SlideShare a Scribd company logo
1 of 5
Page 1 of 5
RESUME – Mr Kong De Sheng (James) MSC Engineering
Specializations:
Design experience and knowledge for oil and gas Tetra Radio, Microwave, Marine Radio,
Satellite Systems, Network System, Structure Cabling , Telephone, CCTV, ACS, PAGA, Fiber
Optic,Video System, Security systems, Electrical , GSM/CDMA, etc.
Nationality: Singaporean. Languages: English and Chinese
BACKGROUND
● 15 years plus working experience in Telecom Engineering company for Radio/Data/Voice/Security
telecom Systems design, testing, proposal and commissioning experience for telecom/oil and gas
industry,
● 10 years working experience in public telecomm service providers for home telephone/mobile
network maintenance, software update, network design /optimizing, commissioning, technical support
for GSM/CDMA system and Automation design/testing and commissioning.
● 3 years plus experience in electrical/Automation company to do automation system design/testing,
commissioning and PCB design experience.
● Familiar with BSC/BTS of GSM/CDMA system, Marine Radio systems, Satellite systems, Security
Systems, eo m, Voice and Data systems T, and IT products. Have transmission and power supply
system knowledge. Familiar with most aspects of RF Radio, Networking and structured cabling system
● Previous experience in Mobile Telecom BTS/BSC project management with subcontractors and
customer support experience. Good engineering analysis skills as well as strong theoretical and practical
knowledge of a broad range of modern Telecommunication / IT technologies.
● Familiar with PC OS operation and maintenance as DOS, Windows 2000/7/8/NT and UNIX, Microsoft
office (Word, Excel, Power Point, Vision), Autocad, Winpro radio coverage software, CCTV and PAGA
coverage software, etc.
● Familiar with PCB design with Protel99, PC hardware and software installation and repairing, LAN
and WAN configure, TCP/IP, Networking knowledge.
● Familiar with router/switch function and application, CCNA trained.
TERTIARY EDUCA TION & QUALIFICA TIONS
● Aug 2012-Jul 2015, Part Time 3 years, Nanyang Technological University, Singapore
Master of Science (Telecommunication Engineering)
● 1984-1988, Full Time 4 years, Dalian Maritime University, People’s Republic of China
Bachelor of Science (1st Class Honors),
Majors: Electronics Engineering, Marine Radio, Radar, Microwave, etc.
MISCELLA NEOUS:
 Operation and Maintenance for NEAX61C Mobile Cellular Telephone Network System
Training(CMTS) at NEC P/L, Japan,
 ERICSSON GSM Mobile System Exchange and Radio Base Station Training, at Sweden.
 Networking CCNA Training course by Genovate P/L Singapore.
 Operation & Familiarization Training for OTDR, Optical Power Meter and Attenuator in
Singapore.
 Microsoft Office Word 2003 Specialist official Certification.
Page 2 of 5
 Siemon Intelligent Cabling System Design Principles and Installation Practices Course in
Singapore
 Commscope SP5500-System SCS iPatch Design &Engineering Course in Singapore
 ND33410-Systinax SCS Installation and Maintenance Course in Singapore.
 SP5502-Systinax iPatch Sales and Marketing Course in Singapore.
 Nexans ND5510-Certified iPatch Support Specialist (CISS) Course in Singapore.
PROFESSIONAL EXPERIENCE
A. Oct 2014 – Now .(Updating In CSET)
Name of Employer: CSE-Transtel Pte Ltd, Singapore
Job Title: System Design Engineer
 P129, Ichthys-Turret project, Project value is more than S$ 2.5 million. It have 7 Telecom systems,
I am responsible for all the 7 systems-LAN system (Cisco) , Telephone system(Cisco) , Structure Cabling
system (Nexans), Access Control System (S3ID), PAGA system (DNH), CCTV system (Synectics)&Tetra
Radio system(RFI) design and commissioning, I need to create the document (BOM, datasheet,
