SlideShare a Scribd company logo
1 of 7
DEVRY ECET 105 Week 2 iLab Soldering Techniques and the
Electronic Die Kit NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/ecet-105-devry/ecet-
105-week-2-ilab-soldering-techniques-and-the-electronic-
die-kit-new
For more classes visit
http://www.assignmentcloud.com
I. OBJECTIVES
1. To learn the basics of soldering.
2. To produce mechanically and electrically sound solder joints.
3. To assemble the Electronic Die Kit.
II. PARTS LIST
Equipment:
Digital Die Kit
Tools:
1 – Soldering Iron
1 – Pair Long-Nose Pliers
1 – Diagonal cutter
1 – Solder and hookup wire
1 – Wire stripper
III. PROCEDURE
1. Preparation
2. Prepare a well-ventilated and clear workspace with ample
lighting.
3. Ensure that the workspace includes a mat to work on in
order to prevent the burning of the table or materials during
the process.
4. Use a tray, egg crate, or vegetable/fruit tray for all (but
especially the small) parts to avoid losing them. Attach the tray
with double-sided tape to your bench or desktop.
5. Have a waste basket or desktop trash receptacle handy.
6. Ensure that the sponge that accompanies the soldering iron
is sufficiently damp. The level of dampness needed is judged by
wetting the sponge and then squeezing out the excess water
until the sponge can be held in the hand with no noticeable
water dripping from it.
CAUTION:
In order to avoid injury to the eyes, goggles or other eye
protection must be worn AT ALL TIMES during the circuit
assembly and soldering process.
A soldering iron at temperature is very hot. It is a fire hazard. It
is a health hazard. Caution must be taken at all times to ensure
that contact with the skin does not occur.
6. Plug in the soldering iron and wait approximately five
minutes for the iron to heat to a proper temperature. The
temperature of the iron may be tested by lightly rubbing the tip
of the iron against the moist sponge. If a majority of water is
evaporated, then the iron is ready for use. The tip should be
kept clean and tinned for soldering. The sponge is used to wipe
away excess solder and materials. Tinning means that there is
always a thin layer of solder on the tip.
7. Procure and prepare the dice kit for soldering. Inventory the
parts and materials and ensure that each part fits the circuit
board correctly by checking the parts on the board WITHOUT
soldering them to the board. Put them in the tray until ready to
install.
8. Prepare the tools that you will need: soldering iron, rosin
core solder, desolder wick, safety glasses, long-nose pliers, and
wire cutters.
1. Assembling the Electronic Die Kit
2. Start with the seven 220 ohm resistors. Note that the color
bands are red-red-brown-gold.
2. With your long-nose pliers, bend the legs of all seven of the
resistors so that they form 90-degree angles.
3. Insert the 220 ohm resistors into R1, R2, R3, R4, R5, R6, and
R7 of your printed circuit board through the side where you see
the labels. Bend the lead on the side away from the component
part, not next to the resistor body, but on the other side of the
pliers. Otherwise, you may break the connection inside the
resistor. Ensure that all components, with the exception of the
IC socket, are not fully inserted in the board, but have small
gaps between them and the circuit board to avoid excessive
heating.
4. Prepare to solder the legs of the resistors to the bottom side
of the printed circuit board. Turn the board upside down.
Caution must be taken to ensure that the “eyelet” solder pads
on the board are not stressed with either hands or the tip of the
iron during the heating process. The eyelets are easily
dislodged and, if damaged, may result in irreparable damage to
the circuit board.
In soldering, firmly touch the tip of the iron to the pad AND the
lead you want to solder. Ensure that only one wire and one pad
(one connection) is heated at a time. When the connection has
been heated sufficiently (it should take only a few seconds),
touch the solder to the pad, opposite from the tip of the iron,
and allow a small amount of solder to flow onto the connection.
The parts should not move while you are heating them or they
will not form a good joint. Sloppy or careless heating may cause
