ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
BUILDING STRUCTURES (ARC 2523)
PROJECT 1
FETTUCCINE TRUSS BRIDGE
ANALYSIS REPORT
GARNETTE DAYANG ROBERT
0315491
OOI ZHI QIAN
0313999
CHUNG WEI JIN
0313789
LEONG HUI YI
0319280
ABDUL MAHI MUHSIN
0314421
DANAR JOVIAN ADITIYA VADYA PUTRA
0314575
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
CONTENTS
1. INTRODUCTION
1.1 AIMS & OBJECTIVES
2. METHODOLOGY
2.1 MAKING OF FETTUCCINE BRIDGE
2.2 REQUIREMENT
3. PRECEDENT STUDY
4. MATERIALS & EQUIPMENTS
4.1 STRENGTH OF MATERIAL
4.1.1 PROPERTIES OF FETTUCCINE
4.1.2 TESTING OF FETTUCCINE
4.1.3 EXPERIMENTS
4.1.4 CONCLUSION
4.2 ADHESIVE ANALYSIS
5. BRIDGE TESTING AND LOAD ANALYSIS
5.1 TIMELINE
5.2 FIRST BRIDGE
5.3 SECOND BRIDGE
5.4 THIRD BRIDGE
5.5 FOURTH BRIDGE
6. FINAL BRIDGE
6.1 AMENDMENTS
6.2 FINAL MODEL MAKING
6.3 JOINT ANALYSIS
6.4 FINAL BRIDGE TESTING AND LOAD ANALYSIS
6.5 CALCULATIONS
7. CONCLUSION
8. APPENDIX
8.1 CASE STUDY 1
8.2 CASE STUDY 2
8.3 CASE STUDY 3
8.4 CASE STUDY 4
8.5 CASE STUDY 5
8.6 CASE STUDY 6
9. REFERENCES
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
1.0 INTRODUCTION
Truss is a structure built up of three or more members that are normally
considered being pinned and hinged at the joints. The following figure shows
different types of trusses. Load applied to the truss is transmitted to joint so
that each individual member is in either pure tension or compression.
1.1 AIMS & OBJECTIVES
This project aims to develop our understanding of tensile and compressive
strength of construction materials by understanding the distribution of force in
a truss and to design a perfect truss bridge of high level of aesthetic value and
minimal construction material.
In order to achieve that, in a group of 6 we were required to carry out a
precedent study on a truss bridge of our choice, analyzing the connections,
arrangements, design and orientations of the members. After that, we were
required to design and construct a fettuccine bridge of 350mm clear span and
maximum weight of 80g. These requirements are to be met, and the bridge
will be then tested to fail. After that, we then need to analyze the reason of its
failure and calculate its efficiency.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
2.0 METHODOLOGY
2.1 MAKING OF FETTUCCINE BRIDGE
STRENGTH OF MATERIAL
Understanding the strength of the fettuccine is important in order to build one
bridge that can carry a maximum load. For the tensile strength in the
fettuccine is considerably low when comparing to aluminum, which has the
same amount of stiffness to the fettuccine.
ADHESIVE
Choosing the best type of adhesive is important as it plays a huge role in this
assignment. As there are many types of adhesive, that each has their own
function and characteristic. Not only the type of it, but the brand itself is
important as it has different quality and choosing one that suits constructing
fettuccine bridge is primary.
MODEL MAKING
To ensure precision in our model making, we drafted the drawings in AutoCad
and it was drawn in 1:1 scale, and we plotted out to ensure precision and to
ease our process. Each pasta was marked individually and placed at their
own location and length and were glued accordingly to strengthen our bridge.
MODEL TESTING
Models were then being tested by placing a hook and a pail hanging under
the bridge. Water was being poured into the pail slowly and all these were
being recorded to allow us to fix and amend and analyze our bridge.
2.2 REQUIREMENTS
-­‐ A clear span of 350mm
-­‐ Maximum weight of 80g
-­‐ Bridge must be made out of fettuccine
-­‐ Allowed to use any type of adhesive
-­‐ Design and workmanship is put to consideration as part of aesthetic
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
3.0 PRECEDENT STUDY
The precedence study below is used as reference knowledge for our
understanding of forces, real truss bridge connections, arrangement and
orientation of both horizontal and vertical members. The analyzed information
is applied in constructing our final model through a series of trial and error.
Information is obtained from different internet sources as well as books.
HISTORIC NAME: WADELL ‘A’ TRUSS BRIDGE
LOCATION: ENGLISH LANDING PARK, PARKVILLE, MISSOURI
ENGINEER: JOHN ALEXANDER LOW WADDELL (1854-1938)
	
  
A BRIEF HISTORY
Originally built as a railroad bridge across Linn Branch Creek, in the
vicinity of Trimble, Clinton County, Missouri, it now crosses Rush Creek
carrying a pedestrian path between a day-use recreational area and two
isolated ball fields. It is a triangular shaped, steel, through-truss, bridge
approximately 100 feet long and 40 feet high. It rests on two concrete
abutments and is composed of pin-connected riveted units. In 1980, the
bridge was disassembled and stored for seven years by the U. S. Army Corps
of Engineers, while awaiting a suitable location and a responsible owner.
Despite its relocation, the Waddell "A" Truss Bridge retains its integrity of
design as drawn by its creator, John Alexander Low.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
PHYSICAL DESCRIPTION
The bridge is a single-span, four-panel, pin-connected, steel truss bridge.
The triangular trusses, known as "A" trusses because of their shape,
resemble king-post roof trusses, except that the king "post" is in tension. The
span is 100 feet (30m), and the trusses, 17 feet (5.2m) apart, are nearly 40
feet (12m) high. Near the apex, well above the height of a railroad locomotive,
X-bracing between the two trusses provides lateral stability. This top bracing
and the designed reduction in the quantity of steel needed to construct the
bridge, are the principal reasons for the bridge's shape.
FORCE DISTRIBUTION DIAGRAM	
  
The compression members of the trusses are shop-riveted built-up sections,
made of channels, angles, and plates, while most tension members are made
of pairs of eye-bars. The bottom chord is in four sections, 25 feet by 17 feet,
sway-braced by angle braces and supporting a pair of girder stringers which
are, in turn, angle braced. The floor system consists of cross-braced, built-up
wooden floor beams and stringers.
	