Functional Design specification, Factory Acceptance Test Procedure, Site Commissioning Test
Procedures) and drawings (Block diagram, Termination diagram, Interconnection diagram, Wiring
Diagram, GA, DMD) etc. I also do the CCTV coverage study, Tetra Radio Coverage study, PAGA
coverage study, All the 7 systems FAT had been done, 95% design document and drawing are
frozen, currently the project is at commissioning stage.
 P077, Ichthys-CPF Project. P077 CPF is very big project. It has 39 telecom systems. I am responsible
for the Video Conferencing System (Polycom), Nurse Call System (Austco) and Telemedicine System
(Polycom) for P077 CPF in the team, I also help LAN Engineer to do some LAN and Structure Cabling
systems Document/drawing, now 90% of the design / drawing of the 5 systems is freezing, FAT and
3 phase system IFAT are done in CPF, between CPF and FPSO, between CPF and Existing site. It is at
coming stage now.
 P330, FPSO of Ichthys, P330 FPSO is also very big project, I am responsible for Video Conference /
Nurse Call / Telemedicine 3 Systems in the team. Now my 3 systems have got 90% document/drawing
freezing, the 3 systems have passed FAT and IFAT in FPSO, between FPSO and existing site. Now the
P330 FPSO is at commissioning stage as well.
B. July 2012- Oct 2014 (Updating in CSET).
Name of Employer: CSE-Transtel Pte Ltd, Singapore
Job Title: Telecom Design Engineer
The projects I involved from Jul 2012 until present (Oct-2015) in CSE-Transtel are as following:
 P573, PNG LNG project, I have taken part in the design of Structured Cabling System, Telephone
system and Site Test Equipment. 3 systems, generate the document and drawing, Currently these 3
had done FAT, and Site commissioning are also fully done under my in-house supporting.
 P604, P674 and P044 Habshan U&O projects, Inside these 3 projects, they are the biggest projects
used in Middle East , valued USD $23millon , I have taken part in the design of LAN and SCS
system(Cisco) PAX system (NEC) , Optical Fiber system(Siemon intelligent FO SCS products), video
conferencing system(Tandberg product), voice recording system(HP,Cybertech products), GPS
system(Spectracom product) in each of the project, until now, all the 3 projects have been done Site
Acceptance Test , the 3 projects have been commissioned completed . I have done in house
commissioning support work for the commissioning of P604, P674 and P044.to co-operate for filed side
work
 P190, KOC1 project, I continue the design of LAN & Telephone System, as it using ITRACS
Intelligent patch panel design, conducted the Nexans intelligent SCS training, now the FAT is done , the
field commissioning is on goning.
 P130, Effulent Water Injection Project, I have helped proposal department to do the proposal
work, there are 6 System are proposed by me, CCTV system (Bosch product), ACS system (Bosch
Page 3 of 5
product), LAN system (Cicso product), Telephone system (NEC IP phone product), FIDS system (Fiber
Optical passive fence cable design ) , PAGA system (Bosch product).
C. February 2006 - June 2012(Updating in CSET).
Name of Employer: CSE-Transtel Pte Ltd, Singapore.
Job Title: Telecom Design Engineer
Responsible for engineering design on the following major Oil & Gas sector projects to date:
Position requires significant travel to attend both technical and commercial meetings with clients,
Design the system as per client requirement, generate the Design documents and Drawings, Conduct
the System Factory Acceptance Test, support and take part in our field engineer to conduct the Site
Acceptance Test during commissioning stage of the delivered systems. Support proposal depart, etc.
From Feb 2006 to Jun 2012 in CSE-Transtel P/L, I had successfully done the following projects:
 P338-0501 project, the project name and systems involved: Bohai Phase II, platform WHP-B, RUP,
