Successfully reported this slideshow.
Your SlideShare is downloading. ×
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Upcoming SlideShare
EDP DSO Challenges
EDP DSO Challenges
Loading in …3
×

Check these out next

1 of 12 Ad

Active coordination

Download to read offline

Fernando García Martínez
GAS NATURAL FENOSA

WORKSHOP: “DEFINING SMART GRIDS: CONDITIONS FOR SUCCESSFUL IMPLEMENTATION”
SESSION 3: SMART GRIDS CHALLENGES: THE VISION OF THE ENERGY SECTOR
Barcelona, 9th February 2017
Organised by TR@NSENER Consortium.
TR@NSENER - European cooperation Network on Energy Transition in Electricity

Fernando García Martínez
GAS NATURAL FENOSA

WORKSHOP: “DEFINING SMART GRIDS: CONDITIONS FOR SUCCESSFUL IMPLEMENTATION”
SESSION 3: SMART GRIDS CHALLENGES: THE VISION OF THE ENERGY SECTOR
Barcelona, 9th February 2017
Organised by TR@NSENER Consortium.
TR@NSENER - European cooperation Network on Energy Transition in Electricity

Advertisement
Advertisement

More Related Content

Slideshows for you (20)

Viewers also liked (20)

Advertisement

Similar to Active coordination (20)

More from Funseam - Fundación para la Sostenibilidad Energética y Ambiental (20)

Advertisement

Recently uploaded (20)

Active coordination

  1. 1. European cooperation Network on Energy Transition in Electricity Fernando García Martínez GAS NATURAL FENOSA SESSION 3: SMART GRIDS CHALLENGES: THE VISION OF THE ENERGY SECTOR WORKSHOP “DEFINING SMART GRIDS: CONDITIONS FOR SUCCESSFUL IMPLEMENTATION” Barcelona, 9th February 2017
  2. 2. • Context • Flexibility & Efficiency • Grid Operator • GNF Experience • Sharing vision & knowledge
  3. 3. 20% 2020 40% 2030 60% 2040 >80% 2050 Long term: decarbonised energy system in 2050 Near future Drivers Winter package Efficiency Flexibility Set plan (action 4) CO2 emission reduction (1990 base)
  4. 4. Andreea Strachinescu 16/09/2016
  5. 5. Andreea Strachinescu 16/09/2016
  6. 6. • Grid interconnection P2G Direct use Fuel Cell CHP Waste Treatment Plants: biomethane • Challenge: Efficiency
  7. 7. • Active customers: automation as a previous step for massive participation. But: • Lack of interoperability in connected home market (very fragmented market) • Technology adoption difficulties by customers. • Challenges: Interoperability, technology adoption
  8. 8. • Grid automation to grid digitalization • DSO 4.0 • Challenge: sensors+ICTs, market models CostvsBenefit Quantity • New services
  9. 9. • Grid operator role
  10. 10. OVIRED. Virtual microgrid operator BigDataAT: 220kV grid.
  11. 11. http://etip-snet.eu http://www.futured.es • Platforms (EU and National/Regional levels)
  12. 12. Thanks for your attention

×