  
	
  
	
  
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
TRUSS CONNECTIONS and MEMBERS
	
  
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
COMPARISON OF THE BRIDGE BEFORE
RELOCATION
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Railroad bridge across Linn Branch Creek, 1989 ( Before dissembling )
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
DETAIL IMAGES
A) B) C)
A) Detail View Of Circa 1952 Steel Approach Beams Taken From
Underneath Bridge
B) Detail Of Support Column Looking At Right Angle To Truss
C) Detail View Of Bracing Around Support Column
DETAILED TRUSS CONNECTION REFERENCE OF
MEMBERS
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
4.0 MATERIALS AND EQUIPMENTS
	
  
	
  	
  
FETTUCCINE
3 SECOND GLUE
PEN KNIFES
S HOOK
PAIL
WATER BOTTLE
SAND PAPER
WEIGHING
MACHINE
CAMERA
To	
  build	
  the	
  bridge	
  
Adhesive	
  for	
  model	
  making	
  	
  
Used	
  to	
  cut	
  fettuccine	
  	
  
Used	
  to	
  hook	
  on	
  the	
  bridge	
  and	
  
to	
  carry	
  the	
  pail	
  	
  
Used	
  to	
  carry	
  the	
  water	
  load	
  
Used	
  to	
  calculate	
  how	
  much	
  
load	
  	
  
To	
  sand	
  the	
  edges	
  of	
  any	
  
members	
  to	
  have	
  a	
  perfect	
  
angle	
  or	
  fit	
  	
  
To	
  weigh	
  the	
  right	
  amount	
  of	
  
the	
  bridge	
  and	
  the	
  load	
  
Take	
  pictures	
  of	
  progress	
  and	
  
the	
  final	
  bridge	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
4.1 STRENGTH OF MATERIAL
Fettuccine was the only material approved to be used for the bridge for this
project. Thus, research and analysis of Fettuccine was conducted before the
model making session.
4.1.1 PROPERTIES OF FETTUCCINE
Before using the fettuccine, it needs to be checked and filtered out, those that
are twisted cannot be used; it is to ensure that the load is able to distribute
evenly and effectively through the flat surface of the fettuccine.
Dimension: 250mm x 5mm
Tensile strength: 2 000 psi
Stiffness (E= stress/strain): 10 000 000 psi
4.1.2 TESTING OF FETTUCCINE
Before testing, we made sure the fettuccine were glued with the proper
technique to prevent uneven surface and to ensure the ease of building.
FIgure 4.1.2.1 Wrong way
of gluing fettuccine
	
  
FIgure 4.1.2.2 Correct
gluing technique for the
members
	
  
FIgure 4.1.2.3 Correct
gluing technique for the
beam
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
4.1.3 EXPERIMENTS
The fettuccine was arranged in so many ways, and we’ve found the best way,
which was the staggered arrangement, it helps us to ensure that the breaking
points were not aligned, hence its stronger.
Also to understand its efficiency and the maximum load each can carry, we’ve
tested several types of beams with different placements and ways to
understand which is the best to be implemented in our bridge.
Layers of
Members
Length of
Fettuccine
(cm)
Clear Span
(m)
Load
Sustained
(Vertical
Facing) (g)
Load
Sustained
(Horizontal
Facing) (g)
1 Layer 26 15 420 205
2 Layers 26 15 500 320
3 Layers 26 15 770 630
4 Layers (I-
beam)
26 15 1300 1110
4.1.4 CONCLUSION
Based on the testing, the I-beam (4 layers of members) is the strongest, both
horizontal and vertical positions can be put in use. When the vertical member
is placed in between two horizontal members, the horizontal members will
enhance the load distributions and the load will transfer to the vertical member
that can withstand more loads. The 3 layers was not used as it was just
carrying extra weight but not effective enough to hold any load. For the 2
layers, it was strong enough and light weight to carry the loads. As for the first
one, it was not used, as it couldn’t hold any load.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
4.2 ADHESIVE ANALYSIS
Four different kinds of glue used to ensure the joints were strong and thus
strengthen the bridge.
Types of
Adhesive
Advantages Disadvantages Rank
V-Tech Super Glue -High efficiency
-Fast setting
-Low viscosity
-Burns skin
-Makes fettuccine
brittle
-Leaves marks on
fettuccine
1
UHU Glue -Easy to use
-Neat
-Low efficiency
-Slow setting time
3
YAMAYO Super
Glue
-High efficiency
-Strong and neat
-Fast setting time
-Expensive 2
V-Tech Super Glue was used the most while constructing the fettuccine
bridge. It has high efficiency and it dried faster than other adhesives, as it is
more concentrated when compared to the rest. The glue was allowed to dry
out for a minute or two in order to ensure the glue to dry out and let the
bridges to perform at its best capabilities.
Yamayo Super Glue was also used a lot as it was very easy and also strong
and neater, but because it was expensive and not much in one bottle we
decided to stick with V-Tech. Furthermore it provides the same strength as V-
Tech.
UHU glue was tried once and it was not as good as the rest. It required longer
time to dry and making it very flexible. Not strong enough to hold loads.
In conclusion, the V-tech Super Glue were much more effective when
combining the joints as well as stacking the layers of the fettuccine as it was
much more efficient, easier to use and it dries out very quickly. In order for the
bridge to reach its maximum potential strength, the bridge was left to dry out
for hours before being tested.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
5.0 BRIDGE TESTING & LOAD ANALYSIS
5.1 PROGRESS TIMELINE
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
5.2 FIRST BRIDGE
	
  
FIRST BRIDGE
The first bridge model that we tested was based on the precedent studies of
the ‘Howe Truss’. In this first experiment, we did two different kinds of ways of
hooking the load onto the bridge as can be seen in figure 1.1 and figure 1.2.
	
  
Figure 1.1 First bridge model
	
  
	
  
Figure 1.2 Single S-hook was attached to the middle part of the horizontal member
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Figure 1.3 Failed horizontal member (Single s-hook)
The structural failure in figure 1.2 occurs at the horizontal member because
the member that bears the most load was too thin and it bears the load all by
itself without distributing it equally through the structure.
Bridge Weight: 64g
Maximum load capacity: 1.6kg
Efficiency: (1600)^2 = 40%
0.064
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
5.2.1 Calculations
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
new doc 7_1.jpg
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
5.3 SECOND BRIDGE
	
  
	
  
The second bridge model was based on the ‘Baltimore Truss’ precedence
study. Some amendments were made for this bridge, by adding more cross
bracings in order to distribute the tension force more equally along the
structure, reducing the possibilities of it breaking. We also improved the top
and bottom chords by replacing them with I-beams.
The I-beams were constructed with 3 layers of fettuccines.
	
