BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 1 of 9
The following tests shall be performed on the above HVR transformer generally in accordance with
IS-2026-1977 (wherever applicable) and Functional Test Procedure TP: 109.
Routine Tests [generally as per IS-2026]
A. Outside the tank (in air): Before the connection of the transformer with rectifier, AC
Reactor, DC Choke etc. and done internally by BHEL.
1. Core: 2 KV ACrms withstand test at 50 Hz for 1 minute.
2. Winding Resistance: HV and LV windings.
3. Ratio Test.
B. Inside the tank (under Oil): After the connection of the transformer with rectifier, AC
reactors, RF choke etc.
i) Check for Oil:- BDV, PPM, Resistivity & Tan Delta
ii) Insulation resistance between HV-LV, HV-E & LV-E
(Use 2.5 KV megger for HV and 1 KV megger for LV)
iii) Applied voltage test between
a) L-E at 3 KV for 1 minute at 50 Hz.
b) H-E at 10 KV for 1 minute at 50 Hz.
iv) Induced over voltage test at 2 x Normal volts at 100 Hz for 1 minute (2 x 373.5 V).
v) No load loss and no load current at 50 Hz at
a) 373.5 Volts (i.e. 415 – 10% V) (Guaranteed Loss = 450 W + IS Tol.)
b) 415 Volts (Loss is Guaranteed at 373.5 V)
c) 456.5 Volts (i.e. 415 + 10%)
vi) Load loss and impedance voltage at rated DC output current
(Guaranteed load loss at rated current = 4000 W + IS Tol.)
vii) DC Voltage measurement between AS1 and AS2 at rated mA current after shorting
AS2 to ground.
viii) DC Voltage measurement between AS2 and AR in no load condition of transformer at
a) 70 KV DC output
b) 95 KV DC output
ix) Check on critical dimensions:
a) Between rollers (Dimension A & B)
b) (-) ve bushing flange to center line of HVR (Dimension C)
c) Height of (-) ve bushing from ground level (Dimension D)
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 2 of 9
Functional Tests [Combined EC-HVR tests as per Functional Test procedure TP-109]
i) Resistive and Capacitive Load test from 0 to rated load inline with clause 2.3.0 of TP-
109.
ii) Time over ride test (T/O test) in line with clause 2.4.0 of TP-109.
iii) Current Regulation test in line with clause 2.5.0 of TP-109
a) Line Regulation test
b) Load Regulation test
iv) Semi pulse Operation at different Charge Ratios: The transformer shall be tested at
charge ratio of 1, 3, 31 & 159 in line with clause 2.6.0 of TP-109.
v) S & T Control test in line with clause 2.7.0 of TP-109.
vi) Spark test inline with clause 2.8.0 of TP-109.
vii) Spark Simulation test inline with clause 2.9.0 of TP-109.
viii) Resistive load test from ‘0’ to rated load inline with clause no. 2.12.0 of TP-109.
ix) Fault Annunciation test on HVR inline with clause no. 2.10.0 of TP-109: For the
following components individual test records shall be verified. After assembling with
HVR wiring continuity shall be checked.
a) Buchholz relay
b) Oil Temperature Indicator
c) Magnetic Oil Level Gauge
NOTE: Standard Electronic controller available with the Test section shall be used for conducting
the Functional tests on HVR.
Type Tests [On one unit only without EC]
1. Temperature Rise Test: - as per IS-2026
This test shall be conducted by using short circuit method. Voltage at 50 Hz shall be
applied to LV winding keeping HV shorted. The voltage shall be adjusted to give full
load rated losses, corresponding to rated DC current of 800 mA.
(i.e. NO Load Loss of transformer + Load Loss of Transformer at 75 °C + Diode Losses
+ Losses of AC Reactor)
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 3 of 9
The test shall be conducted until the oil temperature is steady. The voltage will then
be adjusted to give full load rated current for one hour and LV hot resistance will be
measured after that.
(HV winding hot resistance measurement is not possible since it is connected with
rectifiers.)
The temperature rise will be computed from the hot winding resistance of the LV
winding.
Guaranteed Values:
Top oil Rise : 50 °C
Winding Rise : 55 °C
NOTE: During temperature rise test, Electronic Controller shall not be used and
Power supply will be obtained from MG set of test plant.
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 4 of 9
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 5 of 9
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 6 of 9
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 7 of 9
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 8 of 9
BHARAT HEAVY ELECTRICALS LIMITED, JHANSI
TRANSFORMER ENGINEERING
Doc. No.: TRE/18207N/TS Rev-02
RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for
E.S.P. (Mark V)
KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030
Project: APGENCO, KAKATIYA (1X600 MW)
Test Schedule
W.O. No. : 18207N10200 Calculated : Date : 20-May-11
E.S. No. : 625569 Checked : Date : 20-May-11
E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx
Page 9 of 9

