Nguyen Duy Manh Page 1
UNIVERSITY OF TRANSPORT AND COMMUNICATIONS
DEPARTMENT OF CIVIL ENGINEERING
Division of Urban Transport and coastal engineering
ENGINEERING PRACTICE REPORT
Name: Nguyen duy Manh
Code of student : 1221051
Class: Vietnam – Japan urban transport engineering K53
Nguyen Duy Manh Page 2
TABLE OF CONTENT:
I, The Journey for The Practice.
First Day : (1/4/2015)
To learn about safety of site and searching theory……………………………..
Second Day : (2/4/2015)
1. Visit Cau Giay interchange……………………………………….
2. Visit Buoi – Hoang Quoc Viet interchange……………………
3. Visit Nhat Tan Bridge interchange…………………………….
4. Visit new Highway 5 interchange…………………………….
5. Visit Dong Tru Bridge…………………………………………
6. Visit Overbridge of Thanh Tri bridge ’s segment……………
Third Day : (3/4/2015)
1. Visit Highway 2 interchange………………………………..
2. Visit Viet Tri Bridge…………………………………………
3. Visit colecter way, trench, underpass on the Lang Hoa Lac
Freeway……………………………………………………….
Fourth Day : (4/4/2015)
1. Visit the Walk Trench under Nga Tu So interchange……….
II, Technology in building bridge……………………………………..
III, Summarizing after engineering practice………………………...
Nguyen Duy Manh Page 3
Detail report:
First Day : (1/4/2015).
Students have to learn about safety of contrucsion before going and visiting
direcly on the site by Dr Dao Duy Lam. The lession was useful and essential for
student because it help student easy to understand and imagine the base
principle of safety and working on the site. Moreover, Providing the information
about secure epuiment such as hat, clothes, gloves, shoes…
Second Day : (2/4/2015)
- Cau Giay interchange:
This bridge is reinfocered concrete bridge with 7 continuous spans was built
casted in place concrete method on the scaffold system. To reduce stress for the
ground, the contructor used reinforced concrete plate to support for scaffold.
The bridge has seven couple piers and two abutment with two main spans were
used fix bearing support, other maining used elastomeric bearings (steel core
rubber bearings). During building, at the pier using temporary bearings like fix
bearings for stability.
Nguyen Duy Manh Page 4
The formwork for casting the girder.
Summary:
Type of bridge : reinforced concrete bridge.
Type of structure: continuous hollow slab girder.
Type of foundation: bored pile.
Buiding method: casted in place concrete on formwork and scaffolding systems
combined prestressed steel after casting.
Contructor : Dragons Company.
One abutment and scaffolding system.
Nguyen Duy Manh Page 5
2.Visit Buoi – Hoang Quoc Viet interchange
The bridge is reinforced concrete bridge with mutiple spans was built casted in
place concrete method on the scaffold system. To reduce stress for the ground,
the contructor used reinforced concrete plate to support for scaffold. Prestressed
steel after casting step by step. This bridge used some of bearings support
differently such as fix bearings, elastomeric bearings, pot bearings… it is
depend on working state of bridge.
Under the bridge.
The bridge is located on ring road 2 of Ha Noi capital and builded by 12 Bridge
Contractor , CIENCO 1 Company. That bridge is similar to Cau Giay
interchange about structure and building method.
Type of bridge : reinforced concrete bridge.
Type of structure: continuous hollow slab girder.
Type of foundation: bored pile.
Nguyen Duy Manh Page 6
Buiding method: casted in place concrete on formwork and scaffolding systems
combined prestressed steel after casting.
The expansion joint between abutment and girder.
Pot bearings.
This is one in type of bearing are used for that bridge.
Nguyen Duy Manh Page 7
The worker is making a steel cage and positioning member before pouring
concrete
.
Anchor blook and duct for prestressing steel.
Nguyen Duy Manh Page 8
Steel for central median will make by method of assembling the casted in place
concrete plates together.
3.Visit the clover leaf interchange near Nhat Tan Bridge on new Highway 5
Next station is clover leaf interchange on new highway 5 . We went up the