  
Figure 2 Cross bracings were made when constructing the second bridge
	
  
Figure 2.1 Top and bottom chords were improved with I-beams	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
Figure 2.1 and Figure 2.3 Failed horizontal members	
  
	
  
Figure 2.1 and 2.3 shows structural failure that occurred at the horizontal
member. The failure was similar to the first bridge test, where it occurred in
the horizontal member. This is due to the fact that the S-hook was placed in
the middle of the horizontal member and too much load was concentrated on
that particular spot. Moreover, the fettuccine were not thick enough to
withstand the force, causing it to break apart.
Much improvement was made from the previous test, as this bridge could
withstand loads of up to 5.4kg, 3.8kg more than the previous bridge. This is
due to the I-beams that were constructed along the top and bottom chords.
Bridge Weight: 62g
Maximum load capacity: 5.4kg
Efficiency: (5400)^2 = 47.03%
0.062
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
5.4 THIRD BRIDGE
After the first two tests, we decided to change our truss design into the Wadell
‘A’ truss bridge. This is because we want to explore more on the possibilities
of a stronger structure than the previous models.
I-beams design was constructed lighter than the previous model, with only 2
layers of fettuccines. This is to make the whole structure lighter and to fulfill
the requirements of the project.
Figure 3 Third bridge model
Figure 3.1 Load distribution diagram
Amendments were made whereby positions of the S-hook were changed from
the center of the bridge towards the both sides of the trusses as can be seen
in figure 3.2 in order to distribute the compression and tension load equally on
both trusses.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
Figure 3.4 Failed members of the bridge	
  
	
  
	
  
Figure 3.3 and 3.4 shows structural failure, which occurred on many members
of the bridge (Cross bracings, bottom chords and one side of the top chord).
The placement of the S-hooks in this experiment plays a huge role on the
structural failures. The cross bracings were too small to withstand the tension
and compression force, causing both bottom chords to break apart. Poor
workmanship on constructing the diagonal members has an effect too as they
are not connected properly, hence the poor load distribution along the
members.
Bridge Weight: 50g
Maximum load capacity: 2.3kg
Efficiency: (2300)^2 = 105.8%
0.050
	
  
	
  
	
  
	
  
	
  
Figure 3.2 Placements of S-hooks on
both sides of the trusses
	
  
Figure 3.3 X bracings were
constructed
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
5.5 FOURTH BRIDGE
	
  
We decided to stick with the same truss design for the fourth bridge, with
amendments made with the cross bracings as well as improved workmanship
the joints of the diagonal members. Cross bracings were made longer than
the previous experiment in order for it to withstand the tension forces.
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Figure 4 fourth experimental models with improved cross bracings
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
Figure 4.1 Double S-hook attached to both trusses
	
  
Figure 4.2 Breakage of the bridge during test
	
  
Figure 4.13 Occurrence of structural failures	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
Figure 4.3 shows structural failures, where it occurred on the diagonal
members as well as the bottom chord. This occurred due to the compression
and tension forces. With poor workmanship of the joints of the diagonal
members, joints were weak and were easy to break apart. The I-beam on the
bottom chord was constructed in two separate pieces, where joints of it were
weak and caused it to break apart.
Bridge Weight: 73g
Maximum load capacity: 7.79kg
Efficiency: (7790)^2 = 83.13%
0.073
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
6.0 FINAL BRIDGE
6.1 AMENDMENTS
	
  
	
  
Final Bridge
6.2 FINAL MODEL MAKING
After going through a few times of trial experiments on the draft
bridges, we managed to finalize the structure and joints of our bridge. Also,
we made sure that the efficiency of the final structure was on point to its
maximum by increasing its strength in terms of the constant weight. So, here
is how our final bridge, that weighted 69kg with its ability to hold a bucket of
water that had a weight of 9.1kg in total, was made.
We started off with the individual bridge parts that will be used to build
up the whole bridge model. Using the strongest 3 seconds super glue, we
placed two layers of fettuccini sticks together for each part until it is enough
for the whole structure. The two-layered part was then left ready to be cut
accordingly to the desired measurements based on the outline of the bridge.
For each frame of the bridge structure, we placed one layer of fettuccini stick
on the top and bottom side of the uncut two-layered structure to create an I-
beam-like structure.
We printed out the outline of our bridge structure that was drawn on the
AutoCAD software. In order to achieve the maximum accuracy of the
structure, we placed the two-layered sticks and the I-beams on the outline
sheet and cut the sticks according to the lengths of each structural parts of the
bridge. Then, we placed the readied parts back on the outline sheet to stick
up the edges to create the form of the bridge. We started off from the sides of
the bridge followed by its top and bottom.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
6.3 JOINT ANALYSIS
The joint methods that are used in the construction of the bridge is very
important as it affects the efficiency and failure of the final fettuccine bridge.
The joints are thoroughly tested and studied in order to achieve the maximum
strength in each connection of members. Below are the final joint methods
that were used in our bridge, according to the requirement of each part.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
JOINT A
DIAGONAL/VERTICAL LOAD DISTRIBUTING MEMBERS
From analyzing the forces, we found out that the top of the structural frame
experiences compression forces upon application of load. The vertical
member helps to balance out the force as it has an internal tension force and
transfers the load to the adjacent diagonal member and to the bottom of the
structural frame. This reduces the stress on the I beam as the vertical
member now functions as a supporting column for the I-beam.
JOINT B
MIDDLE MEMBER AS ‘SUPPORT’ COLUMN
The central
vertical member of
the bridge is
joined very
carefully so that it
stands perfectly in
the centre of the
mitre joint of the I-
beam, acting as a
mean of support
and prevents the
top member from
collapsing. We
found of that, when the vertical member is even slightly off balance from the
centre, it causes stress to the structure above
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
JOINT C
TOP CONNECTION OF I-BEAM (STRUCTURAL FRAME)
The diagonal members of the structural frame ( I-beams ), are joined with a
mitre joint. A mitre joint is joint made by beveling each of two parts to be
joined, usually at a 45° angle, to form a corner, usually a 90° angle. The
rigidity of the structural frame is strengthened due to this design, and provides
stability and strength to the loads acting on it from the structures below, and
helps to evenly distribute the forces.
JOINT D
TOP DIAGONAL TO BASE, FRAME CONNECTION OF I-BEAM
Since the top part of the structural frame is in full compression, and the
bottom part is in tension, the force needs to have a proper path to flow along
the structure. To accommodate this huge compression force, the top structure
needs to be carefully shaped and connected to the base without any
faulty/disconnected edges. In order to do that, the I-beam member is cut at a
45’ angle as it adheres perfectly to the bottom member. This provides better
resistance to the structure against compressive stress.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
JOINT E
The vertical connecting members are very critical in the bridge design as
means of supporting as well as distributing the load along the entire structure.
The improvement is made from a very first design where we placed the
horizontal member merely against a single vertical member. The horizontal
member did not aid in transferring the load to the other members however
was only dependent on the adhesive (three second glue) that was used. This
resulted in an instant breakage of the horizontal member.
The second design was improved by placing the horizontal members on top of
the structural base frame, on either sides of the vertical member. This gave
support to the vertical member as well as increasing the surface distance
horizontally. However it did not transfer the load vertically.
The final design was improvised by using two diagonal members touching the
center vertical member. This helped to divert the load stress evenly to the
other parts of the bridge.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
JOINT F
In order to further strengthen the base members, a
horizontal member was placed on either side of the
diagonal members that were supporting the vertical
members. This helped to reduce the stress on the
diagonal members and prevented it from sliding or
breaking off (distortion) from the vertical member.
These members also helped to distribute the loads
horizontally from one side to the other. The edges of the
connection are carefully shaped so as to fit perfectly into the slots between
the base structural frame and diagonal members, to provide extra strength
and rigidity.
BASE JOINTS
JOINT G
HORIZONTAL ‘X’ BRACING ( JOINT TO THE STRUCTURAL FRAME )
Joint H is using the concept of how I-beams are coped inside each other with
one member’s flange resting on the other. This provides a ‘lock ‘mechanism
for the horizontal beam and gives it some strength. Two diagonal bracings are
placed below the two-parallel members, in order to strengthen the beam
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
JOINT G & I
HORIZONTAL ‘X’ BRACING ( JOINT TO THE HORIZONTAL BRACING )
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
6.4 Final Bridge Testing and Load Analysis
The picture below shows the final design of our fettuccine bridge and its load
distribution. In this bridge, the final amendments made are the number of
diagonal members in the structure and an addition of a cross bracing in the
base to strengthen the bridge from torsion.
Figure () Final bridge design showing the distribution of compression and
tension force in the bridge.
	
