Ahmed Effat Mohammed Taher is applying for a senior electrical engineer position. He has a bachelor's degree in electronics and communication engineering and is a member of the Egyptian Syndicates of Engineers. His work experience includes electrical construction and site engineering for various projects such as data centers, factories, and administration buildings. His responsibilities included preparing electrical drawings and specifications, quality control, and ensuring safety compliance.
Chief maintenance engineering/Supervision & implementation on an Executive ME...Qahtan Adnan
* Regarding to my MEP works of Implementation, Finishing, Pre-opening and Operating Maintenance for a:-
1- 36 floor, +five star hotel, 256 rooms & full facilities.
2- 24,000 Square Meter Five star hotel, 135 rooms & facilities.
3- 20,000 Square Meter Villa’s with full facilities.
4- Six floors, 165 rooms/ Accommodation building.
5- Fifth floor building / Plant room for a hospital FMC.
6- Flat 500 (square Meter) /with full luxury facilities.
My briefly duties were:-
• Managing designs, researches, and analysis on a project by project and advice for the best to be implemented and maintain for future time.
• Prepare all drawings on site according to specifications.
• Proposal all the suggestion to make the project plan in easiest way to implemented.
• Study and planning to estimated costs for the projects.
• Managing project schedules and budgets, and following obtain permits for operations.
• Following up engineering calculations connection with field and office assignments.
• Investigate & follow up all problems and recommend the best solutions to be applied.
• Prepared and reviewed engineering plans, specifications required, project schedules time, designs, circuit diagrams, and estimates for construction and maintenance of projects Gradually with the sequence of the project.
• Daily provided technical support for system operations and maintenance.
• Maintained connection effective working relationships with field crews, contractors, vendors, outside agencies, the staff members.
• Prepare requests of proposals and evaluate tenders.
• Ensure that safety requirements and standards procedures are implemented.
• Following up all payment with venders.
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
• Providing OSP technical knowledge and presentations, gathering customer requirements and translating them into a comprehensive solution. Works closely with sales managers, build customer relationship and prospects as a subject-matter expert to demonstrate how a proposed solution meets and exceeds customer requirements
• Design and Supervision of low voltage Distribution Networks and Telephone System (External and Internal Networks)
• Good Experience in electrical cables Installations L.V (Infrastructure).
Chief maintenance engineering/Supervision & implementation on an Executive ME...Qahtan Adnan
* Regarding to my MEP works of Implementation, Finishing, Pre-opening and Operating Maintenance for a:-
1- 36 floor, +five star hotel, 256 rooms & full facilities.
2- 24,000 Square Meter Five star hotel, 135 rooms & facilities.
3- 20,000 Square Meter Villa’s with full facilities.
4- Six floors, 165 rooms/ Accommodation building.
5- Fifth floor building / Plant room for a hospital FMC.
6- Flat 500 (square Meter) /with full luxury facilities.
My briefly duties were:-
• Managing designs, researches, and analysis on a project by project and advice for the best to be implemented and maintain for future time.
• Prepare all drawings on site according to specifications.
• Proposal all the suggestion to make the project plan in easiest way to implemented.
• Study and planning to estimated costs for the projects.
• Managing project schedules and budgets, and following obtain permits for operations.
• Following up engineering calculations connection with field and office assignments.
• Investigate & follow up all problems and recommend the best solutions to be applied.
• Prepared and reviewed engineering plans, specifications required, project schedules time, designs, circuit diagrams, and estimates for construction and maintenance of projects Gradually with the sequence of the project.
• Daily provided technical support for system operations and maintenance.
• Maintained connection effective working relationships with field crews, contractors, vendors, outside agencies, the staff members.
• Prepare requests of proposals and evaluate tenders.
• Ensure that safety requirements and standards procedures are implemented.
• Following up all payment with venders.
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
• Providing OSP technical knowledge and presentations, gathering customer requirements and translating them into a comprehensive solution. Works closely with sales managers, build customer relationship and prospects as a subject-matter expert to demonstrate how a proposed solution meets and exceeds customer requirements
• Design and Supervision of low voltage Distribution Networks and Telephone System (External and Internal Networks)
• Good Experience in electrical cables Installations L.V (Infrastructure).
I'm an Electrical engineer graduated from Egypt (Zagazig University 2014) but I've more than 8 years of experience in my career.
Recently I work for Hassan Allam Technology in super fast track project (New Congress Center Jolie Ville, Sharm El-Sheikh).
I work as Electrical Site and Technical office Engineer and actually as coordination planner, QA\QC, QS
I'm an Electrical engineer graduated from Egypt (Zagazig University 2014) but I've more than 8 years of experience in my career.
Recently I work for Hassan Allam Technology in super fast track project (New Congress Center Jolie Ville, Sharm El-Sheikh).
