REYAD el badry 2015 Fiber Optics Operation Manager
Mohamed Ragab CV
1. Mohamed Ragab Atea Elsenbawy
Electrical Communications and Electronics Engineer
Jedda -KSA
Phone +966595370079
E-mail • Mohamed_elsenbawy@yahoo.com
Objective
Seeking a challenging position in your company where my academic background, field
experience and interpersonal skills are utilized and developed.
Personal Information
• Date of Birth : 1st Jan, 1989
• Nationality : Egyptian
• Marital Status : married
• Military Service : Completed
• Driving License : Available.
Education
Bachelor of Electrical/Electronic Engineering, Department of Electrical
Communications and Electronics, Sep 2006 - Jul 2011.
Graduated from Faculty of Electronic Engineering, Menofia University, Egypt.
Graduation grade: Good.
Graduation project grade: Excellent.
Graduation Project: ZigBee wireless network control system.
Project Description: The project final outcome is about Wireless Network called
ZigBee Network. It is looks like Bluetooth Network but there is a difference in distance,
power and number of nodes. The Network is Two ZigBee modules programmed by
Embedded C able to transmit and receive signals from each other.
2. Trainings, Courses& Certificates
• GSM&GPRS Advanced Course (JELECOM - EGYPT),Jul 2010
Has Successfully Completed The Training Course From 3/7/2010 To 15/7/2010 With General
Grade: Excellent.
• CDMA&UMTS Advanced Course (JELECOM - EGYPT),Jul 2010
Has Successfully Completed The Training Course From 17/7/2010 To 29/7/2010 With General
Grade: Excellent.
• Radio and Television union Training in Broadcast Engineering.
• CCNA Course.
• ICDL (Microsoft Office and Internet).
• Optical and Rader systems courses.
• PSTN planning Course.
• CC++ Programming languages.
• Auto Cad Designing For Civil and Electrical planning .
• Photoshop Drawing.
Work Experience
OSP Engineer in FTTX Projects in Egypt to Sep. 2013 ). TELLSUPPORTCompany
Summary of work: -
Connection between Main Exchange and Cabinets.
Connection between Cabinets and the distribution points.
Pulling cables on poles.
Installation of Manholes and duct systems.
After civil work is completed then Telecom part starts which includes
Jointing, Termination, Testing & Commissioning
• Corrective Maintenance.
(a) Fault Diagnosis
Fault Localization
(b) Splice cables 12, 24, 28, 36, 96 and 144 Fiber Using Fujikura FSM-60S splicing
machine.
Testing and Acceptance Using Anritsu or EXFO OTDR.
3. Fiber Optics Projects.
Installing Optical Cable and Splicing Between Nasr2 Exchange and nasr City
Make connection Between Cabinet in nasr city and GSP Company
Installing Optical cable and splice between Ramsis Exchange and Radio TV Cabinet
Installing Optical Cable between Elmaadi Exchange and passive Cabinet in Elmaadi
Make Connection between this Cabinet and petroleum Company
Installing Cables between Elasher Exchange and Ebny beitak passive Cabinet
Make termination and splicing in ZTE Cabinets in Elasher mn Ramadan
Installing Optical Cables in kafr Elshekh between Main Exchange and passive cabinet
Make more joints and make terminations between Exchanges in kafr elshekh
Maintenance of cables in kafr Elshekh and mansoura
Make joints in Elasher mn Ramadan and Elmansoura
______________________________________________________________________________
Low Current Exp.
Electrical Engineer at AHRAM Company, KSA (SEP 2013 to OCT 2014)
Summary of work: -
• Design and implementation Fire systems (Fire Fighting) identical to the code NFPA
• Design and Implementation Fire alarm systems like. ZETA.
• Design and implementation CCTVSystems
Projects.
OpenUniversityinEl Riyadh
Facultyof Science ingizan'CCTV' fire alarm.
TaboukUniversityAmlog branch'firefightingandfire alarm.
OkashBuildinginRiyadh'firefighting‘firealarmandemergencylight.
BagneedStoresinRiyadh' firefighting.
BietElswayamaintenance.firefighting
ElfawzanGroupin Riyadhfire alarm
Ministry of interior CCTV system
4. LowCurrent Engineer at IKK .(Issam Khairy Kabbany Co) KSA OCT 2014 to NOV2015.
Summary of work: -
Design of all low voltage systems such as fire alarm sys, public address sys, CCTV sys
and access control sys.
Design of fire prevention systems according to country (KSA) national code, national
fire protection association code NFPA rules and other related regulations.
Preparing customer quotations according to standard followed.
Preparing shop drawings of designed systems.
Visit site before project beginning to arrange work progress schedule.
Supervising site engineers work through weekly progress report, …etc.
Performing test & commissioning for entire systems after finishing site work in order to
handover it to the customer in the presence of city civil defense and project consultants.
Projects:-
Ministry of interior (CCTV system for outside towers and connect with head office
in microwave links ) system using (Dante cam and NVR Brand )
Elraghy villa project in Riyadh (CCTV , Access control ) Brands (Pelco cams , ACT
for access control )
Project Engineer at Bazy company from NOV2015 until now.
Summary of work: -
CCTV Works, design and installation.
VOIP and video conference using (yeastar and yealink Brands) Yeastar is Smart PBX
(Private Branch Exchange) and we can connectip phonesthatyealinkbrandonit
Video wall project in paris gallery center
Network installation
Summary of Skills
- Personal Skills:
• Self-Motivated, can work under pressure.
• Ability to learn new technologies.
• Good Communication skills.
• Team Working
- Computer Skills:
• Windows Operating Systems
• Extensive knowledge on application of Microsoft Office
• MATLAB Simulation Program
- Knowing Language:
• Arabic : Mother Tongue
• English : Fluent