A Closed-Circuit Television (CCTV) Camera became stuck in the sanitary sewer line located in the Old Keene Mill Shopping Center. Wastewater Design and Construction Division mobilized to the site with the on-call contractor to begin the 15-foot excavation to replace 50 feet of broken gravity sewer. Because the work was within a shopping center parking lot, the project team worked the night shift to limit disturbance to the community. After four days of work, the camera was retrieved, and the pit was backfilled. This project was substantially complete on August 27, 2021.