Need for Locating a Plant
                                                                              • It arises when:
                                                                                 – The business in newly started
                       Locating a Plant                                          – The expansion to the existing plant is not possible
                                                                                 – A firm wants to establish new branches
                                Presented By:                                    – The landlord does not renew the existing lease
                                                     Anupam Kumar                – Economic or social reasons like:
                                                            Reader
                                                       SMS Varanasi                  • Inadequate power supply
                                       E mail: anupamkr@gmail.com                    • Government regulations, etc.


                             © Copyright 2013 Anupam Kumar                1                          © Copyright 2013 Anupam Kumar                      2




         Importance of the Right Location                                      Importance of the Right Location
       • Location Decision is a long term decision                            • The location of plant fixes the cost structure.
       • Location Decision is difficult to revise or                             – It affects the fixed and variable costs.
         reverse                                                                 – At times transportation costs are almost 25% of
                                                                                   the price of product.
       • The location of plant fixes the production                           • Location of a facility affects the company’s
         technology.                                                            ability to serve its customers quickly and
          – Options between labour intensive or capital /                       conveniently.
            machine intensive production technologies.                        • Location determines the nature and size of the
                                                                                business

                             © Copyright 2013 Anupam Kumar                3                          © Copyright 2013 Anupam Kumar                      4




         Factors Affecting Location Decisions                                    Factors Affecting Plant Location
       • Market Proximity                    • Availability of Services       • Controllable Factors                 • Uncontrollable Factors
       • Integration with other              • Suitability of Land and           – Market                                   –   Government Policy
         parts of the organization             Climate                           – Supply of Raw Material                   –   Climatic Conditions
       • Availability of Labour and          • Regional Regulations              – Transport                                –   Supporting Industries
         Skills                              • Room for Expansion
                                                                                 – Infrastructure                           –   Community
       • Site Cost                           • Safety Requirements                 Availability                             –   Social Network
       • Availability of Amenities           • Political Cultural and            – Labour and Wages
       • Availability of Transport             Economic Situations
         Facilities                          • Regional Taxes, Special
       • Availability of Inputs                Grants and Import /
                                               Export Barriers.
                             © Copyright 2013 Anupam Kumar                5                          © Copyright 2013 Anupam Kumar                      6




© Copyright 2013 Anupam Kumar                                                                                                                               1
Need for Locating a Plant                                                             Location Evaluation Methods
       • The need for locating a plant can broadly be divided                                    • There are various methods for evaluating the
         into 2 types.                                                                             ideal Location for a Plant.
          – Location Choice for Existing Organization
               •   Plants Manufacturing Distinct Products
                                                                                                 • Some of them are:
               •   Plants Supplying to a Specific Market Area                                        – Factor Rating Method
               •   Plants Based on the Process or Stage of Manufacturing
                                                                                                     – Point Rating Method
               •   Plant Emphasizing Flexibility (Increase in Operations)
          – Location Choice for New Organizations                                                    – Locational Break-Even Analysis
               • Identification of Region                                                            – Center of Gravity Method
               • Choice of Site with a region
                                                                                                     – Transportation Model
               • Selecting a Site

                                     © Copyright 2013 Anupam Kumar                           7                              © Copyright 2013 Anupam Kumar                    8




                      Factor Rating Method                                                           Factor Rating – Selection Criteria
                                                                                                 • Labor costs; including                   • State and local government
       • Most widely used location technique                                                         – wages,                                 fiscal policies; including
                                                                                                     – unionization,                               – incentives,
       • Useful for service & industrial locations                                                   – productivity                                – taxes,
       • Rates locations using factors                                                           • Labor availability; including                   – unemployment compensation
                                                                                                     –   attitudes,                         • Utilities; including
          – Intangible (qualitative) factors                                                         –   age,                                      – fuel,
               • Example: Education quality, labor skills                                            –   distribution and                          – electricity,
                                                                                                     –   skills                                    – Water costs
          – Tangible (quantitative) factors                                                      • Proximity to raw materials               • Site costs; including
                                                                                                   and suppliers                                   –   land,
             • Example: Short-run & long-run costs                                                                                                 –   expansion,
                                                                                                 • Proximity to markets                            –   parking,
                                                                                                                                                   –   drainage