walking bridge near the junction and the teacher introduced about characteristic of
type’s intersection and showed the way to go from some point to different point .
After visiting that point, I recongized some thing like that :
This intersection is shaped asterick.
Nguyen Duy Manh Page 9
- about advantage :
Its advantages are not creating conflict traffic, large sight distance for driver. It
can be planted tree along roadsides making aesthetic. There are suitable
condition for creating a special point of the road segment.
- about disadvantage :.
Features of this intersection is easy to confuse the road for driver and turn right
so long (if you want to turn left,then turn right before).Large area for
interchange, cost of construction and clearance site is quite big .This kind of
interchange has two bridges crossing the road, the continuous beams. That kind
of interchange not suitable for central of city because its area is large so its just
for suburban.
Nguyen Duy Manh Page 10
4.Visit underpass on interchange of highway.
Using back fill behind to reinforce for abutment.
Nguyen Duy Manh Page 11
Retaining wall to hold the soil and clearance the road.
5. Visit Dong Tru Bridge.
Dong Tru bridge is impotant bridge located on highway 5 , this bridge is focal
point of highway 5 with total length is 1140m and crossing Duong river to link
Dong Anh and Long Bien. Beside, reducing trffic volume for some province to
Ha Noi such as Hai Phong, Quang Ninh… and back again.
Nguyen Duy Manh Page 12
Dong Tru Bridge has three main spans with total length approximate 500 meter ,
its width is 55 meter.
This is the first bridge used new technology in Viet Nam at that time. It is steel pile
filled with concrete.
Nguyen Duy Manh Page 13
This structure have some advantage comparing with nomal structure. For
example: stability and durability of concrete – steel pile more higher. Because
inside the steel pile was filled full of concrete so it was protected well inside .
The steel pile don’t rust inside, so it is stable and strong during working time or
even have a hitting by verhicle.
Displacement ,deformation and creep fllow longitudinal and lateral is lower
because stell pile like a ahell to cover tightly. Therefore, the concrete inside
steel pile less destructived than nomal reinforced concrete.
Nguyen Duy Manh Page 14
6.Visit Overbridge of Thanh Tri bridge ’s segment.
The last station in that day is overbride of Thanh Tri bridge’s segment. This is
reinforced concrete bridge.
Nguyen Duy Manh Page 15
The girder was built by casted in place method on scaffold – formwork system.
Althought the height of pier is tall but the contractor still using casted in place
method with hollow slab girder combined prestressing cable after pouring the
concrete.
The steel cage is lowered on the site for peparing to pour concrete (bored pile).
Third Day : (3/4/2015)
1.Visit Highway 2 interchange
Nguyen Duy Manh Page 16
This interchange linking Ha Noi – Noi Bai with Phuc Yen and National Highway
14. There are two bridge crossing national highway 2 and specialy, both of bridge
using pre-baem structure for main sapan. Kind of structure have used only this
bridge in Viet Nam up to now.
The drainage system of the bridge.
This bridge was used pre-beam structure for main span and I beam for other
maining spans. Pre- Beam is special beam because its structure have I steel
member inside and covering by concrete.
I saw main span which used pre-beam structure, depth of beam is lower than I
beam structure and having more beam than orther spans.
Nguyen Duy Manh Page 17
Pre – beam structure for main spans.
2.Visit Viet Tri Bridge
Viet Tri bridge is project include main bridge that crossing Lo river , rail overpass
and approach bridge. The contractor is CIENCO 1 Company.
This project located on national highway 2 .
The supervision consultants for the bridge is TEDI company.
Nguyen Duy Manh Page 18
Main Bridge is reinforced concrete with three spans . its structure is box girder,
