REPUBLICA
KATHMANDU, March 8: The government has completed final preparation to establish the Department of Railway (DoR) with the vision of developing 4000 km railway line across the country within 20 years.
The Ministry of Physical Planning and Works (MoPPW), which will oversee the DoR upon its formation, recently finalized the Organization and Management (O&M) survey and sent it to the Ministry of General Administration (MoGA) to forward it to the cabinet for approval.
The government decided to form the DoR to speed up the process of constructing different railway project across the country.
Ram Kumar Lamsal, who was involved in preparing O&M survey, said the DoR would have a total of 35 staffers, including three joint-secretaries, seven under-secretaries, 12 section officers and 13 non-gazetted officers. Annual budget for the department has been estimated at Rs 7.5 million.
"The Department of Railway will be formally established once the cabinet approves the O&M survey," said Lamsal, who is heading the Railway Project that is overseeing railway related works under stop-gap basis.
The Ministry of Finance has already given its consent to form the department. Upon formation, the department will oversee construction and management of railway, metro rail, ropeways and cable car lines in the country.
Lamsal, who is also a joint-secretary at MoPPW, said the department has set a vision of increasing railway line to 4,000 km, including the East-West Railway, Kathmandu-Pokhara Railway, Kathmandu-Tibet Railway and railway lines that connect major bordering towns of India and Nepal, within 20 years.
"We have also set a target of building 150 km metro line in the Kathmandu Valley, extend existing ropeway to 1,500 km and establish at least 60 cable car lines within the period," Lamsal told Republica on Monday.
The to-be-formed department will also complete the Detailed Project Report (DPR) of Janakpur-Bardibas railway line and bring the Nepal Railways Company under the purview of the MoPPW. Existing acts specify the Ministry of Labor and Transport Management as the authority to oversee works related to railway.
2. Objectives
• The overall objective of this course is to
introduce the knowledge about railway
engineering in planning, design, operation and
mmaaiinntteennaannccee aassppeeccttss..
2
3. Learning Outcomes
– An understanding of importance of mass transportation
for the development of nation specially railway
transportation.
– Knowledge of railway and railway related infrastructure
aabboouutt::
• Engineering survey
• Planning
• Design
• Construction, Operation and Maintenance
3
CH-1
CH-2 ,3
and 4
CH-5
and 6
4. Contents
1. Introduction (4 hr)
2. Basic elements and their functions (15 hr)
3. Geometric design of track (12 hr)
4. Track drainage (4 hr)
5. Railway construction, maintenance aanndd ooppeerraattiioonn ((44 hhrr))
6. Railway accidents and disaster management (4 hr)
7. Modernization of railways and high speed rails (2 hr)
4
5. References
• Satish Chanda and M. M. Agrawal (2009), Railway
Engineering, Oxford University Press, New Delhi.
• B. L. Gupta and Amit Gupta (2003), Railway Engineering,
Standard Publishers Distributors, New Delhi.
• Rangwala (2013), Railway Engineering, CChhaarroottaarr PPuubblliisshhiinngg
House, India.
• Clifford F. Bonnett (2005), Practical Railway Engieering (2’nd
Edition), Imperial Collage Press, London.
• Railway Curves, Indian Railway Institute of Civil Engineering,
Pune 411 001, 2010.
5
7. Contents
• Transportation System
• Historical development of railway
• Role of railways
• Classification of railway lines
• Alignment of railway lines
• Engineering Survey
7
8. Transportation System: Definition
• Consisting of:
– Fixed facilities (roadway, bridges)
– Flow entities (vehicles, trains, planes)
– Operation plan (route allocation for flow entities)
– Storage facility ((ppaarrkkiinngg,, ttaaxxiiwwaayy))
– Control system (signs, signal)
• That permit people and goods to overcome the friction of
geographical spaces
• In a most efficient, safe and convenient manner
• In order to achieve time and space utility for desired activity
8
9. Transportation System: Importance
• To derive benefits out of the system with
respect to:
– Political and environmental aassppeeccttss
– Cultural and social aspects
– Economic aspects
9
10. Transportation System: Types
1) Public or Mass transport system
– Public busses, railway, BRT, LRT, monorail
2) Private Transport System
– Car, jeep, mmoottoorrbbiikkee,, vvaann
3) Intermediate Transport System
– Taxi, auto
4) Combination and Coordination of System
10
11. Transport Modes
Modes
LLaanndd Water
Air Others
Roadway
Inland
Ocean
11
Inland Water
Transport
Railway
Railway
12. Historical Development: Global
• 16th Century:
– Mines in England used wooden roadways to
reduce the resistance of mining vehicles
– The rolling surface was provided wwiitthh aann uupprriissiinngg
edge in order to keep the vehicles on the track.