                                     © Copyright 2013 Anupam Kumar                           9                              © Copyright 2013 Anupam Kumar                   10




         Factor Rating – Selection Criteria                                                                     Factor Rating Method
       • Quality-of-life issues;                     • Transportation availability;              • List relevant factors
         including                                     including
          –   all levels of education,                      –   rail,                            • Assign importance weight to each factor (0 - 5)
          –   cost of living,                               –   air,
          –   health care,                                  –   water and                        • Develop scale for each factor (1 - 10)
          –   sports,                                       –   interstate roads
          –   cultural activities,                   • Quality of government;
                                                                                                 • Score each location using factor scale
          –   transportation,                          including                                 • Multiply scores by weights for each factor &
          –   housing,                                      – stability,
          –   entertainment,                                – honesty,                             total
          –   religious facilities                          – attitudes toward new
                                                              business - whether overseas
                                                                                                 • Select location with maximum total score
       • Foreign exchange; including
                                                              or local
          – rates and stability

                                     © Copyright 2013 Anupam Kumar                          11                              © Copyright 2013 Anupam Kumar                   12




© Copyright 2013 Anupam Kumar                                                                                                                                                    2
Factor Rating Method - Illustration                                                               Point Rating Method
                       Factor                                   Factor    Location Location   • While selecting a location, companies have several
                                                                Rating       A        B         objectives,
       Tax Advantage                                              4          8        6          – But not all are of equal importance
       Suitability of labour Skill                                3         2         3       • To overcome this issue, in Factor Rating Method,
       Proximity to customers                                     3          6        5          – each objective is given a Factor Rating depending upon
                                                                                                 – the mutual importance of the various objectives.
       Adequacy of Water                                          1          3        3
                                                                                              • The Point Rating Method takes into consideration a
       Receptivity of community                                   5          4        3         hypothetical ideal location and tries to fix the
       Quality of Education System                                4         1         6         maximum points for each of the objectives.
       Access to rail and Air transport                           3         10        8       • Now all the available locations are given points after
                                                                                                considering the maximum possible points as per the
       Suitability of climate                                     2         7         9         ideal site.
       Availability of Power                                      2          6        4
                                © Copyright 2013 Anupam Kumar
                                                                           139       14013                           © Copyright 2013 Anupam Kumar          14




         Point Rating Method - Illustration                                                               Point Rating Method
                 Factor Rated                     Maximum                Location Location
                                                Possible Points             X        Y
                                                                                              • The drawback of this method is that
       Future Availability of Fuel                     300                200       290          – high score in any factor can overcome a low score
       Transportation, Flexibility &                   250                200        95            in other factor.
       Growth                                                                                 • To overcome such extreme deviations,
       Adequacy of Water Supply                        150                100       140
                                                                                                 – any site which does not have at least a specified
       Labour Availability                             250                210       200            number of points for those essential factors are
       Pollution Regulations                           300                250       280
                                                                                                 – excluded from further consideration.
       Site Topography                                  50                 40        30
       Living Conditions                               150                100       135

                                © Copyright 2013 Anupam Kumar
                                                                           1100      1130
                                                                                        15                           © Copyright 2013 Anupam Kumar          16




         Point Rating Method - Illustration                                                               Point Rating Method
                 Factor Rated                     Maximum       Location Location             • Point Rating Method helps in comparing the
                                                Possible Points    X        Y
                                                                                                tangible factors with the intangible factors.
       Future Availability of Fuel                     300                200       290
       Transportation, Flexibility &                   250                200        95       • Points are assigned only to the intangible
       Growth                                                                                   factors.
       Adequacy of Water Supply                        150                100       140       • Evaluation is made to determine whether
       Labour Availability                             250                210       200          – the difference between the intangible scores is
       Pollution Regulations                           300                250       280            worth
       Site Topography                                  50                 40        30          – the difference between the tangible costs (if any)
       Living Conditions                               150                100       135            of the competing locations.

