SlideShare a Scribd company logo
1 of 6
Profile & Career Objective:
• Providing OSP technical knowledge and presentations, gathering customer requirements
and translating them into a comprehensive solution. Works closely with sales managers,
build customer relationship and prospects as a subject-matter expert to demonstrate how
a proposed solution meets and exceeds customer requirements
• Design and Supervision of low voltage Distribution Networks and Telephone System
(External and Internal Networks)
• Good Experience in electrical cables Installations L.V (Infrastructure).
Specialties:
• Support & promote
• OSP & Rollout management application.
• Electrical Cables Installation (Buried, unburied cables).
• Construction supervision experience in low voltage distribution Networks.
• Design of light Current Systems (Data System, CCTV, Fire alarm systems, Access Door
System).
Professional Experience:
 Design & Supervision of low current systems (structure cable, fire alarm,
CCTV& Access control )
o Sub contractor: El Shehab for electrical and Contracting Company.
Name : Ali Omar Ali El-atabany
Date of Birth : 1/9/1982
Gander : Male
Military Service : Exempted
Marital Status : Married
Nationality : Egyptian
Driving
License
: Valid
Address : Al-Riyadh
Phone/Mobile No. : +966562327862
+966543125069
Personal Email :
eng_ali_atbany@hotmail.com
eng_ali_atbany@yahoo.com
o Location : Egypt-Cairo
o Period: From November 2007 to may 2008.
o Customers: Audi Bank (tow Branches), BNP Paribas (One Branch), Arab Academy for
Science, Technology & Maritime Transport (Alexandria Branch).
o Description :
 Light Current Systems (Fire Alarm System and CCTV): Designing,
Installations and Executions for Audi Bank and BNP Paribas Bank.
 CCTV Systems and Access Door System for Arab Academy and Maritime
Transport.
 Installation and programming the following System :
- CCTV (SANYO).
- Fire Alarm System (NAPCO, THORN, NOTIFIER).
- Access Control System ( KERI system , HID)
Main Responsibilities:
 Perform Survey In Site for Cable Routes.
 Preparation and co-ordination of design and/or detail drawings.
 Preparing material submittal and bill of material.
 Responsible about the implementation & validation of all design process.
 Construction Supervision during project Execution.
 Fiber Optic Cable OSP,ISP & Low Voltage Networks Site Engineer ..
o Sub contractor: Thabthabat for Communications and Contracting Company.
o Location : Saudi Arabia , Riadh
o Period: From June 2008 to September 2010.
o Vendor : THALES (STESA :Saudi Technician Engineering Systems Associated)
o Customer: MOBILY and Integrated Telecom Company (ITC).
o Project name: Saudi National Fiber Network (SNFN).
 Description :
 MOBILY SNFN Project Ring-5, connections between (RIADH-MAJMAHA-HAFR AL-
BATIN-KHAFJI-JUBAIL-DAMMAM-RIADH) 1000 km FOC Network 96F & 48F Single
Mode Fiber.
 METRO Project inside cities (KHAFJI, JUBAL&DAMMAM).
 Construction Supervision of Light Current Systems (Data System, Fire Alarm
System, CCTV and Low Voltage Cables Networks) For Core Center Site of MOBILY
Building In (Jubail and Dammam City).
Main Responsibilities :
 OSP Supervision: Site Work Management, reporting, monitoring.
 Responsible about Site Survey, Implementation ,Installation ,Splicing ,Testing Like
as (CD: Chromatic Desperation, PMD: Polarization Model Dispersion, and AP:
Attenuation Profile. ) and rectification about Long Distance Fiber Optic Cable
Network.
 Manage the subcontractors &/or team members who assigned to perform any of
engineering activities starting form the survey till the as- built phase and
Implementation Supervision during the Execution of Project.
 Manage the customer approval & validation for all engineering work including the
design proposals, AS-BUILT Drawings, Civil Implementation, and Cable Test Result
Approval & BOQs.
 Responsible about the Invoices of subcontractors and make all reviews in site for
approval.
 Fiber Optic Cable OSP,ISP & L.V Electrical Cables Design Engineer
o Sub contractor: Telecomax Group for consulting and Telecommunications.
o Location: Egypt, Cairo.
o Period: From January 2011 to February 2014.
o Vendor: Alcatel-Lucent (Egypt).
o Customer I: ETISALAT MISR
o Customer II : Thales Group (Multinational Company)
o Project name: Etisalat Misr F.O.C Backbone project.
 Description:
 ETISALAT FOC Backbone Phase-2 (CAIRO RING) 170 km FOC.
 Cairo Branches Project: 150 KM - FOC.
 METRO Ring Project: Connections and installation 150 km FOC Inside METRO
Stations (Line-1,Line-2,Line-3) .
 Supervising the Implementation of the fire alarm systems and Data Cables in
METRO Line-3 (From Attaba Station to Abbasia Station).
Main Responsibilities :
 Responsible about the definition & implementation of the time schedule for all
engineering activities.
 Responsible about the implementation & validation of all design process (high level,
survey, detailed design, BOQs, handover & follow-up with implementation team,
