SlideShare a Scribd company logo
1 of 5
THE VALUE OF POWER FACTOR TESTING
Nov 1, 2005 12:00 PM
by John Bleyer and Phillip Prout, National Grid

NATIONAL GRID DISCOVERED A HIGH POWER FACTOR DURING ACCEPTANCE TESTING of a new 40-MVA
transformer in 2004. The unit was then returned to the factory for repairs, burdening both the utility and manufacturer with
additional costs and delays. This article reviews the information gathered and lessons learned from this event, including
testing and root-cause determination results from the teardown/repair process.

National Grid's electricity delivery companies in the United States serve 3.3 million electricity customers in New England
and upstate New York through more than 1200 substations. As part of a substation expansion project, a 24/32/40-MVA, 115-
kVD/13.2-kVY transformer was purchased and installed at a National Grid substation in New England.

The transformer was delivered to the substation. The radiators and bushings were installed. The unit was vacuum processed,
filled under vacuum and tested by the transformer manufacturer's personnel. The following tests were performed at the
substation after the unit was oil filled:
Transformer turns ratio on all taps
Insulation power factor of transformer and all bushings (C1 and C2)
10-kV excitation on all taps
Core ground and winding resistance
Oil quality and dissolved gas analysis (DGA).
The power factor of the high-voltage winding was elevated. The measured value of 0.58% did not meet industry-standard
acceptable values or National Grid's required values. All other tests results were acceptable.
POWER FACTOR TESTING


Insulation power factor tests are used to measure dielectric losses, which relate the wetness, dryness or deterioration of
transformer insulation. Both factory and field testing are performed to verify the insulation integrity of substation
transformers. Power factor testing a two-winding transformer is conducted by energizing the winding at a known ac voltage
(typically 10 kV for windings rated greater than 10 kV) with the common winding bushings shorted together.

The results of overall power factor tests on power transformers reflect the insulation condition of the windings, barriers, tap
changers, bushings and oil. Modern oil-filled power transformers should have power factors of 0.5% or less, corrected to
20°C (68°F), for individual windings to ground (CH and CL) and interwinding insulations (CHL). The National Grid
transformer specification states that the power factor of the insulation system shall not exceed 0.5% at 20°C.
As part of the investigation into the high power factor, the transformer manufacturer retested the power factor with similar
results. The high-voltage bushings were replaced and the unit was retested. The results did not change.

The unit was drained and an internal inspection was performed; nothing was found. The vendor performed a 24-hour hot oil
and vacuum process to rule out the possibility of moisture in the insulation. The power factor was again retested and still had
high CH results. Both the seller and purchaser agreed that the unit should be returned to the factory for further investigation.
REVIEW OF INITIAL FACTORY TESTS PERFORMED


The results of the factory tests performed initially when the transformer was built were reviewed.

Temperature rise tests were acceptable.

Preliminary tests of resistance, polarity, phase relation, ratio, no-load loss and excitation current, impedance and load loss,
excitation and power factor were all acceptable.

Dielectric impulse, applied and induced potential tests were acceptable, following IEEE guidelines, although enhanced
voltage test results were elevated.

DGAs taken before tests and after OA and FA heat run tests were acceptable.

DGA results after high-voltage tests indicated a problem.

Due to the gassing, the unit had been drained, reprocessed and vacuum filled. The induced voltage test and DGA tests were
repeated with acceptable results. The unit was shipped.
INDUCED VOLTAGE TESTING


The purpose of the induced voltage test is to prove the insulation strength between parts of the same winding and insulation
to ground that was not proved during the applied potential test. It also proves the condition of the insulation between
windings and between phases. The voltage applied during the induced voltage testing is on the order of 1.5 to 2 times the
rated voltage. Weaknesses in dielectric design, processing or manufacturing may cause partial-discharge (PD) activity during
this test. PD is generally monitored on all line terminals rated 115 kV or higher during the induced voltage test. A special
generator with a frequency greater than 60 Hz must be used so the core does not saturate due to the higher-than-normal
voltage that is induced in the windings. For most power transformer testing, this generator is 120 Hz, 180 Hz or 240 Hz. The
induced voltage test is the final dielectric test. All class II power transformers shall be induced voltage tested with the
required test levels induced in the high-voltage winding. The taps shall be selected so that the test levels developed in the
other windings are 1.5 times their maximum operating voltage. The voltage is raised to the one-hour level and held long
enough to verify there are no PD problems. The voltage is then raised to the enhanced level and held for 7200 cycles. The
voltage is then reduced to the one-hour level and held for one hour. During the one-hour period, PD measurements should be
recorded at 5-minute intervals on each terminal 115 kV and above. The test is performed with the neutral terminals solidly
grounded; this will stress the insulation at the same per unit of voltage.