More Related Content

What's hot

2 electrical machines lab
2 electrical machines lab2 electrical machines lab
2 electrical machines lab
zeta eksa
 
The value of power factor testing
The value of power factor testingThe value of power factor testing
The value of power factor testing
Abi finni
 
Emergency Generator - Paralleling Switchgear Power Switching Control
Emergency Generator - Paralleling Switchgear Power Switching ControlEmergency Generator - Paralleling Switchgear Power Switching Control
Emergency Generator - Paralleling Switchgear Power Switching Control
michaeljmack
 

What's hot (19)

Substation Maintenance
Substation MaintenanceSubstation Maintenance
Substation Maintenance
 
2 electrical machines lab
2 electrical machines lab2 electrical machines lab
2 electrical machines lab
 
7 8. emi - analog instruments and digital instruments
7 8. emi - analog instruments and digital instruments7 8. emi - analog instruments and digital instruments
7 8. emi - analog instruments and digital instruments
 
TRANSFORMER TEST acceptance criteria
TRANSFORMER TEST acceptance criteriaTRANSFORMER TEST acceptance criteria
TRANSFORMER TEST acceptance criteria
 
Transformer testing on sight and off sight
Transformer testing on sight and off sightTransformer testing on sight and off sight
Transformer testing on sight and off sight
 
Emii
EmiiEmii
Emii
 
Occ of dc generator
Occ of dc generatorOcc of dc generator
Occ of dc generator
 
The value of power factor testing
The value of power factor testingThe value of power factor testing
The value of power factor testing
 
Transformer Site test
Transformer Site testTransformer Site test
Transformer Site test
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
Three phase power measurement
Three phase power measurementThree phase power measurement
Three phase power measurement
 
Verification of maximum power transfer theorem
Verification of maximum power transfer theoremVerification of maximum power transfer theorem
Verification of maximum power transfer theorem
 
1 80 fineshed
1 80 fineshed1 80 fineshed
1 80 fineshed
 
Emergency Generator - Paralleling Switchgear Power Switching Control
Emergency Generator - Paralleling Switchgear Power Switching ControlEmergency Generator - Paralleling Switchgear Power Switching Control
Emergency Generator - Paralleling Switchgear Power Switching Control
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Ls catalog thiet bi dien pf e_dienhathe.vn
Ls catalog thiet bi dien pf e_dienhathe.vnLs catalog thiet bi dien pf e_dienhathe.vn
Ls catalog thiet bi dien pf e_dienhathe.vn
 
5 emi ac bridges (with marking)
5 emi  ac bridges (with marking)5 emi  ac bridges (with marking)
5 emi ac bridges (with marking)
 
Unit 1-2-b
Unit 1-2-bUnit 1-2-b
Unit 1-2-b
 
4. emi potentiometer and ac bridges
4. emi  potentiometer and ac bridges4. emi  potentiometer and ac bridges
4. emi potentiometer and ac bridges
 

Similar to Test schedule hvr tr rev02

Himalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-SystemHimalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-System
Fang Sam
 
Iirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving station
Iaetsd Iaetsd
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
michaeljmack
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
RAJPRASAD RS
 