                                © Copyright 2013 Anupam Kumar
                                                                           1100      1130
                                                                                        17                           © Copyright 2013 Anupam Kumar          18




© Copyright 2013 Anupam Kumar                                                                                                                                    3
Point Rating Method                                                        Locational Break-Even Analysis
       • If two alternative locations are found to be                                        • Method of cost-volume analysis used for
         equally attractive by comparing costs based                                           industrial locations
         on tangible factors then                                                            • Steps
       • These two alternative potential locations may                                              – Determine fixed & variable costs for each location
         further be evaluated, based on the intangible                                              – Plot total cost for each location
         factors using the Point Rating Method.                                                     – Select location with lowest total cost for expected
                                                                                                      production volume
                                                                                                        • Must be above break-even


                                          © Copyright 2013 Anupam Kumar                 19                                  © Copyright 2013 Anupam Kumar                                20




          Locational Break-Even Analysis -
                                                                                                     Locational Break-Even Analysis
                     Illustration
       • You’re an analyst for ACC Cement.                                                   Sr.             Place   Fixed Cost    Variable           Total Cost       Variable Cost
                                                                                             No.                      (in INR)       Cost             (at 0 Unit       ( at 2 Lac unit
       • You’re considering a new manufacturing plant in Aurangabad,                                                    ‘000s      (in INR)          production)        production)
         Bhubaneswar, or Coimbatore. Fixed costs per year are Rs.                                                                                       ‘000s               ‘000 s
         11Cr., Rs. 6Cr., & Rs.3Cr. respectively.                                            1.      Aurangabad         110000             250              110000                 50000
                                                                                             2.      Bhubaneswar         60000             450              60000                  90000
       • Variable costs per case are Rs. 250, Rs.450, & Rs.750
                                                                                             3.      Coimbatore          30000             750              30000               150000
         respectively.
       • The price per bag is Rs. 1200.                                                      Sr.             Place   Fixed Cost Variable    Variable Cost              Variable Cost
                                                                                             No.                      (in INR)     Cost    (at 1 Lac Unit              ( at 5 Lac unit
       • What is the best location for an expected volume of 200,000                                                    ‘000s    (in INR)    production)                production)
         bags per year?                                                                                                        Back to Question ‘000s                       ‘000 s
       • Would your decision change if the expected volume is more                           4.      Aurangabad         110000         250          25000                       125000
         than 5 Lakh bags or less than 1 Lakh bags?                                          5.      Bhubaneswar         60000             450              45000               225000
                                                                                             6.      Coimbatore          30000             750              75000               375000
                                          © Copyright 2013 Anupam Kumar                 21                                  © Copyright 2013 Anupam Kumar                                22




         Locational Break-Even Analysis –
                                                                                                     Locational Break-Even Analysis
                Illustration Chart
                                                                                             • Godavari Electricals Ltd. Wanted to set up its new plant for manufacturing
                       2000                                                                    of heaters. The management of Godavari identified three potential areas
                                                                                               whose fixed and variable costs are as below.
                       1500
         Annual Cost




                                                                                             • The product is expected to be sold at Rs. 1050 per unit and the existing
           (in ‘00)




                                                                                               demand in the market is likely to be 600 units per year.
                       1000                                                                  • Calculate the most profitable location for Godavari under the current
                                                                                               conditions.
                       500            C lowest            B lowest             A             • What is the minimum quantity that Godavari should target to break even
                                      cost                cost                 lowest          its costs in Hyderabad?
                                                                               cost
                              0
                                                                                                  Location                 Fixed Cost / Year                Variable Cost / Unit
                                  0   5         10        15        20    25     30               Kakinada                 Rs. 2,00,000.00                  325
                                                       Volume                                     Vijayawada               Rs. 2,50,000.00                  285
                                                       (in ‘00)                                   Hyderabad                Rs. 3,00,000.00                  265
                                          © Copyright 2013 Anupam Kumar                 23                                  © Copyright 2013 Anupam Kumar                                24




