TAHA ALI
Project Manager Telecom /Solution Architect FTTH
Nokia,Siemens,ZTE,Huawei,
Mobile: +212604453684
Email: tahafull@gmail.com
LinkedIn : http://linkedin.com/in/taha-ali-0980611b
Resume: Project Manager, ICT/OSP/ISP Fiber Design Specialist, FTTx/FTTH, B2B Solution Architect,
Transmission Planning (Microwave, P2P / P2MP, Rollout, Swap, IP Network Design, Swap and Transmission
Optimization
Multivendor experience - Nokia, Huawei, Ericsson, NEC, ZTE, Alcatel-Lucent , Nera .
International experience –Morocco-Senegal-China-Spain .
Operators – Maroc Telecom, INWI , Orange ,Tigo,
(PMP)Project Management Professional Certification (Trained)
Post Graduate Diploma: Master in Telecommunication & Microelectronics Med V-Rabat
Second Graduate Engineering Diploma in Telecom INPT –Rabat
ITIL® Foundation (GR750216768BS3)
Technical Abilities and Skills:
• 19+ years of Experience in Telecom/Cellular, which includes FTTX/FTTH, FTTA,GPON, OLT,ONT, GSM,
PDH, SDH (Microwave - P2P, P2MP & OFC).
• To provide E2E enterprise/mobile solution/services for Global Telecom Operators in transformation approach,
programs initiation and enterprise architecture governance.
• Lead to defining, planning and executing digital transformation programs. This includes strategy development,
business architecture, operating model and roadmap.
Leading E2E enterprise Business Transformation delivery work stream within a transformation
program. This includes leading the business analysis work stream to align program scope to business objectives,
conduct requirement definition for initiating vendor RFPs.
• Analyzing of RFPs, providing solution, and creating Business cases for it.
• Dealing with customer to get their business requirement and then making E2E technical solution along with
inputs from Sales, Presales, Commercial teams to design viable product within budget limitations.
• Managing internal and customer senior management for different enterprise business approvals.
• Vendor management to decided roadmap for timely delivery of the project.
• Supporting and coordinating IT team to design network security and billing of enterprise business product.
• Design of SLA so that desired KPI are maintained for enterprise customers.
• Excellent hands on experience on Microwave transmission planning and transmission optimization.
• Rich experience in B2B, ICT,OFC/FTTH/FTTX/Transmission, Cloud Solution, GSM Rollout Project
management, Project Planning, Cost Estimation, Contract Management, Operation & Maintenance,
Installation & Network designing of Optical Fiber & Transmission Systems, Business Development, NLD-
ILD operations & Leased circuits management in Morocco and Overseas.
• Adept in end-to-end project planning and execution of Telecom networks, Telecom Infrastructure involving
planning, component requirement study (Project Implementation process, schedule & policies etc.), import/
procurement of equipment, cost estimation, bidding/ tendering/ negotiation activities, project execution & delivery,
Technical evaluation & Quality Management.
• Adept in managing network designing, installation & maintenance of telecom (OFC/Wireless) Transmission
and networking equipments in reducing downtime and enhancing operational effectiveness of equipment.
• E2E enterprise solution design for Broadband, Leaseline, VoIP, IPVPN / GVPN, IPLC Wifi services, IPTV,
PRI / BRI, DSL, VSAT,L2 / L3, M2M, B2B SIP / Voice / SMS.
• Lead and executed multiple Optical fibre communications & Transmission projects in Morocco and abroad.
• Microwave Transmission Optimization – Frequency Optimization, Hi-Low Resolution, Availability.
• Link Budgeting and BOQ preparation for sites.
• Network parameter tuning to ensure high availability, KPI and resilience of network.
• Microwave frequency planning& Interference analysis.