method of building was used cantilever technology and moverble casting.
This technology applied a few years ago in Viet Nam and nowadays cantilever
technology had controlled by big building company as CIENCO 1... We don’t
depend on forein building company.
The middle span is waiting for closer joint day of building. I think the building
progess ’s project are on time.
Nguyen Duy Manh Page 19
Picture of general view .
At that moment, the next approach bridge was craning and assembling the beam.
This type of beam is supper -T beam with its long is 38m.
Nguyen Duy Manh Page 20
The appoach bridge and the railway overpass bridge are used Supper T beam and
craning – assembling deam method. This method have many advantage such as:
save money, save time because produced and contructed simultaneously.
Continuous slab deck.
Steel net between two spans. After pouring concrete, It called continuous heat
slab. This slab hold stably for deck of bridge.
End of beam before and after was coved concrete to protect anchorage block.
Nguyen Duy Manh Page 21
Here is casting beam area.
The casting beam is located about 600m to bridge. End of beam have a lot of steel
bar. Its funtion is conect horizontally all of beam. To increse roughness for
conection, they made scabrous surface area linking.
This is expansion joint member to assemble expansion jiont and the
transition slab below.
Nguyen Duy Manh Page 22
The left side is pre-stressing jack for post-tentioning .
The right side is pre-stressing bed for pre-tentioning.
PC bar .
PC bar is high strength steel . This member keeping stable the box girder and the
pier during building time. Because at that point, it have negative moment.
Therefore the box girder easy to overturn down. To resistant that moment, need to
use pc bar to connect girder and pier togerther.
Nguyen Duy Manh Page 23
This is movable casting.
Moverble casting is epuiment for casting by stage in cantilever technology.
The Railway overpass is used stopper block for the beam. It is special member.
Nguyen Duy Manh Page 24
This is special pier with big footing because lacking of railway and building on the
trench.
3.Visit colecter way, trench ,railway underpass on the Lang Hoa Lac Freeway.
Nguyen Duy Manh Page 25
The Railroad underpass on free way.
The expansion joint and light system inside the underpass.
Nguyen Duy Manh Page 26
The interchange on free way with hollow slab girder which used fix bearing for
some middle of span and movable bearing for side spans.
II, Technology in building bridge.
During fieldwork time, I have seen a lot of impression about building technologies
on the site. There are construction technology of bored pile, cantilever girder,pre
beam,super T ... I’m interested in the Super-T girders technology.
Super-T girders is the modern prestressed concrete girders, hollowed inside,
simple structure. Super-T girders has some important advantages compared to
other types of beam current, which leads to advantages for lower costs and saving
Nguyen Duy Manh Page 27
time. Moreover, this method is optimal measure for producing amount of beam
with large number.
Here is casting beam ground.
End of beam have a lot of steel bar. Its funtion is conect horizontally all of beam.
To increse roughness for conection, they made scabrous surface area linking.
It is depent on terain or building contruction to decide assemble method.
There are two main method to build. It is move from casting ground to the site by
crane or dedicated verhical.
Nguyen Duy Manh Page 28
The left side is pre-stressing jack for pressing high strength cable after.
The right side is pre-stressing bed for pressing high strength cable before.
Nguyen Duy Manh Page 29
Speed construction is fast because do not need scaffolding for construction of the
deck. Time to assemble supper T beam is fast and esay.
Summary advantages of Super-T beam.
- Saving cost,saving time for the project
- Istalling,producting easier and more synchronous
- Safety in Construction
- Speed construction is fast