The test frequency is increased relative to the operating frequency to avoid core saturation per IEEE standard C57.12.90.
EVALUATION OF INDUCED VOLTAGE TEST


Per IEEE C57.12-2000, the following criteria shall be met:

Failure may be indicated by the presence of smoke and bubbles rising in the oil, an audible sound such as a thump or a
sudden increase in test current. Any such indication should be carefully investigated by observation, by repeating the test or
by other tests to determine whether a failure has occurred.

In terms of interpretation of PD measurements, the results shall be considered acceptable and no further PD tests required
under the following conditions:

a. The magnitude of the PD level does not exceed 100 µV.

b. The increase in PD levels during the 1-hour test does not exceed 30 µV.

c. The PD levels during the 1-hour test do not exhibit any steadily rising trend, and no sudden, sustained increase in levels
occurs during the last 20 minutes of the tests.

Judgment should be used on the 5-minute readings so that momentary excursions of the radio-influence voltage (RIV) meter
caused by cranes or other ambient sources are not recorded. Also, the test may be extended or repeated until acceptable
results are obtained.

Unless breakdown occurs or very high PDs are sustained for a long time, this test is considered as nondestructive. A failure
to meet the PD acceptance criterion shall, therefore, not warrant immediate rejection, but lead to consultation between
purchaser and manufacturer about further investigations.
DISSOLVED GAS ANALYSIS RESULTS


DGA of oil during factory testing will assist in determining if any arcing, corona discharge, low-energy sparking,
overloading and overheating has occurred. The detection of gases greater than the allowable limits shall require further
investigation. DGA samples should be taken before, during and after thermal performance and high-voltage tests to
determine the amount of gas generated during testing. The limits listed in the table on page 58 are National Grid maximum
allowable increases for gases from the beginning of any testing to the completion of all testing. Any results higher than those
listed in the table would require further investigation.
BACK TO THE MANUFACTURER FOR RETESTING


As agreed upon by National Grid and the manufacturer, the transformer was returned to the manufacturer for inspection. The
core and coils were removed from the tank, the high-voltage delta connection was broken, and single-phase winding power
factor tests were performed with the unit on the drip pad.
DISCUSSION OF POWER FACTOR RESULTS
Treeing on the phase barrier board between H2 and H3 was found on the surface of barrier board at the base of the coils
where the windings are the closest to one another.

The normal watts loss/power factor of H1 and higher watts loss/power factor on both H2 and H3 indicates the problem is
common to H2 and H3 windings.

The barriers were then removed and retested, the H1 remained unchanged and the H2 and H3 watts loss/power factor
lowered to the H1 values. This indicates that the contamination was related to H2-H3 barriers.
DISCUSSION OF INDUCED VOLTAGE TESTS BEFORE INITIAL SHIPMENT


                                                              1 2 Next
The enhanced voltage test results indicated a normal level on H3 and higher level on H1 and H2. This appeared
contradictory to what was visually found. Further analysis of the winding arrangement, location of the treeing and higher-
than-expected micro-volt and pico-coulomb test results all indicated a problem at the base of #2 and #3 windings. This was
because the H1 lead is connected to the bottom of the #2 winding and the H2 lead is connected to the bottom of the #3
winding stressing the bottom of the H2/H3 barrier board.
TEARDOWN, POWER FACTOR AND INDUCED VOLTAGE TESTS