I work as Electrical Site and Technical office Engineer and actually as coordination planner, QA\QC, QS
Angin Siklon Dan Anti Siklon
SIKLON merupakan angin yang masuk ke daerah pusat tekanan rendah yang dikelilingi oleh wilayah wilayah pusat tekanan tinggi kemudian berputar mengelilingi garis garis isobar
AntiSiklon merupakan angin yang bergerak keluar dari daerah pusat tekanan tinggi berputar mengelilingi garis isobar menuju daerah daerah tekanan rendah di sekitarnya
9+ Years of Experience as 7+ years in Electrical Design and Site Engineer for MEP projects as well as 2 years worked as an Assistant Electrical Engineer in 220KV substation.
• I have about four (4) years of experience in Electrical engineering field practice particularly in Electrical Design and Site Engineer for MEP projects of electrical system and contractor technical office.
• Capable of performing full distribution system design including Low & Medium Tension Networks, Emergency and Critical Load calculations studies, A/C loads, Plumbing & Fire Fighting loads, Switch Gear, Transformers, Emergency generator and U.P.S, Sub_ stations, Power fixtures, Sizing and routes of cables/conduits/cable trays and ladders, Short circuit, Voltage drop, Grounding & Lightning protection systems, Indoor-Outdoor Lighting fixtures, Landscape and Façade lighting.
An Electrical and Instrumentation Engineer with knowledge of developing, maintaining electrical systems and controlling
industrial equipment and instruments focusing on economy, safety, reliability, quality and sustainability. I would like to apply
my knowledge and ideas in the research field of Electrical and Instrumentation Engineering and work with dedication and
punctuality to bring out the best.
1. AHMED EFFAT MOHAMMED TAHER
Eng. Ahmed Effat Mohamed Taher Page 1
1. Proposed position: senior electrical Engineer
2. Name of Firm: SIAC
3. Name of Staff: Eng. Ahmed Effat Mohamed Taher
4. Date of Birth:28/11/1983 Nationality: Egyptian
5. Education: General Secondary (Mathematics Division) 1999 B.Sc. Bachelor of Electronics and
Communication Engineering, Obour High Institute for Engineering and technology.
6. Membership of Professional Associations:
Egyptian Syndicates of Engineers, Member
7. Other Training: CCNA Course.
YAT Professional diploma in secretary (June 2002)This diploma includes MS-office suite, tipping
skills
French Communication network course for mobile hardware and software. (Mar 2006).
8. Countries of Work Experience: Egypt
9. Languages:
Languages Speaking Reading Writing
Arabic Mother tongue
English Good Good Good
10. Employment Record:
From: 2-2014 To: Present
Employer: HAC – IIC Egyptian steel factory, Beni-suef, Egypt
Positions held: Electrical site and technical office construction engineer
From: 4-2009 To: 2-2014
Employer: HAC – Smart Village Projects (B.7,Main data center, B2401, EFSA)
Positions held: Electrical construction engineer
2. AHMED EFFAT MOHAMMED TAHER
Eng. Ahmed Effat Mohamed Taher Page 2
From: 7-2007 To: 3-2008
Employer: el-nekhely (Electronics and Scientific Computer Equipment)
Positions held: Technical Support Engineer
11. Detailed Tasks
Assigned
Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
Name of project: IIC- Egyptian steel factory
Year: From: 2-2014 To: Present
2014
To: Present
Location: Beni-suef
Client: IIC- (Industrial investmentco.
Main project features New Mini Mill for steel Rebar
Consultant DANIELI
Positions held: Senior Site & Technical Office Engineer
Activities performed:
1- Construction of main buildings (WG11, XB11, GA01, GD11, GE11,
GB11, GC11).
2- Prepare electrical drawings and specifications.
3- Performed quality assurance and control.
4- Power Sockets, power socket panel and lighting networks of the
building.
5- Cabletray, cablepulling,and interconnection for panel and instrumentation
6- Install all electrical panel insidecabin and on field.
Groundingsystem.
Prepare electrical drawings and specifications.
Prepared and reviewed engineering plans, specifications,
project schedules, designs, circuit diagrams, and estimates for
construction and maintenance of power generation projects.
Make engineering calculations in connection with field and office
assignments.
Investigate problems and recommend solutions.
Performed quality assurance and control.
Ensure compliance with safety requirements and standards
procedures.
3. AHMED EFFAT MOHAMMED TAHER
Eng. Ahmed Effat Mohamed Taher Page 3
Maintained effective working relationships with field crews,
contractors, vendors, outside agencies, the public and city staff
members.
Provided advice regarding code compliance.
Performed highly specialized design, research, and analysis on
a project-by-project basis.
Exercised cost control, monitored schedules, and investigated
problems.
Name of project: Telecom Egypt Building B7
Year:
Location: Smart Village
Client: Smart village
Main project features Telecom Egypt
Consultant ECG (Engineering Consultant Group)
Positions held Site construction engineer
Activities performed:
- Landscape electrical work.
- BMS Work.
- Fire Alarm system.
CCTV
- MCC, Cable tray, Motor connection for (AHU, FCU, EXHF).
- Access Control.
- Electrical fire fighting with (Co2, FM200 & deluge system).
- Power Sockets, Internal power distribution and lighting networks of
the building.