More Related Content

What's hot

Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridge
Ah Jun
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
AELC
 

What's hot (20)

bridge design
 bridge design bridge design
bridge design
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repair
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridge
 
Presentation on bridges
Presentation on bridgesPresentation on bridges
Presentation on bridges
 
Current Long Span Bridges 15
Current Long Span Bridges 15Current Long Span Bridges 15
Current Long Span Bridges 15
 
Bridge collapse
Bridge collapseBridge collapse
Bridge collapse
 
Composite deck bridge systems
Composite deck bridge systemsComposite deck bridge systems
Composite deck bridge systems
 
Bridge pier
Bridge pierBridge pier
Bridge pier
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
Ppt bridges & types
Ppt bridges & typesPpt bridges & types
Ppt bridges & types
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
Bridge
Bridge Bridge
Bridge
 
Bridges presentation dr kiymaz eng002
Bridges presentation dr kiymaz eng002Bridges presentation dr kiymaz eng002
Bridges presentation dr kiymaz eng002
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Concrete and steel bridges
Concrete and steel bridgesConcrete and steel bridges
Concrete and steel bridges
 
Bridges
BridgesBridges
Bridges
 
Bridges and their types
Bridges and their typesBridges and their types
Bridges and their types
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge construction
 
Truss bridges around the world
Truss bridges around the worldTruss bridges around the world
Truss bridges around the world
 

Similar to Thuc tap kt

Bridges new
Bridges newBridges new
Bridges new
agtom02
 
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
toddr4
 

Similar to Thuc tap kt (20)

Case study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutionsCase study: Widening an existing bridge structure Challenges and solutions
Case study: Widening an existing bridge structure Challenges and solutions
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
Deh Cho Bridge
Deh Cho BridgeDeh Cho Bridge
Deh Cho Bridge
 
Bridge construction atlas
Bridge construction atlasBridge construction atlas
Bridge construction atlas
 
Cable suspension bridge pdf
Cable suspension bridge pdfCable suspension bridge pdf
Cable suspension bridge pdf
 
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, ChinaSoutheast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptx
 
training report LMRC
training report LMRCtraining report LMRC
training report LMRC
 
Bridges new
Bridges newBridges new
Bridges new
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setu
 
Undergraduate major project_-_design_of
Undergraduate major project_-_design_ofUndergraduate major project_-_design_of
Undergraduate major project_-_design_of
 
A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction" A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction"
 
The open road
The open roadThe open road
The open road
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEBUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
 
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docxRunning Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
Running Head BRIDGE DESIGN1BRIDGE DESIGN31.docx
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)
 
Construction of Road
Construction of RoadConstruction of Road
Construction of Road
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Bridge-SIT-01.pptx
Bridge-SIT-01.pptxBridge-SIT-01.pptx
Bridge-SIT-01.pptx
 

More from Ttx Love

More from Ttx Love (20)

CIC-LiftingSafetyHandbook-2020.pdf
CIC-LiftingSafetyHandbook-2020.pdfCIC-LiftingSafetyHandbook-2020.pdf
CIC-LiftingSafetyHandbook-2020.pdf
 
SEICO PROFILE
SEICO PROFILESEICO PROFILE
SEICO PROFILE
 
Nghi dinh 63_2014_nd-cp
Nghi dinh 63_2014_nd-cpNghi dinh 63_2014_nd-cp
Nghi dinh 63_2014_nd-cp
 
Luat xay dung_50_2014_qh13
Luat xay dung_50_2014_qh13Luat xay dung_50_2014_qh13
Luat xay dung_50_2014_qh13
 
Luat so 43_2013_qh13
Luat so 43_2013_qh13Luat so 43_2013_qh13
Luat so 43_2013_qh13
 
Tcxdvn104 2007
Tcxdvn104 2007Tcxdvn104 2007
Tcxdvn104 2007
 
Tcvn 4054 2005
Tcvn 4054 2005Tcvn 4054 2005
Tcvn 4054 2005
 
Tinh luc cap tai moi gd thi cong
Tinh luc cap tai moi gd thi congTinh luc cap tai moi gd thi cong
Tinh luc cap tai moi gd thi cong
 
Tinh cau bang midas nckh sinh vien
Tinh cau bang midas nckh sinh vienTinh cau bang midas nckh sinh vien
Tinh cau bang midas nckh sinh vien
 
P tgiai doan tc dam lien hop
P tgiai doan tc dam lien hopP tgiai doan tc dam lien hop
P tgiai doan tc dam lien hop
 
Pt giai doan thi cong su dung fcm wizard
Pt giai doan thi cong su dung fcm wizardPt giai doan thi cong su dung fcm wizard
Pt giai doan thi cong su dung fcm wizard
 
Midas tinh toan_cau_duc_hang
Midas tinh toan_cau_duc_hangMidas tinh toan_cau_duc_hang
Midas tinh toan_cau_duc_hang
 