The power factor testing during the teardown helped in identifying the location of the contamination. The winding design
and location of the contamination accounted for the higher losses identified during the initial enhanced voltage test. We can
assume the contamination caused arcing during the initial enhanced voltage test. The DGA results confirm that arcing
occurred. The high voltage most likely burnt away the majority of the debris during the test and left a carbon tree. The
subsequent oil processing and vacuum filling at the factory may have cleaned the area enough to partially cure the problem.
Therefore, the second induced voltage test, prior to initial shipment, was acceptable and the DGA showed no arcing at that
time.
LABORATORY ANALYSIS OF BARRIER BOARD


The transformer H2/H3 barrier pressboard was removed from the unit and brought to the Doble Materials Laboratory in
Watertown, Massachusetts, U.S., for analysis. An initial visual examination of the pressboard showed that discharge treeing
was quite distinct. An adjacent board was also inspected and there was no discharge treeing visible. The Doble Materials
Laboratory was asked to aid in determining the cause of the discharge treeing in the pressboard. Unfortunately, the
pressboards were not stored in a controlled environment at the transformer manufacturer after they were removed from the
transformer, thus making it impossible to determine if moisture and metal particle contamination were present on the barrier
board when the transformer was assembled.
FACTORY REPAIR


The top yoke was removed and the coils were un-nested. A complete visual inspection of the coils was performed. The
barrier insulation, top and bottom insulation, and leads were replaced. The unit was reassembled and fully re-tested. All
factory test results after the repair were acceptable and the unit was shipped. The unit was delivered to the substation,
dressed, vacuum filled and tested by the vendor. All field test results were acceptable.
LESSONS LEARNED


It is important to set power factor limit for acceptance testing.

It is important to set DGA limits for factory testing.

Require reporting of all factory test results in the final test report.

Factory power factor testing should be performed before and after thermal/high-voltage tests.

Specification should include limits for the induced voltage test during the enhanced voltage period.
Specifications should include a statement similar to: “If the transformer fails any test, the purchaser shall be notified
immediately. The purchaser shall be consulted about the failure, and based on the test results, the purchaser may require a
complete retest of all tests.”

Preservation of removed parts in controlled environments is essential when performing root-cause analysis.

In conclusion, there is great value in analyzing all test results, as each test represents a different component that verifies the
design and manufacturing process. All test results should be reviewed prior to releasing a transformer for shipment. National
Grid believes there is value in performing a power factor test before and after factory testing. In this case, induced voltage
testing was acceptable but power factor testing revealed a problem. Final power factor test results also will assist the
purchaser when performing field acceptance testing. The manufacturer who supplied this transformer now performs power
factor tests before and after high-voltage testing.

