TECHNIQUES BEHIND
DEMOLITION OF STRUCTURES
INDEX
1. INTRODUCTION
2. OBJECTIVES
3. STEPS BEFORE DEMOLITION
4. DEMOLITION SEQUENCE
5. METHODS OF DEMOLITION
2
1. INTRODUCTION.
 In general, demolition can be defined as
wrecking or taking out of any load supporting
structural element of a building (houses,
commercial establishments, and office
buildings) or non-building facility (highways,
streets, and other non- inhabitable construction
projects).
3
2. OBJECTIVES.
 Old and damaged buildings ( due to earthquake & other
various reasons) which are prone to fall down completely or
partially must be demolished before any fatal accident.
 When the important structural components like beams and
columns become absolutely insufficient for service then
there is no option other than demolishing the building.
 When a new structure need to be constructed on the site the
old structure is demolished.
 For safety of neighbouring area a deteriorated building is
often demolished.
4
3. STEPS BEFORE
DEMOLITION.
a. Surveying.
b. Removal of
hazardous
materials.
c. Preparation of
plan.
d. Safety
measures.
5
SURVEYING
The building survey should cover the following:
• The construction materials.
• The existing use and, if possible, the past uses of the
building prior to demolition.
• Adjoining pedestrian and vehicular traffic conditions.
• The sensitivity of neighbourhood with respect to noise, dust,
vibration and traffic impact.
• Available site area to allow on-site sorting of building
debris.
6
REMOVAL OF HAZARDOUS
MATERIALS:
Asbestos Containing Material:
• In the case when asbestos containing material are
discovered, specialist contractor shall be employed
to remove such asbestos containing material. The
asbestos waste should be handled, stored and
disposed of as chemical waste in accordance with
the waste disposal regulation.
7
Soil Contamination Material:
• In the case when possible soil contamination
materials is present, specialist shall be employed to
prepare soil contamination test proposal and submit
such proposal to the environmental protection
department for comment.
8
PREPARATION OF PLAN:
• A plan showing location of the building to be
demolished, sections of the slopes with ground level
contours and detailed topography, ground removal and
backfilling, distances of adjacent structures from the
building to be demolished.
• A layout plan of all floors of the building to be
demolished, with adequate sections.
• A plan showing the procedure for the demolition of the
building.
9
• A plan showing the proposed shoring and temporary
support to be provided to the building to be
demolished.
• In the case when powered mechanical plants and
equipment are used, a plan showing the route of
movement of powered mechanical plants and
equipments.
10
SAFETY MEASURES:
Training and Communication:
• Demolition workers, including plant or equipment
operators, shall go through proper job safety
training and be informed of the potential hazards by
attending training sessions as well as on the – job
training.
11
Equipment Maintenance:
• All equipment shall be tested and examined before
use. They shall be properly stored and maintained.
The equipment shall be inspected daily and results
of the inspected daily and results of the inspection
shall be recorded accordingly.
12
Electrical Safety:
• A properly connected power source from a local electric
utility supplier or a mobile electricity generator shall be
utilized in demolition sites.
Fire:
• All flammable goods shall be removed from site unless
they are necessary for works involved. Any remaining
flammable goods shall be stored in proper storage
facilities.
13
METHODS OF DEMOLITION
A. Ball and crane method.
B. Dismantling
C. Pneumatic and hydraulic breaker
D. Explosives
14
A. Ball and crane method.
• A crane uses awrecking ball, weighing up to 6120
kg, which is either dropped onto or swung into the
element to be demolished.
15
B. Dismantling.
• Selective or complete demolition of concrete
structures is possible by cutting elements and then
removing them with a crane.
• The cutting process may be by sawing, water
jetting or thermal lance.
16
C. Pneumatic and hydraulic breaker.
A common piece of equipment used for demolishing
bridgedecks, foundations and pavements is a
hydraulically or pneumatically operated, boom-
mounted breaker.
• A jackhammer is a pneumatic or electro-mechanical
tool that combines a hammer directly with chisel.
17
• A hydraulic breaker is a powerful percussion
hammer fitted to an excavator for demolishing
concrete structures or rocks. It is powered by an
auxiliary hydraulic system from the excavator,
which is fitted with a foot- operated valve for this
purpose
18
D. Implosion.
• In the controlled demolition industry, building
implosion is the strategic placing of explosive
material and timing of its detonation so that a
structure collapses on itself in a matter of seconds,
minimizing the physical damage to its immediate
surroundings.
19
Advantages of explosive demolition.
• Less expensive.
• No ground vibrations.
• Quickest methods.
• Suitable for multi-storyed / high piers, cabins,
distressed piers etc.
20
21
CONCLUSION
• It can be concluded that demolishing/ imploing the
building structure will prove very useful,
economical and the quickest for reconstruction.
• Leads to safe and controlled demolition for the
occupants and neighbourhood.
• Development in techniques allows a rapid
demolition with no harm to the environment.
22
THANK YOU
Add a Footer 23