Midas civil
Midas civilMidas civil
Midas civil
 
Midas gioi thieu 2
Midas gioi thieu 2Midas gioi thieu 2
Midas gioi thieu 2
 
Gioi thieu midas
Gioi thieu midasGioi thieu midas
Gioi thieu midas
 
Qt ks t.ke nen duong tren dat yeu 22 tcn 262 2000
Qt ks t.ke nen duong tren dat yeu 22 tcn 262 2000Qt ks t.ke nen duong tren dat yeu 22 tcn 262 2000
Qt ks t.ke nen duong tren dat yeu 22 tcn 262 2000
 
C93 22 tcn262_2000p9
C93 22 tcn262_2000p9C93 22 tcn262_2000p9
C93 22 tcn262_2000p9
 
C89 22 tcn262_2000p6
C89 22 tcn262_2000p6C89 22 tcn262_2000p6
C89 22 tcn262_2000p6
 
C8 f 22tcn262_2000p1
C8 f 22tcn262_2000p1C8 f 22tcn262_2000p1
C8 f 22tcn262_2000p1
 
Bae 22 tcn262_2000p8
Bae 22 tcn262_2000p8Bae 22 tcn262_2000p8
Bae 22 tcn262_2000p8
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Recently uploaded (20)

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Thuc tap kt

  • 1. Nguyen Duy Manh Page 1 UNIVERSITY OF TRANSPORT AND COMMUNICATIONS DEPARTMENT OF CIVIL ENGINEERING Division of Urban Transport and coastal engineering ENGINEERING PRACTICE REPORT Name: Nguyen duy Manh Code of student : 1221051 Class: Vietnam – Japan urban transport engineering K53
  • 2. Nguyen Duy Manh Page 2 TABLE OF CONTENT: I, The Journey for The Practice. First Day : (1/4/2015) To learn about safety of site and searching theory…………………………….. Second Day : (2/4/2015) 1. Visit Cau Giay interchange………………………………………. 2. Visit Buoi – Hoang Quoc Viet interchange…………………… 3. Visit Nhat Tan Bridge interchange……………………………. 4. Visit new Highway 5 interchange……………………………. 5. Visit Dong Tru Bridge………………………………………… 6. Visit Overbridge of Thanh Tri bridge ’s segment…………… Third Day : (3/4/2015) 1. Visit Highway 2 interchange……………………………….. 2. Visit Viet Tri Bridge………………………………………… 3. Visit colecter way, trench, underpass on the Lang Hoa Lac Freeway………………………………………………………. Fourth Day : (4/4/2015) 1. Visit the Walk Trench under Nga Tu So interchange………. II, Technology in building bridge…………………………………….. III, Summarizing after engineering practice………………………...
  • 3. Nguyen Duy Manh Page 3 Detail report: First Day : (1/4/2015). Students have to learn about safety of contrucsion before going and visiting direcly on the site by Dr Dao Duy Lam. The lession was useful and essential for student because it help student easy to understand and imagine the base principle of safety and working on the site. Moreover, Providing the information about secure epuiment such as hat, clothes, gloves, shoes… Second Day : (2/4/2015) - Cau Giay interchange: This bridge is reinfocered concrete bridge with 7 continuous spans was built casted in place concrete method on the scaffold system. To reduce stress for the ground, the contructor used reinforced concrete plate to support for scaffold. The bridge has seven couple piers and two abutment with two main spans were used fix bearing support, other maining used elastomeric bearings (steel core rubber bearings). During building, at the pier using temporary bearings like fix bearings for stability.
  • 4. Nguyen Duy Manh Page 4 The formwork for casting the girder. Summary: Type of bridge : reinforced concrete bridge. Type of structure: continuous hollow slab girder. Type of foundation: bored pile. Buiding method: casted in place concrete on formwork and scaffolding systems combined prestressed steel after casting. Contructor : Dragons Company. One abutment and scaffolding system.
  • 5. Nguyen Duy Manh Page 5 2.Visit Buoi – Hoang Quoc Viet interchange The bridge is reinforced concrete bridge with mutiple spans was built casted in place concrete method on the scaffold system. To reduce stress for the ground, the contructor used reinforced concrete plate to support for scaffold. Prestressed steel after casting step by step. This bridge used some of bearings support differently such as fix bearings, elastomeric bearings, pot bearings… it is depend on working state of bridge. Under the bridge. The bridge is located on ring road 2 of Ha Noi capital and builded by 12 Bridge Contractor , CIENCO 1 Company. That bridge is similar to Cau Giay interchange about structure and building method. Type of bridge : reinforced concrete bridge. Type of structure: continuous hollow slab girder. Type of foundation: bored pile.