and FPSO. VHF Marine Radio system, AM radio system, MF-HF Radio system (Sailor, Motorola Tait
radio products) Entertainment system ( WISI products).
 P009-0601 project, the project name and systems involved: Facility Upgrade & Relocation of
Underground Process Piping for Gathering Center & Booster Stations poroject, LAN and Telephone
system.(Cisco, Panasonic products)
 P312-0501 project, the project name and systems involved: Bohai phase II, platform D, VHF Marine
Radio system, AM radio system (Sailor, Tait products), Entertainment system (Wisi products) and
Hotline system.
 P329-0709 project, the project name and systems involved: Bohai phase II, platform E, VHF Marine
Radio AM Radio system Entertainment system and Hotline system.
 P331-0709 project, the project name and systems involved: Bohai phase II, platform F, VHF Marine
Radio system, Entertainment system and Hotline system.
 P395-0711project, the project name and systems involved: Saudi Kayan olefins project, Structured
Cabling system(Systimax Products)
 P070-0802 project, the project name and systems involved: Saudi Kayan Polycarbonate project,
Structured Cabling system (Nexans Products)
 P321-0708 project, the project name and systems involved: Saudi Kayan PP & PH project, Telephone
and LAN system (Alcatel , Cisco , Nexans Products)
 P322-0708 project, the project name and systems involved: Saudi Kayan PP & PH project, Telephone
and LAN system. (Alcatel , Cisco , Nexans Products)
 P347-0710 project, the project name and systems involved: ARRMCO, Heavy Lift Jack-up Barge
project, TV and Entertainment system (Ikusi products)
 P126-0803 project, the project name and systems involved: PAZFLOR project, UHF-Trunk Radio
system (tait trunk radio), VHF-Marine Radio system, MF-HF Radio system , GMDSS system, Lifeboat
Radio system (Sailor, Tait, Furuno, Motorola)
 P573-0811 project, the project name and systems involved: Odevrecht Drillllship Norbe VIII,
SHIP1&2, Entertainment system ,UPS system and GMDSS console system (Wisi, Eaton UPS, Furuno
navigation products)
Above projects have been successfully tested and delivered to clients, and their commissioning works
have been done, client’s feedback is good.
Also involved the following projects in the design stage works:
Page 4 of 5
● P469-0712 project, the project name and systems involved: Upper Kotmale Hydropower project,
Optical Fiber system, PABX system.( RAD FO rooducts, NEC Pabx products)
● P491-0808 project, the project name and system involved: Jubail, Process Area Network System,
Meteorological system, Server Farm system , OSP system, Computer and Workstation
system.(Cisco,HP,IBM Vaisala, Systimax products) ,
● P573-1009 project, the project name and system involved: PNG LNG Plant project, Structured
Cabling system, , Telephone system, Site Testing Equipment system. For this project, client requests
for a few shipments until end of this year, so we need documentation and do the testing for each time (
Krone, FHF, etc).
Until Jun-2012, I am mainly working on P573 PLN LNG plant project and also follow up the previous
projects remained document submission and field support activities.
D. February 2004 - February 2006
Name of Employer: Riq Pte Ltd, Singapore
JOB Title: Electrical/PCB designer
● I worked as a designed in RIQ Pte Ltd which is authorized distributor for KOBLET’S ship steering and
electronic engine control system (Canda Company) and NAVMAN ( New Zealand Company)
● My main job was design the Electronics & Electrical drawing of control panel and steering gear
system for ships with Autocad LT 2004/2005 and use Protel 99 to do PCB design for ships. The ship size
is between 30 to 70 meters, the mechanical design contains the hydraulic system/ pump piping system