As-Built).
 Perform onsite route survey for all cable routes along the network.
 Perform & issue CAD design maps, layouts & reports.
 Considering the optimum & cost effective planning methodology (selecting
optimum routes, minimum crossings & best implementation ability).
 Provide effective & efficient onsite support during project implementation phase to
rollout teams.
 Prepare & issue the design BOQ (joints, holes, pipes, sub ducts, drums, civil works,
Cables … etc.)
 Designing of Fiber Optic and copper Cable Networks
 Responsible about Trenching, Ducting, Cable Laying, Cable Blowing, Manhole /
Hand-hole Constructions, Testing and Commissioning of Fiber Optic and Copper
Cables.
 Responsible about OFC Records and Management with reference to As built
received from External works section. Also to provide necessary OFC route¬ & fiber
details to the Maintenance Team in breakdown and other hazard conditions.
 Planning and Design of Complete Network (OSP & ISP) for GPON deployment. To
Make BOQs/Estimates¬ & Detail Project Plans for the GPON Projects which includes
Civil Works, Cable Works, ISP Works and all the Equipment Installations.
 Optimization of the Legacy Copper OSP network and also the Migration of the
Existing Network to GPON.
 Responsible to provide assistance to Fiber Optic Cable Planners in FTTH
Deployment from OLT to ONT including survey for Design, joint closure and ODF
Installation.
 Manage the subcontractors &/or team members who assigned to perform any of
engineering activities starting form the survey till the as- built phase.
 Manage the customer approval & validation for all engineering work including the
design proposals, design variations & BOQs.
 Making update for Bill of materials (BOM) after survey & design approval.
 Providing close supervision, support & management for subcontractors & team
members to qualify that executed engineering work are according to contractual
specifications, schedule and standards.
 Responsible about the supervision in low voltage distributions networks.
 Prepare periodic follow-up reports to the progress of the work site.
 Design of the electrical systems in buildings using the design software programs
and draw using AutoCAD Software.
 Participate in preparing the tender documents of the project including B.O.Q and
specs.
 Responsible about the design of light current systems (data system, Telephone
system, fire alrm system) Of METRO Project.
 coordinating project sourcing efforts & related strategic partnerships.
 Responsible for the timely management of the bidding process: tendering
documents, technical solution, definition of reports, tasks and schedule, escalation
of issues for timely decisions, the application of the product and pricing policy.
 Electrical Maintenance Engineer
o Sub contractor: AL TAIF Company for operation, maintenance and construction.
o Location: Riyadh, Saudi Arabia.
o Period: From May 2014 Till Now.
o Customer : General Presidency For Youth Welfare
o Project name: Arabian Institute for Training Youth And Sports Leaders , Riyadh
Main Responsibilities :
 Responsible for all the electrical maintenance activities of plant.
 Designing maintenance strategies, procedures and methods.
 Planning and scheduling planned and unplanned work.
 Diagnosing breakdown problems.
 Controlling maintenance tools, stores and equipment.
 Monitoring and controlling maintenance costs.
 Dealing with emergency and unplanned problems and repairs.
 Writing maintenance strategies to help with installation and commissioning guidelines.
Education :
- University Degree : B.Sc. of Electrical / Electronics engineering
- University : Mansoura University, faculty of engineering
- Graduation year & grade : 2007 ( 62.3 % ).
- Graduated project : wireless data acquisition for monitoring railways
application (excellent)
Language :
Arabic : Mother Language.
English : Good [Reading - Writing - Speaking]
Computer skills :
Working knowledge of Windows 2000, XP, Vista and Microsoft Office products
 High Experience in Using AutoCAD.
 In depth knowledge of TCP/IP, dynamic routing protocols, ISDN, VPN, VOIP.
 Firewalls, Cisco routers, PIX and switches.
 CCNA/CCNP.
 Unix/Linux/ Oracle platforms.
 Windows mobile applications.
Self Study Topics :
• High Voltage Tension Power Cables Installation.
• Microwave: standard, services, equipments
• Fiber optics: FTTH, fiber optic data communications, standard and equipments.
Computer skills :
Working knowledge of Windows 2000, XP, Vista and Microsoft Office products
 High Experience in Using AutoCAD.
 In depth knowledge of TCP/IP, dynamic routing protocols, ISDN, VPN, VOIP.
 Firewalls, Cisco routers, PIX and switches.
 CCNA/CCNP.
 Unix/Linux/ Oracle platforms.
 Windows mobile applications.
Self Study Topics :
• High Voltage Tension Power Cables Installation.
• Microwave: standard, services, equipments
• Fiber optics: FTTH, fiber optic data communications, standard and equipments.