John Bleyer is a senior substation equipment maintenance engineer at National Grid. He graduated from Worcester
Polytechnic Institute in 1986 with a BSEE degree. Bleyer provides technical support to substation field operations personnel
in the New England area. He has more than 15 years of experience in substation maintenance and
design. JOHN.BLEYER@us.ngrid.com
Phillip Prout is lead senior maintenance engineer at National Grid in the Substation O&M Services group located in
Massachusetts. He is a 1986 graduate of Wentworth Institute of Technology from the mechanical engineering program. He
has 15 years of field experience, including 10 years as a substation supervisor. He is currently the chairperson on the Doble
Insulating Materials Committee. PHILLIP.PROUT@us.ngrid.com
           Insulation Tested                                      % Power Factor Corrected to 20°C
CH                                        0.58
CL                                        0.21
CHL(UST)                                  0.15
Oil                                       0.02
Power factor acceptance test.
             Insulation Tested                                      % Power Factor Corrected to 20°C
CH                                          0.21
CL                                          0.18
CHL(UST)                                    0.14
Initial factory power factor testing prior to high-voltage testing.
   Kv P-P             % of Enhancement                   Time (min)                H1                 H2                  H3
                                                                             pC         uV      pC         uV       pC       uV
0            0                                                           0         9          0       12          0       11
52           25                                                          0         9          0       12          0       11
104          50                                                          5         9          5       12          0       11
156          75                                                          19        13         20      17          0       11
208          100                                                         478       250        581     700         34      35
182          87.5                                 0-60                   5-20      16-50      0-8     23-40       0-5     20-35
Factory-induced voltage testing dated April 26, 2004, prior to shipment.
(Enhanced 120L-G/208P-P — One Hour 105L-G/182P-P)
          Date              4/24/04                4/25/04                    4/26/04                4/26/04         Test Limits
          Note          Before all tests     After OA Heat Run          After FA Heat Run         After all Tests
Hydrogen              1                    8                          8                         16                  10
Methane               0                    0                          0                         0                   5
Ethane                0                    0                          0                         0                   2
Ethylene              0                    0                          0                         1                   2
Acetylene             0                    0                          0                         5                   0
Carbon Monoxide       4                    20                         48                        67                  30
Carbon Dioxide        25                   62                         149                       153                 300
Initial factory DGA test results.
                        Gas name                                         Gas symbol                             ppm limit
Hydrogen                                                   H2                                        10
Methane                                                    CH4                                       5
Ethane                                                     C2H6                                      2
Ethylene                                                   C2H4                                      2
Acetylene                                                  C2H2                                      0
Carbon Monoxide                                            CO                                        30
Gas name                                        Gas symbol                       ppm limit
Carbon Dioxide                                         CO2                                  300
National Grid maximum gas limits.
  Test #       Insulation                        Test Connection                     Mode    kV      % PF          Cap.
                                 Energize          Ground            Guard
1          CH1                  H1             -              LV, H2, H3           GST      2.5   0.44          267.39
2          CH2                  H2             -              LV, H1, H3           GST      2.5   1.95          227.30
3          CH3                  H3             -              LV, H1, H2           GST      2.5   1.92          237.29
Power factor (PF) testing of transformer (115kV delta connection cut — on drip pad).
 Test #     Insulation                   Test Connection              Mode    kV     mA      Watts       % PF      Cap.
                              Energize      Ground        Guard
4        CH1               H1             -           LV, H2, H3     GST     2.5 0.253      2.4      0.39        268.79
5        CH2               H2             -           LV, H1, H3     GST     2.5 0.212      2.4      0.45        220.90
6        CH3               H3             -           LV, H1, H2     GST     2.5 0.219      2.0      0.35        230.26
Power factor testing of transformer (barriers removed).
                                                     Previous 1 2

More Related Content

What's hot

Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Emeka Ojeah
 
Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...
Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...
Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...IRJET Journal
 
Pre commissioning checks & periodic inspection on power transformers
Pre commissioning checks & periodic inspection  on power transformersPre commissioning checks & periodic inspection  on power transformers
Pre commissioning checks & periodic inspection on power transformersayyadurai SHANMUGAM
 
Online hv bushing monitoring
Online hv bushing monitoringOnline hv bushing monitoring
Online hv bushing monitoringAL ADF
 
smes_proof_of_principle_experiment
smes_proof_of_principle_experimentsmes_proof_of_principle_experiment
smes_proof_of_principle_experimentdhjr
 
Assuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable SystemsAssuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable Systemsmichaeljmack
 
Identifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim WaltonIdentifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim Waltonnacetwincities
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sightDHAVALKUMAR JULASANA
 
BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline HydrostaticScott Nunn
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformerPraveenKumar5880
 
Transformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisTransformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisHamedPasha1
 

What's hot (19)

Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
Gabriel Ojeah - HV CONFERENCE PAPER- PERTH 2015
 
Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...
Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...
Neutral Current and Frequency Response Analysis of Single and Multiple Turn F...
 
Pre commissioning checks & periodic inspection on power transformers
Pre commissioning checks & periodic inspection  on power transformersPre commissioning checks & periodic inspection  on power transformers
Pre commissioning checks & periodic inspection on power transformers
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
Online hv bushing monitoring
Online hv bushing monitoringOnline hv bushing monitoring
Online hv bushing monitoring
 
smes_proof_of_principle_experiment
smes_proof_of_principle_experimentsmes_proof_of_principle_experiment
smes_proof_of_principle_experiment
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
Assuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable SystemsAssuring Reliability of Critical Power Cable Systems
Assuring Reliability of Critical Power Cable Systems
 
Identifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim WaltonIdentifying Casing Shorts With or Without Test Leads - Jim Walton
Identifying Casing Shorts With or Without Test Leads - Jim Walton
 
Deis talk-nov-2014-revised
Deis talk-nov-2014-revisedDeis talk-nov-2014-revised
Deis talk-nov-2014-revised
 