and power unit. The Electrical design contains Rudder angle and feedback system/ Forward & AFT
steering control panel / steering gear alarm system changeover module system.
● Supporting on system commissioning, repairing and troubleshooting.
E. January 2002 - January 2004
Name of Employer: HUAWEI TECHNOLOGIES Pte Ltd, China.
Job Title : GSM/CDMA Technical support Engineer
● The company majors are in research and manufacturing IT and Telecommunication products of
world level. For example, Fiber Transmission Network Products, Switching Exchange, Intelligent
Network, Router, Switch GSM and CDMA products, etc.
● Responsible for the Huawei’s GSM and CDMA Radio network products installation plan &
management/ hardware and software installation / checking / test & radio network system upgrading /
GSM network traffic statistic and Mobile Cellular Network system management and optimizing.
● Responsible for Mobile Network BTS & BSC’s voice call traffic analyzing and optimizing, propose
BSC/BTS new installation & expanding plan for China Mobile P/L, China Unicom P/L, China Netcom P/L.
I also create BTS network adjustment plan for customer according to the mobile network traffic
distribution.
● Our main clients are China Mobile P/L, China Unicom P/L. China Telecom P/L, China Netcom P/L, etc.
● As a telecom technical support engineer, I am in charge of 10 BSC, 109 BTS and 325 TRX for GSM
system in JiangXi province of China in the past 2 years.
I also completed the CDMA project for setting up 2CBSC and 30 CBTS for China Unicom and China
Netcom, supported the customers daily on maintenance, troubling, network optimizing to keep the
network operating in good quality.
F. October 1999 – December 2001
Name of Employer: Norelco Centraline Pte Ltd, Singapore
Job Title: Automation / Electronics Engineer
● I had worked as an Electronic Engineer and group leader in Norelco Centraline P/L. in Singapore.
Page 5 of 5
● Norelco Centroline was the main hard disk production line provider. Our main customer was Seagate,
Maxtor and Western Digital Pte Ltd.
● In charge of the hard disk production equipment setup / test / commissioning / troubleshooting as
an Automation / Electrical Engineer.
* Tested and Setup more than 2000 sets STW ( SERVO TRACK WRITER) machines of ZELDA and LULU
hard disk, 8 sets STW rack for Maxtor Pte Ltd.
* Tested and Setup more than 900 sets Pack Track Writer machines ( for U6, U8, Snowmass hard disk),
3 sets of Media Network, 10 sets of Genius Screw Driver Install Station for SEAGATE Pte Ltd.
* Tested and commissioned 9 sets Top Cover Install machine for Western Digital Pte Ltd.
G. May 1992 - October 1999
Name of Employer: Fushun Liaoning Brunch China Mobile Telecom Pte Ltd, China.
Job Title: GSM Mobile Switching /Base Station Engineer
● I worked as a Telecom Engineer in Liaoning Province Mobile Telecommunication Pte Ltd in China.
This company is the mobile telephone telecom networking service supplier for Liaoning Province.
● In charge of maintaining and optimizing the GSM 900/1800MHZ Mobile Telephone Network’s
Switching Centers and Radio Base Stations maintenance / Optimizing / Expending, etc. the equipment
was imported for Motorola Corporation of USA, NEC of Japan and Ericsson of Sweden.
H. September1988 – May 1992
Name of Employer: Fushun Liaoning Brunch, China Telecom Pte Ltd, China.
Job Title: Assistant Telecom Engineer
● My job was to maintain and troubleshoot the AXE-10 Program Controlled Telephone Switching
System which was imported from Sweden. In very short period, I have understood the telephone
switching principle, function structure, software data, repairing method, statistics method of call traffic,
power supply system, transmission system, etc.
From:
Mr. Kong Desheng
HP: 0065-90468389
Email: kongdesheng8@gmail.com