© Copyright 2013 Anupam Kumar                                                                                                                                                                 4
Center of Gravity Method                                          Center of Gravity Method Steps
       • Finds location of single distribution center                       • Place existing locations on a coordinate grid
         serving several destinations                                            – Grid has arbitrary origin & scale
                                                                                 – Maintains relative distances
       • Used primarily for services
       • Considers                                                          • Calculate X & Y coordinates for ‘center of
                                                                              gravity’
         – Location of existing destinations
                                                                                 – Gives location of distribution center
             • Example: Markets, retailers etc.
                                                                                 – Minimizes transportation cost
         – Volume to be shipped
         – Shipping distance (or cost)
             • Shipping cost/unit/mile is constant


                                   © Copyright 2013 Anupam Kumar       25                                          © Copyright 2013 Anupam Kumar                                       26




               Center of Gravity Method                                                         Transportation Model
                                                                            • Finds amount to be shipped from several
                                                                              sources to several destinations
                                                                            • Used primarily for industrial locations
                                                                            • Type of linear programming model
                                                                                 – Objective: Minimize total production
                                                                                   & shipping costs
                                                                                 – Constraints
                                                                                       • Production capacity at source (factory)
                                                                                       • Demand requirement at destination
                                   © Copyright 2013 Anupam Kumar       27                                          © Copyright 2013 Anupam Kumar                                       28




                                                                                                              Bibliography
                                                                            •   Buffa, E.S. and Sarin, R.K., “Modern Production/Operations Management,” Eighth Edition. Singapore: John
                                                                                Wiley & Sons (Asia). 1994.
                                                                            •   Martinich, J.S., “Production and Operations Management: An Applied Approach”, Singapore: John Wiley &
                                                                                Sons (Asia), 2003.
                                                                            •   Monks, J.G., “Theory and Problems of Operations Management”, Second Edition, New Delhi: Tata McGraw
                     For further details …                                  •
                                                                                Hill, 2004.
                                                                                Chary, S.N., “Productions and Operations Management,” Third Edition, New Delhi: Tata McGraw Hill, 2004
                                                                            •   Kumar, S.A., and Suresh, N., “Production and Operations Management”, Second Edition, New Delhi: New
                                                                                Age, 2008.
                                                                            •   Goel, B.S., “Production Operations Management”, Twenty Second Edition, Meerut, U.P.: Pragati Prakashan,
                                           Contact                              2010.
                                                     Anupam Kumar           •   Kachru, U. “Production and Operations Management: Text and Cases,” New Delhi: Excel Books, 2007.
                                                                            •   Rama Murthy, P., “Production and Operations Management,” New Delhi: New Age International, 2012.
                                                             Reader         •   Chunawalla, S.A., and Patel, D.R., “Production and Operations Management,” Mumbai: Himalaya
                            School of Management Sciences, Varanasi.            Publishing House, 2006.
                                        Email: anupamkr@gmail.com           •   Jauhari, V. and Dutta, K., “Services: Marketing Operations and Management,” New Delhi: Oxford University
                                                                                Press, 2010.
                                                                            •   Verma, H.V., “Services Marketing: Text and Cases,” New Delhi: Dorling Kindersley, Pearson Education, 2009



                                   © Copyright 2013 Anupam Kumar       29                                          © Copyright 2013 Anupam Kumar                                       30




© Copyright 2013 Anupam Kumar                                                                                                                                                               5

More Related Content

What's hot

types of production system
types of production systemtypes of production system
types of production systempakkiaarzoo
 
Chapter 13 Supply Chain Management 2014
Chapter 13 Supply Chain Management 2014Chapter 13 Supply Chain Management 2014
Chapter 13 Supply Chain Management 2014Earlene McNair
 
Manufacturing & operations management
Manufacturing & operations managementManufacturing & operations management
Manufacturing & operations managementVaibhav Govindjiwala
 
Pgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacity
Pgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacityPgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacity
Pgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacityAquamarine Emerald
 
Challenges of Services Marketing
Challenges of Services MarketingChallenges of Services Marketing
Challenges of Services MarketingDr. Amitabh Mishra
 
role of service in an economy
role of service in an economyrole of service in an economy
role of service in an economyAamir chouhan
 
Executive development l12
Executive development l12Executive development l12
Executive development l12Jags Jagdish
 