More Related Content

What's hot

Ch 5 demolition of structures
Ch 5 demolition of structuresCh 5 demolition of structures
Ch 5 demolition of structuresAnkit Patel
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONSANJEEV Wazir
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATAbhinav Rawat
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentationRahul bhatnagar
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolitionManthan Vaghasiya
 
Stability certificate
Stability certificateStability certificate
Stability certificatestructaudit
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONDAVIDSON ECHIDIKE
 
Steel Structure Fabrication and erection (Ravi Choudhary).pptx
Steel Structure Fabrication and erection (Ravi Choudhary).pptxSteel Structure Fabrication and erection (Ravi Choudhary).pptx
Steel Structure Fabrication and erection (Ravi Choudhary).pptxmrujjavalsinghvarana
 
Building Service Chapter 4
Building Service Chapter 4Building Service Chapter 4
Building Service Chapter 4Izam Lukman
 
Formwork design vs falsework design key differences
Formwork design vs falsework design  key differencesFormwork design vs falsework design  key differences
Formwork design vs falsework design key differencesscaffolddesign
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction purvi golecha
 
Demolition of building
Demolition of buildingDemolition of building
Demolition of buildingAnimesh1714013
 
Demolition of building
Demolition of buildingDemolition of building
Demolition of buildingvikas mishra
 
Post tensioning company method statement | shivforce.in
Post tensioning company   method statement | shivforce.in Post tensioning company   method statement | shivforce.in
Post tensioning company method statement | shivforce.in Sathish Kumar
 
Demolition Techniques.pptx
Demolition Techniques.pptxDemolition Techniques.pptx
Demolition Techniques.pptxAnanthakumar75
 

What's hot (20)

Ch 5 demolition of structures
Ch 5 demolition of structuresCh 5 demolition of structures
Ch 5 demolition of structures
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTION
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWATDEMOLITION OF STRUCTURE BY ABHINAV RAWAT
DEMOLITION OF STRUCTURE BY ABHINAV RAWAT
 
pile foundation and pile cap presentation
pile foundation and pile cap presentationpile foundation and pile cap presentation
pile foundation and pile cap presentation
 
Safety precautions during demolition
Safety precautions during demolitionSafety precautions during demolition
Safety precautions during demolition
 
Stability certificate
Stability certificateStability certificate
Stability certificate
 
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
 
Steel Structure Fabrication and erection (Ravi Choudhary).pptx
Steel Structure Fabrication and erection (Ravi Choudhary).pptxSteel Structure Fabrication and erection (Ravi Choudhary).pptx
Steel Structure Fabrication and erection (Ravi Choudhary).pptx
 
Building Service Chapter 4
Building Service Chapter 4Building Service Chapter 4
Building Service Chapter 4
 
Formwork design vs falsework design key differences
Formwork design vs falsework design  key differencesFormwork design vs falsework design  key differences
Formwork design vs falsework design key differences
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
BCT Mod 4 demolition of structure
BCT Mod 4 demolition of structureBCT Mod 4 demolition of structure
BCT Mod 4 demolition of structure
 