TRANSFORMERS
TRANSFORMERSTRANSFORMERS
TRANSFORMERS
 
Det4 tc2
Det4 tc2Det4 tc2
Det4 tc2
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
BP_Waterline Hydrostatic
BP_Waterline HydrostaticBP_Waterline Hydrostatic
BP_Waterline Hydrostatic
 
TPI - Example Report.
TPI - Example Report.TPI - Example Report.
TPI - Example Report.
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
High voltage testing of electrical transformer
High voltage testing of electrical transformerHigh voltage testing of electrical transformer
High voltage testing of electrical transformer
 
Transformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisTransformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response Analysis
 

Similar to The value of power factor testing

13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdfvikram desai
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushingNovia Putri
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerSystem Protection
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL Rahul Akinapelli
 
Power monic application notes chk power quality
Power monic application notes chk power qualityPower monic application notes chk power quality
Power monic application notes chk power qualityAjeesh Joseph
 
Design planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryDesign planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryvishalgohel12195
 
Ac Test Transformer
Ac Test TransformerAc Test Transformer
Ac Test Transformerkennypowerhv
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...Ali Sepehri
 
Liquid Insulation Dissipation factor and Dielectric Factor Measurement Unit
Liquid Insulation Dissipation factor and Dielectric Factor Measurement UnitLiquid Insulation Dissipation factor and Dielectric Factor Measurement Unit
Liquid Insulation Dissipation factor and Dielectric Factor Measurement UnitNadiiaHubar
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTRAJPRASAD RS
 
Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsAli Sepehri
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.pptThien Phan Bản
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 

Similar to The value of power factor testing (20)

Module 6part1
Module 6part1Module 6part1
Module 6part1
 
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
13-Webinar-Transformer-Maintenance-Testing-Fundamentals-06-26-18.pdf
 
Isolator and bushing
Isolator and bushingIsolator and bushing
Isolator and bushing
 
16950
1695016950
16950
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Transformer
TransformerTransformer
Transformer
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Power monic application notes chk power quality
Power monic application notes chk power qualityPower monic application notes chk power quality
Power monic application notes chk power quality
 
Design planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratoryDesign planning & layout of high voltage laboratory
Design planning & layout of high voltage laboratory
 
Ac Test Transformer
Ac Test TransformerAc Test Transformer
Ac Test Transformer
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
 
Liquid Insulation Dissipation factor and Dielectric Factor Measurement Unit
Liquid Insulation Dissipation factor and Dielectric Factor Measurement UnitLiquid Insulation Dissipation factor and Dielectric Factor Measurement Unit
Liquid Insulation Dissipation factor and Dielectric Factor Measurement Unit
 
Bam Nuttall Hv Test Report
Bam Nuttall   Hv Test ReportBam Nuttall   Hv Test Report
Bam Nuttall Hv Test Report
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 
Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing Methods
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Substation commissioning1
Substation commissioning1Substation commissioning1
Substation commissioning1
 

Recently uploaded

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 

Recently uploaded (20)

