HAFIZ MUHAMMAD ATIF
Module: Problem Solving
Course: MSc Asset Integrity Management
Robert Gordon University, UK
PSVM FPSO
Flixborough 1974
Grangemouth 1987
Piper Alpha 1988
Deep-water Horizon 2006
 Incompetency
 Inappropriate Design
 No Identification of Barriers
 Absence of Process and Safety Management
 Absence of Integrity Management Strategy
 Absence of MOC process
 Operation outside the limits
 Absence of Reporting, Communication and Information Management
Asset Management
Systematic and Synchronized activities through which
organizations manage their assets optimal and sustainable over
their life cycle to accomplish organizations strategic plans
Asset Integrity Management
To manage the integrity over the life cycle of an asset.
Asset Integrity
Ability of an asset to perform its function effectively and
efficiently though protection the health, safety and
environment.
PRINCIPLES AND ATTRIBUTES OF ASSET MANAGEMENT
Attributes Description
HOLISTIC Emphasizing the functional relation
among all departments of organization
SYSTEMATIC characterized the asset management in
an organized, consistent and planned
manner
SYSTEMIC Affecting the whole system rather than
optimizing individual asset separately
RISK – BASED: Prioritize the assets with respect to risk
(health and safety, environment and cost)
SUSTAINABLE Capable of being maintained over the life
cycle without Loss of containment
OPTIMAL Best value of asset under limits of
performance, cost and risk with relative
to other assets
INTEGRATED Interlinking of above attributes to
achieve successful Asset Management
KEY ELEMENTS OF ASSET INTEGRITY MANAGEMENT
Integrity Management System as per DNV RP 116
Concept
Selection /
Design
DecommissioningOperation
Hook – up
Installation/
Commissioning
Procurement /
Manufacturing / Construction
Integrity Management is a function of Entire Life Cycle
Maintain IntegrityDesign
Integrity
Technical Integrity
PHASES AND STAGES OF ASSET INTEGRITY MANAGEMENT
There are three phases of integrity management
1. Design Integrity
2. Technical Integrity
3. Maintain Integrity
1. Design
2. Procurement/Construction/Manufacturing /
Installation / Hook – up
3. Commissioning
4. Operation
5. Modification
6. Decommissioning
There are six stages of integrity management
Modification
DESIGN INTEGRITY
ESTABBLISHMENT OF PILLARS TO AVOID
MAJOR ACCIDENT HAZARDS

 


Poor material selection, Inadequate Competency, Absence of Safety Studies are the key factors for
Major Accident Hazards and cause threat to Health, Safety and Environment. These can be avoid to
invest money in the design stage to established an Asset Management System which ensures the
facility will be capable to handle any major accident hazard which will not only protect the health
and safety of the personnel's but also control environment and business risk over the life cycle of an
asset. Key documentation are necessary to established the integrity are:.
 Material Selection (ISO 15156; NORSOK D-001; EEMUA 194, Group Practices etc.)
 Corrosion Prediction for their asset life (Multicorp, ECE, Casandra etc.)
 Risk Management (Risk Assessment, Risk Management, Risk Acceptance and
Risk Communication)
 Conducting HAZOP, PHA, PSM, LOPA, SIMOPS
 Developing Safety Case (To make sure facility is enough capacity to handle
Major Accident Hazard)
 Identification of SCEs (Safety Critical Elements), BCEs (Business Critical
Elements) and ICE (Integrity Critical Elements)
 Integrity Management Strategy (Topside, Controls & Umbilical, Subsea
Equipment, Pipelines, Riser, Corrosion, Flow Assurance, follow up with Integrity
Management Plan)
 Robust MOC process
TECHNICAL INTEGRITY
 Manufacturing of Pressure and Non-Pressure equipment as per code and standards
 Construction of the facilities as per Code and Standards
 Robust QA / QC during Construction, Hook-up / Installation
 Third party inspection and verification
 Documentation of Anomaly Register and communicated to Operation
 Ensure performance standards to make sure it conforms the design intent
 Robust MOC process
ESTABBLISHMENT OF PILLARS TO AVOID
MAJOR ACCIDENT HAZARDS
Incompetency, poor methods of manufacturing and installations, lack of communication for
anomalies among the engineering departments and avoidance of third party verification are the
high probable factors for damages at the infant stage of operational asset life which leads to Major
Accident Hazards which can be controlled by:
OPERATIONAL INTEGRITY
 Implementation of Integrity Management Strategy (Implementation of RBI, RCM, IPF and
Corrosion Management to manage the integrity and reliability of assets)
 Adherence to Integrity Operating Windows
 Audit and Review process
 Continual Improvements and Lesson Learnt
 Enhancement of Personnel competency and skills
 Robust MOC process
MAINTANED PILLARS TO AVOID MAJOR
ACCIDENT HAZARDS
Incompetency, Absence of integrity management strategy, lack of communication among
departments , Absence of SMS (Safety Management System) and Non-conformance of operational
procedures are the major causes which leads to Major Accident Hazards which can be prevent
during operational life stage by:

 


PLAN
DO
CHECK
ACT
CONCLUSION
Organization can prevent the Piper Alpha and Deep-water Horizon GoM by establishing
and maintaining the integrity over life cycle of an asset with Organization Commitment,
Organizational Strategic Plans and Robust Asset Management System.
 PAS 55 – 1: 2008, Asset Management, Specification for the optimized
management of physical assets
 PAS 55 – 2: 2008, Asset Management, Guidelines for the application of PAS 55 - 1
 DNV RP F – 116, Integrity Management of Submarine Pipeline System
 Asset Integrity Toolkit, UKOOA
 OGP Asset Integrity – the key to managing major accident risks
 Overview of Asset Integrity Management, Robert Gordon University Document
 Presentation by John Reynolds, Establishing IOWs, Shell Global Solutions, IPEIA
Conference February 2, 2006, Banff, Alberta
 Presentation by Racehl Horne, BP, Integrity Management, Project Awareness and
Basic Application, Angola Development Program
 Slide Images:
1. http://www.bbc.co.uk/news/uk-scotland-22840445
2. http://www.growthaccelerator.com/wp-content/uploads/2013/03/Winning.jpg
3. http://www.chanhassenfitnessrevolution.com/wp-content/uploads/2012/07/6-Steps-to-
Success-Chanhassen-Fitness-Revolution.jpg
4. http://www.alstern-technologies.com/main_images/PLANT_2.jpg
5. http://www.seaphantom.com/images2/Offshore_platform_in_night.jpg
6. http://www.offshore-technology.com/projects/8133/images/199971/large/1l-image.jpg
7. http://static.guim.co.uk/sys-
images/Business/Pix/pictures/2010/10/19/1287476298203/Deepwater-Horizon-006.jpg
8. http://www.genesisoilandgas.com/Pages/default.aspx
REFERENCES

More Related Content

What's hot

LAYER OF PROTECTION ANALYSIS
LAYER OF PROTECTION ANALYSISLAYER OF PROTECTION ANALYSIS
LAYER OF PROTECTION ANALYSIS
Thapa Prakash (TA-1)
 
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputHazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry
Arrelic
 
Hazid & hazops
Hazid & hazopsHazid & hazops
Hazid & hazops
Jumanda Kasdadi
 
Safety Integrity Levels
Safety Integrity LevelsSafety Integrity Levels
Safety Integrity Levels
Sandeep Patalay
 
Innovations for Asset Integrity Management
Innovations for Asset Integrity ManagementInnovations for Asset Integrity Management
Innovations for Asset Integrity Management
SGS
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
SHIVAJI CHOUDHURY
 
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Tony Ciliberti PE
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety Management
Shirazeh arghami
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 Framework
Life Cycle Engineering
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management System
ACM Facility Safety
 
Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluids
John Kingsley
 
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh RajputLOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
Gaurav Singh Rajput
 
Asset management developing a reliability culture
Asset management developing a reliability cultureAsset management developing a reliability culture
Asset management developing a reliability culture
Richard Rockwood
 
Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2
DEEPAK SAHOO
 
Risk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islamRisk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islam
Md.Aminul Islam ,CMRP,CSSBB
 
management of change
management of changemanagement of change
management of change
Ammar Abdelgader, Ph.D.
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_Management
Essam Osmaan
 