Demolition of building
Demolition of buildingDemolition of building
Demolition of building
 
Demolition of building
Demolition of buildingDemolition of building
Demolition of building
 
Post tensioning company method statement | shivforce.in
Post tensioning company   method statement | shivforce.in Post tensioning company   method statement | shivforce.in
Post tensioning company method statement | shivforce.in
 
Demolition Techniques.pptx
Demolition Techniques.pptxDemolition Techniques.pptx
Demolition Techniques.pptx
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 

Similar to Techniques behind demolition of structures

demolition of building
demolition of buildingdemolition of building
demolition of buildingtushar garg
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKKHUSHBU SHAH
 
Demolition Safety 2015
Demolition Safety 2015Demolition Safety 2015
Demolition Safety 2015John Newquist
 
Techniques for Demolition of Structure
Techniques for Demolition of StructureTechniques for Demolition of Structure
Techniques for Demolition of StructureDinaker Dixit
 
Demolishing of concrete structures
Demolishing of concrete structuresDemolishing of concrete structures
Demolishing of concrete structuresTsegaye Arega
 
Demolishing of concrete structures
Demolishing of concrete structuresDemolishing of concrete structures
Demolishing of concrete structuresTsegaye Arega
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codejaimin1702
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfPinakRay1
 
Rehabilitation of structures,Method of Demolition of Structures
Rehabilitation of  structures,Method of Demolition of  StructuresRehabilitation of  structures,Method of Demolition of  Structures
Rehabilitation of structures,Method of Demolition of StructuresPRAJWAL SHRIRAO
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aRai University
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aRai University
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aRai University
 
Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Sumit Modi
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structureMinh Bui Si
 

Similar to Techniques behind demolition of structures (20)

demolition of building
demolition of buildingdemolition of building
demolition of building
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORK
 
Demolition.pptx
Demolition.pptxDemolition.pptx
Demolition.pptx
 
Demolition Safety 2015
Demolition Safety 2015Demolition Safety 2015
Demolition Safety 2015
 
Bs bab 4
Bs bab 4Bs bab 4
Bs bab 4
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
 
Techniques for Demolition of Structure
Techniques for Demolition of StructureTechniques for Demolition of Structure
Techniques for Demolition of Structure
 
Demolishing of concrete structures
Demolishing of concrete structuresDemolishing of concrete structures
Demolishing of concrete structures
 
Demolishing of concrete structures
Demolishing of concrete structuresDemolishing of concrete structures
Demolishing of concrete structures
 
Demolition pptx
Demolition pptxDemolition pptx
Demolition pptx
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
 
Presentation-Demolition-Yıkım
Presentation-Demolition-YıkımPresentation-Demolition-Yıkım
Presentation-Demolition-Yıkım
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
Rehabilitation of structures,Method of Demolition of Structures
Rehabilitation of  structures,Method of Demolition of  StructuresRehabilitation of  structures,Method of Demolition of  Structures
Rehabilitation of structures,Method of Demolition of Structures
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction a
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction a
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction a
 
Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildings
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 