multiple connections to be soldered together, causing damage
to the circuit board.
5. Care must be taken as to not apply too much solder because
this will result in a convex-shaped connection and, possibly, a
cold solder joint. Ideally, the solder should be melted by the
connection, not the iron.
6. Remove the iron after ensuring that the solder has spread
over the pad and that the lead is sufficiently secured. A
resulting concave shape should be observed at the connection.
Have your team member or instructor verify proper
connection.
7. Trim the excess leads, pointing into a paper or plastic waste
bag or basket. Metal clippings may fly far, fall into computer
keyboards, or otherwise pose as a shorting hazard.
8. Insert the two, 0.1μF ceramic capacitors into C1 and C2.
9. Solder the legs of the capacitors to the bottom side of the
printed circuit board and carefully cut off the excess leads.
1. Insert the 7805, 5-volt regulator into U1 following the
drawing on the printed circuit board. Push the component
down carefully until it is fully set. DO NOT force the IC all the
way onto the board. Push the part partially down and allow the
leads to spread out. The result should be that the part stands off
the board as shown. Solder and carefully cut excess leads.
2. Insert the 8-pin, IC socket into U2 following the drawing on
the printed circuit board. Solder two pins on diagonally
opposite corners. (Hold one pin with the heat sink clip or paper
clip while soldering the other.) Inspect and confirm that all pins
are in the correct holes in the PCB and the socket is seated on
the board. Solder each pin and repair any bridging before
continuing.
2. Insert the momentary switch into S1 following the drawing
on the printed circuit board and solder the two contact pins.
3. Insert the seven red LEDs into D1, D2, D3, D4, D5, D6, and D7
following the drawing on the printed circuit board. PLEASE
NOTE that the longer lead of the LEDs is the anode and should
go into the hole marked with a + sign.
4. Insert the 9V battery connector into P1 and solder. You may
insert the battery leads from the bottom. This will make a
neater assembly should you decide to put the Dice in a case. It is
VERY IMPORTANT that the red wire is soldered into V+ and the
black wire is soldered into V-.
5. Have a team member or your instructor inspect your board
when you have finished.
6. Completing and Testing the Kit
7. Inspect the Atmel ATTINY85-20PU microcontroller.
Straighten any severely bent pins, very slowly; otherwise, they
could break. Align the IC on your breadboard so that the dot in
the top lefthand corner of the IC is at the same end as the notch
in the IC socket.
Insert the pins on one side, but do not press in, making sure
that each pin is started in its socket. Gently press the IC from
the other side against the pins started until the pins on the
other side easily start in their sockets. Double check that no pin
is bent under or is outside of its intended socket location. Press
the IC into the socket, firmly but gently.
2. Attach the 9V battery firmly to the battery connector.
3. The die kit should resemble Figure 4.1 when assembly is
completed. The Atmel ATTINY85-20PU has been shipped with a
program already stored so that the die may be tested by
connecting the 9V battery to the connector, then pressing and
holding the momentary switch and releasing it. While the
switch is pressed, the LEDs will blink in a random pattern.
When the switch is released, a randomly generated number
between 1 and 6 will be displayed on the LED die. Note any
performance issues.
Hints:
If the die is not working on the first try, turn it off by
unplugging the battery. Check for warm/hot components.
If the regulator U1 is hot, you have a short somewhere. Look for
solder shorts, incorrectly inserted components, and leads that
may be touching adjacent leads. Remove the shorting
connection and try again.
Hints:
If the die is not working on the first try, turn it off by
unplugging the battery. Check for warm/hot components.
If the regulator U1 is hot, you have a short somewhere. Look for
solder shorts, incorrectly inserted components, and leads that
may be touching adjacent leads. Remove the shorting
connection and try again.

