SlideShare a Scribd company logo
1 of 4
Download to read offline
Instrument supervisor
Surname and name: Hossamnasralishabaaneisa
Birth date: 4 / 4 / 1980
EDUCATION: Medial Diploma in Industrial Specialization.
University/College: Mahalla secondary mechanical industrial.
Date and location: 1993-1997 /Algharbya
Language: English level: fluent
Language: ARABIC level: Native
Driving licence: C class international
MobilePhone: +201111777672
E-mail:hossam.oilandgas@gmail.com
Training:
Course: Pneumatic & Hydraulic control.
Period and location :01/ 01 / 2007-10/ 02 / 2007 Bapetco- west desert.
Course: Programmable Logic Controller (PLC Siemens) Step 7-300 .
Period and location: 15 / 05 / 2012-13/ 06 / 2012 DonBosco Institute Certificate Alexandria.
Course: Win CC Flexible.
Period and location: 13 / 06/ 2012 -13 / 07 / 2012 Don Bosco Institute Certificate Alexandria
Summary of the job position held
Period: from 01 / 06 / 2015 till now
Position/Role: instrumentSupervisor
Company: ON-SHORE JV ( ENPPI and TOYO )
Department/Unit: Instrumentation-Commissioning
Project: Egyptian Polyethylene Project (ETHEDCO) /Ameria Alexandria, Egypt
Verifying Loop check for all on &off skid instruments.
Verifying the instrument functionality and the system logic integrity forHART based instruments.
Verify cause and effect matrix for all on&off skid instruments.
Responsible to check and verify the functionality of the field utilities (Air Compressors, Air
Driers, Analyzers)
Period: from 01 / 04 / 2015 to 01/05/2016
Position/Role: instrumentSupervisor
Company: IAE INSTRUMENTATION & AUTOMATION & ESTjoint venture (ARAMCO)
Department/Unit: Instrumentation/ Loss Prevention
Country/Location: SAUDI ARABIA / AINDAR WIP1
implement and configuration for signals communications between 2 HVAC units type (EMERSON)
which have signals communicate for DCS system Type (Invensys) and other signals for alarms and trip
communicate for ESD system Type ( triconex )
Period: from 01 / 05 / 2014 to 25 / 02 / 2015
Position/Role: FG instrument commissioningSupervisor
Company: Enppi Engineering for the petroleum & process industries joint venture (SHELL)
Department/Unit: Instrumentation/ Loss Prevention
Country/Location: Egypt / west desert
Main tasks performed and related context:(Carbon removable plant)
Preparation of cable schedule .
Installation , Loop Checking and commissioning for Addressable system simplex.
Installation , Loop Checking and commissioning for & VESDA system.
Megger continuity test for all cable’s I/O’S signals AS shell standard.
Installation , Alignment ,Loop Checking ,commissioning for Dragger , Det-tronics open path gas detectors.
Installation ,calibration ,commissioning for Det-tronics , Net safety spot type gas detectors.
Installation , commissioning for Det-tronics , Net safety 3IR flame detectors.
Installation , commissioning for firefighting deluge, Self Oscillating monitors , (FM200, ,CO2 &sprinkler
systems).
Installation , commissioning for Heat detectors ( Addressable , Conventional , LHD)
Period: from 01 / 09 / 2013 to 01 / 05 / 2014
Position/Role: FG instrument commissioningSpecialist
Company: Enppi Engineering for the petroleum & process industries joint venture (BP)
Department/Unit: Instrumentation
Country/Location: Egypt-port said
Main tasks performed and related context:(GAS compressors plant)
Preparation of cable schedule .
Installation and Calibration of all Instruments and Fire & Gas Devices.
Installation and commissioning for gas detectors-open path gas detectors, spot type(Honeywell).
Installation and commissioning for CCTV micropackFDS301 Visual Flame Detector.
Preparation of inter connection wiring diagrams .
Participate in daily and weekly meetings with client and consultants. Supervising and monitoring the
work of Sub contractors as per project schedule. Preparation of work permits and approval .
Loop Checking ,commissioning fire detection and fighting System startup.
Installation and commissioning for ENERGEN firefighting system.
Period: from 01 / 10 / 2011 to 25 / 08 / 2013
Position/Role: FG instrument commissioningtechnician
Company: Enppi Engineering for the petroleum & process industries joint venture (E- Styrenics)
Department/Unit: Instrumentation
Country/Location: Egypt /Alexandria
Main tasks performed and related context: (petrochemical-styrene plant)