More Related Content

What's hot

What's hot (19)

List_of_Completed_Projects
List_of_Completed_ProjectsList_of_Completed_Projects
List_of_Completed_Projects
 
ANJUM CV-1
ANJUM CV-1ANJUM CV-1
ANJUM CV-1
 
Resume-RNO
Resume-RNOResume-RNO
Resume-RNO
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
my Resume
my Resumemy Resume
my Resume
 
Rassell Domnic Go - updated
Rassell Domnic Go - updatedRassell Domnic Go - updated
Rassell Domnic Go - updated
 
Campbell michael resume mtli 7
Campbell michael resume mtli 7Campbell michael resume mtli 7
Campbell michael resume mtli 7
 
AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
Yan Zhang resume
Yan Zhang resumeYan Zhang resume
Yan Zhang resume
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
Sunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATEDSunil Saini_RF Engineer UPDATED
Sunil Saini_RF Engineer UPDATED
 
MHZarrabizadeh
MHZarrabizadehMHZarrabizadeh
MHZarrabizadeh
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
CV(joshy C D)
CV(joshy C D)CV(joshy C D)
CV(joshy C D)
 

Similar to Mr Kong DeSheng CV Up to Now

Similar to Mr Kong DeSheng CV Up to Now (20)

Mamdouh C.V NEW
Mamdouh C.V NEWMamdouh C.V NEW
Mamdouh C.V NEW
 
Rehan Rauf CV
Rehan Rauf CVRehan Rauf CV
Rehan Rauf CV
 
Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
Stretton CV
Stretton CVStretton CV
Stretton CV
 
PrasadResume
PrasadResumePrasadResume
PrasadResume
 
Alta Gpon
Alta GponAlta Gpon
Alta Gpon
 
CV(joshy C D)
CV(joshy C D)CV(joshy C D)
CV(joshy C D)
 
Borapureddi Ashok_present
Borapureddi Ashok_presentBorapureddi Ashok_present
Borapureddi Ashok_present
 
sabry C.V UD-3
sabry C.V UD-3sabry C.V UD-3
sabry C.V UD-3
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
Network Engineer CCNP CV
Network Engineer CCNP CVNetwork Engineer CCNP CV
Network Engineer CCNP CV
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
Phuong Nguyen - Resume
Phuong Nguyen - ResumePhuong Nguyen - Resume
Phuong Nguyen - Resume
 
RESUME2016
RESUME2016RESUME2016
RESUME2016
 
Amr Sabry Elsaadany CV_Update.DOC
Amr Sabry Elsaadany CV_Update.DOCAmr Sabry Elsaadany CV_Update.DOC
Amr Sabry Elsaadany CV_Update.DOC
 
Bivin paul resume physical security and elv system engineer _ may 3rd 2016
Bivin paul resume  physical security and elv  system engineer _  may 3rd 2016Bivin paul resume  physical security and elv  system engineer _  may 3rd 2016
Bivin paul resume physical security and elv system engineer _ may 3rd 2016
 