12
13. Reconstruction of flat
wooden track for
transporting silver ore;
guidance was by a vertical
pin running between the
timbers
Fig-3, Josephistollen (tiefer
Stollen) des
mittelalterlichen
Silberbergwerks Suggental
13
15. Fig-2, Leitnagel Hund (Mining cart )
Contemporary illustration of guided truck used in 16th-century
mines in Germany
Early mine wagon (German: Leitnagel Hund) running on wooden
rails. The vertical pin ran in the slot between the two narrowly
separated wooden rails
Fig: Mining Cart
15
16. Historical Development: Global
• 18th Century:
– In England in 1760, The wooden rails were
covered with cast iron plates
16
17. Fig-4, A section of L-shaped plate rails
Ref: Wikipedia from a Welsh tramway in the Berlin Technical Museum,,
17
18. Historical Development: Global
• About 1800:
– Free bearing rails (Outtram) were applied, which
were supported at the ends by cast iron sockets
oonn wwooooddeenn sslleeeeppeerrss
– Flanged iron wheel took care of guiding
18
22. Historical Development: Global
• 1804 AD:
– The first full-scale working railway steam
locomotive was built by Richard Trevithick in the
United Kingdom and, on 2211 FFeebbrruuaarryy 11880044..
22
33. Historical Development: India
• Lord Dalhousie prepared the proposal for
railway lines between:
– Culcutta and Lahore
–– AAggrraa aanndd BBoommbbaayy
– Bombay and Madras
33
34. Historical Development: India
• The director of East India Company approved
his proposal
• The first railway line was opened for traffic on
16th April, 1853, between MMuummbbaaii aanndd TThhaannaa..
34
37. Historical Development: Nepal
• 1927 AD:
– First railway was started at the period of
Chandrashamsher from Raxaul to Amlekhgunj, 48
kkmm
• 1936 AD:
– Bijalpura-Janakpur-Jayanagar, 53 km
– Janakpur-Jayanagar 29 km is in operation
37
40. Historical Development: Nepal
• 2004 AD:
– Transport Corporation of Nepal - Janakpur
Railway was renamed to “Nepal Railways
CCoorrppoorraattiioonn LLttdd..
• 2011 AD:
– ‘Department of Railways’ was established on
2068/03/01 B.S (15-June, 2011)
40
47. Railways in Nepal: Future Plan
• Government of Nepal has completed the
feasibility study on East-West and
Kathmandu-Pokhara electric rraaiillwwaayy hhaavviinngg
total length of 1317.5 km
– Mechi-Mahakali ≈945 km
– Tamasariya-Bharatpur-Abukhaireni ≈ 72 km
– Pokhara – Kathmandu ≈ 187 km
– Connections to Indian Border Towns ≈ 113.5 km
47
48. Railways in Nepal: Future Plan
Connections to India:
I – Kohalpur-Nepalganj
II A- Butwal-Bhairahawa
II B – Bhairahawa-Lumbini
III- Simara-Birganj
IV- Bardibas
V – Itahari-Biratnagar
48
VI – Kakarbita
50. Railways in Nepal: Future Plan
• Kathmandu metro rail:
– Five metro lines - would be feasible:
• four lines inside the Ring Road
• One line rruunnnniinngg aarroouunndd rriinngg rrooaadd
– A feasibility study concluded that the railway
system in the Capital would costs US$ 3.88 billion
(Rs 330 billion).