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 

The value of power factor testing

  • 1. THE VALUE OF POWER FACTOR TESTING Nov 1, 2005 12:00 PM by John Bleyer and Phillip Prout, National Grid NATIONAL GRID DISCOVERED A HIGH POWER FACTOR DURING ACCEPTANCE TESTING of a new 40-MVA transformer in 2004. The unit was then returned to the factory for repairs, burdening both the utility and manufacturer with additional costs and delays. This article reviews the information gathered and lessons learned from this event, including testing and root-cause determination results from the teardown/repair process. National Grid's electricity delivery companies in the United States serve 3.3 million electricity customers in New England and upstate New York through more than 1200 substations. As part of a substation expansion project, a 24/32/40-MVA, 115- kVD/13.2-kVY transformer was purchased and installed at a National Grid substation in New England. The transformer was delivered to the substation. The radiators and bushings were installed. The unit was vacuum processed, filled under vacuum and tested by the transformer manufacturer's personnel. The following tests were performed at the substation after the unit was oil filled: Transformer turns ratio on all taps Insulation power factor of transformer and all bushings (C1 and C2) 10-kV excitation on all taps Core ground and winding resistance Oil quality and dissolved gas analysis (DGA). The power factor of the high-voltage winding was elevated. The measured value of 0.58% did not meet industry-standard acceptable values or National Grid's required values. All other tests results were acceptable. POWER FACTOR TESTING Insulation power factor tests are used to measure dielectric losses, which relate the wetness, dryness or deterioration of transformer insulation. Both factory and field testing are performed to verify the insulation integrity of substation transformers. Power factor testing a two-winding transformer is conducted by energizing the winding at a known ac voltage (typically 10 kV for windings rated greater than 10 kV) with the common winding bushings shorted together. The results of overall power factor tests on power transformers reflect the insulation condition of the windings, barriers, tap changers, bushings and oil. Modern oil-filled power transformers should have power factors of 0.5% or less, corrected to 20°C (68°F), for individual windings to ground (CH and CL) and interwinding insulations (CHL). The National Grid transformer specification states that the power factor of the insulation system shall not exceed 0.5% at 20°C. As part of the investigation into the high power factor, the transformer manufacturer retested the power factor with similar results. The high-voltage bushings were replaced and the unit was retested. The results did not change. The unit was drained and an internal inspection was performed; nothing was found. The vendor performed a 24-hour hot oil and vacuum process to rule out the possibility of moisture in the insulation. The power factor was again retested and still had high CH results. Both the seller and purchaser agreed that the unit should be returned to the factory for further investigation. REVIEW OF INITIAL FACTORY TESTS PERFORMED The results of the factory tests performed initially when the transformer was built were reviewed. Temperature rise tests were acceptable. Preliminary tests of resistance, polarity, phase relation, ratio, no-load loss and excitation current, impedance and load loss, excitation and power factor were all acceptable. Dielectric impulse, applied and induced potential tests were acceptable, following IEEE guidelines, although enhanced voltage test results were elevated. DGAs taken before tests and after OA and FA heat run tests were acceptable. DGA results after high-voltage tests indicated a problem. Due to the gassing, the unit had been drained, reprocessed and vacuum filled. The induced voltage test and DGA tests were repeated with acceptable results. The unit was shipped.
  • 2. INDUCED VOLTAGE TESTING The purpose of the induced voltage test is to prove the insulation strength between parts of the same winding and insulation to ground that was not proved during the applied potential test. It also proves the condition of the insulation between windings and between phases. The voltage applied during the induced voltage testing is on the order of 1.5 to 2 times the rated voltage. Weaknesses in dielectric design, processing or manufacturing may cause partial-discharge (PD) activity during this test. PD is generally monitored on all line terminals rated 115 kV or higher during the induced voltage test. A special generator with a frequency greater than 60 Hz must be used so the core does not saturate due to the higher-than-normal voltage that is induced in the windings. For most power transformer testing, this generator is 120 Hz, 180 Hz or 240 Hz. The induced voltage test is the final dielectric test. All class II power transformers shall be induced voltage tested with the required test levels induced in the high-voltage winding. The taps shall be selected so that the test levels