Calibration all instruments transmitters, control valves (foundation fieldbus ).
Commissioning and start up for Silos plant through Siemens Step 7-300 with the central control room.
Calibration and commissioning for gas analyzer which measure oxygen Concentration in styrene, ethyl
benzene tanks.
Commissioning and start up for bagging system.
Installation , calibration , alignment for all Gas and Flame detectors.
Loop Checking ,commissioning fire detection and fighting System startup.
Period: from 01 / 08 / 2011 to 01 / 02 / 2012
Position/Role: Instrument / fire &gas senior technician
Company: Enppi Engineering for the petroleum & process industries joint venture (E-gas)
Department/Unit: Instrumentation
Country/Location: Egypt / Dahshour
Main tasks performed and related context: (GAS compressors plant)
Commissioning for Fire & Gas system.
Period: from 01 / 02 / 21010 to 01 / 06 / 2011
Position/Role: instrument and electronic workshop
Company: EMC joint venture LNG(UNION FENOSA)
Department/Unit: Instrumentation / maintenance
Country/Location: EGYPT/ DAMITTA
Main tasks performed and related context: (LNG plant)
Responsible for workshop calibration and maintenance.
responsible for maintenance and calibration of all instrumentation in the field.
Calibration all devices including transmitters, measurement devices, and control valves.
Maintenance as a procedures for preventive and corrective maintenance of Automation Control System.
Maintenance all types of instruments transmitters, control valves pneumatic ,smart.
Maintenance, calibration ,alignment for all open path gas detectors types
Period: from 01/ 06/ 2009 to 01 / 01 / 2010
Position/Role: senior instrument technician
Company: Yemen gas LNG joint venture (Technip)
Department/Unit: Commissioning
Country/Location: Yemen / Balhaf
Main tasks performed and related context: (LNG plant)
Fire and gas equipment’s calibration.
Motorized valves adjustments.
Nitrogen plant instruments calibration.
Steam boilers instruments calibration
Commissioning and start up for Nitrogen plant through Allen Bradley PLC LOGIX 5000 with the central
control room.
Commissioning and start the up for Motorized valves with the Central control room.
Commissioning and start up for Fire and Gas with the central Control room.
Commissioning and start up for Steam boilers with the central Control room.
Also participate in Operation maintenance and trouble shooting for Nitrogen plant.
Preparation of work permits and approval.
Preparation of daily and weekly report.
Loop Checking, Pre-commissioning and System start-up
Period: from 01 / 10 / 2006 to 01 / 06 / 2009
Position/Role: Instrument foreman
Company: Bapetco joint venture (shell)
Department/Unit: Instrumentation /construction
Country/Location: Egypt /west desert
Main tasks performed and related context: (Oil and gas production)
workingan a Different Scenarios of Oil wells: Gas Lift , ESP Pump, water injection.
Preparation, installation for (oil & gas) Baker wellhead Hydraulic control panel ,commissioning start up.
Preparation of Hook-up diagrams.
Planning and scheduling of daily activities.
Calibration for all instruments transmitters, pilots, control valves ,pneumatic controllers.
Loop Checking, Pre-commissioning and System start-up.
Period: from 01 / 01 / 2004 to 01 / 06 / 2006
Position/Role: instrument technician.
Company: Abu Madi Gas Fieldjoint venture (Eni)
Department/Unit: instrumentation
Country/Location: Egypt / Almansuora
Main tasks performed and related context:( gas production).
Preparation of work permits and approval.
Preparation of cable termination schedule.
Calibration for all instruments and switches for 3 Gas turbine nuovopignone.
adjust axial Bentley Nevada probes control and monitoring with system control room.
Loop Checking, Pre-commissioning and System start-up.
Period: from 01 / 11 / 2002 to date 31 / 12 / 2003
Position/Role: instrument technician
Company: Adec Electronics & Control joint venture (Khalda Petroleum)
Department/Unit: instrumentation & control
Country/Location: Egypt / West Desert
Main tasks performed and related context: (Oil and gas production)
Installation and Calibration of all Instruments pneumatic and Hydraulic.
Calibration for different type of transmitter (pressure-flow-level-temperature).
Installation and Calibration of control valves.
Loop Checking, Pre-commissioning and System start-up