More Related Content

What's hot (20)

Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
ANJUM CV-1
ANJUM CV-1ANJUM CV-1
ANJUM CV-1
 
mohammed iftequar hussain Telecom
mohammed iftequar hussain Telecommohammed iftequar hussain Telecom
mohammed iftequar hussain Telecom
 
resume
resumeresume
resume
 
Alaba Adedayo CV
Alaba Adedayo CVAlaba Adedayo CV
Alaba Adedayo CV
 
Mohsen sharghi english cv apr. 2016
Mohsen sharghi english cv  apr. 2016Mohsen sharghi english cv  apr. 2016
Mohsen sharghi english cv apr. 2016
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
 
Ibrahim_2014CV
Ibrahim_2014CVIbrahim_2014CV
Ibrahim_2014CV
 
ADEEL SHAHZAD Resume
ADEEL SHAHZAD ResumeADEEL SHAHZAD Resume
ADEEL SHAHZAD Resume
 
CV_May_2016_James_Sutton_Network_Engineer
CV_May_2016_James_Sutton_Network_EngineerCV_May_2016_James_Sutton_Network_Engineer
CV_May_2016_James_Sutton_Network_Engineer
 
Semper Fi Telecom profile
Semper Fi Telecom profileSemper Fi Telecom profile
Semper Fi Telecom profile
 
A Helm CV-19032016P
A Helm CV-19032016PA Helm CV-19032016P
A Helm CV-19032016P
 
List_of_Completed_Projects
List_of_Completed_ProjectsList_of_Completed_Projects
List_of_Completed_Projects
 
eng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMeng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORM
 
DHANANJAY SHASTRI-1.Mod_040116
DHANANJAY SHASTRI-1.Mod_040116DHANANJAY SHASTRI-1.Mod_040116
DHANANJAY SHASTRI-1.Mod_040116
 
Resume_Arvind_Srivastava
Resume_Arvind_SrivastavaResume_Arvind_Srivastava
Resume_Arvind_Srivastava
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
 
shashank3
shashank3shashank3
shashank3
 
Resume_Arvind_Srivastava
Resume_Arvind_SrivastavaResume_Arvind_Srivastava
Resume_Arvind_Srivastava
 
Mr Kong DeSheng CV Up to Now
Mr Kong DeSheng CV   Up to NowMr Kong DeSheng CV   Up to Now
Mr Kong DeSheng CV Up to Now
 

Similar to Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

Similar to Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014 (20)

ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
 
Mohamed Ragab CV
Mohamed Ragab CVMohamed Ragab CV
Mohamed Ragab CV
 
Mohamed HENDI CV
Mohamed HENDI CVMohamed HENDI CV
Mohamed HENDI CV
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
Alaa Mahmoud' CV
Alaa Mahmoud' CVAlaa Mahmoud' CV
Alaa Mahmoud' CV
 
Mamdouh C.V NEW
Mamdouh C.V NEWMamdouh C.V NEW
Mamdouh C.V NEW
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
omer daraz cv
omer daraz cvomer daraz cv
omer daraz cv
 
umer new cv
umer new cvumer new cv
umer new cv
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
Cris Jayson Baluyut CV
Cris Jayson Baluyut CVCris Jayson Baluyut CV
Cris Jayson Baluyut CV
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
CV_PrncplEngg
CV_PrncplEnggCV_PrncplEngg
CV_PrncplEngg
 