  • 6. Nguyen Duy Manh Page 6 Buiding method: casted in place concrete on formwork and scaffolding systems combined prestressed steel after casting. The expansion joint between abutment and girder. Pot bearings. This is one in type of bearing are used for that bridge.
  • 7. Nguyen Duy Manh Page 7 The worker is making a steel cage and positioning member before pouring concrete . Anchor blook and duct for prestressing steel.
  • 8. Nguyen Duy Manh Page 8 Steel for central median will make by method of assembling the casted in place concrete plates together. 3.Visit the clover leaf interchange near Nhat Tan Bridge on new Highway 5 Next station is clover leaf interchange on new highway 5 . We went up the walking bridge near the junction and the teacher introduced about characteristic of type’s intersection and showed the way to go from some point to different point . After visiting that point, I recongized some thing like that : This intersection is shaped asterick.
  • 9. Nguyen Duy Manh Page 9 - about advantage : Its advantages are not creating conflict traffic, large sight distance for driver. It can be planted tree along roadsides making aesthetic. There are suitable condition for creating a special point of the road segment. - about disadvantage :. Features of this intersection is easy to confuse the road for driver and turn right so long (if you want to turn left,then turn right before).Large area for interchange, cost of construction and clearance site is quite big .This kind of interchange has two bridges crossing the road, the continuous beams. That kind of interchange not suitable for central of city because its area is large so its just for suburban.
  • 10. Nguyen Duy Manh Page 10 4.Visit underpass on interchange of highway. Using back fill behind to reinforce for abutment.
  • 11. Nguyen Duy Manh Page 11 Retaining wall to hold the soil and clearance the road. 5. Visit Dong Tru Bridge. Dong Tru bridge is impotant bridge located on highway 5 , this bridge is focal point of highway 5 with total length is 1140m and crossing Duong river to link Dong Anh and Long Bien. Beside, reducing trffic volume for some province to Ha Noi such as Hai Phong, Quang Ninh… and back again.
  • 12. Nguyen Duy Manh Page 12 Dong Tru Bridge has three main spans with total length approximate 500 meter , its width is 55 meter. This is the first bridge used new technology in Viet Nam at that time. It is steel pile filled with concrete.
  • 13. Nguyen Duy Manh Page 13 This structure have some advantage comparing with nomal structure. For example: stability and durability of concrete – steel pile more higher. Because inside the steel pile was filled full of concrete so it was protected well inside . The steel pile don’t rust inside, so it is stable and strong during working time or even have a hitting by verhicle. Displacement ,deformation and creep fllow longitudinal and lateral is lower because stell pile like a ahell to cover tightly. Therefore, the concrete inside steel pile less destructived than nomal reinforced concrete.
  • 14. Nguyen Duy Manh Page 14 6.Visit Overbridge of Thanh Tri bridge ’s segment. The last station in that day is overbride of Thanh Tri bridge’s segment. This is reinforced concrete bridge.
  • 15. Nguyen Duy Manh Page 15 The girder was built by casted in place method on scaffold – formwork system. Althought the height of pier is tall but the contractor still using casted in place method with hollow slab girder combined prestressing cable after pouring the concrete. The steel cage is lowered on the site for peparing to pour concrete (bored pile). Third Day : (3/4/2015) 1.Visit Highway 2 interchange
  • 16. Nguyen Duy Manh Page 16 This interchange linking Ha Noi – Noi Bai with Phuc Yen and National Highway 14. There are two bridge crossing national highway 2 and specialy, both of bridge using pre-baem structure for main sapan. Kind of structure have used only this bridge in Viet Nam up to now. The drainage system of the bridge. This bridge was used pre-beam structure for main span and I beam for other maining spans. Pre- Beam is special beam because its structure have I steel member inside and covering by concrete. I saw main span which used pre-beam structure, depth of beam is lower than I beam structure and having more beam than orther spans.
  • 17. Nguyen Duy Manh Page 17 Pre – beam structure for main spans. 2.Visit Viet Tri Bridge Viet Tri bridge is project include main bridge that crossing Lo river , rail overpass and approach bridge. The contractor is CIENCO 1 Company. This project located on national highway 2 . The supervision consultants for the bridge is TEDI company.
