Jesús Fernández López
EDP HC ENERGÍA

WORKSHOP: “DEFINING SMART GRIDS: CONDITIONS FOR SUCCESSFUL IMPLEMENTATION”
SESSION 3: SMART GRIDS CHALLENGES: THE VISION OF THE ENERGY SECTOR
Barcelona, 9th February 2017
Organised by TR@NSENER Consortium.
TR@NSENER - European cooperation Network on Energy Transition in Electricity

Published in: Technology
  • Be the first to comment

  • Be the first to like this

EDP DSO Challenges

  1. 1. Jesús Fernández López EDP HC ENERGÍA SESSION 3: SMART GRIDS CHALLENGES: THE VISION OF THE ENERGY SECTOR WORKSHOP “DEFINING SMART GRIDS: CONDITIONS FOR SUCCESSFUL IMPLEMENTATION” Barcelona, 9th February 2017
  2. 2. InovGrid edp hc energia
  3. 3. InovGrid edp hc energia
  4. 4. 4 DSO Challenges HISTORICAL CHALLENGES NEW SOLUTIONS Technical Quality of service Operational Efficiency Customer quality service Fast response Smart Grid MV and LV failure location Instantaneous access to meter Remote reading and operations
  5. 5. XX -40 XX -30 XX 30 2030 XX -40 XX -30 XX 30 Climate Challenges
  6. 6. EDP Commitments
  7. 7. New equipment
  8. 8. ¿How do we manage the network?
  9. 9. 9 DSO Challenges HISTORICAL CHALLENGES NEW CHALLENGES Technical Quality of service Electric VehicleOperational Efficiency Smart Grid Increase Distributed Energy Resource (DER) Efficiency Collaborative consumption, sharing economy social media, … Customer quality service: fast response
  10. 10. 10 HV network Substation HV /MVT MV/MV Secondary Substation Costumer Substation VHV/HV TSO network Power Plant Network management system (SCADA) x1 x10 x100 Con telemando x65.000x650 2 readings per year 6 readings per year Traditional network MV network LV network
  11. 11. 11 Smart Meter (EB) Sistemas Telegestión (AMI) Data Concentrator (DC) Wide area network Local area network PLC communicationTCP/IP LANWAN FV x1 x10 x100 Con telemando 65.000650 PAST NOW X12 Smart Grid HV network Substation HV /MVT MV/MV Secondary Substation Costumer Substation VHV/HV TSO network Power Plant MV network LV network Network management system (SCADA)
  12. 12. 12 DSO Challenges HISTORICAL CHALLENGES NEW CHALLENGES Technical Quality of service Electric VehicleOperational Efficiency Smart Grid Increase Distributed Energy Resource (DER) Efficiency Data Management, neutral market facilitator, … Customer quality service: fast response Collaborative consumption, sharing economy social media, …
  13. 13. Thank you

×