Governing systemGoverning system
System preparationSystem preparation
Parameters to followParameters to follow
GOVENING SYSTEM BLOCK DIAGRAM
PUMP
MAIN SOLENOID
VALVE
DUPLEX FILTER
OST TESTER
TRIPPING
DEVICE
ESV
STARTING
DEVICE
I / H CONVERTOR
SERVOMOTOR
GOV.
VALVE
OS GOVERNOR
CLEANING OF THE SYSTEM
Oil flushing:
- servomotor pilot pistons to be removed.
-cleaning of oil lines in the console.
- ESV cleaning and assembly.
Governor stroke check up:
preconditions
steam system should be completely isolated.
No vacuum
by pass trips coming from PLC/ DCS
check the the control valve movements vis a vis actuator signals.
Parameters
• Governing oil pressure : 8-10 atg
• Trip oil pressure : 7 -9atg
• Sec Oil Pr. : 1.5atg-4.5 atg
• signal : 4MA-20MA
• Valve Lift : 0 mm-full scale
• Governing oil temp : 50-60 deg c
• Max & Min Extr signal thro’ Governor & compare with diagram
Start up diagram
• Typical example
critical speed
zone
Time in minutes
Speed
in
rpm
Idle speed
Idle speed
COMMON GOVERNING PROBLEMS
- Hunting.
-Chattering.
-sudden rise /fall in the speed/ load.
-spurious tripping due to trip oil pr very low.
CHATTERING:
- Oil temperature, de aeration
- Oil pressure fluctuation
Hunting of control valves
1. Sec oil pressure VS valve lift calibration.
2. Oil purity
3. Sluggishness of the moving parts.
4. Frequent changes in steam inlet parameters.
5. Damage of control valve cones.
6. Tuning of electronic signals in case of electronic
Governor.
7.Programming of controllers as per start up curve /
extraction map / site conditions.
8. Problems of EHTC ( converters ).
9. Damage of Electronic components.
Hunting of control valves
Trip oil pressure very low trips
1.Mechanical problems with tripping device.
2.Tripping device lever radial and axial clearances not proper.
3.Turbine axial displacement very high (failure of T B).
4. Control oil pressure very low.
5. Heavy leakage through ESV drains due improper seating
of disk and cylinder.
6. Governing console duplex filter choking.
7.Choking of trip oil line.
8. Lube oil pump discharge pressure fluctuation.
9. Malfunctioning of trip oil pressure low- low switch.
10. Overspeed of turbine by pin actuation
SUDDEN RISE/ FALL IN SPEED/ LOAD
- control valves’ problems.
-servomotor pilot piston non rotation.
Control Valve Actuator
P
c
T
PILOT PISTON ASSEMBLY
Pilot piston top
Spurious tripping :
sudden drop in the trip oil pressure
malfunctioning of pressure switches
blocking of oil lines viz. Sec oil , power oil lines.
Lay out of the governing piping- should allow smooth
flow, should
posses less bends.
Loose connections, particularly at trip solenoid valves.
DO’S & DON’TS OF TURBINE
OPERATION (BEFORE START UP)
Do:
1. Check up the start of opening and full lift of the
servomotor.
2. WWG- ensure I/H converter manual knob is in min.
position.
3.Ensure the extraction valves are fully closed
before rolling.
4. . Check the operation of over-speed governor once
in 3 months.
DO’S & DON’TS OF TURBINE
DON’T….
1. Try to tune the servomotor while m/c in
operation.
2. Operate the m/c with the governor hunting.
3. Meddle with the manual knob of I/H converter
when m/c is in operation.
4. Raise the speed fast when MOP/ Governor
are taking over.
EMERGENCY STOP VALVE
OVERSPEED TRIP PIN ASSLY
CHANGEOVER VALVE FOR QCNRV
TRIP SOLENOID VALVE
Case study #1
FEED BACK ON CONTROL
VALVE SERVOMOTOR ASSLY
OBSERVATION:
• Speed raise immediately after opening
of Emergency Stop Valve
ANALYSIS
• Improper assembly of servomotor with
control valve lever
• Result in lift of valve cone
Preventive Action : Assly sequence to be followed
1. Fix the dampers (horizontal & vertical)
2. Fix the assembly fixture (Clamping
Device)
3. De-link Lever jointing Head & Control
valve lever.
4. Gently push the lever towards the Control
valve
5. Fix a dial gauge on the lever bracket and
the dial pointer on the pin towards the
control valve center.
Preventive Action : Assly sequence to be followed
6. Bring the power cylinder piston rod to the
top extreme position and hold it there.
7. With the help of the fixture, lift the control
valve lever by 1.5 and < 2 mm and hold
the position there.
8. Link the power cylinder piston and the
control valve lever head and lock the nut
of the lever jointing head.
Preventive Action : Assly sequence to be followed
HP GOVERNING VALVE ASSLY
Case study # 2
20 MW STG
PROBLEM:
EMERGENCY STOP VALVE NOT OPENING
DURING THE LOAD RUN TRIAL THOUGH IT WAS
NOT HAVING OPENING PROBLEM DURING NO
LOAD TRIAL.
ESV ASSEMBLY DRAWING
ESV REMOVED FROM THE POSITION WITH THE STRAINER
Scratch mark
Broken tack welding
DETACHED DISPENSER
RESOLUTION
1. Scratch mark removed by lapping.
2. The Piston was made free moving.
3. Dispenser tack weld in thee places in position
and fixed firmly.
4. ESV assembled and mounted back in position.
5. Opening of the ESV done from the remote (Control
Room)
and found satisfactory.
6. Load run trial of 20 MW STG completed successfully.
Problem:
Load hunting at various loads, but
not always. All of a sudden hunting
occurs at full load or even at partial
loads
Reasons:
pilot valve compression spring is
having lot of bent. (Refer Figure)
Action taken:
New compression spring supplied,
case study # 3
Sitapuram Power
PILOT VALVE ASSEMBLY
COMPRESSION SPRING LOCATION
STEAM TURBINES Governing System & TROUBLE SHOOTING