shailesh
shaileshshailesh
shailesh
 

Mr Kong DeSheng CV Up to Now

  • 1. Page 1 of 5 RESUME – Mr Kong De Sheng (James) MSC Engineering Specializations: Design experience and knowledge for oil and gas Tetra Radio, Microwave, Marine Radio, Satellite Systems, Network System, Structure Cabling , Telephone, CCTV, ACS, PAGA, Fiber Optic,Video System, Security systems, Electrical , GSM/CDMA, etc. Nationality: Singaporean. Languages: English and Chinese BACKGROUND ● 15 years plus working experience in Telecom Engineering company for Radio/Data/Voice/Security telecom Systems design, testing, proposal and commissioning experience for telecom/oil and gas industry, ● 10 years working experience in public telecomm service providers for home telephone/mobile network maintenance, software update, network design /optimizing, commissioning, technical support for GSM/CDMA system and Automation design/testing and commissioning. ● 3 years plus experience in electrical/Automation company to do automation system design/testing, commissioning and PCB design experience. ● Familiar with BSC/BTS of GSM/CDMA system, Marine Radio systems, Satellite systems, Security Systems, eo m, Voice and Data systems T, and IT products. Have transmission and power supply system knowledge. Familiar with most aspects of RF Radio, Networking and structured cabling system ● Previous experience in Mobile Telecom BTS/BSC project management with subcontractors and customer support experience. Good engineering analysis skills as well as strong theoretical and practical knowledge of a broad range of modern Telecommunication / IT technologies. ● Familiar with PC OS operation and maintenance as DOS, Windows 2000/7/8/NT and UNIX, Microsoft office (Word, Excel, Power Point, Vision), Autocad, Winpro radio coverage software, CCTV and PAGA coverage software, etc. ● Familiar with PCB design with Protel99, PC hardware and software installation and repairing, LAN and WAN configure, TCP/IP, Networking knowledge. ● Familiar with router/switch function and application, CCNA trained. TERTIARY EDUCA TION & QUALIFICA TIONS ● Aug 2012-Jul 2015, Part Time 3 years, Nanyang Technological University, Singapore Master of Science (Telecommunication Engineering) ● 1984-1988, Full Time 4 years, Dalian Maritime University, People’s Republic of China Bachelor of Science (1st Class Honors), Majors: Electronics Engineering, Marine Radio, Radar, Microwave, etc. MISCELLA NEOUS:  Operation and Maintenance for NEAX61C Mobile Cellular Telephone Network System Training(CMTS) at NEC P/L, Japan,  ERICSSON GSM Mobile System Exchange and Radio Base Station Training, at Sweden.  Networking CCNA Training course by Genovate P/L Singapore.  Operation & Familiarization Training for OTDR, Optical Power Meter and Attenuator in Singapore.  Microsoft Office Word 2003 Specialist official Certification.
  • 2. Page 2 of 5  Siemon Intelligent Cabling System Design Principles and Installation Practices Course in Singapore  Commscope SP5500-System SCS iPatch Design &Engineering Course in Singapore  ND33410-Systinax SCS Installation and Maintenance Course in Singapore.  SP5502-Systinax iPatch Sales and Marketing Course in Singapore.  Nexans ND5510-Certified iPatch Support Specialist (CISS) Course in Singapore. PROFESSIONAL EXPERIENCE A. Oct 2014 – Now .(Updating In CSET) Name of Employer: CSE-Transtel Pte Ltd, Singapore Job Title: System Design Engineer  P129, Ichthys-Turret project, Project value is more than S$ 2.5 million. It have 7 Telecom systems, I am responsible for all the 7 systems-LAN system (Cisco) , Telephone system(Cisco) , Structure Cabling system (Nexans), Access Control System (S3ID), PAGA system (DNH), CCTV system (Synectics)&Tetra Radio system(RFI) design and commissioning, I need to create the document (BOM, datasheet, Functional Design specification, Factory Acceptance Test Procedure, Site Commissioning Test Procedures) and drawings (Block diagram, Termination diagram, Interconnection diagram, Wiring Diagram, GA, DMD) etc. I also do the CCTV coverage study, Tetra Radio Coverage study, PAGA coverage study, All the 7 systems FAT had been done, 95% design document and drawing are frozen, currently the project is at commissioning stage.  P077, Ichthys-CPF Project. P077 CPF is very big project. It has 39 telecom systems. I am responsible for the Video Conferencing System (Polycom), Nurse Call System (Austco) and Telemedicine System (Polycom) for P077 CPF in the team, I also help LAN Engineer to do some LAN and Structure Cabling systems Document/drawing, now 90% of the design / drawing of the 5 systems is freezing, FAT and 3 phase system IFAT are done in CPF, between CPF and FPSO, between CPF and Existing site. It is at coming stage now.  