Ch 4. the labour market context of hrm
Ch 4. the labour market context of hrmCh 4. the labour market context of hrm
Ch 4. the labour market context of hrmAndrew Bolton
 
Globalization of services
Globalization of servicesGlobalization of services
Globalization of servicesPrasoon Agarwal
 
Service operation ppt
Service operation pptService operation ppt
Service operation pptBhaskar Das
 
Employee Involvement And Participation
Employee Involvement And ParticipationEmployee Involvement And Participation
Employee Involvement And ParticipationAbinash Pandia
 
Service blueprint
Service blueprintService blueprint
Service blueprintvicku1111
 
Ch01.Operation Strategy
Ch01.Operation StrategyCh01.Operation Strategy
Ch01.Operation StrategySaumyakanti
 

What's hot (20)

Location decision
Location decisionLocation decision
Location decision
 
types of production system
types of production systemtypes of production system
types of production system
 
Industrial purchasing system
Industrial purchasing systemIndustrial purchasing system
Industrial purchasing system
 
Chapter 13 Supply Chain Management 2014
Chapter 13 Supply Chain Management 2014Chapter 13 Supply Chain Management 2014
Chapter 13 Supply Chain Management 2014
 
Manufacturing & operations management
Manufacturing & operations managementManufacturing & operations management
Manufacturing & operations management
 
Service Encounter
Service Encounter Service Encounter
Service Encounter
 
Pgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacity
Pgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacityPgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacity
Pgbm03 MBA OPERATION MANAGEMENT session 06 planning and managing capacity
 
Strategic Business Unit
Strategic Business UnitStrategic Business Unit
Strategic Business Unit
 
Challenges of Services Marketing
Challenges of Services MarketingChallenges of Services Marketing
Challenges of Services Marketing
 
role of service in an economy
role of service in an economyrole of service in an economy
role of service in an economy
 
Executive development l12
Executive development l12Executive development l12
Executive development l12
 
Demand forecasting
Demand forecastingDemand forecasting
Demand forecasting
 
Ch 4. the labour market context of hrm
Ch 4. the labour market context of hrmCh 4. the labour market context of hrm
Ch 4. the labour market context of hrm
 
Demand forecasting
Demand forecastingDemand forecasting
Demand forecasting
 
Globalization of services
Globalization of servicesGlobalization of services
Globalization of services
 
Service operation ppt
Service operation pptService operation ppt
Service operation ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Employee Involvement And Participation
Employee Involvement And ParticipationEmployee Involvement And Participation
Employee Involvement And Participation
 
Service blueprint
Service blueprintService blueprint
Service blueprint
 
Ch01.Operation Strategy
Ch01.Operation StrategyCh01.Operation Strategy
Ch01.Operation Strategy
 

Viewers also liked

plant location
plant locationplant location
plant locationSanjay War
 
A project report on survey of retailer’s and consumer of soft drinks
A project report on survey of retailer’s and consumer of soft drinksA project report on survey of retailer’s and consumer of soft drinks
A project report on survey of retailer’s and consumer of soft drinksProjects Kart
 
Facility location and layout planning
Facility location and layout planningFacility location and layout planning
Facility location and layout planningBirodh Adhikari
 
Facility location and techniques
Facility location and techniquesFacility location and techniques
Facility location and techniquesPiyush Sharma
 
Optimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for GenerationOptimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for GenerationHossam Zein
 
Packed Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed Gas
Packed Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed GasPacked Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed Gas
Packed Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed Gasijsrd.com
 
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدنPush over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدنDr.Youssef Hammida
 
Pepsi channels of distribution
Pepsi   channels of distributionPepsi   channels of distribution
Pepsi channels of distributionPULIPATISIVAKUMAR
 
Inventory Control ABC Analysis
Inventory Control ABC AnalysisInventory Control ABC Analysis
Inventory Control ABC Analysisyashpal01
 

Viewers also liked (20)

Plant Location Decision
Plant Location DecisionPlant Location Decision
Plant Location Decision
 