  
Figure () Top view of the bridge
	
  
Figure () Base Design
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
Figure() Bridge while testing.
	
  
Figure () Top chords of bridge broke and caused the bridge to fall
After observing, calculating and analyzing our final bridge, we came to a
conclusion that the failure of this bridge is due to the breakage of the top
chords which had to withstand a huge amount of compression forces. Longer
members tend to have a weaker resistance to compression force which might
also be one of the reasons to the failure to our bridge as the top chords are
both 215mm each. Moreover, Joint BE and Joint IJ, which are diagonal
members are also under large compression forces which are 133.41N each,
further weakening the support of the bridge.In addition to that, the middle
member is also under large compression force, which is 202.91N, causing a
large upward force acting on the top and bottom chords, resulting in torsion in
both of these members.
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
Figure () Highlighted are the failed members.
Bridge weight: 74g
Load: 8670g
Efficiency: (8.67)
=1015.80%
The efficiency of the final bridge was over our expectations as the maximum
load that our final testing bridge withstood was 7790g which was 880g lighter
than the final load withstood. If the large amount of compression force could
be lessen down to a smaller amount, the bridge could have resulted in a
higher efficiency than this. Moreover, if the middle member was acted on by a
tension force instead of compression force, The top chords and bottom chords
would have lesser force acting on them in the middle, resulting in higher
efficiency.
	
  
Failed Components Top chords and bottom chords.
Failed Reasons Large compression force acting on
top chords and bottome chords
exerted from middle member of the
fettuccine bridge.
	
  
	
  
	
  
	
  
	
  
	
  
	
  
2	
  0.07
4
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
6.5 Calculations
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
7.0 CONCLUSION 	
  
In a group of 6, we have carried out experiment and tested 5 bridges in
total. Each of them has different truss and different efficiency is tested out.
The precedent study that we have taken inspiration and modified from is the
“Waddell A Truss Bridge”.
After rounds of testing and calculating the efficiency, we have decided
to make our bridge triangular shape because the equivalent triangle is the
strongest form in withstanding pressure. In the process of changing the truss
and pattern, we realize that the angle too, plays a crucial part in sharing the
load and having clear state of how tension and compression work in different
methods.
In the last few rounds of finalizing the bridge shape, we decided to
keep it simple because the more truss added in, the weaker it actually gets
because these trusses act as additional and useless weight that serve no
purpose except adding the total loads. Thus, we make it to the easiest and
obvious triangle shape with the same length and same angle on inverted side.
At the end, it’s efficiency increases way more than our first try.
As a team, we learnt that time management is very important as we
need time to carried out countless experiments and also calculating the
efficiency and highest possibilities of either which bridge can withstand the
most weight. We also learnt that the unity of all team members can make the
workload lesser and also make the progress faster when all of us corporate
well together as a team.
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
8.0 APPENDIX
CASE STUDY NO. 1
JANE OOI ZHI QIAN
0313999
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
CASE STUDY NO. 2
MEGAN CHUNG WEI JIN
03
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
CASE STUDY NO. 3
ABDUL MAHI MUHSIN
0314421
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
CASE STUDY NO. 4
GARNETTE DAYANG
ROBERT
0315491
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
CASE STUDY NO. 25
LEONG HUIYI
0319280
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
CASE STUDY NO. 6
DANAR JOVIAN ADITIYA PUTRA
0314575
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report
	
  
9.0 REFERENCES
Vitaltechnical.com,. 'Sealant Manufacturer In Malaysia | Adhesive | Vital
Technical'. N.p., 2015. Web. 8 Oct. 2015.
Ching, Francis D.K (2008) Building Construction Illustrated Fourth Edition.
New Jersey: John Wiley & Sons, Inc.
	
  

More Related Content

What's hot

Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeDexter Ng
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeColby Hooi
 
Building Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss BridgeBuilding Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss BridgeEe Dong Chen
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridgerajdutt1111
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGEAELC
 
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEBUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEPatricia Kong
 
Truss bridges around the world
Truss bridges around the worldTruss bridges around the world
Truss bridges around the worldAsifKhan17884
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge reportIvy Yee
 
Structural analysis of a road bridge using ansys
Structural analysis of a road bridge  using ansysStructural analysis of a road bridge  using ansys
Structural analysis of a road bridge using ansysSubham kumar
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report Soh Shing
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportJoyeeLee0131
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Josia Tannos, EIT
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1Gertrude Lee
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel StructureGaurang Kakadiya
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Reportkimberlywjs
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionvaignan
 

What's hot (19)

Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Building Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss BridgeBuilding Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss Bridge
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
 
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEBUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
 
Truss bridges around the world
Truss bridges around the worldTruss bridges around the world
Truss bridges around the world
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge report
 
Structural analysis of a road bridge using ansys
Structural analysis of a road bridge  using ansysStructural analysis of a road bridge  using ansys
Structural analysis of a road bridge using ansys
 
presentation
presentationpresentation
presentation
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
 
Bridge construction methods aug 2007
Bridge construction methods aug 2007Bridge construction methods aug 2007
Bridge construction methods aug 2007
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel Structure
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Report
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
 

Viewers also liked

Building structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmBuilding structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmJ.j. Hayashi
 
Spaghetti bridge project description 1314
Spaghetti bridge project description 1314Spaghetti bridge project description 1314
Spaghetti bridge project description 1314donpata
 
How to do your own spaghetti bridge
How to do your own spaghetti bridgeHow to do your own spaghetti bridge
How to do your own spaghetti bridgeAna Carvalho
 

Viewers also liked (10)

Building structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalmBuilding structuresproject1 fettuccinnefinalm
Building structuresproject1 fettuccinnefinalm
 
Final report
Final reportFinal report
Final report
 
Spaghetti bridge project description 1314
Spaghetti bridge project description 1314Spaghetti bridge project description 1314
Spaghetti bridge project description 1314
 
How to do your own spaghetti bridge
How to do your own spaghetti bridgeHow to do your own spaghetti bridge
How to do your own spaghetti bridge
 
Steel truss ppt
Steel truss pptSteel truss ppt
Steel truss ppt
 
Fettucine truss bridge
Fettucine truss bridgeFettucine truss bridge
Fettucine truss bridge
 