Rehan_Afzal_new[1] 2-2 (2)
Rehan_Afzal_new[1] 2-2 (2)Rehan_Afzal_new[1] 2-2 (2)
Rehan_Afzal_new[1] 2-2 (2)
 
haitham_afifi_CV
haitham_afifi_CVhaitham_afifi_CV
haitham_afifi_CV
 

Recently uploaded

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 

Recently uploaded (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 

Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

  • 1. Profile & Career Objective: • Providing OSP technical knowledge and presentations, gathering customer requirements and translating them into a comprehensive solution. Works closely with sales managers, build customer relationship and prospects as a subject-matter expert to demonstrate how a proposed solution meets and exceeds customer requirements • Design and Supervision of low voltage Distribution Networks and Telephone System (External and Internal Networks) • Good Experience in electrical cables Installations L.V (Infrastructure). Specialties: • Support & promote • OSP & Rollout management application. • Electrical Cables Installation (Buried, unburied cables). • Construction supervision experience in low voltage distribution Networks. • Design of light Current Systems (Data System, CCTV, Fire alarm systems, Access Door System). Professional Experience:  Design & Supervision of low current systems (structure cable, fire alarm, CCTV& Access control ) o Sub contractor: El Shehab for electrical and Contracting Company. Name : Ali Omar Ali El-atabany Date of Birth : 1/9/1982 Gander : Male Military Service : Exempted Marital Status : Married Nationality : Egyptian Driving License : Valid Address : Al-Riyadh Phone/Mobile No. : +966562327862 +966543125069 Personal Email : eng_ali_atbany@hotmail.com eng_ali_atbany@yahoo.com
  • 2. o Location : Egypt-Cairo o Period: From November 2007 to may 2008. o Customers: Audi Bank (tow Branches), BNP Paribas (One Branch), Arab Academy for Science, Technology & Maritime Transport (Alexandria Branch). o Description :  Light Current Systems (Fire Alarm System and CCTV): Designing, Installations and Executions for Audi Bank and BNP Paribas Bank.  CCTV Systems and Access Door System for Arab Academy and Maritime Transport.  Installation and programming the following System : - CCTV (SANYO). - Fire Alarm System (NAPCO, THORN, NOTIFIER). - Access Control System ( KERI system , HID) Main Responsibilities:  Perform Survey In Site for Cable Routes.  Preparation and co-ordination of design and/or detail drawings.  Preparing material submittal and bill of material.  Responsible about the implementation & validation of all design process.  Construction Supervision during project Execution.  Fiber Optic Cable OSP,ISP & Low Voltage Networks Site Engineer .. o Sub contractor: Thabthabat for Communications and Contracting Company. o Location : Saudi Arabia , Riadh o Period: From June 2008 to September 2010. o Vendor : THALES (STESA :Saudi Technician Engineering Systems Associated) o Customer: MOBILY and Integrated Telecom Company (ITC). o Project name: Saudi National Fiber Network (SNFN).  Description :  MOBILY SNFN Project Ring-5, connections between (RIADH-MAJMAHA-HAFR AL- BATIN-KHAFJI-JUBAIL-DAMMAM-RIADH) 1000 km FOC Network 96F & 48F Single Mode Fiber.  METRO Project inside cities (KHAFJI, JUBAL&DAMMAM).  Construction Supervision of Light Current Systems (Data System, Fire Alarm System, CCTV and Low Voltage Cables Networks) For Core Center Site of MOBILY Building In (Jubail and Dammam City). Main Responsibilities :  OSP Supervision: Site Work Management, reporting, monitoring.  Responsible about Site Survey, Implementation ,Installation ,Splicing ,Testing Like as (CD: Chromatic Desperation, PMD: Polarization Model Dispersion, and AP: Attenuation Profile. ) and rectification about Long Distance Fiber Optic Cable Network.  Manage the subcontractors &/or team members who assigned to perform any of engineering activities starting form the survey till the as- built phase and Implementation Supervision during the Execution of Project.  Manage the customer approval & validation for all engineering work including the design proposals, AS-BUILT Drawings, Civil Implementation, and Cable Test Result Approval & BOQs.  Responsible about the Invoices of subcontractors and make all reviews in site for approval.
  • 3.  Fiber Optic Cable OSP,ISP & L.V Electrical Cables Design Engineer o Sub contractor: Telecomax Group for consulting and Telecommunications. o Location: Egypt, Cairo. o Period: From January 2011 to February 2014. o Vendor: Alcatel-Lucent (Egypt). o Customer I: ETISALAT MISR o Customer II : Thales Group (Multinational Company) o Project name: Etisalat Misr F.O.C Backbone project.  Description:  ETISALAT FOC Backbone Phase-2 (CAIRO RING) 170 km FOC.  Cairo Branches Project: 150 KM - FOC.  METRO Ring Project: Connections and installation 150 km FOC Inside METRO Stations (Line-1,Line-2,Line-3) .  Supervising the Implementation of the fire alarm systems and Data Cables in METRO Line-3 (From Attaba Station to Abbasia Station). Main Responsibilities :  Responsible about the definition & implementation of the time schedule for all engineering activities.  