• IP/MPLS Network Connectivity design for Mobile Networks
• DCN, HSRP, EIGRP, RIP, OSPF, BGP, MPLS, VLAN, VRRP, planning
• 3G, 4G Datafill for NodeB and RNC
Professional Experience:
Meditel ,INWI, IAM Operators, Morocco April-16-April 19
Employer: Soma NTIC solutions, Consultant
Role: Project Manager/Solution Architect B2B, FTTX, MSAN, ISP, ICT, LTE,3G,2G
Vendor: Huawe,ZTE
Roles and Responsibilities:
• Responsible for all Project Management Office domains: Scope, Time, Cost, Quality, Change, HR,
Communication, Risk, Procurement and Integration
• Delivered defined project outcomes on time, within budget and with a high level of quality
• E2E developed the project's Scope of Work, and is accountable for building and maintaining an ongoing Project
Management Plan
• Build and manage an effective and engaged multi-disciplinary project team to ensure efficient project delivery,
usually in a matrix manner
• Responsible for E2E management of project resources (clients and sub-contractors), ensuring that budget and
scheduling constraints are adhered to.
• Align project with overall program policies, roadmap, constraints and plans. Prioritize tasks and resolves
issues/conflicts.
• Review enterprise business customers FTTX/FTTH/Mobile requirement and designing solution with optimized
cost and timeline.
• Analyzing RFPs and submitting technical proposals.
• E2E Project planning and implementation for 2G, 3G, LTE and FTTX/FTTH B2B customers.
• Analysis all enterprise B2B FTTX/FTTH customers demand from sales/presales on SalesForce.
• Solution design for B2B customers.
• E2E enterprise Solution design for Broadband, Leaseline, VoIP, IPVPN / GVPN, Wifi services, IPTV, PRI /
BRI, DSL, VSAT, IPLC, DLC, Private VPN
• Managing design of E2E B2B / Enterprise solutions including GPON, FTTX, Unified Communications, Video
Conferencing, Private APN, Cloud PABX, Wireless Gateway, DNS services, SIP trunk, IP Microwave.
• Contribute to Preparing the Cost Budget and worked under the Cost
• Conduct Initial project survey. Study in detail all designs and drawing.
• Preparations of Tenders based on Tender documents & drawing.
• Preparation of details in response to customer queries.
• Attending Pre-&-Post bid meetings with customers. Preparation of specifications and BOQ.
• Receive, analyze and evaluate quotations suiting requirement s.
• E2E Work out competitive offers. Suggest cost effective measures for reducing project cost.
• Budgeting, BOQ preparation, Project planning and implementation for FTTX B2B customers.
• GPON (OLT, ONT, ODF, CPE), FOC/SDH, P2P, P2MP, VSAT design for network considering increasing
capacity & customer demands.
• FTTX, Long-Haul and B2B solutions Plan, Design and Budgeting.
• Preparation of BOM for GPON and Optical Fiber Networks.
• Prepare & Evaluate Networks Design Parameters and Network Budgeting.
• FTTH, FTTB and FTTC Networks Planning & Design.
• Network Products Evaluation, Selection and Type Approvals.
• Sub-Contractor Management.
• Arc GIS/Intergraph based OFC database administration.
• Techno-Commercial evaluation and selection of suppliers for B2B customer's connectivity.
• FTTX /OSP network as-built verification and issuance of work completion certificate.
• Reviewing GPON network weekly and monthly Dashboards/ KPI’s and reporting.
• Based on periodic performance report and trend, participate in the optimization initiative.
• Overseeing the rolling out activities of all projects under domain of OSP and GPON/FTTX networks.
• Designing, Driving the implementation of GPON Network Expansion and OBC ODN clusters connectivity to
serve Ooredoo's FTTH HBB users according to Annual Operation plan (AoP).
• Coordination with Project roll out teams to complete the project deliverables and handover to SA/NOC.
• Researching and identifying new cost-effective and optimal technologies that can be used for designing existing
and new business customer services.
• Participating in technical RFP preparation, technical clarifications and vendor discussions and meetings.
• Developing new and improvement in existing procedures.
• TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation, ES,
SES, and Synchronization issues.
• Tx Planning for rollout and ISP customers.
• Public/ Private Wifi planning for business customer/buildings.
• Monitoring and resolving End to End O&M issues.
• Perform detailed IP planning to in order to produce network plans for 2G and 3G mobile infrastructure solutions
• Customized IP Network Connectivity design for Mobile Networks
• Provide network designs and data fill, in line with project and tender deliverables.