Business Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation SlidesBusiness Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation Slides
SlideTeam
 
Oil & Gas Maintenance Guide
Oil & Gas Maintenance GuideOil & Gas Maintenance Guide
Oil & Gas Maintenance Guide
Josiah Igoni (B. Eng., DiPM)
 

What's hot (20)

LAYER OF PROTECTION ANALYSIS
LAYER OF PROTECTION ANALYSISLAYER OF PROTECTION ANALYSIS
LAYER OF PROTECTION ANALYSIS
 
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh RajputHazard and Operability Study (HAZOP) | Gaurav Singh Rajput
Hazard and Operability Study (HAZOP) | Gaurav Singh Rajput
 
Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry Asset Performance Management in Oil and Gas Industry
Asset Performance Management in Oil and Gas Industry
 
Hazid & hazops
Hazid & hazopsHazid & hazops
Hazid & hazops
 
Safety Integrity Levels
Safety Integrity LevelsSafety Integrity Levels
Safety Integrity Levels
 
Innovations for Asset Integrity Management
Innovations for Asset Integrity ManagementInnovations for Asset Integrity Management
Innovations for Asset Integrity Management
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
Enabling Corporate Failure Metrics at Nexen Energy with ISO 14224
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety Management
 
Connecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 FrameworkConnecting Reliability & Business + ISO 55000 Framework
Connecting Reliability & Business + ISO 55000 Framework
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management System
 
Sil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluidsSil assessment Risk Graph and LOPA Training iFluids
Sil assessment Risk Graph and LOPA Training iFluids
 
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh RajputLOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
 
Asset management developing a reliability culture
Asset management developing a reliability cultureAsset management developing a reliability culture
Asset management developing a reliability culture
 
Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2Asset Performance Management_Deepak Sahoo_v0.2
Asset Performance Management_Deepak Sahoo_v0.2
 
Risk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islamRisk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islam
 
management of change
management of changemanagement of change
management of change
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_Management
 
Business Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation SlidesBusiness Continuity Management PowerPoint Presentation Slides
Business Continuity Management PowerPoint Presentation Slides
 
Oil & Gas Maintenance Guide
Oil & Gas Maintenance GuideOil & Gas Maintenance Guide
Oil & Gas Maintenance Guide
 

Viewers also liked

Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Mike Poland, CMRP
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
Lloyd's Register Energy
 
Profissional Ladder Presentation4
Profissional Ladder Presentation4Profissional Ladder Presentation4
Profissional Ladder Presentation4
Dr.Abdulla Al Beshr
 
Module1
Module1Module1
Module1
Simon Rice
 
Safety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile IslandSafety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile Island
Kienbaum Consultants
 
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
OutSmart Independent Wind Asset Experts
 
A holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity ExcellenceA holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity Excellence
Kienbaum Consultants
 
Case Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO OperationsCase Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO Operations
Alvin CJ Chin
 
Sgs presentacion
Sgs presentacion Sgs presentacion
Sgs presentacion
ameriraa
 
plant layout for services
plant layout for servicesplant layout for services
plant layout for services
naveen13safare
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
Sandeep Jain
 
SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]
SENTRO TECHNOLOGIES
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latest
Kartini Ibrahim
 
Hse oil and gas management services
Hse oil and gas management servicesHse oil and gas management services
Hse oil and gas management services
Lloyd's Register Energy
 

Viewers also liked (14)

Implementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINALImplementing an Asset Management System for Safe and Reliable Operations -FINAL
Implementing an Asset Management System for Safe and Reliable Operations -FINAL
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
Profissional Ladder Presentation4
Profissional Ladder Presentation4Profissional Ladder Presentation4
Profissional Ladder Presentation4
 
Module1
Module1Module1
Module1
 
Safety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile IslandSafety & Asset Integrity Excellence - A Study of Three Mile Island
Safety & Asset Integrity Excellence - A Study of Three Mile Island
 
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
Building your ISO 55000 Wind Asset Management System - Introduction and Case ...
 
A holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity ExcellenceA holistic approach to Safety and Asset Integrity Excellence
A holistic approach to Safety and Asset Integrity Excellence
 
Case Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO OperationsCase Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO Operations
 
Sgs presentacion
Sgs presentacion Sgs presentacion
Sgs presentacion
 
plant layout for services
plant layout for servicesplant layout for services
plant layout for services
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
 
SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]SENTRO - Acoustic Emission Presentation [2016]
SENTRO - Acoustic Emission Presentation [2016]
 
Jaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latestJaya supermarket presentation 2011 latest
Jaya supermarket presentation 2011 latest
 
Hse oil and gas management services
Hse oil and gas management servicesHse oil and gas management services
Hse oil and gas management services
 

Similar to Asset Integrity Management

Cv HASSAN RIAZ
Cv HASSAN RIAZCv HASSAN RIAZ
Cv HASSAN RIAZ
Hassan Riaz
 
AI-PS Element Guide No pdo documents 7.docx
AI-PS Element Guide No pdo documents 7.docxAI-PS Element Guide No pdo documents 7.docx
AI-PS Element Guide No pdo documents 7.docx
banubanu0101
 
CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman Morshed
Ayman Morshed
 
2014 resume (2)
2014 resume (2)2014 resume (2)
2014 resume (2)
Aaron Mark Buxo
 
Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015
Aamish J. Khan, CSP
 
RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™
CPaschal
 
Risk management in ILRI
Risk management in ILRI Risk management in ILRI
Risk management in ILRI
ILRI
 
Maximo Overview
Maximo OverviewMaximo Overview
Maximo Overview
Sebastian Osterc
 
Chigozie_HSE Eng_210715
Chigozie_HSE Eng_210715Chigozie_HSE Eng_210715
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docxPart -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
karlhennesey
 
Aips guide element 6 process safety knowledge rev 2
Aips guide   element 6 process safety knowledge rev 2Aips guide   element 6 process safety knowledge rev 2
Aips guide element 6 process safety knowledge rev 2
bitsgian
 
Ism cbt
Ism cbtIsm cbt
Ism cbt
Abner_Llenos
 
Job Description
Job DescriptionJob Description
Job Description
1Victoria Swancutt
 
risk analysis
risk analysisrisk analysis
risk analysis
arvind kumar
 
BLE 1213 MUST.pptx- basics principles of Physical Security
BLE 1213 MUST.pptx- basics  principles of Physical SecurityBLE 1213 MUST.pptx- basics  principles of Physical Security
BLE 1213 MUST.pptx- basics principles of Physical Security
Major K. Subramaniam Kmaravehlu
 
SMS Fundamentals Module 1
SMS Fundamentals Module 1SMS Fundamentals Module 1
SMS Fundamentals Module 1
Scott McCamish
 
Auditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAuditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptx
Angad45
 
Ca5009
Ca5009Ca5009
Ca5009
Saqib Iqbal
 
Psm by Ronak
Psm by RonakPsm by Ronak
Psm by Ronak
Ronak Kumawat
 
Process Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINALProcess Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINAL
Aamish J. Khan, CSP
 

Similar to Asset Integrity Management (20)

Cv HASSAN RIAZ
Cv HASSAN RIAZCv HASSAN RIAZ
Cv HASSAN RIAZ
 
AI-PS Element Guide No pdo documents 7.docx
AI-PS Element Guide No pdo documents 7.docxAI-PS Element Guide No pdo documents 7.docx
AI-PS Element Guide No pdo documents 7.docx
 
CV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman MorshedCV_Senior HSEQ Officer_ Ayman Morshed
CV_Senior HSEQ Officer_ Ayman Morshed
 
2014 resume (2)
2014 resume (2)2014 resume (2)
2014 resume (2)
 
Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015Process Safety Bulletin Sep 2015
Process Safety Bulletin Sep 2015
 
RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™RiskWatch for Financial Institutions™
RiskWatch for Financial Institutions™
 
Risk management in ILRI
Risk management in ILRI Risk management in ILRI
Risk management in ILRI
 
Maximo Overview
Maximo OverviewMaximo Overview
Maximo Overview
 
Chigozie_HSE Eng_210715
Chigozie_HSE Eng_210715Chigozie_HSE Eng_210715
Chigozie_HSE Eng_210715
 