More Related Content

What's hot

What's hot (8)

CV Update1 2015, November.
CV Update1 2015, November.CV Update1 2015, November.
CV Update1 2015, November.
 
Curriculum Saif
Curriculum SaifCurriculum Saif
Curriculum Saif
 
Resume & Certificates (Yasser M) (Instrumentation & Control Engr.) Nov.16
Resume & Certificates (Yasser M) (Instrumentation & Control Engr.) Nov.16Resume & Certificates (Yasser M) (Instrumentation & Control Engr.) Nov.16
Resume & Certificates (Yasser M) (Instrumentation & Control Engr.) Nov.16
 
PRATIK PATEL
PRATIK PATELPRATIK PATEL
PRATIK PATEL
 
My new cv
My new cvMy new cv
My new cv
 
Mohamed Abou Bakr CV
Mohamed Abou Bakr CVMohamed Abou Bakr CV
Mohamed Abou Bakr CV
 
Vijay cv
Vijay cvVijay cv
Vijay cv
 
CV Abraham Frederick August NEW (1)
CV Abraham Frederick August NEW (1)CV Abraham Frederick August NEW (1)
CV Abraham Frederick August NEW (1)
 

Viewers also liked (20)

My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 
ibrahim cv10a
ibrahim cv10aibrahim cv10a
ibrahim cv10a
 
safety Cv
safety Cvsafety Cv
safety Cv
 
Ahmed - Process commissioing
Ahmed - Process commissioingAhmed - Process commissioing
Ahmed - Process commissioing
 
Enppi Old Letter (Project Engineer)
Enppi Old Letter (Project Engineer)Enppi Old Letter (Project Engineer)
Enppi Old Letter (Project Engineer)
 
R.R CV
R.R CVR.R CV
R.R CV
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
Enppi
EnppiEnppi
Enppi
 
Wessam magdy
Wessam magdyWessam magdy
Wessam magdy
 
SAGE Profile 3
SAGE Profile 3SAGE Profile 3
SAGE Profile 3
 
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
ENP-EI-T-16-0001 - ARAMCO Replor Resume (Islam abd elrhman )
 
My CV
My CVMy CV
My CV
 
Eng Ahmed Afifi final CV
Eng Ahmed Afifi final CVEng Ahmed Afifi final CV
Eng Ahmed Afifi final CV
 
M.adel_CV
M.adel_CVM.adel_CV
M.adel_CV
 
Reda CV Uptated (June 2015)
Reda CV Uptated (June 2015)Reda CV Uptated (June 2015)
Reda CV Uptated (June 2015)
 
Mohamed Abo El Fotouh Mohamed(1)
Mohamed Abo El Fotouh Mohamed(1)Mohamed Abo El Fotouh Mohamed(1)
Mohamed Abo El Fotouh Mohamed(1)
 
Mostafa_El-Iskandarani_CV_FINAL (1)
Mostafa_El-Iskandarani_CV_FINAL (1)Mostafa_El-Iskandarani_CV_FINAL (1)
Mostafa_El-Iskandarani_CV_FINAL (1)
 
Mohammed Abdelazeem Resume
Mohammed Abdelazeem ResumeMohammed Abdelazeem Resume
Mohammed Abdelazeem Resume
 
Chemical Engineering Career Divergence
Chemical Engineering Career DivergenceChemical Engineering Career Divergence
Chemical Engineering Career Divergence
 

Similar to instrument supervisor

Similar to instrument supervisor (20)

Moh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMoh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaa
 
Mohamed Anis Ahmed 2
Mohamed Anis Ahmed 2Mohamed Anis Ahmed 2
Mohamed Anis Ahmed 2
 
my C.V Mohanad Zaki
my C.V Mohanad Zakimy C.V Mohanad Zaki
my C.V Mohanad Zaki
 
CV Ahmed1
CV Ahmed1CV Ahmed1
CV Ahmed1
 
Mohanad 123-4
Mohanad 123-4Mohanad 123-4
Mohanad 123-4
 
M.ZALNOUN
M.ZALNOUNM.ZALNOUN
M.ZALNOUN
 
Mahmoud El Sayed CV
Mahmoud El Sayed CVMahmoud El Sayed CV
Mahmoud El Sayed CV
 
MOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATEMOTAZ ALI C.V LAST UPDATE
MOTAZ ALI C.V LAST UPDATE
 
moataz cv
moataz cvmoataz cv
moataz cv
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
Ahmed CV
Ahmed CVAhmed CV
Ahmed CV
 
Mohamed Ahmed Gado
Mohamed Ahmed GadoMohamed Ahmed Gado
Mohamed Ahmed Gado
 
Ibrahim El naggar CV
Ibrahim El naggar CVIbrahim El naggar CV
Ibrahim El naggar CV
 