  • 18. Nguyen Duy Manh Page 18 Main Bridge is reinforced concrete with three spans . its structure is box girder, method of building was used cantilever technology and moverble casting. This technology applied a few years ago in Viet Nam and nowadays cantilever technology had controlled by big building company as CIENCO 1... We don’t depend on forein building company. The middle span is waiting for closer joint day of building. I think the building progess ’s project are on time.
  • 19. Nguyen Duy Manh Page 19 Picture of general view . At that moment, the next approach bridge was craning and assembling the beam. This type of beam is supper -T beam with its long is 38m.
  • 20. Nguyen Duy Manh Page 20 The appoach bridge and the railway overpass bridge are used Supper T beam and craning – assembling deam method. This method have many advantage such as: save money, save time because produced and contructed simultaneously. Continuous slab deck. Steel net between two spans. After pouring concrete, It called continuous heat slab. This slab hold stably for deck of bridge. End of beam before and after was coved concrete to protect anchorage block.
  • 21. Nguyen Duy Manh Page 21 Here is casting beam area. The casting beam is located about 600m to bridge. End of beam have a lot of steel bar. Its funtion is conect horizontally all of beam. To increse roughness for conection, they made scabrous surface area linking. This is expansion joint member to assemble expansion jiont and the transition slab below.
  • 22. Nguyen Duy Manh Page 22 The left side is pre-stressing jack for post-tentioning . The right side is pre-stressing bed for pre-tentioning. PC bar . PC bar is high strength steel . This member keeping stable the box girder and the pier during building time. Because at that point, it have negative moment. Therefore the box girder easy to overturn down. To resistant that moment, need to use pc bar to connect girder and pier togerther.
  • 23. Nguyen Duy Manh Page 23 This is movable casting. Moverble casting is epuiment for casting by stage in cantilever technology. The Railway overpass is used stopper block for the beam. It is special member.
  • 24. Nguyen Duy Manh Page 24 This is special pier with big footing because lacking of railway and building on the trench. 3.Visit colecter way, trench ,railway underpass on the Lang Hoa Lac Freeway.
  • 25. Nguyen Duy Manh Page 25 The Railroad underpass on free way. The expansion joint and light system inside the underpass.
  • 26. Nguyen Duy Manh Page 26 The interchange on free way with hollow slab girder which used fix bearing for some middle of span and movable bearing for side spans. II, Technology in building bridge. During fieldwork time, I have seen a lot of impression about building technologies on the site. There are construction technology of bored pile, cantilever girder,pre beam,super T ... I’m interested in the Super-T girders technology. Super-T girders is the modern prestressed concrete girders, hollowed inside, simple structure. Super-T girders has some important advantages compared to other types of beam current, which leads to advantages for lower costs and saving
  • 27. Nguyen Duy Manh Page 27 time. Moreover, this method is optimal measure for producing amount of beam with large number. Here is casting beam ground. End of beam have a lot of steel bar. Its funtion is conect horizontally all of beam. To increse roughness for conection, they made scabrous surface area linking. It is depent on terain or building contruction to decide assemble method. There are two main method to build. It is move from casting ground to the site by crane or dedicated verhical.
  • 28. Nguyen Duy Manh Page 28 The left side is pre-stressing jack for pressing high strength cable after. The right side is pre-stressing bed for pressing high strength cable before.
  • 29. Nguyen Duy Manh Page 29 Speed construction is fast because do not need scaffolding for construction of the deck. Time to assemble supper T beam is fast and esay. Summary advantages of Super-T beam. - Saving cost,saving time for the project - Istalling,producting easier and more synchronous - Safety in Construction - Speed construction is fast