developed in the other windings are 1.5 times their maximum operating voltage. The voltage is raised to the one-hour level and held long enough to verify there are no PD problems. The voltage is then raised to the enhanced level and held for 7200 cycles. The voltage is then reduced to the one-hour level and held for one hour. During the one-hour period, PD measurements should be recorded at 5-minute intervals on each terminal 115 kV and above. The test is performed with the neutral terminals solidly grounded; this will stress the insulation at the same per unit of voltage. The test frequency is increased relative to the operating frequency to avoid core saturation per IEEE standard C57.12.90. EVALUATION OF INDUCED VOLTAGE TEST Per IEEE C57.12-2000, the following criteria shall be met: Failure may be indicated by the presence of smoke and bubbles rising in the oil, an audible sound such as a thump or a sudden increase in test current. Any such indication should be carefully investigated by observation, by repeating the test or by other tests to determine whether a failure has occurred. In terms of interpretation of PD measurements, the results shall be considered acceptable and no further PD tests required under the following conditions: a. The magnitude of the PD level does not exceed 100 µV. b. The increase in PD levels during the 1-hour test does not exceed 30 µV. c. The PD levels during the 1-hour test do not exhibit any steadily rising trend, and no sudden, sustained increase in levels occurs during the last 20 minutes of the tests. Judgment should be used on the 5-minute readings so that momentary excursions of the radio-influence voltage (RIV) meter caused by cranes or other ambient sources are not recorded. Also, the test may be extended or repeated until acceptable results are obtained. Unless breakdown occurs or very high PDs are sustained for a long time, this test is considered as nondestructive. A failure to meet the PD acceptance criterion shall, therefore, not warrant immediate rejection, but lead to consultation between purchaser and manufacturer about further investigations. DISSOLVED GAS ANALYSIS RESULTS DGA of oil during factory testing will assist in determining if any arcing, corona discharge, low-energy sparking, overloading and overheating has occurred. The detection of gases greater than the allowable limits shall require further investigation. DGA samples should be taken before, during and after thermal performance and high-voltage tests to determine the amount of gas generated during testing. The limits listed in the table on page 58 are National Grid maximum allowable increases for gases from the beginning of any testing to the completion of all testing. Any results higher than those listed in the table would require further investigation. BACK TO THE MANUFACTURER FOR RETESTING As agreed upon by National Grid and the manufacturer, the transformer was returned to the manufacturer for inspection. The core and coils were removed from the tank, the high-voltage delta connection was broken, and single-phase winding power factor tests were performed with the unit on the drip pad. DISCUSSION OF POWER FACTOR RESULTS
  • 3. Treeing on the phase barrier board between H2 and H3 was found on the surface of barrier board at the base of the coils where the windings are the closest to one another. The normal watts loss/power factor of H1 and higher watts loss/power factor on both H2 and H3 indicates the problem is common to H2 and H3 windings. The barriers were then removed and retested, the H1 remained unchanged and the H2 and H3 watts loss/power factor lowered to the H1 values. This indicates that the contamination was related to H2-H3 barriers. DISCUSSION OF INDUCED VOLTAGE TESTS BEFORE INITIAL SHIPMENT 1 2 Next The enhanced voltage test results indicated a normal level on H3 and higher level on H1 and H2. This appeared contradictory to what was visually found. Further analysis of the winding arrangement, location of the treeing and higher- than-expected micro-volt and pico-coulomb test results all indicated a problem at the base of #2 and #3 windings. This was because the H1 lead is connected to the bottom of the #2 winding and the H2 lead is connected to the bottom of the #3 winding stressing the bottom of the H2/H3 barrier board. TEARDOWN, POWER FACTOR AND INDUCED VOLTAGE TESTS The power factor testing during the teardown helped in identifying the location of the contamination. The winding design and location of the contamination accounted for the higher losses identified during the initial enhanced voltage test. We can assume the contamination caused arcing during the initial enhanced voltage test. The DGA results confirm that arcing occurred. The high voltage most likely burnt away the majority of the debris during the test and left a carbon tree. The subsequent oil processing and vacuum filling at the factory may have cleaned the area enough to partially cure the problem. Therefore, the second induced voltage test, prior to initial shipment, was acceptable and the DGA showed no arcing at that time. LABORATORY ANALYSIS OF BARRIER BOARD The transformer H2/H3 barrier pressboard