Trusses
TrussesTrusses
Trusses
 
Types roof trusses
Types roof trussesTypes roof trusses
Types roof trusses
 
Trusses
TrussesTrusses
Trusses
 
PPT OF TRUSSES
PPT OF TRUSSESPPT OF TRUSSES
PPT OF TRUSSES
 

Similar to Fettuccine Truss Bridge Analysis Report Summary

Building structure report
Building structure reportBuilding structure report
Building structure reportChenyi Teo
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis ReportEsther Lau
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoJason Juen
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoJason Juen
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoAnthony Chew
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1Nur Zaas
 
Steel Bridge Dr.Metwally
Steel Bridge Dr.MetwallySteel Bridge Dr.Metwally
Steel Bridge Dr.MetwallyBahzad5
 
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...Hossam Shafiq II
 
building Structure
building Structurebuilding Structure
building Structureamee16
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkKAVYA H
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptxSauravShahane
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET Journal
 

Similar to Fettuccine Truss Bridge Analysis Report Summary (20)

Fettucine recipe
Fettucine recipeFettucine recipe
Fettucine recipe
 
Building structure report
Building structure reportBuilding structure report
Building structure report
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
 
Fettucine
FettucineFettucine
Fettucine
 
Steel Bridge Dr.Metwally
Steel Bridge Dr.MetwallySteel Bridge Dr.Metwally
Steel Bridge Dr.Metwally
 
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
Ch1 Introduction (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Metwally A...
 
building Structure
building Structurebuilding Structure
building Structure
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
 
Deh Cho Bridge
Deh Cho BridgeDeh Cho Bridge
Deh Cho Bridge
 

More from Garnette Robert (20)

Btechfinal
BtechfinalBtechfinal
Btechfinal
 
Food and culture
Food and cultureFood and culture
Food and culture
 
Final bsc
Final bscFinal bsc
Final bsc
 
Part B
Part B Part B
Part B
 
Project 2
Project 2 Project 2
Project 2
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Ff final servicee
Ff final serviceeFf final servicee
Ff final servicee
 
Esd project 1 my community my commitment
Esd project 1   my community my commitmentEsd project 1   my community my commitment
Esd project 1 my community my commitment
 
Culture&historyanalysis
Culture&historyanalysisCulture&historyanalysis
Culture&historyanalysis
 
Research Proposal
Research Proposal Research Proposal
Research Proposal
 
Social Psychology Journal 1
Social Psychology Journal 1Social Psychology Journal 1
Social Psychology Journal 1
 
Social Psychology Journal 2
Social Psychology Journal 2Social Psychology Journal 2
Social Psychology Journal 2
 
Example of work for cnc
Example of work for cncExample of work for cnc
Example of work for cnc
 
Compare and Contrast essay
Compare and Contrast essay Compare and Contrast essay
Compare and Contrast essay
 
English Descriptive essay
English Descriptive essayEnglish Descriptive essay
English Descriptive essay
 
Company profile ici print
Company profile ici print Company profile ici print
Company profile ici print
 
Garnette's ici project 1
Garnette's ici project 1Garnette's ici project 1
Garnette's ici project 1
 
Idea journal 4
Idea journal 4Idea journal 4
Idea journal 4
 
Idea Journal 3
Idea Journal 3Idea Journal 3
Idea Journal 3
 

Recently uploaded

DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 

Recently uploaded (20)

DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 

Fettuccine Truss Bridge Analysis Report Summary

  • 1. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   BUILDING STRUCTURES (ARC 2523) PROJECT 1 FETTUCCINE TRUSS BRIDGE ANALYSIS REPORT GARNETTE DAYANG ROBERT 0315491 OOI ZHI QIAN 0313999 CHUNG WEI JIN 0313789 LEONG HUI YI 0319280 ABDUL MAHI MUHSIN 0314421 DANAR JOVIAN ADITIYA VADYA PUTRA 0314575
  • 2. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 3. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   CONTENTS 1. INTRODUCTION 1.1 AIMS & OBJECTIVES 2. METHODOLOGY 2.1 MAKING OF FETTUCCINE BRIDGE 2.2 REQUIREMENT 3. PRECEDENT STUDY 4. MATERIALS & EQUIPMENTS 4.1 STRENGTH OF MATERIAL 4.1.1 PROPERTIES OF FETTUCCINE 4.1.2 TESTING OF FETTUCCINE 4.1.3 EXPERIMENTS 4.1.4 CONCLUSION 4.2 ADHESIVE ANALYSIS 5. BRIDGE TESTING AND LOAD ANALYSIS 5.1 TIMELINE 5.2 FIRST BRIDGE 5.3 SECOND BRIDGE 5.4 THIRD BRIDGE 5.5 FOURTH BRIDGE 6. FINAL BRIDGE 6.1 AMENDMENTS 6.2 FINAL MODEL MAKING 6.3 JOINT ANALYSIS 6.4 FINAL BRIDGE TESTING AND LOAD ANALYSIS 6.5 CALCULATIONS 7. CONCLUSION 8. APPENDIX 8.1 CASE STUDY 1 8.2 CASE STUDY 2 8.3 CASE STUDY 3 8.4 CASE STUDY 4 8.5 CASE STUDY 5 8.6 CASE STUDY 6 9. REFERENCES
  • 4. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   1.0 INTRODUCTION Truss is a structure built up of three or more members that are normally considered being pinned and hinged at the joints. The following figure shows different types of trusses. Load applied to the truss is transmitted to joint so that each individual member is in either pure tension or compression. 1.1 AIMS & OBJECTIVES This project aims to develop our understanding of tensile and compressive strength of construction materials by understanding the distribution of force in a truss and to design a perfect truss bridge of high level of aesthetic value and minimal construction material. In order to achieve that, in a group of 6 we were required to carry out a precedent study on a truss bridge of our choice, analyzing the connections, arrangements, design and orientations of the members. After that, we were required to design and construct a fettuccine bridge of 350mm clear span and maximum weight of 80g. These requirements are to be met, and the bridge will be then tested to fail. After that, we then need to analyze the reason of its failure and calculate its efficiency.
  • 5. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   2.0 METHODOLOGY 2.1 MAKING OF FETTUCCINE BRIDGE STRENGTH OF MATERIAL Understanding the strength of the fettuccine is important in order to build one bridge that can carry a maximum load. For the tensile strength in the fettuccine is considerably low when comparing to aluminum, which has the same amount of stiffness to the fettuccine. ADHESIVE Choosing the best type of adhesive is important as it plays a huge role in this assignment. As there are many types of adhesive, that each has their own function and characteristic. Not only the type of it, but the brand itself is important as it has different quality and choosing one that suits constructing fettuccine bridge is primary. MODEL MAKING To ensure precision in our model making, we drafted the drawings in AutoCad and it was drawn in 1:1 scale, and we plotted out to ensure precision and to ease our process. Each pasta was marked individually and placed at their own location and length and were glued accordingly to strengthen our bridge. MODEL TESTING Models were then being tested by placing a hook and a pail hanging under the bridge. Water was being poured into the pail slowly and all these were being recorded to allow us to fix and amend and analyze our bridge. 2.2 REQUIREMENTS -­‐ A clear span of 350mm -­‐ Maximum weight of 80g -­‐ Bridge must be made out of fettuccine -­‐ Allowed to use any type of adhesive -­‐ Design and workmanship is put to consideration as part of aesthetic      
  • 6. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   3.0 PRECEDENT STUDY The precedence study below is used as reference knowledge for our understanding of forces, real truss bridge connections, arrangement and orientation of both horizontal and vertical members. The analyzed information is applied in constructing our final model through a series of trial and error. Information is obtained from different internet sources as well as books. HISTORIC NAME: WADELL ‘A’ TRUSS BRIDGE LOCATION: ENGLISH LANDING PARK, PARKVILLE, MISSOURI ENGINEER: JOHN ALEXANDER LOW WADDELL (1854-1938)   A BRIEF HISTORY Originally built as a railroad bridge across Linn Branch Creek, in the vicinity of Trimble, Clinton County, Missouri, it now crosses Rush Creek carrying a pedestrian path between a day-use recreational area and two isolated ball fields. It is a triangular shaped, steel, through-truss, bridge approximately 100 feet long and 40 feet high. It rests on two concrete abutments and is composed of pin-connected riveted units. In 1980, the bridge was disassembled and stored for seven years by the U. S. Army Corps of Engineers, while awaiting a suitable location and a responsible owner. Despite its relocation, the Waddell "A" Truss Bridge retains its integrity of design as drawn by its creator, John Alexander Low.
  • 7. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   PHYSICAL DESCRIPTION The bridge is a single-span, four-panel, pin-connected, steel truss bridge. The triangular trusses, known as "A" trusses because of their shape, resemble king-post roof trusses, except that the king "post" is in tension. The span is 100 feet (30m), and the trusses, 17 feet (5.2m) apart, are nearly 40 feet (12m) high. Near the apex, well above the height of a railroad locomotive, X-bracing between the two trusses provides lateral stability. This top bracing and the designed reduction in the quantity of steel needed to construct the bridge, are the principal reasons for the bridge's shape. FORCE DISTRIBUTION DIAGRAM   The compression members of the trusses are shop-riveted built-up sections, made of channels, angles, and plates, while most tension members are made of pairs of eye-bars. The bottom chord is in four sections, 25 feet by 17 feet, sway-braced by angle braces and supporting a pair of girder stringers which are, in turn, angle braced. The floor system consists of cross-braced, built-up wooden floor beams and stringers.              
  • 8. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report     TRUSS CONNECTIONS and MEMBERS          
  • 9. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report                            
  • 10. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   COMPARISON OF THE BRIDGE BEFORE RELOCATION                                                             Railroad bridge across Linn Branch Creek, 1989 ( Before dissembling )
  • 11. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   DETAIL IMAGES A) B) C) A) Detail View Of Circa 1952 Steel Approach Beams Taken From Underneath Bridge B) Detail Of Support Column Looking At Right Angle To Truss C) Detail View Of Bracing Around Support Column DETAILED TRUSS CONNECTION REFERENCE OF MEMBERS  
  • 12. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   4.0 MATERIALS AND EQUIPMENTS       FETTUCCINE 3 SECOND GLUE PEN KNIFES S HOOK PAIL WATER BOTTLE SAND PAPER WEIGHING MACHINE CAMERA To  build  the  bridge   Adhesive  for  model  making     Used  to  cut  fettuccine     Used  to  hook  on  the  bridge  and   to  carry  the  pail     Used  to  carry  the  water  load   Used  to  calculate  how  much   load     To  sand  the  edges  of  any   members  to  have  a  perfect   angle  or  fit     To  weigh  the  right  amount  of   the  bridge  and  the  load   Take  pictures  of  progress  and   the  final  bridge  
  • 13. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   4.1 STRENGTH OF MATERIAL Fettuccine was the only material approved to be used for the bridge for this project. Thus, research and analysis of Fettuccine was conducted before the model making session. 4.1.1 PROPERTIES OF FETTUCCINE Before using the fettuccine, it needs to be checked and filtered out, those that are twisted cannot be used; it is to ensure that the load is able to distribute evenly and effectively through the flat surface of the fettuccine. Dimension: 250mm x 5mm Tensile strength: 2 000 psi Stiffness (E= stress/strain): 10 000 000 psi 4.1.2 TESTING OF FETTUCCINE Before testing, we made sure the fettuccine were glued with the proper technique to prevent uneven surface and to ensure the ease of building. FIgure 4.1.2.1 Wrong way of gluing fettuccine   FIgure 4.1.2.2 Correct gluing technique for the members   FIgure 4.1.2.3 Correct gluing technique for the beam  
  • 14. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   4.1.3 EXPERIMENTS The fettuccine was arranged in so many ways, and we’ve found the best way, which was the staggered arrangement, it helps us to ensure that the breaking points were not aligned, hence its stronger. Also to understand its efficiency and the maximum load each can carry, we’ve tested several types of beams with different placements and ways to understand which is the best to be implemented in our bridge. Layers of Members Length of Fettuccine (cm) Clear Span (m) Load Sustained (Vertical Facing) (g) Load Sustained (Horizontal Facing) (g) 1 Layer 26 15 420 205 2 Layers 26 15 500 320 3 Layers 26 15 770 630 4 Layers (I- beam) 26 15 1300 1110 4.1.4 CONCLUSION Based on the testing, the I-beam (4 layers of members) is the strongest, both horizontal and vertical positions can be put in use. When the vertical member is placed in between two horizontal members, the horizontal members will enhance the load distributions and the load will transfer to the vertical member that can withstand more loads. The 3 layers was not used as it was just carrying extra weight but not effective enough to hold any load. For the 2 layers, it was strong enough and light weight to carry the loads. As for the first one, it was not used, as it couldn’t hold any load.