Responsible about the implementation & validation of all design process (high level, survey, detailed design, BOQs, handover & follow-up with implementation team, As-Built).  Perform onsite route survey for all cable routes along the network.  Perform & issue CAD design maps, layouts & reports.  Considering the optimum & cost effective planning methodology (selecting optimum routes, minimum crossings & best implementation ability).  Provide effective & efficient onsite support during project implementation phase to rollout teams.  Prepare & issue the design BOQ (joints, holes, pipes, sub ducts, drums, civil works, Cables … etc.)  Designing of Fiber Optic and copper Cable Networks  Responsible about Trenching, Ducting, Cable Laying, Cable Blowing, Manhole / Hand-hole Constructions, Testing and Commissioning of Fiber Optic and Copper Cables.  Responsible about OFC Records and Management with reference to As built received from External works section. Also to provide necessary OFC route¬ & fiber details to the Maintenance Team in breakdown and other hazard conditions.  Planning and Design of Complete Network (OSP & ISP) for GPON deployment. To Make BOQs/Estimates¬ & Detail Project Plans for the GPON Projects which includes Civil Works, Cable Works, ISP Works and all the Equipment Installations.  Optimization of the Legacy Copper OSP network and also the Migration of the Existing Network to GPON.  Responsible to provide assistance to Fiber Optic Cable Planners in FTTH Deployment from OLT to ONT including survey for Design, joint closure and ODF Installation.  Manage the subcontractors &/or team members who assigned to perform any of engineering activities starting form the survey till the as- built phase.  Manage the customer approval & validation for all engineering work including the design proposals, design variations & BOQs.  Making update for Bill of materials (BOM) after survey & design approval.
  • 4.  Providing close supervision, support & management for subcontractors & team members to qualify that executed engineering work are according to contractual specifications, schedule and standards.  Responsible about the supervision in low voltage distributions networks.  Prepare periodic follow-up reports to the progress of the work site.  Design of the electrical systems in buildings using the design software programs and draw using AutoCAD Software.  Participate in preparing the tender documents of the project including B.O.Q and specs.  Responsible about the design of light current systems (data system, Telephone system, fire alrm system) Of METRO Project.  coordinating project sourcing efforts & related strategic partnerships.  Responsible for the timely management of the bidding process: tendering documents, technical solution, definition of reports, tasks and schedule, escalation of issues for timely decisions, the application of the product and pricing policy.  Electrical Maintenance Engineer o Sub contractor: AL TAIF Company for operation, maintenance and construction. o Location: Riyadh, Saudi Arabia. o Period: From May 2014 Till Now. o Customer : General Presidency For Youth Welfare o Project name: Arabian Institute for Training Youth And Sports Leaders , Riyadh Main Responsibilities :  Responsible for all the electrical maintenance activities of plant.  Designing maintenance strategies, procedures and methods.  Planning and scheduling planned and unplanned work.  Diagnosing breakdown problems.  Controlling maintenance tools, stores and equipment.  Monitoring and controlling maintenance costs.  Dealing with emergency and unplanned problems and repairs.  Writing maintenance strategies to help with installation and commissioning guidelines. Education : - University Degree : B.Sc. of Electrical / Electronics engineering - University : Mansoura University, faculty of engineering - Graduation year & grade : 2007 ( 62.3 % ). - Graduated project : wireless data acquisition for monitoring railways application (excellent) Language : Arabic : Mother Language. English : Good [Reading - Writing - Speaking]
  • 5. Computer skills : Working knowledge of Windows 2000, XP, Vista and Microsoft Office products  High Experience in Using AutoCAD.  In depth knowledge of TCP/IP, dynamic routing protocols, ISDN, VPN, VOIP.  Firewalls, Cisco routers, PIX and switches.  CCNA/CCNP.  Unix/Linux/ Oracle platforms.  Windows mobile applications. Self Study Topics : • High Voltage Tension Power Cables Installation. • Microwave: standard, services, equipments • Fiber optics: FTTH, fiber optic data communications, standard and equipments.
  • 6. Computer skills : Working knowledge of Windows 2000, XP, Vista and Microsoft Office products  High Experience in Using AutoCAD.  In depth knowledge of TCP/IP, dynamic routing protocols, ISDN, VPN, VOIP.  Firewalls, Cisco routers, PIX and switches.  CCNA/CCNP.  Unix/Linux/ Oracle platforms.  Windows mobile applications. Self Study Topics : • High Voltage Tension Power Cables Installation. • Microwave: standard, services, equipments • Fiber optics: FTTH, fiber optic data communications, standard and equipments.