Techniques behind demolition of structures

  • 2. INDEX 1. INTRODUCTION 2. OBJECTIVES 3. STEPS BEFORE DEMOLITION 4. DEMOLITION SEQUENCE 5. METHODS OF DEMOLITION 2
  • 3. 1. INTRODUCTION.  In general, demolition can be defined as wrecking or taking out of any load supporting structural element of a building (houses, commercial establishments, and office buildings) or non-building facility (highways, streets, and other non- inhabitable construction projects). 3
  • 4. 2. OBJECTIVES.  Old and damaged buildings ( due to earthquake & other various reasons) which are prone to fall down completely or partially must be demolished before any fatal accident.  When the important structural components like beams and columns become absolutely insufficient for service then there is no option other than demolishing the building.  When a new structure need to be constructed on the site the old structure is demolished.  For safety of neighbouring area a deteriorated building is often demolished. 4
  • 5. 3. STEPS BEFORE DEMOLITION. a. Surveying. b. Removal of hazardous materials. c. Preparation of plan. d. Safety measures. 5
  • 6. SURVEYING The building survey should cover the following: • The construction materials. • The existing use and, if possible, the past uses of the building prior to demolition. • Adjoining pedestrian and vehicular traffic conditions. • The sensitivity of neighbourhood with respect to noise, dust, vibration and traffic impact. • Available site area to allow on-site sorting of building debris. 6
  • 7. REMOVAL OF HAZARDOUS MATERIALS: Asbestos Containing Material: • In the case when asbestos containing material are discovered, specialist contractor shall be employed to remove such asbestos containing material. The asbestos waste should be handled, stored and disposed of as chemical waste in accordance with the waste disposal regulation. 7
  • 8. Soil Contamination Material: • In the case when possible soil contamination materials is present, specialist shall be employed to prepare soil contamination test proposal and submit such proposal to the environmental protection department for comment. 8
  • 9. PREPARATION OF PLAN: • A plan showing location of the building to be demolished, sections of the slopes with ground level contours and detailed topography, ground removal and backfilling, distances of adjacent structures from the building to be demolished. • A layout plan of all floors of the building to be demolished, with adequate sections. • A plan showing the procedure for the demolition of the building. 9
  • 10. • A plan showing the proposed shoring and temporary support to be provided to the building to be demolished. • In the case when powered mechanical plants and equipment are used, a plan showing the route of movement of powered mechanical plants and equipments. 10
  • 11. SAFETY MEASURES: Training and Communication: • Demolition workers, including plant or equipment operators, shall go through proper job safety training and be informed of the potential hazards by attending training sessions as well as on the – job training. 11
  • 12. Equipment Maintenance: • All equipment shall be tested and examined before use. They shall be properly stored and maintained. The equipment shall be inspected daily and results of the inspected daily and results of the inspection shall be recorded accordingly. 12
  • 13. Electrical Safety: • A properly connected power source from a local electric utility supplier or a mobile electricity generator shall be utilized in demolition sites. Fire: • All flammable goods shall be removed from site unless they are necessary for works involved. Any remaining flammable goods shall be stored in proper storage facilities. 13
  • 14. METHODS OF DEMOLITION A. Ball and crane method. B. Dismantling C. Pneumatic and hydraulic breaker D. Explosives 14
  • 15. A. Ball and crane method. • A crane uses awrecking ball, weighing up to 6120 kg, which is either dropped onto or swung into the element to be demolished. 15
  • 16. B. Dismantling. • Selective or complete demolition of concrete structures is possible by cutting elements and then removing them with a crane. • The cutting process may be by sawing, water jetting or thermal lance. 16
  • 17. C. Pneumatic and hydraulic breaker. A common piece of equipment used for demolishing bridgedecks, foundations and pavements is a hydraulically or pneumatically operated, boom- mounted breaker. • A jackhammer is a pneumatic or electro-mechanical tool that combines a hammer directly with chisel. 17
  • 18. • A hydraulic breaker is a powerful percussion hammer fitted to an excavator for demolishing concrete structures or rocks. It is powered by an auxiliary hydraulic system from the excavator, which is fitted with a foot- operated valve for this purpose 18
  • 19. D. Implosion. • In the controlled demolition industry, building implosion is the strategic placing of explosive material and timing of its detonation so that a structure collapses on itself in a matter of seconds, minimizing the physical damage to its immediate surroundings. 19
  • 20. Advantages of explosive demolition. • Less expensive. • No ground vibrations. • Quickest methods. • Suitable for multi-storyed / high piers, cabins, distressed piers etc. 20
  • 21. 21
  • 22. CONCLUSION • It can be concluded that demolishing/ imploing the building structure will prove very useful, economical and the quickest for reconstruction. • Leads to safe and controlled demolition for the occupants and neighbourhood. • Development in techniques allows a rapid demolition with no harm to the environment. 22
  • 23. THANK YOU Add a Footer 23