More Related Content

What's hot

Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
Salil Vaidya
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
SURAJ KUMAR
 

What's hot (20)

Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
Handling of turbine side emergencies
Handling of turbine side emergenciesHandling of turbine side emergencies
Handling of turbine side emergencies
 
Turbine governing system an overview
Turbine governing system an overviewTurbine governing system an overview
Turbine governing system an overview
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
Steam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance pptSteam turbine introduction & maintenance ppt
Steam turbine introduction & maintenance ppt
 
STEAM TURBINE BASIC
STEAM TURBINE BASIC STEAM TURBINE BASIC
STEAM TURBINE BASIC
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection system
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
TURBINE FUNDAMENTAL
TURBINE FUNDAMENTALTURBINE FUNDAMENTAL
TURBINE FUNDAMENTAL
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
Condensate system
Condensate systemCondensate system
Condensate system
 

Similar to STEAM TURBINES Governing System & TROUBLE SHOOTING

Similar to STEAM TURBINES Governing System & TROUBLE SHOOTING (8)

1997 chevrolet lumina service repair manual
1997 chevrolet lumina service repair manual1997 chevrolet lumina service repair manual
1997 chevrolet lumina service repair manual
 
1996 chevrolet lumina service repair manual
1996 chevrolet lumina service repair manual1996 chevrolet lumina service repair manual
1996 chevrolet lumina service repair manual
 
1995 chevrolet lumina service repair manual
1995 chevrolet lumina service repair manual1995 chevrolet lumina service repair manual
1995 chevrolet lumina service repair manual
 
2000 01 power steering
2000 01 power steering2000 01 power steering
2000 01 power steering
 
Hyundai hsl650 7 skid steer loader service repair manual
Hyundai hsl650 7 skid steer loader service repair manualHyundai hsl650 7 skid steer loader service repair manual
Hyundai hsl650 7 skid steer loader service repair manual
 