50
56. Railways in Nepal: Challenges
Harsh topography not suitable for railway
56
57. Railways in Nepal: Challenges
Railway projects are not feasible for private
funding
Unlike roads, rolling stocks are to be managed
by ooppeerraattoorr iinn rraaiillwwaayy
57
59. Role of Railway
• At present age:
– Transportation are considered as an index of social,
economic and commercial development of a country
– The whole structure of industry ddeeppeennddss uuppoonn tthhee
well laid foundation of transportation
• For economic growth of country
– Adequate mode of transportation is indispensable
• Railway:
– cheapest and convenient mode
59
60. Role of Railway
• Was regarded as rival of inland waterway
• Exists practically all over the world
• Cheapest mode of transportation
Require least traction • ttoo mmoovvee iitt iinn
comparison to weight
• Direction of movement is controlled
60
61. Role of Railway
• Political Aspects
• Social Aspects
• Economic Aspects
61
62. Role of Railway
• Political Aspects
– Central and regional government are well
connected with the transportation, efficiency of
government iinnccrreeaasseess
– Opportunity of meeting people from different part
of the country, developing a sense of national
unity
62
63. Role of Railway
• Social Aspects
– Faster, Convenient and safer mode than highways
– Remove the feeling of isolation in people’s mind
– Easier to visit aatt vvaarriioouuss ppllaacceess
63
64. Role of Railway
• Economic Aspects
– Cheapest mode of transportation
– Large number of employment generation
– Increase mobility and industrial ddeevveellooppmmeenntt
– Stabilized cost of transportation
– Finally, national wealth of country increases
64
66. Broad Gauge (BG) Track Classification
Group A B C D E
1. Speed up to (kmph) 160 130 Sub-urban
100 100
urban
2. Type of Rail Section (kg/m-lenth
of rail)
• Traffic 20 GMT
• Traffic 10-20 GMT
• Traffic 10 GMT
60
52
52
-
52
52SS
3. Sleeper Density
(No. of Sleeper per km length)
1660 1660 or
1540
1660
or
1540
1660 or
1540
1540 or
1310
66
67. Broad Gauge (BG) Track Classification
Cont…
Group A B C D E
4. Ballast cushion
(Depth of ballast below
300 300 or
250
300 300 or
250
300 or
200
Sleeper)
5. Rails used (kg/mm2)
(Ultimate Tensile Strength)
90 UTS
6. Sleeper type Concrete or CST-9
67
CST-9= Central Standard Trial-9 Sleepers.
It is the 9th series designed and produced by
central office.
68. Meter Gauge (MG) Track Classification
• Q-Routes
– With max speed 75 kmph or
– Traffic density 2.5 GMT
•• RR--RRoouutteess
– With max speed = 75 kmph
– Traffic density 1.5 GMT
a. R-1 Routes 5 GMT per year
b. R-2 Routes 2.5-5 GMT per year
c. R-3 Routes 1.5 to 2.5 GMT per year
68
69. Meter Gauge (MG) Track Classification
Cont…
• S-Routes
– These are all remaining MG track with max
permissible speed 75 kmph
aanndd//oorr
– traffic density 1.5 GMT/year
69
70. Some IR- Track Specifications
• Permissible Degree of Curvature
– BG=100
– MG=160
–– NNGG==440000
• Length of Rail
– BG=13 m
– MG=12 m
70
71. Some IR- Track Specifications
• Turn-Out
– For goods train; 1 in
2
8 1
– For passenger train; 1 in 12 or 1 in 16
– For train with speed 300 kmph; 1 in 20 or 1 in 24
(not implemented, under consideration in India)
71
72. Some IR- Track Specifications
• Permissible Degree of Curvature
– BG=100
– MG=160
–– NNGG==440000
• Length of Rail
– BG=13 m
– MG=12 m
72
73. Alignment of Railway Lines
• Making the position of centerline on the
ground and giving the direction to the railway
track is known as alignment of the railway
track
• Components
– Horizontal components
• Straights, curves
– Vertical components
• Gradients
73
74. Purpose of New Railway Lines
• Strategic considerations
• Linking of trade centers
• Connecting port/boarder with interior of the
ccoouunnttrryy
• Shortening existing route
• Laying of branch line
• To develop un-developed areas
74
75. Requirements of Good Alignment