  • 15. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   4.2 ADHESIVE ANALYSIS Four different kinds of glue used to ensure the joints were strong and thus strengthen the bridge. Types of Adhesive Advantages Disadvantages Rank V-Tech Super Glue -High efficiency -Fast setting -Low viscosity -Burns skin -Makes fettuccine brittle -Leaves marks on fettuccine 1 UHU Glue -Easy to use -Neat -Low efficiency -Slow setting time 3 YAMAYO Super Glue -High efficiency -Strong and neat -Fast setting time -Expensive 2 V-Tech Super Glue was used the most while constructing the fettuccine bridge. It has high efficiency and it dried faster than other adhesives, as it is more concentrated when compared to the rest. The glue was allowed to dry out for a minute or two in order to ensure the glue to dry out and let the bridges to perform at its best capabilities. Yamayo Super Glue was also used a lot as it was very easy and also strong and neater, but because it was expensive and not much in one bottle we decided to stick with V-Tech. Furthermore it provides the same strength as V- Tech. UHU glue was tried once and it was not as good as the rest. It required longer time to dry and making it very flexible. Not strong enough to hold loads. In conclusion, the V-tech Super Glue were much more effective when combining the joints as well as stacking the layers of the fettuccine as it was much more efficient, easier to use and it dries out very quickly. In order for the bridge to reach its maximum potential strength, the bridge was left to dry out for hours before being tested.
  • 16. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   5.0 BRIDGE TESTING & LOAD ANALYSIS 5.1 PROGRESS TIMELINE  
  • 17. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   5.2 FIRST BRIDGE   FIRST BRIDGE The first bridge model that we tested was based on the precedent studies of the ‘Howe Truss’. In this first experiment, we did two different kinds of ways of hooking the load onto the bridge as can be seen in figure 1.1 and figure 1.2.   Figure 1.1 First bridge model     Figure 1.2 Single S-hook was attached to the middle part of the horizontal member    
  • 18. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report                   Figure 1.3 Failed horizontal member (Single s-hook) The structural failure in figure 1.2 occurs at the horizontal member because the member that bears the most load was too thin and it bears the load all by itself without distributing it equally through the structure. Bridge Weight: 64g Maximum load capacity: 1.6kg Efficiency: (1600)^2 = 40% 0.064
  • 19. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   5.2.1 Calculations
  • 20. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   new doc 7_1.jpg
  • 21. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 22. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   5.3 SECOND BRIDGE     The second bridge model was based on the ‘Baltimore Truss’ precedence study. Some amendments were made for this bridge, by adding more cross bracings in order to distribute the tension force more equally along the structure, reducing the possibilities of it breaking. We also improved the top and bottom chords by replacing them with I-beams. The I-beams were constructed with 3 layers of fettuccines.   Figure 2 Cross bracings were made when constructing the second bridge   Figure 2.1 Top and bottom chords were improved with I-beams                
  • 23. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report         Figure 2.1 and Figure 2.3 Failed horizontal members     Figure 2.1 and 2.3 shows structural failure that occurred at the horizontal member. The failure was similar to the first bridge test, where it occurred in the horizontal member. This is due to the fact that the S-hook was placed in the middle of the horizontal member and too much load was concentrated on that particular spot. Moreover, the fettuccine were not thick enough to withstand the force, causing it to break apart. Much improvement was made from the previous test, as this bridge could withstand loads of up to 5.4kg, 3.8kg more than the previous bridge. This is due to the I-beams that were constructed along the top and bottom chords. Bridge Weight: 62g Maximum load capacity: 5.4kg Efficiency: (5400)^2 = 47.03% 0.062      
  • 24. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   5.4 THIRD BRIDGE After the first two tests, we decided to change our truss design into the Wadell ‘A’ truss bridge. This is because we want to explore more on the possibilities of a stronger structure than the previous models. I-beams design was constructed lighter than the previous model, with only 2 layers of fettuccines. This is to make the whole structure lighter and to fulfill the requirements of the project. Figure 3 Third bridge model Figure 3.1 Load distribution diagram Amendments were made whereby positions of the S-hook were changed from the center of the bridge towards the both sides of the trusses as can be seen in figure 3.2 in order to distribute the compression and tension load equally on both trusses.
  • 25. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   Figure 3.4 Failed members of the bridge       Figure 3.3 and 3.4 shows structural failure, which occurred on many members of the bridge (Cross bracings, bottom chords and one side of the top chord). The placement of the S-hooks in this experiment plays a huge role on the structural failures. The cross bracings were too small to withstand the tension and compression force, causing both bottom chords to break apart. Poor workmanship on constructing the diagonal members has an effect too as they are not connected properly, hence the poor load distribution along the members. Bridge Weight: 50g Maximum load capacity: 2.3kg Efficiency: (2300)^2 = 105.8% 0.050           Figure 3.2 Placements of S-hooks on both sides of the trusses   Figure 3.3 X bracings were constructed  
  • 26. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report                 5.5 FOURTH BRIDGE   We decided to stick with the same truss design for the fourth bridge, with amendments made with the cross bracings as well as improved workmanship the joints of the diagonal members. Cross bracings were made longer than the previous experiment in order for it to withstand the tension forces.                                   Figure 4 fourth experimental models with improved cross bracings    
  • 27. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report     Figure 4.1 Double S-hook attached to both trusses   Figure 4.2 Breakage of the bridge during test   Figure 4.13 Occurrence of structural failures        
  • 28. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report       Figure 4.3 shows structural failures, where it occurred on the diagonal members as well as the bottom chord. This occurred due to the compression and tension forces. With poor workmanship of the joints of the diagonal members, joints were weak and were easy to break apart. The I-beam on the bottom chord was constructed in two separate pieces, where joints of it were weak and caused it to break apart. Bridge Weight: 73g Maximum load capacity: 7.79kg Efficiency: (7790)^2 = 83.13% 0.073        
  • 29. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   6.0 FINAL BRIDGE 6.1 AMENDMENTS     Final Bridge 6.2 FINAL MODEL MAKING After going through a few times of trial experiments on the draft bridges, we managed to finalize the structure and joints of our bridge. Also, we made sure that the efficiency of the final structure was on point to its maximum by increasing its strength in terms of the constant weight. So, here is how our final bridge, that weighted 69kg with its ability to hold a bucket of water that had a weight of 9.1kg in total, was made. We started off with the individual bridge parts that will be used to build up the whole bridge model. Using the strongest 3 seconds super glue, we placed two layers of fettuccini sticks together for each part until it is enough for the whole structure. The two-layered part was then left ready to be cut accordingly to the desired measurements based on the outline of the bridge. For each frame of the bridge structure, we placed one layer of fettuccini stick on the top and bottom side of the uncut two-layered structure to create an I- beam-like structure. We printed out the outline of our bridge structure that was drawn on the AutoCAD software. In order to achieve the maximum accuracy of the structure, we placed the two-layered sticks and the I-beams on the outline sheet and cut the sticks according to the lengths of each structural parts of the bridge. Then, we placed the readied parts back on the outline sheet to stick up the edges to create the form of the bridge. We started off from the sides of the bridge followed by its top and bottom.
  • 30. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   6.3 JOINT ANALYSIS The joint methods that are used in the construction of the bridge is very important as it affects the efficiency and failure of the final fettuccine bridge. The joints are thoroughly tested and studied in order to achieve the maximum strength in each connection of members. Below are the final joint methods that were used in our bridge, according to the requirement of each part.
  • 31. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   JOINT A DIAGONAL/VERTICAL LOAD DISTRIBUTING MEMBERS From analyzing the forces, we found out that the top of the structural frame experiences compression forces upon application of load. The vertical member helps to balance out the force as it has an internal tension force and transfers the load to the adjacent diagonal member and to the bottom of the structural frame. This reduces the stress on the I beam as the vertical member now functions as a supporting column for the I-beam. JOINT B MIDDLE MEMBER AS ‘SUPPORT’ COLUMN The central vertical member of the bridge is joined very carefully so that it stands perfectly in the centre of the mitre joint of the I- beam, acting as a mean of support and prevents the top member from collapsing. We found of that, when the vertical member is even slightly off balance from the centre, it causes stress to the structure above