Similar to Test schedule hvr tr rev02 (20)

RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
Novel 9-Steps Automatic Voltage Regulator based on Two Step-Down Transformers
Novel 9-Steps Automatic Voltage Regulator based on Two  Step-Down Transformers Novel 9-Steps Automatic Voltage Regulator based on Two  Step-Down Transformers
Novel 9-Steps Automatic Voltage Regulator based on Two Step-Down Transformers
 
Simulation and Experimental Verification of Single-Phase Pwm Boost -Rectifier...
Simulation and Experimental Verification of Single-Phase Pwm Boost -Rectifier...Simulation and Experimental Verification of Single-Phase Pwm Boost -Rectifier...
Simulation and Experimental Verification of Single-Phase Pwm Boost -Rectifier...
 
Power Electronics Lab Manual Spring 2017
Power Electronics Lab Manual Spring 2017Power Electronics Lab Manual Spring 2017
Power Electronics Lab Manual Spring 2017
 
Electrical machine lab
Electrical machine labElectrical machine lab
Electrical machine lab
 
Ee 791 drives lab maual
Ee 791 drives lab maualEe 791 drives lab maual
Ee 791 drives lab maual
 
Himalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-SystemHimalayal-AC-Resonant-Test-System
Himalayal-AC-Resonant-Test-System
 
Ac machines-lab-manual
Ac machines-lab-manualAc machines-lab-manual
Ac machines-lab-manual
 
Iii eie ii sem pe lab manual(ee382)
Iii eie ii sem pe lab manual(ee382)Iii eie ii sem pe lab manual(ee382)
Iii eie ii sem pe lab manual(ee382)
 
An Experimental Study of the Unbalance Compensation by Voltage Source Inverte...
An Experimental Study of the Unbalance Compensation by Voltage Source Inverte...An Experimental Study of the Unbalance Compensation by Voltage Source Inverte...
An Experimental Study of the Unbalance Compensation by Voltage Source Inverte...
 
Iirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving stationIirdem mitigation of voltage collapse at davanagere receiving station
Iirdem mitigation of voltage collapse at davanagere receiving station
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
INSTALLATION OF 500MVA TRANSFORMER AT PGCIL
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
farady 15kv pole mounted auto circuit breaker
farady 15kv pole mounted auto circuit breakerfarady 15kv pole mounted auto circuit breaker
farady 15kv pole mounted auto circuit breaker
 
Far 15 kv auto recloser
Far 15 kv auto recloserFar 15 kv auto recloser
Far 15 kv auto recloser
 
Electrical machines-lab-i-ee0209
Electrical machines-lab-i-ee0209Electrical machines-lab-i-ee0209
Electrical machines-lab-i-ee0209
 
REPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANTREPORT -VALLUR THERMAL POWER PLANT
REPORT -VALLUR THERMAL POWER PLANT
 

Recently uploaded

Recently uploaded (20)