was removed from the unit and brought to the Doble Materials Laboratory in Watertown, Massachusetts, U.S., for analysis. An initial visual examination of the pressboard showed that discharge treeing was quite distinct. An adjacent board was also inspected and there was no discharge treeing visible. The Doble Materials Laboratory was asked to aid in determining the cause of the discharge treeing in the pressboard. Unfortunately, the pressboards were not stored in a controlled environment at the transformer manufacturer after they were removed from the transformer, thus making it impossible to determine if moisture and metal particle contamination were present on the barrier board when the transformer was assembled. FACTORY REPAIR The top yoke was removed and the coils were un-nested. A complete visual inspection of the coils was performed. The barrier insulation, top and bottom insulation, and leads were replaced. The unit was reassembled and fully re-tested. All factory test results after the repair were acceptable and the unit was shipped. The unit was delivered to the substation, dressed, vacuum filled and tested by the vendor. All field test results were acceptable. LESSONS LEARNED It is important to set power factor limit for acceptance testing. It is important to set DGA limits for factory testing. Require reporting of all factory test results in the final test report. Factory power factor testing should be performed before and after thermal/high-voltage tests. Specification should include limits for the induced voltage test during the enhanced voltage period.
  • 4. Specifications should include a statement similar to: “If the transformer fails any test, the purchaser shall be notified immediately. The purchaser shall be consulted about the failure, and based on the test results, the purchaser may require a complete retest of all tests.” Preservation of removed parts in controlled environments is essential when performing root-cause analysis. In conclusion, there is great value in analyzing all test results, as each test represents a different component that verifies the design and manufacturing process. All test results should be reviewed prior to releasing a transformer for shipment. National Grid believes there is value in performing a power factor test before and after factory testing. In this case, induced voltage testing was acceptable but power factor testing revealed a problem. Final power factor test results also will assist the purchaser when performing field acceptance testing. The manufacturer who supplied this transformer now performs power factor tests before and after high-voltage testing. John Bleyer is a senior substation equipment maintenance engineer at National Grid. He graduated from Worcester Polytechnic Institute in 1986 with a BSEE degree. Bleyer provides technical support to substation field operations personnel in the New England area. He has more than 15 years of experience in substation maintenance and design. JOHN.BLEYER@us.ngrid.com Phillip Prout is lead senior maintenance engineer at National Grid in the Substation O&M Services group located in Massachusetts. He is a 1986 graduate of Wentworth Institute of Technology from the mechanical engineering program. He has 15 years of field experience, including 10 years as a substation supervisor. He is currently the chairperson on the Doble Insulating Materials Committee. PHILLIP.PROUT@us.ngrid.com Insulation Tested % Power Factor Corrected to 20°C CH 0.58 CL 0.21 CHL(UST) 0.15 Oil 0.02 Power factor acceptance test. Insulation Tested % Power Factor Corrected to 20°C CH 0.21 CL 0.18 CHL(UST) 0.14 Initial factory power factor testing prior to high-voltage testing. Kv P-P % of Enhancement Time (min) H1 H2 H3 pC uV pC uV pC uV 0 0 0 9 0 12 0 11 52 25 0 9 0 12 0 11 104 50 5 9 5 12 0 11 156 75 19 13 20 17 0 11 208 100 478 250 581 700 34 35 182 87.5 0-60 5-20 16-50 0-8 23-40 0-5 20-35 Factory-induced voltage testing dated April 26, 2004, prior to shipment. (Enhanced 120L-G/208P-P — One Hour 105L-G/182P-P) Date 4/24/04 4/25/04 4/26/04 4/26/04 Test Limits Note Before all tests After OA Heat Run After FA Heat Run After all Tests Hydrogen 1 8 8 16 10 Methane 0 0 0 0 5 Ethane 0 0 0 0 2 Ethylene 0 0 0 1 2 Acetylene 0 0 0 5 0 Carbon Monoxide 4 20 48 67 30 Carbon Dioxide 25 62 149 153 300 Initial factory DGA test results. Gas name Gas symbol ppm limit Hydrogen H2 10 Methane CH4 5 Ethane C2H6 2 Ethylene C2H4 2 Acetylene C2H2 0 Carbon Monoxide CO 30
  • 5. Gas name Gas symbol ppm limit Carbon Dioxide CO2 300 National Grid maximum gas limits. Test # Insulation Test Connection Mode kV % PF Cap. Energize Ground Guard 1 CH1 H1 - LV, H2, H3 GST 2.5 0.44 267.39 2 CH2 H2 - LV, H1, H3 GST 2.5 1.95 227.30 3 CH3 H3 - LV, H1, H2 GST 2.5 1.92 237.29 Power factor (PF) testing of transformer (115kV delta connection cut — on drip pad). Test # Insulation Test Connection Mode kV mA Watts % PF Cap. Energize Ground Guard 4 CH1 H1 - LV, H2, H3 GST 2.5 0.253 2.4 0.39 268.79 5 CH2 H2 - LV, H1, H3 GST 2.5 0.212 2.4 0.45 220.90 6 CH3 H3 - LV, H1, H2 GST 2.5 0.219 2.0 0.35 230.26 Power factor testing of transformer (barriers removed). Previous 1 2