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docxPart -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
Part -1 Chapter 35 ERM at Malaysia’s Media Company Astro Qui.docx
 
Aips guide element 6 process safety knowledge rev 2
Aips guide   element 6 process safety knowledge rev 2Aips guide   element 6 process safety knowledge rev 2
Aips guide element 6 process safety knowledge rev 2
 
Ism cbt
Ism cbtIsm cbt
Ism cbt
 
Job Description
Job DescriptionJob Description
Job Description
 
risk analysis
risk analysisrisk analysis
risk analysis
 
BLE 1213 MUST.pptx- basics principles of Physical Security
BLE 1213 MUST.pptx- basics  principles of Physical SecurityBLE 1213 MUST.pptx- basics  principles of Physical Security
BLE 1213 MUST.pptx- basics principles of Physical Security
 
SMS Fundamentals Module 1
SMS Fundamentals Module 1SMS Fundamentals Module 1
SMS Fundamentals Module 1
 
Auditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptxAuditor Training 2023 _ Safety General.pptx
Auditor Training 2023 _ Safety General.pptx
 
Ca5009
Ca5009Ca5009
Ca5009
 
Psm by Ronak
Psm by RonakPsm by Ronak
Psm by Ronak
 
Process Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINALProcess Safety Booklet 1st issue Dec2014 FINAL
Process Safety Booklet 1st issue Dec2014 FINAL
 