Hyundai hsl650 7 skid steer loader service repair manual
Hyundai hsl650 7 skid steer loader service repair manualHyundai hsl650 7 skid steer loader service repair manual
Hyundai hsl650 7 skid steer loader service repair manual
 
bobcat t320
bobcat t320bobcat t320
bobcat t320
 
Halderman ch027 lecture
Halderman ch027 lectureHalderman ch027 lecture
Halderman ch027 lecture
 

More from Ashish Kumar Jain

More from Ashish Kumar Jain (20)

Proximate & ultimate analysis of coal
Proximate & ultimate analysis of coalProximate & ultimate analysis of coal
Proximate & ultimate analysis of coal
 
Assessment of boiler performance
Assessment of boiler performanceAssessment of boiler performance
Assessment of boiler performance
 
Condensate
Condensate Condensate
Condensate
 
Belt conveyor-manufacturing & utilization
Belt conveyor-manufacturing & utilizationBelt conveyor-manufacturing & utilization
Belt conveyor-manufacturing & utilization
 
Cooling tower
Cooling towerCooling tower
Cooling tower
 
Permacare RO membrane expertise
Permacare RO membrane expertisePermacare RO membrane expertise
Permacare RO membrane expertise
 
Governing system
Governing systemGoverning system
Governing system
 
Generator capability curve
Generator capability curve Generator capability curve
Generator capability curve
 
Hydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheetHydraullically assisted pressure relief valve service sheet
Hydraullically assisted pressure relief valve service sheet
 
Bhel STEAM safety valve_1700_series
Bhel STEAM safety valve_1700_seriesBhel STEAM safety valve_1700_series
Bhel STEAM safety valve_1700_series
 
Deaerator -thermal power plants
Deaerator  -thermal power plantsDeaerator  -thermal power plants
Deaerator -thermal power plants
 
Chiller absorption machine working principle
Chiller absorption machine  working principleChiller absorption machine  working principle
Chiller absorption machine working principle
 
Belt Conveyor System
Belt Conveyor SystemBelt Conveyor System
Belt Conveyor System
 
High speed balancing of turbine rotors
High speed balancing of turbine rotorsHigh speed balancing of turbine rotors
High speed balancing of turbine rotors
 
Excel Tips in computers
Excel Tips in computersExcel Tips in computers
Excel Tips in computers
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Boiler -Emergency Handling
 Boiler -Emergency Handling Boiler -Emergency Handling
Boiler -Emergency Handling
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
 
Rankine cycle
Rankine cycleRankine cycle
Rankine cycle
 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPE
 

Recently uploaded

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 

Recently uploaded (20)

