery processes. • Disassembly:(I) hazardous components that cannot enter the recycling flow(ii) re-usable parts with high residual value(iii) parts that need to go through a dedicated recycling process chain. • Remanufacturing: Dismantling the unit or a component, inspecting these components, repairing defective components or replacing them with new ones, reassembling the units, readjusting as specification and sent it to the inspection department. • Recycling is mainly performed by mechanical processes or by thermal processes. • Recovery processes make use of chemical reactions to separate the target materials at very high grade levels. They are typically performed in batches. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 17. Mechatronic Components • Mechatronic products can be defined as systems combining mechanics, electronics and information technology. De-Manufacturing pilot plant: • De-Manufacturing process chain is the pilot plant recently installed at ITIA-CNR, the Institute of Industrial Technologies and Automation of the National Council for Research, in Milan, Italy. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 18. Multi-level integrated De-Manufacturing research approach. Fig: 8.Multi-level integrated De-Manufacturing research approach. ( source: www.sciencedirect.com) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 19. Layout of the De-manufacturing Pilot Plant Fig: 9. Layout of the De-manufacturing Pilot Plant at ITIA CNR. ( source: www.sciencedirect.com) 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 20. Layout of the De-manufacturing Pilot Plant • The first cell is dedicated to the robotics disassembly of the mechatronic components. Two cooperating robots and a lightweight robot assist the operator in the disassembly operations. • Second cell is dedicated to testing, repair and remanufacturing operations. • Third cell is dedicated to assembly and final inspection to market. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 21. Research challenges • Human-machine interaction: All the industrial robots are designed to assemble the components not for disassemble • De-Manufacturing Process Models • De-Manufacturing System Engineering: integrating all departments in a demanufacturing company is so tough. • Reconfigurability of De-Manufacturing Systems: De-Manufacturing Systems should be reconfigurable to be able to process different types of products over time • Energy in De-Manufacturing systems :the energy consumption in De- Manufacturing systems can be extremely high 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 22. Conclusion • De-Manufacturing Systems can constitute the driver for sustainable economy and sustainable growth in high-wage countries. • However, major technological, methodological and business oriented innovations need to be developed as enabler for this new concept, which directly affects both the energy footprint and the raw material consumption in manufacturing operations. 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology
  • 23. References • www.merchant ricks.com • J . H. Greene, production control : system and decisions • www.sciencedirect.com • www.mosaicprojects.com 4/12/2017 C.S.Gowsick(16MI31) PSG college of technology