More Related Content

Similar to Devry ecet 105 week 2 i lab soldering techniques and the electronic die kit new

Us 100 crct diagram
Us 100 crct diagramUs 100 crct diagram
Us 100 crct diagramL7lgbB9220
 
Soldering and desoldering electronic components
Soldering and desoldering electronic componentsSoldering and desoldering electronic components
Soldering and desoldering electronic componentsG-one Paisones
 
Chapter 1 soldering technique
Chapter 1 soldering techniqueChapter 1 soldering technique
Chapter 1 soldering techniqueMichael Recolito
 
Insructables fm listening bug
Insructables   fm listening bugInsructables   fm listening bug
Insructables fm listening bugzubeditufail
 
Quarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlinkQuarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlinkaiyaosobi
 
Replacing lightship battery
Replacing lightship batteryReplacing lightship battery
Replacing lightship batterysollightsolar
 
ECET 105 Entire Course NEW
ECET 105 Entire Course NEWECET 105 Entire Course NEW
ECET 105 Entire Course NEWshyamuopfive
 
How To Solder V3.5
How To Solder V3.5How To Solder V3.5
How To Solder V3.5JasonDeMoe
 
Como adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switchComo adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switch23palmela
 
pioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdfpioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdfssuser4e6376
 
SCHL1-with-answersV2WEB.pdf
SCHL1-with-answersV2WEB.pdfSCHL1-with-answersV2WEB.pdf
SCHL1-with-answersV2WEB.pdfElbatoulA
 
Catalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.comCatalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.comBeeteco
 
howtospliceelectricalwires-160915075216.pdf
howtospliceelectricalwires-160915075216.pdfhowtospliceelectricalwires-160915075216.pdf
howtospliceelectricalwires-160915075216.pdfJhoanaTamondong
 
Basic Electrical Splicing
Basic Electrical SplicingBasic Electrical Splicing
Basic Electrical SplicingRaymar Baquilar
 
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...Kevin Lazkanu
 
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxCOMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxNioLemuelLazatinConc
 

Similar to Devry ecet 105 week 2 i lab soldering techniques and the electronic die kit new (20)

Us 100 crct diagram
Us 100 crct diagramUs 100 crct diagram
Us 100 crct diagram
 
Soldering and desoldering electronic components
Soldering and desoldering electronic componentsSoldering and desoldering electronic components
Soldering and desoldering electronic components
 
Chapter 1 soldering technique
Chapter 1 soldering techniqueChapter 1 soldering technique
Chapter 1 soldering technique
 
Insructables fm listening bug
Insructables   fm listening bugInsructables   fm listening bug
Insructables fm listening bug
 
Build-It: Dimmable LED lantern
Build-It: Dimmable LED lanternBuild-It: Dimmable LED lantern
Build-It: Dimmable LED lantern
 
ElectricalClass
ElectricalClassElectricalClass
ElectricalClass
 
Quarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlinkQuarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlink
 
SOLDERING TQ.pptx
SOLDERING TQ.pptxSOLDERING TQ.pptx
SOLDERING TQ.pptx
 
Replacing lightship battery
Replacing lightship batteryReplacing lightship battery
Replacing lightship battery
 
ECET 105 Entire Course NEW
ECET 105 Entire Course NEWECET 105 Entire Course NEW
ECET 105 Entire Course NEW
 
How To Solder V3.5
How To Solder V3.5How To Solder V3.5
How To Solder V3.5
 
Desktop assembly
Desktop assemblyDesktop assembly
Desktop assembly
 
Como adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switchComo adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switch
 
pioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdfpioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdf
 
SCHL1-with-answersV2WEB.pdf
SCHL1-with-answersV2WEB.pdfSCHL1-with-answersV2WEB.pdf
SCHL1-with-answersV2WEB.pdf
 
Catalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.comCatalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.com
 
howtospliceelectricalwires-160915075216.pdf
howtospliceelectricalwires-160915075216.pdfhowtospliceelectricalwires-160915075216.pdf
howtospliceelectricalwires-160915075216.pdf
 
Basic Electrical Splicing
Basic Electrical SplicingBasic Electrical Splicing
Basic Electrical Splicing
 
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
 
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxCOMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
 

More from arvelcoxx

Uop hrm 552 week 1 hrd plan
Uop  hrm 552 week 1 hrd planUop  hrm 552 week 1 hrd plan
Uop hrm 552 week 1 hrd planarvelcoxx
 
Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...
Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...
Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...arvelcoxx
 
Argosy b6028 module 4 assignment 2 internal environmental scan organizational...
Argosy b6028 module 4 assignment 2 internal environmental scan organizational...Argosy b6028 module 4 assignment 2 internal environmental scan organizational...
Argosy b6028 module 4 assignment 2 internal environmental scan organizational...arvelcoxx
 
Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...
Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...
Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...arvelcoxx
 
Argosy b6028 module 2 assignment 2 external environmental scan target new
Argosy b6028 module 2 assignment 2 external environmental scan target newArgosy b6028 module 2 assignment 2 external environmental scan target new
Argosy b6028 module 2 assignment 2 external environmental scan target newarvelcoxx
 
Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...
Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...
Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...arvelcoxx
 
Uop mkt 571 final exam guide
Uop mkt 571 final exam guideUop mkt 571 final exam guide
Uop mkt 571 final exam guidearvelcoxx
 
Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...
Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...
Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...arvelcoxx
 
Uop eco 561 week 3 team managing fixed and variable cost (2 ppt) new
Uop eco 561 week 3 team managing fixed and variable cost (2 ppt) newUop eco 561 week 3 team managing fixed and variable cost (2 ppt) new
Uop eco 561 week 3 team managing fixed and variable cost (2 ppt) newarvelcoxx
 
Uop eco 561 week 3 assignment research analysis for business (general motors)...
Uop eco 561 week 3 assignment research analysis for business (general motors)...Uop eco 561 week 3 assignment research analysis for business (general motors)...
Uop eco 561 week 3 assignment research analysis for business (general motors)...arvelcoxx
 
Uop eco 561 week 3 assignment research analysis for business (game stop) new
Uop eco 561 week 3 assignment research analysis for business (game stop) newUop eco 561 week 3 assignment research analysis for business (game stop) new
Uop eco 561 week 3 assignment research analysis for business (game stop) newarvelcoxx
 
Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...
Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...
Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...arvelcoxx
 
Devry ecet 105 week 3 i lab introduction to digital logic gates new
Devry ecet 105 week 3 i lab introduction to digital logic gates newDevry ecet 105 week 3 i lab introduction to digital logic gates new
Devry ecet 105 week 3 i lab introduction to digital logic gates newarvelcoxx
 
Uop soc 315 week 4 individual assignment eeoc presentation
Uop soc 315 week 4 individual assignment eeoc presentationUop soc 315 week 4 individual assignment eeoc presentation
Uop soc 315 week 4 individual assignment eeoc presentationarvelcoxx
 
Uop hrm 300 week 2 hr case study scenarios new
Uop hrm 300 week 2 hr case study scenarios newUop hrm 300 week 2 hr case study scenarios new
Uop hrm 300 week 2 hr case study scenarios newarvelcoxx
 

More from arvelcoxx (15)

Uop hrm 552 week 1 hrd plan
Uop  hrm 552 week 1 hrd planUop  hrm 552 week 1 hrd plan
Uop hrm 552 week 1 hrd plan
 
Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...
Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...
Argosy b6028 module 5 assignment 2 lasa 2 presentation of strategy audit find...
 
Argosy b6028 module 4 assignment 2 internal environmental scan organizational...
Argosy b6028 module 4 assignment 2 internal environmental scan organizational...Argosy b6028 module 4 assignment 2 internal environmental scan organizational...
Argosy b6028 module 4 assignment 2 internal environmental scan organizational...
 
Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...
Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...
Argosy b6028 module 3 assignment 2 lasa 1 preliminary strategy audit merriwet...
 
Argosy b6028 module 2 assignment 2 external environmental scan target new
Argosy b6028 module 2 assignment 2 external environmental scan target newArgosy b6028 module 2 assignment 2 external environmental scan target new
Argosy b6028 module 2 assignment 2 external environmental scan target new
 
Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...
Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...
Argosy fp6020 module 5 assignment 2 lasa mock individual assessment final dra...
 
Uop mkt 571 final exam guide
Uop mkt 571 final exam guideUop mkt 571 final exam guide
Uop mkt 571 final exam guide
 
Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...
Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...
Uop eco 561 week 4 assignment inflation and analyses of monetary policies (2 ...
 
Uop eco 561 week 3 team managing fixed and variable cost (2 ppt) new
Uop eco 561 week 3 team managing fixed and variable cost (2 ppt) newUop eco 561 week 3 team managing fixed and variable cost (2 ppt) new
Uop eco 561 week 3 team managing fixed and variable cost (2 ppt) new
 
Uop eco 561 week 3 assignment research analysis for business (general motors)...
Uop eco 561 week 3 assignment research analysis for business (general motors)...Uop eco 561 week 3 assignment research analysis for business (general motors)...
Uop eco 561 week 3 assignment research analysis for business (general motors)...
 
Uop eco 561 week 3 assignment research analysis for business (game stop) new
Uop eco 561 week 3 assignment research analysis for business (game stop) newUop eco 561 week 3 assignment research analysis for business (game stop) new
Uop eco 561 week 3 assignment research analysis for business (game stop) new
 
Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...
Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...
Uop eco 561 week 2 assignment government interventions (bailout of u.s. auto ...
 