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

Test schedule hvr tr rev02

  • 1. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 1 of 9 The following tests shall be performed on the above HVR transformer generally in accordance with IS-2026-1977 (wherever applicable) and Functional Test Procedure TP: 109. Routine Tests [generally as per IS-2026] A. Outside the tank (in air): Before the connection of the transformer with rectifier, AC Reactor, DC Choke etc. and done internally by BHEL. 1. Core: 2 KV ACrms withstand test at 50 Hz for 1 minute. 2. Winding Resistance: HV and LV windings. 3. Ratio Test. B. Inside the tank (under Oil): After the connection of the transformer with rectifier, AC reactors, RF choke etc. i) Check for Oil:- BDV, PPM, Resistivity & Tan Delta ii) Insulation resistance between HV-LV, HV-E & LV-E (Use 2.5 KV megger for HV and 1 KV megger for LV) iii) Applied voltage test between a) L-E at 3 KV for 1 minute at 50 Hz. b) H-E at 10 KV for 1 minute at 50 Hz. iv) Induced over voltage test at 2 x Normal volts at 100 Hz for 1 minute (2 x 373.5 V). v) No load loss and no load current at 50 Hz at a) 373.5 Volts (i.e. 415 – 10% V) (Guaranteed Loss = 450 W + IS Tol.) b) 415 Volts (Loss is Guaranteed at 373.5 V) c) 456.5 Volts (i.e. 415 + 10%) vi) Load loss and impedance voltage at rated DC output current (Guaranteed load loss at rated current = 4000 W + IS Tol.) vii) DC Voltage measurement between AS1 and AS2 at rated mA current after shorting AS2 to ground. viii) DC Voltage measurement between AS2 and AR in no load condition of transformer at a) 70 KV DC output b) 95 KV DC output ix) Check on critical dimensions: a) Between rollers (Dimension A & B) b) (-) ve bushing flange to center line of HVR (Dimension C) c) Height of (-) ve bushing from ground level (Dimension D)
  • 2. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 2 of 9 Functional Tests [Combined EC-HVR tests as per Functional Test procedure TP-109] i) Resistive and Capacitive Load test from 0 to rated load inline with clause 2.3.0 of TP- 109. ii) Time over ride test (T/O test) in line with clause 2.4.0 of TP-109. iii) Current Regulation test in line with clause 2.5.0 of TP-109 a) Line Regulation test b) Load Regulation test iv) Semi pulse Operation at different Charge Ratios: The transformer shall be tested at charge ratio of 1, 3, 31 & 159 in line with clause 2.6.0 of TP-109. v) S & T Control test in line with clause 2.7.0 of TP-109. vi) Spark test inline with clause 2.8.0 of TP-109. vii) Spark Simulation test inline with clause 2.9.0 of TP-109. viii) Resistive load test from ‘0’ to rated load inline with clause no. 2.12.0 of TP-109. ix) Fault Annunciation test on HVR inline with clause no. 2.10.0 of TP-109: For the following components individual test records shall be verified. After assembling with HVR wiring continuity shall be checked. a) Buchholz relay b) Oil Temperature Indicator c) Magnetic Oil Level Gauge NOTE: Standard Electronic controller available with the Test section shall be used for conducting the Functional tests on HVR. Type Tests [On one unit only without EC] 1. Temperature Rise Test: - as per IS-2026 This test shall be conducted by using short circuit method. Voltage at 50 Hz shall be applied to LV winding keeping HV shorted. The voltage shall be adjusted to give full load rated losses, corresponding to rated DC current of 800 mA. (i.e. NO Load Loss of transformer + Load Loss of Transformer at 75 °C + Diode Losses + Losses of AC Reactor)
  • 3. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 3 of 9 The test shall be conducted until the oil temperature is steady. The voltage will then be adjusted to give full load rated current for one hour and LV hot resistance will be measured after that. (HV winding hot resistance measurement is not possible since it is connected with rectifiers.) The temperature rise will be computed from the hot winding resistance of the LV winding. Guaranteed Values: Top oil Rise : 50 °C Winding Rise : 55 °C NOTE: During temperature rise test, Electronic Controller shall not be used and Power supply will be obtained from MG set of test plant.
  • 4. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 4 of 9
  • 5. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 5 of 9
  • 6. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 6 of 9
  • 7. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 7 of 9
  • 8. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 8 of 9
  • 9. BHARAT HEAVY ELECTRICALS LIMITED, JHANSI TRANSFORMER ENGINEERING Doc. No.: TRE/18207N/TS Rev-02 RATING: 95 KVp, 800 mA (average) DC, High Voltage Rectifier Transformer (HVR) for E.S.P. (Mark V) KVA: 83 Phase: 1 Frequency: 50 Voltage: 373.5/74030 Project: APGENCO, KAKATIYA (1X600 MW) Test Schedule W.O. No. : 18207N10200 Calculated : Date : 20-May-11 E.S. No. : 625569 Checked : Date : 20-May-11 E:SanketESPTestSchedule_ESP18207-95-800-02-20-05-2011.docx Page 9 of 9