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 

STEAM TURBINES Governing System & TROUBLE SHOOTING

  • 1.
  • 2. Governing systemGoverning system System preparationSystem preparation Parameters to followParameters to follow
  • 3. GOVENING SYSTEM BLOCK DIAGRAM PUMP MAIN SOLENOID VALVE DUPLEX FILTER OST TESTER TRIPPING DEVICE ESV STARTING DEVICE I / H CONVERTOR SERVOMOTOR GOV. VALVE OS GOVERNOR
  • 4. CLEANING OF THE SYSTEM Oil flushing: - servomotor pilot pistons to be removed. -cleaning of oil lines in the console. - ESV cleaning and assembly.
  • 5. Governor stroke check up: preconditions steam system should be completely isolated. No vacuum by pass trips coming from PLC/ DCS check the the control valve movements vis a vis actuator signals.
  • 6. Parameters • Governing oil pressure : 8-10 atg • Trip oil pressure : 7 -9atg • Sec Oil Pr. : 1.5atg-4.5 atg • signal : 4MA-20MA • Valve Lift : 0 mm-full scale • Governing oil temp : 50-60 deg c • Max & Min Extr signal thro’ Governor & compare with diagram
  • 7. Start up diagram • Typical example critical speed zone Time in minutes Speed in rpm Idle speed Idle speed
  • 8. COMMON GOVERNING PROBLEMS - Hunting. -Chattering. -sudden rise /fall in the speed/ load. -spurious tripping due to trip oil pr very low.
  • 9. CHATTERING: - Oil temperature, de aeration - Oil pressure fluctuation
  • 10. Hunting of control valves 1. Sec oil pressure VS valve lift calibration. 2. Oil purity 3. Sluggishness of the moving parts. 4. Frequent changes in steam inlet parameters. 5. Damage of control valve cones.
  • 11. 6. Tuning of electronic signals in case of electronic Governor. 7.Programming of controllers as per start up curve / extraction map / site conditions. 8. Problems of EHTC ( converters ). 9. Damage of Electronic components. Hunting of control valves
  • 12. Trip oil pressure very low trips 1.Mechanical problems with tripping device. 2.Tripping device lever radial and axial clearances not proper. 3.Turbine axial displacement very high (failure of T B). 4. Control oil pressure very low. 5. Heavy leakage through ESV drains due improper seating of disk and cylinder. 6. Governing console duplex filter choking. 7.Choking of trip oil line. 8. Lube oil pump discharge pressure fluctuation. 9. Malfunctioning of trip oil pressure low- low switch. 10. Overspeed of turbine by pin actuation
  • 13. SUDDEN RISE/ FALL IN SPEED/ LOAD - control valves’ problems. -servomotor pilot piston non rotation.
  • 17. Spurious tripping : sudden drop in the trip oil pressure malfunctioning of pressure switches blocking of oil lines viz. Sec oil , power oil lines. Lay out of the governing piping- should allow smooth flow, should posses less bends. Loose connections, particularly at trip solenoid valves.
  • 18. DO’S & DON’TS OF TURBINE OPERATION (BEFORE START UP) Do: 1. Check up the start of opening and full lift of the servomotor. 2. WWG- ensure I/H converter manual knob is in min. position. 3.Ensure the extraction valves are fully closed before rolling. 4. . Check the operation of over-speed governor once in 3 months.
  • 19. DO’S & DON’TS OF TURBINE DON’T…. 1. Try to tune the servomotor while m/c in operation. 2. Operate the m/c with the governor hunting. 3. Meddle with the manual knob of I/H converter when m/c is in operation. 4. Raise the speed fast when MOP/ Governor are taking over.
  • 24. Case study #1 FEED BACK ON CONTROL VALVE SERVOMOTOR ASSLY
  • 25. OBSERVATION: • Speed raise immediately after opening of Emergency Stop Valve ANALYSIS • Improper assembly of servomotor with control valve lever • Result in lift of valve cone
  • 26. Preventive Action : Assly sequence to be followed
  • 27. 1. Fix the dampers (horizontal & vertical) 2. Fix the assembly fixture (Clamping Device) 3. De-link Lever jointing Head & Control valve lever. 4. Gently push the lever towards the Control valve 5. Fix a dial gauge on the lever bracket and the dial pointer on the pin towards the control valve center. Preventive Action : Assly sequence to be followed
  • 28. 6. Bring the power cylinder piston rod to the top extreme position and hold it there. 7. With the help of the fixture, lift the control valve lever by 1.5 and < 2 mm and hold the position there. 8. Link the power cylinder piston and the control valve lever head and lock the nut of the lever jointing head. Preventive Action : Assly sequence to be followed
  • 30. Case study # 2 20 MW STG PROBLEM: EMERGENCY STOP VALVE NOT OPENING DURING THE LOAD RUN TRIAL THOUGH IT WAS NOT HAVING OPENING PROBLEM DURING NO LOAD TRIAL.
  • 32. ESV REMOVED FROM THE POSITION WITH THE STRAINER
  • 36. RESOLUTION 1. Scratch mark removed by lapping. 2. The Piston was made free moving. 3. Dispenser tack weld in thee places in position and fixed firmly. 4. ESV assembled and mounted back in position. 5. Opening of the ESV done from the remote (Control Room) and found satisfactory. 6. Load run trial of 20 MW STG completed successfully.
  • 37. Problem: Load hunting at various loads, but not always. All of a sudden hunting occurs at full load or even at partial loads Reasons: pilot valve compression spring is having lot of bent. (Refer Figure) Action taken: New compression spring supplied, case study # 3