• Hands-on experience with SDH & PDH Planning.
MarocTelcom & Huawei. Ltd., Morocco Mai 2011- Sept.2016
Employer: Huawei
Role: MSAN, OFC,IBS 3G Transmission Planning, Network Design & Optimization
Roles and Responsibilities:
• Member of the HUAWEI Central Transmission Planning team.
• E2E transmission solution design for new network and optimization of existing network
• E2E TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation,
ES, SES, and Synchronization issues.
• Tx Planning for rollout and ISP customers.
• Monitoring and resolving End to End O&M issues.
• BOQ and project plan preparation.
• Perform detailed IP planning to in order to produce network plans for 3G and 4G mobile infrastructure solutions
• Mux, Metrohub, DCN, AoIP planning.
• Capacity planning for E1, Edge, TRX, OSC and EDAP.
• Datafill for NodeB, eNodeB, RNC, McRNC
• Customized IP Network Connectivity design for Mobile Networks
• Provide network designs and data fill, in line with project and tender deliverables.
• Providing ring protection for 5 +1 dependency sites
• Hands-on experience with SDH & PDH Planning.
• E1 Planning – With reference to the number of TRX used and keeping in view, the future expansion plans.
• Deployment of the project OFC Transport cable inter rural direct burred and in HDPE 800KM
• Swap of the switches PSTN: EWSD, AXE, OCB, DMS, DSLAM (IP, ATM) access networks to MSAN 983
sites outdoor and indoor
• Providing migrations corresponding subscribers lines broadband and narrowband
Project: Maroc Telecom, June.2006- July2011
Employer: ZTE
Role: Manager / Solution Architect and deployment - B2B, Transmission, CDMA: Network Design & Optimization
Vendor: ZTE
Roles and Responsibilities:
• Planning BOQ for Transmission and BSS CDMA
• Planning budget for financial year with respect to expansion and rollout.
• Planning and getting bandwidth for ISP and International carriers.
• TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation, ES,
SES, and Synchronization issues.
• Perform detailed IP planning to in order to produce network plans for CDMA mobile infrastructure solutions
• OFC backbone planning for complete Morocco IAM and major cities. Working as a Project Manager for
Optical Fiber connectivity to the Central IAM & North – Eastern provinces of Morocco IAM by interconnection
to the Existing Backbone OFC Ring of Morocco IAM
• Planning and Design CDMA Network New Cities
• Checking OFC pop requirements.
• Customized IP Network Connectivity design for Mobile CDMA Networks
• Link Budgeting for Microwave Links with proper Threshold Degradation & Availability.
• Microwave frequency planning & Interference analysis with no HIGH – Low violation.
• Managing LOS Team and validate all the LOS on Topo maps with map reading.
• Getting POI from local IAM operators.
• Analyzing RFPs and submitting technical proposals.
• E2E Project planning and implementation for CDMA in existing 3G sites, IAM customers.
• Analysis all B2B CDMA-EVDO subscribers IAM customers demand from sales/presales on Salesforce.
• Solution design for B2B customers.
• E2E enterprise Solution design for Broadband, Leaseline, VoIP, IPVPN / Wifi services, IPTV, PRI / BRI, DSL,
VSAT, IPLC, DLC, Private APN
• Managing design of E2E, B2B / Enterprise solutions including cloud PABX, Unified Communications, Video
Conferencing, Private APN, Wireless Gateway, DNS services, SIP trunk, PDSN , IP Microwave, P2P, P2MP
• Contribute to Preparing the Cost Budget and worked under the Cost
• Conduct Initial project survey. Study in detail all designs and drawing.
• Preparations of Tenders based on Tender documents & drawing.
• Preparation of details in response to customer queries.
• Attending Pre-&-Post bid meetings with customers. Preparation of specifications and BOQ.
• Receive, analyze and evaluate quotations suiting requirements.
• Work out competitive offers. Suggest cost effective measures for reducing project cost.
• Budgeting, BOQ preparation, Project planning and implementation for CDMA B2B customers.