Asset Integrity Management

  • 1. HAFIZ MUHAMMAD ATIF Module: Problem Solving Course: MSc Asset Integrity Management Robert Gordon University, UK PSVM FPSO
  • 2. Flixborough 1974 Grangemouth 1987 Piper Alpha 1988 Deep-water Horizon 2006
  • 3.  Incompetency  Inappropriate Design  No Identification of Barriers  Absence of Process and Safety Management  Absence of Integrity Management Strategy  Absence of MOC process  Operation outside the limits  Absence of Reporting, Communication and Information Management
  • 4. Asset Management Systematic and Synchronized activities through which organizations manage their assets optimal and sustainable over their life cycle to accomplish organizations strategic plans Asset Integrity Management To manage the integrity over the life cycle of an asset. Asset Integrity Ability of an asset to perform its function effectively and efficiently though protection the health, safety and environment.
  • 5. PRINCIPLES AND ATTRIBUTES OF ASSET MANAGEMENT Attributes Description HOLISTIC Emphasizing the functional relation among all departments of organization SYSTEMATIC characterized the asset management in an organized, consistent and planned manner SYSTEMIC Affecting the whole system rather than optimizing individual asset separately RISK – BASED: Prioritize the assets with respect to risk (health and safety, environment and cost) SUSTAINABLE Capable of being maintained over the life cycle without Loss of containment OPTIMAL Best value of asset under limits of performance, cost and risk with relative to other assets INTEGRATED Interlinking of above attributes to achieve successful Asset Management
  • 6. KEY ELEMENTS OF ASSET INTEGRITY MANAGEMENT Integrity Management System as per DNV RP 116
  • 7. Concept Selection / Design DecommissioningOperation Hook – up Installation/ Commissioning Procurement / Manufacturing / Construction Integrity Management is a function of Entire Life Cycle Maintain IntegrityDesign Integrity Technical Integrity PHASES AND STAGES OF ASSET INTEGRITY MANAGEMENT There are three phases of integrity management 1. Design Integrity 2. Technical Integrity 3. Maintain Integrity 1. Design 2. Procurement/Construction/Manufacturing / Installation / Hook – up 3. Commissioning 4. Operation 5. Modification 6. Decommissioning There are six stages of integrity management Modification
  • 8.
  • 9. DESIGN INTEGRITY ESTABBLISHMENT OF PILLARS TO AVOID MAJOR ACCIDENT HAZARDS      Poor material selection, Inadequate Competency, Absence of Safety Studies are the key factors for Major Accident Hazards and cause threat to Health, Safety and Environment. These can be avoid to invest money in the design stage to established an Asset Management System which ensures the facility will be capable to handle any major accident hazard which will not only protect the health and safety of the personnel's but also control environment and business risk over the life cycle of an asset. Key documentation are necessary to established the integrity are:.  Material Selection (ISO 15156; NORSOK D-001; EEMUA 194, Group Practices etc.)  Corrosion Prediction for their asset life (Multicorp, ECE, Casandra etc.)  Risk Management (Risk Assessment, Risk Management, Risk Acceptance and Risk Communication)  Conducting HAZOP, PHA, PSM, LOPA, SIMOPS  Developing Safety Case (To make sure facility is enough capacity to handle Major Accident Hazard)  Identification of SCEs (Safety Critical Elements), BCEs (Business Critical Elements) and ICE (Integrity Critical Elements)  Integrity Management Strategy (Topside, Controls & Umbilical, Subsea Equipment, Pipelines, Riser, Corrosion, Flow Assurance, follow up with Integrity Management Plan)  Robust MOC process
  • 10. TECHNICAL INTEGRITY  Manufacturing of Pressure and Non-Pressure equipment as per code and standards  Construction of the facilities as per Code and Standards  Robust QA / QC during Construction, Hook-up / Installation  Third party inspection and verification  Documentation of Anomaly Register and communicated to Operation  Ensure performance standards to make sure it conforms the design intent  Robust MOC process ESTABBLISHMENT OF PILLARS TO AVOID MAJOR ACCIDENT HAZARDS Incompetency, poor methods of manufacturing and installations, lack of communication for anomalies among the engineering departments and avoidance of third party verification are the high probable factors for damages at the infant stage of operational asset life which leads to Major Accident Hazards which can be controlled by:
  • 11. OPERATIONAL INTEGRITY  Implementation of Integrity Management Strategy (Implementation of RBI, RCM, IPF and Corrosion Management to manage the integrity and reliability of assets)  Adherence to Integrity Operating Windows  Audit and Review process  Continual Improvements and Lesson Learnt  Enhancement of Personnel competency and skills  Robust MOC process MAINTANED PILLARS TO AVOID MAJOR ACCIDENT HAZARDS Incompetency, Absence of integrity management strategy, lack of communication among departments , Absence of SMS (Safety Management System) and Non-conformance of operational procedures are the major causes which leads to Major Accident Hazards which can be prevent during operational life stage by:      PLAN DO CHECK ACT
  • 12. CONCLUSION Organization can prevent the Piper Alpha and Deep-water Horizon GoM by establishing and maintaining the integrity over life cycle of an asset with Organization Commitment, Organizational Strategic Plans and Robust Asset Management System.
  • 13.  PAS 55 – 1: 2008, Asset Management, Specification for the optimized management of physical assets  PAS 55 – 2: 2008, Asset Management, Guidelines for the application of PAS 55 - 1  DNV RP F – 116, Integrity Management of Submarine Pipeline System  Asset Integrity Toolkit, UKOOA  OGP Asset Integrity – the key to managing major accident risks  Overview of Asset Integrity Management, Robert Gordon University Document  Presentation by John Reynolds, Establishing IOWs, Shell Global Solutions, IPEIA Conference February 2, 2006, Banff, Alberta  Presentation by Racehl Horne, BP, Integrity Management, Project Awareness and Basic Application, Angola Development Program  Slide Images: 1. http://www.bbc.co.uk/news/uk-scotland-22840445 2. http://www.growthaccelerator.com/wp-content/uploads/2013/03/Winning.jpg 3. http://www.chanhassenfitnessrevolution.com/wp-content/uploads/2012/07/6-Steps-to- Success-Chanhassen-Fitness-Revolution.jpg 4. http://www.alstern-technologies.com/main_images/PLANT_2.jpg 5. http://www.seaphantom.com/images2/Offshore_platform_in_night.jpg 6. http://www.offshore-technology.com/projects/8133/images/199971/large/1l-image.jpg 7. http://static.guim.co.uk/sys- images/Business/Pix/pictures/2010/10/19/1287476298203/Deepwater-Horizon-006.jpg 8. http://www.genesisoilandgas.com/Pages/default.aspx REFERENCES