Magdy hussine cv
Magdy hussine cvMagdy hussine cv
Magdy hussine cv
 
REVISED CURRICULUM VITAE OF MR. HAMMED
REVISED CURRICULUM VITAE OF MR. HAMMEDREVISED CURRICULUM VITAE OF MR. HAMMED
REVISED CURRICULUM VITAE OF MR. HAMMED
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CV
 
Surface well test field engineer C.V
Surface well test field engineer C.VSurface well test field engineer C.V
Surface well test field engineer C.V
 
Mpe. muhammad elkhatib
Mpe. muhammad elkhatibMpe. muhammad elkhatib
Mpe. muhammad elkhatib
 
Muhammad's CV
Muhammad's CVMuhammad's CV
Muhammad's CV
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 

instrument supervisor

  • 1. Instrument supervisor Surname and name: Hossamnasralishabaaneisa Birth date: 4 / 4 / 1980 EDUCATION: Medial Diploma in Industrial Specialization. University/College: Mahalla secondary mechanical industrial. Date and location: 1993-1997 /Algharbya Language: English level: fluent Language: ARABIC level: Native Driving licence: C class international MobilePhone: +201111777672 E-mail:hossam.oilandgas@gmail.com Training: Course: Pneumatic & Hydraulic control. Period and location :01/ 01 / 2007-10/ 02 / 2007 Bapetco- west desert. Course: Programmable Logic Controller (PLC Siemens) Step 7-300 . Period and location: 15 / 05 / 2012-13/ 06 / 2012 DonBosco Institute Certificate Alexandria. Course: Win CC Flexible. Period and location: 13 / 06/ 2012 -13 / 07 / 2012 Don Bosco Institute Certificate Alexandria Summary of the job position held Period: from 01 / 06 / 2015 till now Position/Role: instrumentSupervisor Company: ON-SHORE JV ( ENPPI and TOYO ) Department/Unit: Instrumentation-Commissioning Project: Egyptian Polyethylene Project (ETHEDCO) /Ameria Alexandria, Egypt Verifying Loop check for all on &off skid instruments. Verifying the instrument functionality and the system logic integrity forHART based instruments. Verify cause and effect matrix for all on&off skid instruments. Responsible to check and verify the functionality of the field utilities (Air Compressors, Air Driers, Analyzers) Period: from 01 / 04 / 2015 to 01/05/2016 Position/Role: instrumentSupervisor Company: IAE INSTRUMENTATION & AUTOMATION & ESTjoint venture (ARAMCO) Department/Unit: Instrumentation/ Loss Prevention Country/Location: SAUDI ARABIA / AINDAR WIP1 implement and configuration for signals communications between 2 HVAC units type (EMERSON) which have signals communicate for DCS system Type (Invensys) and other signals for alarms and trip communicate for ESD system Type ( triconex )
  • 2. Period: from 01 / 05 / 2014 to 25 / 02 / 2015 Position/Role: FG instrument commissioningSupervisor Company: Enppi Engineering for the petroleum & process industries joint venture (SHELL) Department/Unit: Instrumentation/ Loss Prevention Country/Location: Egypt / west desert Main tasks performed and related context:(Carbon removable plant) Preparation of cable schedule . Installation , Loop Checking and commissioning for Addressable system simplex. Installation , Loop Checking and commissioning for & VESDA system. Megger continuity test for all cable’s I/O’S signals AS shell standard. Installation , Alignment ,Loop Checking ,commissioning for Dragger , Det-tronics open path gas detectors. Installation ,calibration ,commissioning for Det-tronics , Net safety spot type gas detectors. Installation , commissioning for Det-tronics , Net safety 3IR flame detectors. Installation , commissioning for firefighting deluge, Self Oscillating monitors , (FM200, ,CO2 &sprinkler systems). Installation , commissioning for Heat detectors ( Addressable , Conventional , LHD) Period: from 01 / 09 / 2013 to 01 / 05 / 2014 Position/Role: FG instrument commissioningSpecialist Company: Enppi Engineering for the petroleum & process industries joint venture (BP) Department/Unit: Instrumentation Country/Location: Egypt-port said Main tasks performed and related context:(GAS compressors plant) Preparation of cable schedule . Installation and Calibration of all Instruments and Fire & Gas Devices. Installation and commissioning for gas detectors-open path gas detectors, spot type(Honeywell). Installation and commissioning for CCTV micropackFDS301 Visual Flame Detector. Preparation of inter connection wiring diagrams . Participate in daily and weekly meetings with client and consultants. Supervising and monitoring the work of Sub contractors as per project schedule. Preparation of work permits and approval . Loop Checking ,commissioning fire detection and fighting System startup. Installation and commissioning for ENERGEN firefighting system. Period: from 01 / 10 / 2011 to 25 / 08 / 2013 Position/Role: FG instrument commissioningtechnician Company: Enppi Engineering for the petroleum & process industries joint venture (E- Styrenics) Department/Unit: Instrumentation Country/Location: Egypt /Alexandria Main tasks performed and related context: (petrochemical-styrene plant) Calibration all instruments transmitters, control valves (foundation fieldbus ). Commissioning and start up for Silos plant through Siemens Step 7-300 with the central control room. Calibration and commissioning for gas analyzer which measure oxygen Concentration in styrene, ethyl benzene tanks. Commissioning and start up for bagging system. Installation , calibration , alignment for all Gas and Flame detectors. Loop Checking ,commissioning fire detection and fighting System startup.
  • 3. Period: from 01 / 08 / 2011 to 01 / 02 / 2012 Position/Role: Instrument / fire &gas senior technician Company: Enppi Engineering for the petroleum & process industries joint venture (E-gas) Department/Unit: Instrumentation Country/Location: Egypt / Dahshour Main tasks performed and related context: (GAS compressors plant) Commissioning for Fire & Gas system. Period: from 01 / 02 / 21010 to 01 / 06 / 2011 Position/Role: instrument and electronic workshop Company: EMC joint venture LNG(UNION FENOSA) Department/Unit: Instrumentation / maintenance Country/Location: EGYPT/ DAMITTA Main tasks performed and related context: (LNG plant) Responsible for workshop calibration and maintenance. responsible for maintenance and calibration of all instrumentation in the field. Calibration all devices including transmitters, measurement devices, and control valves. Maintenance as a procedures for preventive and corrective maintenance of Automation Control System. Maintenance all types of instruments transmitters, control valves pneumatic ,smart. Maintenance, calibration ,alignment for all open path gas detectors types Period: from 01/ 06/ 2009 to 01 / 01 / 2010 Position/Role: senior instrument technician Company: Yemen gas LNG joint venture (Technip) Department/Unit: Commissioning Country/Location: Yemen / Balhaf Main tasks performed and related context: (LNG plant) Fire and gas equipment’s calibration. Motorized valves adjustments. Nitrogen plant instruments calibration. Steam boilers instruments calibration Commissioning and start up for Nitrogen plant through Allen Bradley PLC LOGIX 5000 with the central control room. Commissioning and start the up for Motorized valves with the Central control room. Commissioning and start up for Fire and Gas with the central Control room. Commissioning and start up for Steam boilers with the central Control room. Also participate in Operation maintenance and trouble shooting for Nitrogen plant. Preparation of work permits and approval. Preparation of daily and weekly report. Loop Checking, Pre-commissioning and System start-up
  • 4. Period: from 01 / 10 / 2006 to 01 / 06 / 2009 Position/Role: Instrument foreman Company: Bapetco joint venture (shell) Department/Unit: Instrumentation /construction Country/Location: Egypt /west desert Main tasks performed and related context: (Oil and gas production) workingan a Different Scenarios of Oil wells: Gas Lift , ESP Pump, water injection. Preparation, installation for (oil & gas) Baker wellhead Hydraulic control panel ,commissioning start up. Preparation of Hook-up diagrams. Planning and scheduling of daily activities. Calibration for all instruments transmitters, pilots, control valves ,pneumatic controllers. Loop Checking, Pre-commissioning and System start-up. Period: from 01 / 01 / 2004 to 01 / 06 / 2006 Position/Role: instrument technician. Company: Abu Madi Gas Fieldjoint venture (Eni) Department/Unit: instrumentation Country/Location: Egypt / Almansuora Main tasks performed and related context:( gas production). Preparation of work permits and approval. Preparation of cable termination schedule. Calibration for all instruments and switches for 3 Gas turbine nuovopignone. adjust axial Bentley Nevada probes control and monitoring with system control room. Loop Checking, Pre-commissioning and System start-up. Period: from 01 / 11 / 2002 to date 31 / 12 / 2003 Position/Role: instrument technician Company: Adec Electronics & Control joint venture (Khalda Petroleum) Department/Unit: instrumentation & control Country/Location: Egypt / West Desert Main tasks performed and related context: (Oil and gas production) Installation and Calibration of all Instruments pneumatic and Hydraulic. Calibration for different type of transmitter (pressure-flow-level-temperature). Installation and Calibration of control valves. Loop Checking, Pre-commissioning and System start-up