Meditelcom/Orange Feb.2000-May2006
Employer:Siemens
Role: Team Lead - Transmission Planning, Network Design & Optimization
Roles and Responsibilities:
• Member of the Siemens Central in north of Morocco Transmission Planning team and deployment.
• TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation, ES,
SES, and Synchronization issues.
• Backhaul planning for 2G Meditelecom .
• Perform detailed IP planning to in order to produce network plans for 2G mobile infrastructure solutions
• Customized IP Network Connectivity design for Mobile Networks
• Provide network designs and data fill, in line with project and tender deliverables.
• Transmission Network Design – Being in central team, providing support to all the projects throughout in north
Of Morocco like Kenetra ,larach Assila Tanger, Tetoune martile chaoune ouzzane ,lakssar 2G Siemens
Equipments
• Transmission Planning SRAL and Sagem for Siemens network 2G.
• Planning Highway Protection plan for Hub sites LOOP MW – Providing redundancy path for all major towns
and hub sites LOOPS both on Microwave and Fiber.
Project: Access Network fix lines Planning and distribution SR May 1998- Feb.2000
Employer: Sigma CO Maroc .
Vendor: Alcatel
Role: Project Manager, Network Design & Planning
• Responsible for delivery of telecom projects in access network fix lines copper cabling
And wiring SR .
• Project delivery management by Zone including Civil work infrastructures
• Tracked vendor hardware and software implementations PSTN.
• Coordinated with circuit provisioning personnel in Central.
• Coordination with engineering and operations.
• Scheduled, tracked and reported on all project movement.
• Maintained strong customer/vendor relationship.
• Provided on-site post manhole , handhold and their junction connections to stakeholders on complex escalations
/ problems.
Tools: MS Suite including MS Project and Visio, remote network manipulation and testing tools
Keywords: Service delivery, redundancy, shadow circuits.
Educational Background:
-Master in microelectronics physics and sciences of computer in University Med V Rabat –Morocco
-Engineering diplomas QC in high school of telecommunication INPT in Rabat 1998
-Certificate of qualification in project management Enterprise high school EMI 2000
Personnel Details:
Name: Taha Ali
Date of Birth: Mar 26, 1970
Nationality: Moroccan

Cv Project manager & solution architect ftth

  • 1.
    TAHA ALI Project ManagerTelecom /Solution Architect FTTH Nokia,Siemens,ZTE,Huawei, Mobile: +212604453684 Email: tahafull@gmail.com LinkedIn : http://linkedin.com/in/taha-ali-0980611b Resume: Project Manager, ICT/OSP/ISP Fiber Design Specialist, FTTx/FTTH, B2B Solution Architect, Transmission Planning (Microwave, P2P / P2MP, Rollout, Swap, IP Network Design, Swap and Transmission Optimization Multivendor experience - Nokia, Huawei, Ericsson, NEC, ZTE, Alcatel-Lucent , Nera . International experience –Morocco-Senegal-China-Spain . Operators – Maroc Telecom, INWI , Orange ,Tigo, (PMP)Project Management Professional Certification (Trained) Post Graduate Diploma: Master in Telecommunication & Microelectronics Med V-Rabat Second Graduate Engineering Diploma in Telecom INPT –Rabat ITIL® Foundation (GR750216768BS3) Technical Abilities and Skills: • 19+ years of Experience in Telecom/Cellular, which includes FTTX/FTTH, FTTA,GPON, OLT,ONT, GSM, PDH, SDH (Microwave - P2P, P2MP & OFC). • To provide E2E enterprise/mobile solution/services for Global Telecom Operators in transformation approach, programs initiation and enterprise architecture governance. • Lead to defining, planning and executing digital transformation programs. This includes strategy development, business architecture, operating model and roadmap. Leading E2E enterprise Business Transformation delivery work stream within a transformation program. This includes leading the business analysis work stream to align program scope to business objectives, conduct requirement definition for initiating vendor RFPs. • Analyzing of RFPs, providing solution, and creating Business cases for it. • Dealing with customer to get their business requirement and then making E2E technical solution along with inputs from Sales, Presales, Commercial teams to design viable product within budget limitations. • Managing internal and customer senior management for different enterprise business approvals. • Vendor management to decided roadmap for timely delivery of the project. • Supporting and coordinating IT team to design network security and billing of enterprise business product. • Design of SLA so that desired KPI are maintained for enterprise