- Video Projector, Video Conference, Sound, Audio conference
systems.
- RMU, Medium voltage Switch gear, Transformer, Generator, ATS,
UPS, MDB, EMDB, UMDB, DB Panels.
- Electrical Connection and Control for submersible Pump, Cold water
pump and entrance fountain.
- Earthing system medium & low voltage.
Review all procedure documents such as shop drawings, and as built
drawings.
4. AHMED EFFAT MOHAMMED TAHER
Eng. Ahmed Effat Mohamed Taher Page 4
Experience in material control.
Reviewing all the specification and standards for the project.
Study and solve the problems and site design modifications during
the work.
Preparing the monthly Invoice & purchases orders.
Making complete evaluation for the tenders to determine the
material, manpower and equipment required executing the work and
pricing for each item to get the final cost of the tender.
Name of project: Telecom Egypt Main Data Center power substation
Year:
Location: Smart Village
Client: Smart Village
Main project features Power substation for B.7
Consultant ECG (Engineering Consultant Group)
Positions held Site construction engineer
Activities performed:
- Landscape electrical work.
- BMS Work.
- Fire Alarm system.
CCTV
- MCC, Cable tray, Motor connection for (AHU, FCU, EXHF).
- Access Control.
- Electrical fire fighting with (Co2, FM200 & deluge system).
- Power Sockets, Internal power distribution and lighting networks of
the building.
- Video Projector, Video Conference, Sound, Audio conference
systems.
- RMU, Medium voltage Switch gear, Transformer, Generator, ATS,
UPS, MDB, EMDB, UMDB, DB Panels.
- Electrical Connection and Control for submersible Pump, Cold water
pump and entrance fountain.
- Earthing system medium & low voltage.
Review all procedure documents such as shop drawings, and as built
drawings.
Experience in material control.
Reviewing all the specification and standards for the project.
5. AHMED EFFAT MOHAMMED TAHER
Eng. Ahmed Effat Mohamed Taher Page 5
Study and solve the problems and site design modifications during
the work.
Preparing the monthly Invoice & purchases orders.
Making complete evaluation for the tenders to determine the
material, manpower and equipment required executing the work and
pricing for each item to get the final cost of the tender.
Name of project: B2401
Year:
Location: Smart Village
Client: Smart Village
Main project features
Administration building
Consultant ECG (Engineering Consultant Group)
Positions held: Site construction engineer
Activities performed:
- Landscape electrical work.
- BMS Work.
- Fire Alarm system.
CCTV
- MCC, Cable tray, Motor connection for (AHU, FCU, EXHF).
- Access Control.
- Electrical fire fighting with (Co2, FM200 & deluge system).
- Power Sockets, Internal power distribution and lighting networks of
the building.
- Video Projector, Video Conference, Sound, Audio conference
systems.
- RMU, Medium voltage Switch gear, Transformer, Generator, ATS,
UPS, MDB, EMDB, UMDB, DB Panels.
- Electrical Connection and Control for submersible Pump, Cold water
pump and entrance fountain.
- Earthing system medium & low voltage.
Review all procedure documents such as shop drawings, and as built
drawings.
Experience in material control.
Reviewing all the specification and standards for the project.
Study and solve the problems and site design modifications during
the work.
6. AHMED EFFAT MOHAMMED TAHER
Eng. Ahmed Effat Mohamed Taher Page 6
Preparing the monthly Invoice & purchases orders.
Making complete evaluation for the tenders to determine the
material, manpower and equipment required executing the work and
pricing for each item to get the final cost of the tender.
Name of project: EFSA ( Egyptian Financial Supervisory Authority) B 136 & B.137
Year:
Location: Smart Village
Client: Smart Village
Main project features Egyptian Financial Supervisory Authority
Consultant ECG (Engineering Consultant Group)
Positions held: Site & Technical Office Engineer
Activities performed:
- Landscape electrical work.
- BMS Work.
- Fire Alarm system.
CCTV
- MCC, Cable tray, Motor connection for (AHU, FCU, EXHF).
- Access Control.
- Electrical fire fighting with (Co2, FM200 & deluge system).
- Power Sockets, Internal power distribution and lighting networks of
the building.
- Video Projector, Video Conference, Sound, Audio conference
systems.
- RMU, Medium voltage Switch gear, Transformer, Generator, ATS,
UPS, MDB, EMDB, UMDB, DB Panels.
- Electrical Connection and Control for submersible Pump, Cold water
pump and entrance fountain.
- Earthing system medium & low voltage.
Review all procedure documents such as shop drawings, and as built
drawings.
Experience in material control.
Reviewing all the specification and standards for the project.
Study and solve the problems and site design modifications during
the work.
Preparing the monthly Invoice & purchases orders.
7. AHMED EFFAT MOHAMMED TAHER
Eng. Ahmed Effat Mohamed Taher Page 7
12. Certification:
Making complete evaluation for the tenders to determine the
material, manpower and equipments required executing the work
and pricing for each item to get the final cost of the tender.