2. FES INTERNATIONAL BACKGROUND
Since its birth in 2011, formed by some experienced and adolescent engineers
from Bangladesh University of Engineering and Technology (BUET), the adage of
FAHIM ENGINEERING SOLUTION is to accommodate one stop band-aid to the
client. Thats why the basin of experts includes humans from altered abandon and
sectors which accommodate it is the adequacy to complete multidisciplinary
tasks. As the name FAHIM ENGINEERING SOLUTIONS means derives ideas, style,
or aftertaste from a ample and assorted ambit of sources. We ace the appropriate
ideas, methods and plan for the applicant and abutment with our expertise. The
basin of experts includes professionals from the acreage of management,
engineering, amusing and ambiance studies. We accept acquired ability in activity
management, activity monitoring, study, research, analysis in altered field.
On the added duke Fahim Engineering Band-aid has been formed beneath the
administration of Mohammad Azhar Ali who has a continued career in the RMG
area in industrial Design, installation Master Plan, Layout, machineries selection,
Electro-Mechanical Design aliment specialization. He has served abounding
companies as agent and aswell as consultant; above audience are Bitopi-Misami
Group, Integrated Textile Ltd., Bangladesh Navy, Metro Knitting and Dyeing
3. Industries, IDS Group, Square Knit Fabrics Ltd., Sparkle Knit Composite Ltd.,
Esquire Knit Composite Ltd. etc. FES has all-inclusive ability in Electro-Mechanical
Architecture of RMGs. This accumulated access will advance to a different
consultancy band-aid to the applicant both in architecture aesthetics and able use
of resources.
4. COMPANY HIERARCHY
CEOCEO
DESIGNDESIGN SALES & SERVICE
SERVICE
SALES & SERVICE
SERVICE
HR& ACCOUNTSHR& ACCOUNTS
DESIGN HEADDESIGN HEAD
EXECUTIVEEXECUTIVE
DRAFTS MANDRAFTS MAN
GMGM
SALES EXECUTIVESALES EXECUTIVE
SERVICE
EXECUTIVE
SERVICE
EXECUTIVE
HR & ACC HEADHR & ACC HEAD
ACCOUNTSACCOUNTS
OFFICE ASSISTANTOFFICE ASSISTANT
5. PROJECT STRENGTH OF FAHIM ENGINEERING SOLUTIONS
SERIAL
NO
CLIENTS NAME YEAR OF
SERVICE
TYPES OF SERVICE RENDERED
1. BITOPI-MISAMI GROUP
Contact Details-
Col Hasan
Executive Director
Mob- 01713095748
2011-2013
Design of all utility (water
supply, air line system, boiler
system) works
Supervision of utility line setup
Selection of machineries
WTP, ETP design and
installation.
Water recycle plant design.
2.
INTEGRATED TEXTILE LTD
Contact Details-
Md. Moniruzzaman
Managing Director
Mob-01755568404
2011
Factory design
Machine layout preparation
Design of utility (water supply,
air line system, boiler system)
works
ETP design.
3. BANGLADESH NAVY 2011-2012
Design of Iron removal plant
Supervision of plant installation.
4.
METRO KNITTING &
DYEING
Contact Details-
Mr Taraq
GM Engineering
Mob-01713041526
Running
Design of 40 ton dyeing
capacity plant
All utility system design
Supervision of works
5. IDS GROUP Completed
Energy audit of whole
electromechanical system.
6. BROTHER FURNITURE
FACTORY
Completed
Electrical & Plumbing design
&drawing
Estimating electrical and
plumbing
500kva substation design and
supervision
Supervision of labor shed and
all lighting works
PROJECT STRENGTH OF FAHIM ENGINEERING SOLUTIONS
6. Note- Act as External Consultant of CP project of WORLD Bank Project.
SERIAL
NO
CLIENTS NAME YEAR OF
SERVICE
TYPES OF SERVICE RENDERED
7 SPARKLE KNIT COMPOSITE
LTD.
Contact details- Mr Azizul Islam
Head Of Finance
Mob-01713388102
2011-2012 Master plan Making.
Utility Design.
Machineries selection.
Etp, Wtp design.
Installation of whole project.
8 SQUARE KNIT FABRICS
LTD
Completed Machine layout making.
Energy savings utility Design
Energy efficient boiler selection.
Energy efficient machineries
selection.
Salt recovery plant design.
Cost effective ETP Design.
Effient thermal design.
Lighting and ventilation design.
Humidification plant design
9 MASCO GROUP Completed Energy efficiency Audit and
solution.
ETP Plant making.
WTP Installation.
10 Leeu Fashion Ltd. Completed Complete Factory design
ETP Plant making.
Lighting and ventilation design.
Machine layout making.