customers. • Excellent hands on experience on Microwave transmission planning and transmission optimization. • Rich experience in B2B, ICT,OFC/FTTH/FTTX/Transmission, Cloud Solution, GSM Rollout Project management, Project Planning, Cost Estimation, Contract Management, Operation & Maintenance, Installation & Network designing of Optical Fiber & Transmission Systems, Business Development, NLD- ILD operations & Leased circuits management in Morocco and Overseas. • Adept in end-to-end project planning and execution of Telecom networks, Telecom Infrastructure involving planning, component requirement study (Project Implementation process, schedule & policies etc.), import/ procurement of equipment, cost estimation, bidding/ tendering/ negotiation activities, project execution & delivery, Technical evaluation & Quality Management. • Adept in managing network designing, installation & maintenance of telecom (OFC/Wireless) Transmission and networking equipments in reducing downtime and enhancing operational effectiveness of equipment. • E2E enterprise solution design for Broadband, Leaseline, VoIP, IPVPN / GVPN, IPLC Wifi services, IPTV, PRI / BRI, DSL, VSAT,L2 / L3, M2M, B2B SIP / Voice / SMS. • Lead and executed multiple Optical fibre communications & Transmission projects in Morocco and abroad. • Microwave Transmission Optimization – Frequency Optimization, Hi-Low Resolution, Availability.
  • 2.
    • Link Budgetingand BOQ preparation for sites. • Network parameter tuning to ensure high availability, KPI and resilience of network. • Microwave frequency planning& Interference analysis. • IP/MPLS Network Connectivity design for Mobile Networks • DCN, HSRP, EIGRP, RIP, OSPF, BGP, MPLS, VLAN, VRRP, planning • 3G, 4G Datafill for NodeB and RNC Professional Experience: Meditel ,INWI, IAM Operators, Morocco April-16-April 19 Employer: Soma NTIC solutions, Consultant Role: Project Manager/Solution Architect B2B, FTTX, MSAN, ISP, ICT, LTE,3G,2G Vendor: Huawe,ZTE Roles and Responsibilities: • Responsible for all Project Management Office domains: Scope, Time, Cost, Quality, Change, HR, Communication, Risk, Procurement and Integration • Delivered defined project outcomes on time, within budget and with a high level of quality • E2E developed the project's Scope of Work, and is accountable for building and maintaining an ongoing Project Management Plan • Build and manage an effective and engaged multi-disciplinary project team to ensure efficient project delivery, usually in a matrix manner • Responsible for E2E management of project resources (clients and sub-contractors), ensuring that budget and scheduling constraints are adhered to. • Align project with overall program policies, roadmap, constraints and plans. Prioritize tasks and resolves issues/conflicts. • Review enterprise business customers FTTX/FTTH/Mobile requirement and designing solution with optimized cost and timeline. • Analyzing RFPs and submitting technical proposals. • E2E Project planning and implementation for 2G, 3G, LTE and FTTX/FTTH B2B customers. • Analysis all enterprise B2B FTTX/FTTH customers demand from sales/presales on SalesForce. • Solution design for B2B customers. • E2E enterprise Solution design for Broadband, Leaseline, VoIP, IPVPN / GVPN, Wifi services, IPTV, PRI / BRI, DSL, VSAT, IPLC, DLC, Private VPN • Managing design of E2E B2B / Enterprise solutions including GPON, FTTX, Unified Communications, Video Conferencing, Private APN, Cloud PABX, Wireless Gateway, DNS services, SIP trunk, IP Microwave. • Contribute to Preparing the Cost Budget and worked under the Cost • Conduct Initial project survey. Study in detail all designs and drawing. • Preparations of Tenders based on Tender documents & drawing. • Preparation of details in response to customer queries. • Attending Pre-&-Post bid meetings with customers. Preparation of specifications and BOQ. • Receive, analyze and evaluate quotations suiting requirement s. • E2E Work out competitive offers. Suggest cost effective measures for reducing project cost. • Budgeting, BOQ preparation, Project planning and implementation for FTTX B2B customers. • GPON (OLT, ONT, ODF, CPE), FOC/SDH, P2P, P2MP, VSAT design for network considering increasing capacity & customer demands. • FTTX, Long-Haul and B2B solutions Plan, Design and Budgeting. • Preparation of BOM for GPON and Optical Fiber Networks. • Prepare & Evaluate Networks Design Parameters and Network Budgeting. • FTTH, FTTB and FTTC Networks Planning & Design. • Network Products Evaluation, Selection and Type Approvals. • Sub-Contractor Management. • Arc GIS/Intergraph based OFC database administration.