1. Fulfill the purpose of opening new track
2. Feasible to construct and maintenance
– Easy to construct, operate and maintain
33.. EEccoonnoommiiccaall
– Cost: construction, operation and maintenance
4. Safe
– Safe: construction, operation and maintenance
5. Aesthetic beauty
– Beautiful natural surroundings
75
76. Factors Controlling the Alignment
• Obligatory points
• Traffic
• Geometric Design Standards
• Topography ooff tthhee AArreeaa
• Economy
• Other Considerations
– Foreign territory
– Religious and other conservation area
76
78. Traffic Survey
• General characteristics of location:
– Agriculture dominated
– Industrialized
–– FFoorreesstt ddoommiinnaatteedd
• Population, industries, towns, villages within a
range of 10-20 km on either side
• Places of tourism and pilgrimage (religious journey)
• The rust periods on the occasion of festivals
and fairs etc
78
79. Traffic Survey
• Location of existing features and scope of their
development by opening new railway track
– Industries
–– QQuuaarrrriieess
– Mines
– markets
• Estimate of traffic in terms of passengers and
wagons
• Traffic history and mode of transportation
79
80. Reconnaissance
• Following information are collected
– Physical features of country
– Type of soil
– Topography ooff tthhee aarreeaa
– Sources of water and their discharge
– Approximate elevation and depression of the area
– Labors, materials availability
– Climatic conditions
80
81. Reconnaissance
• Factors to be considered:
– Area, not route/line only
– Existing roads should not
• Instruments to be
used:
– Aneroid
guide the alignment
– Starting of route not alone
decide the selection
– Assumptions/specifications
– Survey route selection
– revenue calculation
Barometer
– Abney Level
– Prismatic
Compass
– Strong Binocular
– Pedometer
81
83. Preliminary Survey: Field Work
• Field work:
– Open traverse with RoW=100-150 m
– Control points
–– DDeettaaiilliinngg
• Elevation along alignment
• Rivers, streams, canals crossings
• Existing culverts, bridges etc if any
• Land ownership for land acquisition
• Local resources availability
– Climatic conditions
83
84. Preliminary Survey: Office Work
• Salient Features:
– General
– Length of track
• Drawings:
– Details of the field plan
– Profile
– Cross-sections
– Maximum and minimum
– Ruling and excessive
gradient
– Cost of sub grade and
formation
– No and type of bridges,
tunnels, culverts
width of formation
84
85. Location Survey
• From preliminary survey, a final route is decided
and is marked up on the prepared plan
• This is known as paper location….. In which the
following details aarree wwoorrkkeedd oouutt::
– Gradients
– Curves
– Contours
– Directions
– crossing of streams etc
85
86. Location Survey
• Specifications for route layout
– 15 cm pegs at 30 m intervals
– 60 cm pegs at 300 m intervals
– Masonry pillar at each kkiilloommeetteerr aanndd aatt BBMM
• Instruments:
– Auto Level
– Theodolite or total station
– Tape
86
87. Model Questions
1. Write a brief note on development on
railways in global as well as our context.
2. What is the role of railway for efficient
transportation ssyysstteemm??
3. Discuss the classification of railway lines.
4. What is alignment? Mention the factors that
control the selection of the railway
alignment?.
87
88. Model Questions
5. Explain about the various stages of railway
survey.
6. What are the expected outcomes by
conducting reconnaissance ssuurrvveeyy??
7. How preliminary survey is different than final
location survey? Explain based on
instruments used, field work and expected
outcomes.
88
89. Model Questions
8. Discuss the comparative analysis of
proposed East-West and Kathmandu-Pokhara
electric railway in Nepal.
9. Is metro rail suitable iinn KKaatthhmmaanndduu??
Postulate logics to support your answer.
10.There is gap for railway construction in Nepal
from 1936 A.D. What are the possible
causes?
89