P330, FPSO of Ichthys, P330 FPSO is also very big project, I am responsible for Video Conference / Nurse Call / Telemedicine 3 Systems in the team. Now my 3 systems have got 90% document/drawing freezing, the 3 systems have passed FAT and IFAT in FPSO, between FPSO and existing site. Now the P330 FPSO is at commissioning stage as well. B. July 2012- Oct 2014 (Updating in CSET). Name of Employer: CSE-Transtel Pte Ltd, Singapore Job Title: Telecom Design Engineer The projects I involved from Jul 2012 until present (Oct-2015) in CSE-Transtel are as following:  P573, PNG LNG project, I have taken part in the design of Structured Cabling System, Telephone system and Site Test Equipment. 3 systems, generate the document and drawing, Currently these 3 had done FAT, and Site commissioning are also fully done under my in-house supporting.  P604, P674 and P044 Habshan U&O projects, Inside these 3 projects, they are the biggest projects used in Middle East , valued USD $23millon , I have taken part in the design of LAN and SCS system(Cisco) PAX system (NEC) , Optical Fiber system(Siemon intelligent FO SCS products), video conferencing system(Tandberg product), voice recording system(HP,Cybertech products), GPS system(Spectracom product) in each of the project, until now, all the 3 projects have been done Site Acceptance Test , the 3 projects have been commissioned completed . I have done in house commissioning support work for the commissioning of P604, P674 and P044.to co-operate for filed side work  P190, KOC1 project, I continue the design of LAN & Telephone System, as it using ITRACS Intelligent patch panel design, conducted the Nexans intelligent SCS training, now the FAT is done , the field commissioning is on goning.  P130, Effulent Water Injection Project, I have helped proposal department to do the proposal work, there are 6 System are proposed by me, CCTV system (Bosch product), ACS system (Bosch
  • 3. Page 3 of 5 product), LAN system (Cicso product), Telephone system (NEC IP phone product), FIDS system (Fiber Optical passive fence cable design ) , PAGA system (Bosch product). C. February 2006 - June 2012(Updating in CSET). Name of Employer: CSE-Transtel Pte Ltd, Singapore. Job Title: Telecom Design Engineer Responsible for engineering design on the following major Oil & Gas sector projects to date: Position requires significant travel to attend both technical and commercial meetings with clients, Design the system as per client requirement, generate the Design documents and Drawings, Conduct the System Factory Acceptance Test, support and take part in our field engineer to conduct the Site Acceptance Test during commissioning stage of the delivered systems. Support proposal depart, etc. From Feb 2006 to Jun 2012 in CSE-Transtel P/L, I had successfully done the following projects:  P338-0501 project, the project name and systems involved: Bohai Phase II, platform WHP-B, RUP, and FPSO. VHF Marine Radio system, AM radio system, MF-HF Radio system (Sailor, Motorola Tait radio products) Entertainment system ( WISI products).  P009-0601 project, the project name and systems involved: Facility Upgrade & Relocation of Underground Process Piping for Gathering Center & Booster Stations poroject, LAN and Telephone system.(Cisco, Panasonic products)  P312-0501 project, the project name and systems involved: Bohai phase II, platform D, VHF Marine Radio system, AM radio system (Sailor, Tait products), Entertainment system (Wisi products) and Hotline system.  P329-0709 project, the project name and systems involved: Bohai phase II, platform E, VHF Marine Radio AM Radio system Entertainment system and Hotline system.  P331-0709 project, the project name and systems involved: Bohai phase II, platform F, VHF Marine Radio system, Entertainment system and Hotline system.  P395-0711project, the project name and systems involved: Saudi Kayan olefins project, Structured Cabling system(Systimax Products)  P070-0802 project, the project name and systems involved: Saudi Kayan Polycarbonate project, Structured Cabling system (Nexans Products)  P321-0708 project, the project name and systems involved: Saudi Kayan PP & PH project, Telephone and LAN system (Alcatel , Cisco , Nexans Products)  P322-0708 project, the project name and systems involved: Saudi Kayan PP & PH project, Telephone and LAN system. (Alcatel , Cisco , Nexans Products)  P347-0710 project, the project name and systems involved: ARRMCO, Heavy Lift Jack-up Barge project, TV and Entertainment system (Ikusi products)  P126-0803 project, the project name and systems involved: PAZFLOR project, UHF-Trunk Radio system (tait trunk radio), VHF-Marine Radio system, MF-HF Radio system , GMDSS system, Lifeboat Radio system (Sailor, Tait, Furuno, Motorola)  P573-0811 project, the project name and systems involved: Odevrecht Drillllship Norbe VIII, SHIP1&2, Entertainment system ,UPS system and GMDSS console system (Wisi, Eaton UPS, Furuno navigation products) Above projects have been successfully tested and delivered to clients, and their commissioning works have been done, client’s feedback is good. Also involved the following projects in the design stage works:
  • 4. Page 4 of 5 ● P469-0712 project, the project name and systems involved: Upper Kotmale Hydropower project, Optical Fiber system, PABX system.( RAD FO rooducts, NEC Pabx products) ● P491-0808 project, the project name and system involved: Jubail, Process Area Network System, Meteorological system, Server Farm system , OSP system, Computer and Workstation system.(Cisco,HP,IBM Vaisala, Systimax products) , ● P573-1009 project, the project name and system involved: PNG LNG Plant project, Structured Cabling system, , Telephone system, Site Testing Equipment system. For this project, client requests for a few shipments until end of this year, so we need documentation and do the testing for each time ( Krone, FHF, etc). Until Jun-2012, I am mainly working on P573 PLN LNG plant project and also follow up the previous projects remained document submission and field support activities. D. February 2004 - February 2006 Name of Employer: Riq Pte Ltd, Singapore JOB Title: Electrical/PCB designer ● I worked as a designed in RIQ Pte Ltd which is authorized distributor for KOBLET’S ship steering and electronic engine control system (Canda Company) and NAVMAN ( New Zealand Company) ● My main job was design the Electronics & Electrical drawing of control panel and steering gear system for ships with Autocad LT 2004/2005 and use Protel 99 to do PCB design for ships. The ship size is between 30 to 70 meters, the mechanical design contains the hydraulic system/ pump piping system and power unit. The Electrical design contains Rudder angle and feedback system/ Forward & AFT steering control panel / steering gear alarm system changeover module system. ● Supporting on system commissioning, repairing and troubleshooting. E. January 2002 - January 2004 Name of Employer: HUAWEI TECHNOLOGIES Pte Ltd, China. Job Title : GSM/CDMA Technical support Engineer ● The company majors are in research and manufacturing IT and Telecommunication products of world level. For example, Fiber Transmission Network Products, Switching Exchange, Intelligent Network, Router, Switch GSM and CDMA products, etc. ● Responsible for the Huawei’s GSM and CDMA Radio network products installation plan & management/ hardware and software installation / checking / test & radio network system upgrading / GSM network traffic statistic and Mobile Cellular Network system management and optimizing. ● Responsible for Mobile Network BTS & BSC’s voice call traffic analyzing and optimizing, propose BSC/BTS new installation & expanding plan for China Mobile P/L, China Unicom P/L, China Netcom P/L. I also create BTS network adjustment plan for customer according to the mobile network traffic distribution. ● Our main clients are China Mobile P/L, China Unicom P/L. China Telecom P/L, China Netcom P/L, etc. ● As a telecom technical support engineer, I am in charge of 10 BSC, 109 BTS and 325 TRX for GSM system in JiangXi province of China in the past 2 years. I also completed the CDMA project for setting up 2CBSC and 30 CBTS for China Unicom and China Netcom, supported the customers daily on maintenance, troubling, network optimizing to keep the network operating in good quality. F. October 1999 – December 2001 Name of Employer: Norelco Centraline Pte Ltd, Singapore Job Title: Automation / Electronics Engineer ● I had worked as an Electronic Engineer and group leader in Norelco Centraline P/L. in Singapore.
  • 5. Page 5 of 5 ● Norelco Centroline was the main hard disk production line provider. Our main customer was Seagate, Maxtor and Western Digital Pte Ltd. ● In charge of the hard disk production equipment setup / test / commissioning / troubleshooting as an Automation / Electrical Engineer. * Tested and Setup more than 2000 sets STW ( SERVO TRACK WRITER) machines of ZELDA and LULU hard disk, 8 sets STW rack for Maxtor Pte Ltd. * Tested and Setup more than 900 sets Pack Track Writer machines ( for U6, U8, Snowmass hard disk), 3 sets of Media Network, 10 sets of Genius Screw Driver Install Station for SEAGATE Pte Ltd. * Tested and commissioned 9 sets Top Cover Install machine for Western Digital Pte Ltd. G. May 1992 - October 1999 Name of Employer: Fushun Liaoning Brunch China Mobile Telecom Pte Ltd, China. Job Title: GSM Mobile Switching /Base Station Engineer ● I worked as a Telecom Engineer in Liaoning Province Mobile Telecommunication Pte Ltd in China. This company is the mobile telephone telecom networking service supplier for Liaoning Province. ● In charge of maintaining and optimizing the GSM 900/1800MHZ Mobile Telephone Network’s Switching Centers and Radio Base Stations maintenance / Optimizing / Expending, etc. the equipment was imported for Motorola Corporation of USA, NEC of Japan and Ericsson of Sweden. H. September1988 – May 1992 Name of Employer: Fushun Liaoning Brunch, China Telecom Pte Ltd, China. Job Title: Assistant Telecom Engineer ● My job was to maintain and troubleshoot the AXE-10 Program Controlled Telephone Switching System which was imported from Sweden. In very short period, I have understood the telephone switching principle, function structure, software data, repairing method, statistics method of call traffic, power supply system, transmission system, etc. From: Mr. Kong Desheng HP: 0065-90468389 Email: kongdesheng8@gmail.com