  • 3.
    • Techno-Commercial evaluationand selection of suppliers for B2B customer's connectivity. • FTTX /OSP network as-built verification and issuance of work completion certificate. • Reviewing GPON network weekly and monthly Dashboards/ KPI’s and reporting. • Based on periodic performance report and trend, participate in the optimization initiative. • Overseeing the rolling out activities of all projects under domain of OSP and GPON/FTTX networks. • Designing, Driving the implementation of GPON Network Expansion and OBC ODN clusters connectivity to serve Ooredoo's FTTH HBB users according to Annual Operation plan (AoP). • Coordination with Project roll out teams to complete the project deliverables and handover to SA/NOC. • Researching and identifying new cost-effective and optimal technologies that can be used for designing existing and new business customer services. • Participating in technical RFP preparation, technical clarifications and vendor discussions and meetings. • Developing new and improvement in existing procedures. • TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation, ES, SES, and Synchronization issues. • Tx Planning for rollout and ISP customers. • Public/ Private Wifi planning for business customer/buildings. • Monitoring and resolving End to End O&M issues. • Perform detailed IP planning to in order to produce network plans for 2G and 3G mobile infrastructure solutions • Customized IP Network Connectivity design for Mobile Networks • Provide network designs and data fill, in line with project and tender deliverables. • Hands-on experience with SDH & PDH Planning. MarocTelcom & Huawei. Ltd., Morocco Mai 2011- Sept.2016 Employer: Huawei Role: MSAN, OFC,IBS 3G Transmission Planning, Network Design & Optimization Roles and Responsibilities: • Member of the HUAWEI Central Transmission Planning team. • E2E transmission solution design for new network and optimization of existing network • E2E TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation, ES, SES, and Synchronization issues. • Tx Planning for rollout and ISP customers. • Monitoring and resolving End to End O&M issues. • BOQ and project plan preparation. • Perform detailed IP planning to in order to produce network plans for 3G and 4G mobile infrastructure solutions • Mux, Metrohub, DCN, AoIP planning. • Capacity planning for E1, Edge, TRX, OSC and EDAP. • Datafill for NodeB, eNodeB, RNC, McRNC • Customized IP Network Connectivity design for Mobile Networks • Provide network designs and data fill, in line with project and tender deliverables. • Providing ring protection for 5 +1 dependency sites • Hands-on experience with SDH & PDH Planning. • E1 Planning – With reference to the number of TRX used and keeping in view, the future expansion plans. • Deployment of the project OFC Transport cable inter rural direct burred and in HDPE 800KM • Swap of the switches PSTN: EWSD, AXE, OCB, DMS, DSLAM (IP, ATM) access networks to MSAN 983 sites outdoor and indoor • Providing migrations corresponding subscribers lines broadband and narrowband Project: Maroc Telecom, June.2006- July2011 Employer: ZTE Role: Manager / Solution Architect and deployment - B2B, Transmission, CDMA: Network Design & Optimization Vendor: ZTE Roles and Responsibilities:
  • 4.