Devry ecet 105 week 3 i lab introduction to digital logic gates new
Devry ecet 105 week 3 i lab introduction to digital logic gates newDevry ecet 105 week 3 i lab introduction to digital logic gates new
Devry ecet 105 week 3 i lab introduction to digital logic gates new
 
Uop soc 315 week 4 individual assignment eeoc presentation
Uop soc 315 week 4 individual assignment eeoc presentationUop soc 315 week 4 individual assignment eeoc presentation
Uop soc 315 week 4 individual assignment eeoc presentation
 
Uop hrm 300 week 2 hr case study scenarios new
Uop hrm 300 week 2 hr case study scenarios newUop hrm 300 week 2 hr case study scenarios new
Uop hrm 300 week 2 hr case study scenarios new
 

Recently uploaded

Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 

Recently uploaded (20)

Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

Devry ecet 105 week 2 i lab soldering techniques and the electronic die kit new

  • 1. DEVRY ECET 105 Week 2 iLab Soldering Techniques and the Electronic Die Kit NEW Check this A+ tutorial guideline at http://www.assignmentcloud.com/ecet-105-devry/ecet- 105-week-2-ilab-soldering-techniques-and-the-electronic- die-kit-new For more classes visit http://www.assignmentcloud.com I. OBJECTIVES 1. To learn the basics of soldering. 2. To produce mechanically and electrically sound solder joints. 3. To assemble the Electronic Die Kit. II. PARTS LIST Equipment: Digital Die Kit Tools: 1 – Soldering Iron 1 – Pair Long-Nose Pliers 1 – Diagonal cutter 1 – Solder and hookup wire 1 – Wire stripper III. PROCEDURE 1. Preparation 2. Prepare a well-ventilated and clear workspace with ample lighting. 3. Ensure that the workspace includes a mat to work on in
  • 2. order to prevent the burning of the table or materials during the process. 4. Use a tray, egg crate, or vegetable/fruit tray for all (but especially the small) parts to avoid losing them. Attach the tray with double-sided tape to your bench or desktop. 5. Have a waste basket or desktop trash receptacle handy. 6. Ensure that the sponge that accompanies the soldering iron is sufficiently damp. The level of dampness needed is judged by wetting the sponge and then squeezing out the excess water until the sponge can be held in the hand with no noticeable water dripping from it. CAUTION: In order to avoid injury to the eyes, goggles or other eye protection must be worn AT ALL TIMES during the circuit assembly and soldering process. A soldering iron at temperature is very hot. It is a fire hazard. It is a health hazard. Caution must be taken at all times to ensure that contact with the skin does not occur. 6. Plug in the soldering iron and wait approximately five minutes for the iron to heat to a proper temperature. The temperature of the iron may be tested by lightly rubbing the tip of the iron against the moist sponge. If a majority of water is evaporated, then the iron is ready for use. The tip should be kept clean and tinned for soldering. The sponge is used to wipe away excess solder and materials. Tinning means that there is always a thin layer of solder on the tip. 7. Procure and prepare the dice kit for soldering. Inventory the parts and materials and ensure that each part fits the circuit board correctly by checking the parts on the board WITHOUT soldering them to the board. Put them in the tray until ready to install. 8. Prepare the tools that you will need: soldering iron, rosin
  • 3. core solder, desolder wick, safety glasses, long-nose pliers, and wire cutters. 1. Assembling the Electronic Die Kit 2. Start with the seven 220 ohm resistors. Note that the color bands are red-red-brown-gold. 2. With your long-nose pliers, bend the legs of all seven of the resistors so that they form 90-degree angles. 3. Insert the 220 ohm resistors into R1, R2, R3, R4, R5, R6, and R7 of your printed circuit board through the side where you see the labels. Bend the lead on the side away from the component part, not next to the resistor body, but on the other side of the pliers. Otherwise, you may break the connection inside the resistor. Ensure that all components, with the exception of the IC socket, are not fully inserted in the board, but have small gaps between them and the circuit board to avoid excessive heating. 4. Prepare to solder the legs of the resistors to the bottom side of the printed circuit board. Turn the board upside down. Caution must be taken to ensure that the “eyelet” solder pads on the board are not stressed with either hands or the tip of the iron during the heating process. The eyelets are easily dislodged and, if damaged, may result in irreparable damage to the circuit board. In soldering, firmly touch the tip of the iron to the pad AND the lead you want to solder. Ensure that only one wire and one pad (one connection) is heated at a time. When the connection has been heated sufficiently (it should take only a few seconds), touch the solder to the pad, opposite from the tip of the iron, and allow a small amount of solder to flow onto the connection. The parts should not move while you are heating them or they