7. Design SMFL of Square Group
FIGURE: ETP PLANT OF SQUARE FASION LTD
POJECT RESPONSIBILITIES:
1. ETP RENNOVATION DESIGN
2. SALT RECOVERY PLANT ANALYSIS
3. WHOLE UTILITY DESIGN
4. ESTIMATING AND BOQ
5. SUPERVISION OF THE PROJECT
8. FIGURE: UNDER CONTRUCTION OF DB, MDB OF BROTHER FURNITURE FACTORY
SHED 1
POJECT RESPONSIBILITIES:
6. ELECTRICAL DESIGN & DRAWING
7. PLUMBING DESIGN & DRAWING
8. ESTIMATING ELECTRICAL AND PLUMBING
BRIEF DESCRIPTION OF THE PROJECT
LOCATION HORINDHORA, TANNERY
HEMAYETPUR, SAVAR ,DHAKA
COUNTRY BANGLADESH
CLIENT BROTHERS FURNITURE LTD YEAR 2012-2013
CLIENT
ADDRESS
HORINDHORA, TANNERY HEMAYETPUR, SAVAR ,DHAKA
STATUS 80 %
COMPLETE
PROJECT
TYPE
INDUSTRIAL ELECTRICAL & PLUMBING
DESIGN
PROJECT
COST
15 CRORE VALUE OF
SERVICE
4 LAC
ELECTRIFICATION DESIGN AND SUPERVISION OF BROTHERS
FURNITURE
9. 9. 500KVA SUBSTATION DESIGN AND SUPERVISION
10. SUPERVISION OF LABOR SHED AND ALL LIGHTING WORKS
Design SPARKLE KNIT COMPOSITE LTD
FIGURE: FACTORY PREMISES OF SPARKLE KNIT COMPOSITE LTD.
POJECT RESPONSIBILITIES:
1. FACTORY MASTER PLAN MAKING, MACHINERIES SELECTION, PROCESS
LAYOUT DESIGN AND INSTALLATION .
2. ETP,WTP DESIGN AND INSTALLATION.
3. WHOLE UTILITY DESIGN AND INSTALLATION.
BRIEF DESCRIPTION OF THE PROJECT
LOCATION JIRANI BAZAR, SAVAR COUNTRY BANGLADESH
CLIENT SPARKLE KNIT COMPOSITE LTD. YEAR 2010-2012
CLIENT
ADDRESS
JIRANI BAZAR, SAVAR
STATUS COMPLETED PROJECT
TYPE
INDUSTRIAL DESIGN, ETP , WATER
RECYCLE, UTILITY,ELECTRICAL.
PROJECT
COST
80 CRORE
11. FIGURE: ELECTRICAL NETWORK OF SAVAR DOHS
POJECT RESPONSIBILITIES:
1. ELECTRICAL DESIGN & DRAWING
2. ESTIMATING ELECTRICAL AND PLUMBING
3. STREET LIGHTING DESIGN
4. SOLAR PANEL DESIGN
BRIEF DESCRIPTION OF THE PROJECT
LOCATION SAVAR,NOBINOGOR COUNTRY BANGLADESH
CLIENT BANGLADESH ARMY YEAR 2013
CLIENT
ADDRESS
BANGLADESH ARMY ,SAVAR CANTONMENT
STATUS RUNNUNG PROJECT
TYPE
UTILITY DESIGN
PROJECT
COST
35 CRORE
ELECTRIC AND PLUMBING DESIGN OF SAVAR DOHS
12. FIGURE: BANGLADESH NAVY CHIEF VISITED IRON REMOVAL PLANT
POJECT RESPONSIBILITIES:
1. WHOLE PLANT FILTRATION SYSTEM
2. PLUMBING AND ELECTRIFICATION DESIGN
3. BOQ AND ESTIMATING OF PLUMBING , FILTRATION VASSEL AND ELECTRICAL WORKS
4. IRON REMOVAL ON CHEMICAL PROCESS
5. SUPERVIOSION OF THE PROJECT
BRIEF DESCRIPTION OF THE PROJECT
LOCATION NABIK COLONY COUNTRY BANGLADESH
CLIENT BANGLADESH NAVY YEAR 2011-2012
CLIENT
ADDRESS
GE NAVY , ISSA KHA, CTITTAGONG , BANGLADESH
STATUS COMPLETED PROJECT
TYPE
PLANT DESIGN
PROJECT
COST
1.41 CRORE VALUE
OF
SERVICE
3 LAC
IRON REMOVAL PLANT DESIGN ( BANGLADESH NEAVY)
13. BMA ( MILITARY ACADEMY)
BRIEF DESCRIPTION OF THE PROJECT
LOCATION VATIARY COUNTRY BANGLADESH
CLIENT BANGLADESH ARMY YEAR 2011-2012
CLIENT
ADDRESS
MILITARY ACADEMY, CTITTAGONG , BANGLADESH
STATUS ONGOING PROJECT
TYPE
LIGHTING DESIGN
PROJECT
COST
VALUE
OF
SERVICE
14. PRODUCTS AND SERVICES
1. TUPESA WASHING PLANT MACHINERIES – SPAIN
2. Belly Wash – Taizhou. China
3. Warehouse rack , fork lift ,Scissor Lift – Sino Lift
Warehouse fork lift, Ireland Scissor lift, China
15. Ware House Rack, China
4. Industrial Lighting with 50-80% Energy savings – Spark LED
5. Industrial and Commercial Design and Installation
6. Energy Efficiency Audit and Improvement
7. WTP, ETP, Sewerage Treatment plant , Water Recycle System , Salt Recovery Plant ,
Ventilation , Lighting design.