    • Planning BOQfor Transmission and BSS CDMA • Planning budget for financial year with respect to expansion and rollout. • Planning and getting bandwidth for ISP and International carriers. • TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation, ES, SES, and Synchronization issues. • Perform detailed IP planning to in order to produce network plans for CDMA mobile infrastructure solutions • OFC backbone planning for complete Morocco IAM and major cities. Working as a Project Manager for Optical Fiber connectivity to the Central IAM & North – Eastern provinces of Morocco IAM by interconnection to the Existing Backbone OFC Ring of Morocco IAM • Planning and Design CDMA Network New Cities • Checking OFC pop requirements. • Customized IP Network Connectivity design for Mobile CDMA Networks • Link Budgeting for Microwave Links with proper Threshold Degradation & Availability. • Microwave frequency planning & Interference analysis with no HIGH – Low violation. • Managing LOS Team and validate all the LOS on Topo maps with map reading. • Getting POI from local IAM operators. • Analyzing RFPs and submitting technical proposals. • E2E Project planning and implementation for CDMA in existing 3G sites, IAM customers. • Analysis all B2B CDMA-EVDO subscribers IAM customers demand from sales/presales on Salesforce. • Solution design for B2B customers. • E2E enterprise Solution design for Broadband, Leaseline, VoIP, IPVPN / Wifi services, IPTV, PRI / BRI, DSL, VSAT, IPLC, DLC, Private APN • Managing design of E2E, B2B / Enterprise solutions including cloud PABX, Unified Communications, Video Conferencing, Private APN, Wireless Gateway, DNS services, SIP trunk, PDSN , IP Microwave, P2P, P2MP • Contribute to Preparing the Cost Budget and worked under the Cost • Conduct Initial project survey. Study in detail all designs and drawing. • Preparations of Tenders based on Tender documents & drawing. • Preparation of details in response to customer queries. • Attending Pre-&-Post bid meetings with customers. Preparation of specifications and BOQ. • Receive, analyze and evaluate quotations suiting requirements. • Work out competitive offers. Suggest cost effective measures for reducing project cost. • Budgeting, BOQ preparation, Project planning and implementation for CDMA B2B customers. Meditelcom/Orange Feb.2000-May2006 Employer:Siemens Role: Team Lead - Transmission Planning, Network Design & Optimization Roles and Responsibilities: • Member of the Siemens Central in north of Morocco Transmission Planning team and deployment. • TX Optimization of the existing network for Threshold Degradation, Availability, High-Low Violation, ES, SES, and Synchronization issues. • Backhaul planning for 2G Meditelecom . • Perform detailed IP planning to in order to produce network plans for 2G mobile infrastructure solutions • Customized IP Network Connectivity design for Mobile Networks • Provide network designs and data fill, in line with project and tender deliverables. • Transmission Network Design – Being in central team, providing support to all the projects throughout in north Of Morocco like Kenetra ,larach Assila Tanger, Tetoune martile chaoune ouzzane ,lakssar 2G Siemens Equipments • Transmission Planning SRAL and Sagem for Siemens network 2G. • Planning Highway Protection plan for Hub sites LOOP MW – Providing redundancy path for all major towns and hub sites LOOPS both on Microwave and Fiber. Project: Access Network fix lines Planning and distribution SR May 1998- Feb.2000
  • 5.
    Employer: Sigma COMaroc . Vendor: Alcatel Role: Project Manager, Network Design & Planning • Responsible for delivery of telecom projects in access network fix lines copper cabling And wiring SR . • Project delivery management by Zone including Civil work infrastructures • Tracked vendor hardware and software implementations PSTN. • Coordinated with circuit provisioning personnel in Central. • Coordination with engineering and operations. • Scheduled, tracked and reported on all project movement. • Maintained strong customer/vendor relationship. • Provided on-site post manhole , handhold and their junction connections to stakeholders on complex escalations / problems. Tools: MS Suite including MS Project and Visio, remote network manipulation and testing tools Keywords: Service delivery, redundancy, shadow circuits. Educational Background: -Master in microelectronics physics and sciences of computer in University Med V Rabat –Morocco -Engineering diplomas QC in high school of telecommunication INPT in Rabat 1998 -Certificate of qualification in project management Enterprise high school EMI 2000 Personnel Details: Name: Taha Ali Date of Birth: Mar 26, 1970 Nationality: Moroccan