  • 4. will not form a good joint. Sloppy or careless heating may cause multiple connections to be soldered together, causing damage to the circuit board. 5. Care must be taken as to not apply too much solder because this will result in a convex-shaped connection and, possibly, a cold solder joint. Ideally, the solder should be melted by the connection, not the iron. 6. Remove the iron after ensuring that the solder has spread over the pad and that the lead is sufficiently secured. A resulting concave shape should be observed at the connection. Have your team member or instructor verify proper connection. 7. Trim the excess leads, pointing into a paper or plastic waste bag or basket. Metal clippings may fly far, fall into computer keyboards, or otherwise pose as a shorting hazard. 8. Insert the two, 0.1μF ceramic capacitors into C1 and C2. 9. Solder the legs of the capacitors to the bottom side of the printed circuit board and carefully cut off the excess leads. 1. Insert the 7805, 5-volt regulator into U1 following the drawing on the printed circuit board. Push the component down carefully until it is fully set. DO NOT force the IC all the way onto the board. Push the part partially down and allow the leads to spread out. The result should be that the part stands off the board as shown. Solder and carefully cut excess leads. 2. Insert the 8-pin, IC socket into U2 following the drawing on the printed circuit board. Solder two pins on diagonally opposite corners. (Hold one pin with the heat sink clip or paper clip while soldering the other.) Inspect and confirm that all pins are in the correct holes in the PCB and the socket is seated on the board. Solder each pin and repair any bridging before continuing. 2. Insert the momentary switch into S1 following the drawing on the printed circuit board and solder the two contact pins.
  • 5. 3. Insert the seven red LEDs into D1, D2, D3, D4, D5, D6, and D7 following the drawing on the printed circuit board. PLEASE NOTE that the longer lead of the LEDs is the anode and should go into the hole marked with a + sign. 4. Insert the 9V battery connector into P1 and solder. You may insert the battery leads from the bottom. This will make a neater assembly should you decide to put the Dice in a case. It is VERY IMPORTANT that the red wire is soldered into V+ and the black wire is soldered into V-. 5. Have a team member or your instructor inspect your board when you have finished. 6. Completing and Testing the Kit 7. Inspect the Atmel ATTINY85-20PU microcontroller. Straighten any severely bent pins, very slowly; otherwise, they could break. Align the IC on your breadboard so that the dot in the top lefthand corner of the IC is at the same end as the notch in the IC socket. Insert the pins on one side, but do not press in, making sure that each pin is started in its socket. Gently press the IC from the other side against the pins started until the pins on the other side easily start in their sockets. Double check that no pin is bent under or is outside of its intended socket location. Press the IC into the socket, firmly but gently. 2. Attach the 9V battery firmly to the battery connector. 3. The die kit should resemble Figure 4.1 when assembly is completed. The Atmel ATTINY85-20PU has been shipped with a program already stored so that the die may be tested by connecting the 9V battery to the connector, then pressing and holding the momentary switch and releasing it. While the switch is pressed, the LEDs will blink in a random pattern. When the switch is released, a randomly generated number between 1 and 6 will be displayed on the LED die. Note any performance issues.
  • 6. Hints: If the die is not working on the first try, turn it off by unplugging the battery. Check for warm/hot components. If the regulator U1 is hot, you have a short somewhere. Look for solder shorts, incorrectly inserted components, and leads that may be touching adjacent leads. Remove the shorting connection and try again.
  • 7. Hints: If the die is not working on the first try, turn it off by unplugging the battery. Check for warm/hot components. If the regulator U1 is hot, you have a short somewhere. Look for solder shorts, incorrectly inserted components, and leads that may be touching adjacent leads. Remove the shorting connection and try again.