  • 32. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   JOINT C TOP CONNECTION OF I-BEAM (STRUCTURAL FRAME) The diagonal members of the structural frame ( I-beams ), are joined with a mitre joint. A mitre joint is joint made by beveling each of two parts to be joined, usually at a 45° angle, to form a corner, usually a 90° angle. The rigidity of the structural frame is strengthened due to this design, and provides stability and strength to the loads acting on it from the structures below, and helps to evenly distribute the forces. JOINT D TOP DIAGONAL TO BASE, FRAME CONNECTION OF I-BEAM Since the top part of the structural frame is in full compression, and the bottom part is in tension, the force needs to have a proper path to flow along the structure. To accommodate this huge compression force, the top structure needs to be carefully shaped and connected to the base without any faulty/disconnected edges. In order to do that, the I-beam member is cut at a 45’ angle as it adheres perfectly to the bottom member. This provides better resistance to the structure against compressive stress.
  • 33. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   JOINT E The vertical connecting members are very critical in the bridge design as means of supporting as well as distributing the load along the entire structure. The improvement is made from a very first design where we placed the horizontal member merely against a single vertical member. The horizontal member did not aid in transferring the load to the other members however was only dependent on the adhesive (three second glue) that was used. This resulted in an instant breakage of the horizontal member. The second design was improved by placing the horizontal members on top of the structural base frame, on either sides of the vertical member. This gave support to the vertical member as well as increasing the surface distance horizontally. However it did not transfer the load vertically. The final design was improvised by using two diagonal members touching the center vertical member. This helped to divert the load stress evenly to the other parts of the bridge.
  • 34. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   JOINT F In order to further strengthen the base members, a horizontal member was placed on either side of the diagonal members that were supporting the vertical members. This helped to reduce the stress on the diagonal members and prevented it from sliding or breaking off (distortion) from the vertical member. These members also helped to distribute the loads horizontally from one side to the other. The edges of the connection are carefully shaped so as to fit perfectly into the slots between the base structural frame and diagonal members, to provide extra strength and rigidity. BASE JOINTS JOINT G HORIZONTAL ‘X’ BRACING ( JOINT TO THE STRUCTURAL FRAME ) Joint H is using the concept of how I-beams are coped inside each other with one member’s flange resting on the other. This provides a ‘lock ‘mechanism for the horizontal beam and gives it some strength. Two diagonal bracings are placed below the two-parallel members, in order to strengthen the beam
  • 35. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   JOINT G & I HORIZONTAL ‘X’ BRACING ( JOINT TO THE HORIZONTAL BRACING )
  • 36. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   6.4 Final Bridge Testing and Load Analysis The picture below shows the final design of our fettuccine bridge and its load distribution. In this bridge, the final amendments made are the number of diagonal members in the structure and an addition of a cross bracing in the base to strengthen the bridge from torsion. Figure () Final bridge design showing the distribution of compression and tension force in the bridge.   Figure () Top view of the bridge   Figure () Base Design
  • 37. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report     Figure() Bridge while testing.   Figure () Top chords of bridge broke and caused the bridge to fall After observing, calculating and analyzing our final bridge, we came to a conclusion that the failure of this bridge is due to the breakage of the top chords which had to withstand a huge amount of compression forces. Longer members tend to have a weaker resistance to compression force which might also be one of the reasons to the failure to our bridge as the top chords are both 215mm each. Moreover, Joint BE and Joint IJ, which are diagonal members are also under large compression forces which are 133.41N each, further weakening the support of the bridge.In addition to that, the middle member is also under large compression force, which is 202.91N, causing a large upward force acting on the top and bottom chords, resulting in torsion in both of these members.
  • 38. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report     Figure () Highlighted are the failed members. Bridge weight: 74g Load: 8670g Efficiency: (8.67) =1015.80% The efficiency of the final bridge was over our expectations as the maximum load that our final testing bridge withstood was 7790g which was 880g lighter than the final load withstood. If the large amount of compression force could be lessen down to a smaller amount, the bridge could have resulted in a higher efficiency than this. Moreover, if the middle member was acted on by a tension force instead of compression force, The top chords and bottom chords would have lesser force acting on them in the middle, resulting in higher efficiency.   Failed Components Top chords and bottom chords. Failed Reasons Large compression force acting on top chords and bottome chords exerted from middle member of the fettuccine bridge.               2  0.07 4
  • 39. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   6.5 Calculations
  • 40. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 41. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 42. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 43. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   7.0 CONCLUSION   In a group of 6, we have carried out experiment and tested 5 bridges in total. Each of them has different truss and different efficiency is tested out. The precedent study that we have taken inspiration and modified from is the “Waddell A Truss Bridge”. After rounds of testing and calculating the efficiency, we have decided to make our bridge triangular shape because the equivalent triangle is the strongest form in withstanding pressure. In the process of changing the truss and pattern, we realize that the angle too, plays a crucial part in sharing the load and having clear state of how tension and compression work in different methods. In the last few rounds of finalizing the bridge shape, we decided to keep it simple because the more truss added in, the weaker it actually gets because these trusses act as additional and useless weight that serve no purpose except adding the total loads. Thus, we make it to the easiest and obvious triangle shape with the same length and same angle on inverted side. At the end, it’s efficiency increases way more than our first try. As a team, we learnt that time management is very important as we need time to carried out countless experiments and also calculating the efficiency and highest possibilities of either which bridge can withstand the most weight. We also learnt that the unity of all team members can make the workload lesser and also make the progress faster when all of us corporate well together as a team.  
  • 44. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   8.0 APPENDIX CASE STUDY NO. 1 JANE OOI ZHI QIAN 0313999  
  • 45. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report    
  • 46. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report    
  • 47. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report     CASE STUDY NO. 2 MEGAN CHUNG WEI JIN 03
  • 48. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report                
  • 49. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report        
  • 50. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report              
  • 51. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report                  
  • 52. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report     CASE STUDY NO. 3 ABDUL MAHI MUHSIN 0314421  
  • 53. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report    
  • 54. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report      
  • 55. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report      
  • 56. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report    
  • 57. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   CASE STUDY NO. 4 GARNETTE DAYANG ROBERT 0315491
  • 58. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report    
  • 59. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   CASE STUDY NO. 25 LEONG HUIYI 0319280
  • 60. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 61. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 62. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   CASE STUDY NO. 6 DANAR JOVIAN ADITIYA PUTRA 0314575
  • 63. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report      
  • 64. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report      
  • 65. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report    
  • 66. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report    
  • 67. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report  
  • 68. ARC2213 Building Structures Project 1: Fettuccine Truss Bridge Analysis Report   9.0 REFERENCES Vitaltechnical.com,. 'Sealant Manufacturer In Malaysia | Adhesive | Vital Technical'. N.p., 2015. Web. 8 Oct. 2015. Ching, Francis D.K (2008) Building Construction Illustrated Fourth Edition. New Jersey: John Wiley & Sons, Inc.