Unit4
Unit4Unit4
Unit4
 
Plant location
Plant locationPlant location
Plant location
 
plant location
plant locationplant location
plant location
 
A project report on survey of retailer’s and consumer of soft drinks
A project report on survey of retailer’s and consumer of soft drinksA project report on survey of retailer’s and consumer of soft drinks
A project report on survey of retailer’s and consumer of soft drinks
 
Facility location and layout planning
Facility location and layout planningFacility location and layout planning
Facility location and layout planning
 
Facility location and techniques
Facility location and techniquesFacility location and techniques
Facility location and techniques
 
Optimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for GenerationOptimization of Cairo West Power Plant for Generation
Optimization of Cairo West Power Plant for Generation
 
Scarb eesbm6e ppt_14
Scarb eesbm6e ppt_14Scarb eesbm6e ppt_14
Scarb eesbm6e ppt_14
 
Packed Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed Gas
Packed Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed GasPacked Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed Gas
Packed Bed Reactor for Catalytic Cracking of Plasma Pyrolyzed Gas
 
Location models
Location modelsLocation models
Location models
 
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدنPush over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
 
HAZOP Basics
HAZOP BasicsHAZOP Basics
HAZOP Basics
 
Plant location
Plant locationPlant location
Plant location
 
Pepsi channels of distribution
Pepsi   channels of distributionPepsi   channels of distribution
Pepsi channels of distribution
 
Census vs sampling
Census vs samplingCensus vs sampling
Census vs sampling
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
Plant location
Plant locationPlant location
Plant location
 
Inventory Control ABC Analysis
Inventory Control ABC AnalysisInventory Control ABC Analysis
Inventory Control ABC Analysis
 
Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 

Similar to Location of a plant

location planning and analysis
location planning and analysislocation planning and analysis
location planning and analysisjanyne aguilar
 
Plant layout & its objectives
Plant layout & its objectivesPlant layout & its objectives
Plant layout & its objectivesAnupam Kumar
 
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...eyefortransport
 
Plant Location and Plant Layout
Plant Location and Plant LayoutPlant Location and Plant Layout
Plant Location and Plant LayoutDr. Mohit Sahu
 
MATHESON SelectPRO QuickView
MATHESON SelectPRO QuickViewMATHESON SelectPRO QuickView
MATHESON SelectPRO QuickViewMATHESON
 
Total quality management (tqm)
Total quality management (tqm)Total quality management (tqm)
Total quality management (tqm)Anupam Kumar
 
Module 6 comepensation !
Module 6 comepensation !Module 6 comepensation !
Module 6 comepensation !Binty Agarwal
 
Module 6 comepensation !!!!!!
Module 6 comepensation !!!!!!Module 6 comepensation !!!!!!
Module 6 comepensation !!!!!!Binty Agarwal
 
Man org session 1_intro_28th june 2012
Man org session 1_intro_28th june 2012Man org session 1_intro_28th june 2012
Man org session 1_intro_28th june 2012vivek_shaw
 
"Enterprise Mobile", Marco Nielsen
"Enterprise Mobile", Marco Nielsen"Enterprise Mobile", Marco Nielsen
"Enterprise Mobile", Marco Nielsenrayvillares
 
Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...
Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...
Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...Beeline
 
Techniques of buying 01
Techniques of buying 01Techniques of buying 01
Techniques of buying 01Shyam Gajrani
 
Introduction to production management
Introduction to production managementIntroduction to production management
Introduction to production managementSiddhant Ghadse
 
uTest STPCon 2011 Presentation
uTest STPCon 2011 PresentationuTest STPCon 2011 Presentation
uTest STPCon 2011 PresentationuTest
 
Nazdar Top Ten Mistakes Webinar
Nazdar Top Ten Mistakes WebinarNazdar Top Ten Mistakes Webinar
Nazdar Top Ten Mistakes WebinarJudyHeft
 
Assessing the Procurement Function
Assessing the Procurement FunctionAssessing the Procurement Function
Assessing the Procurement FunctionBravoSolution
 
Assessing the procurement function
Assessing the procurement functionAssessing the procurement function
Assessing the procurement functionBravoSolution
 
Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...mike benedetto
 
An action plan vision -- marketing propensities for ivorysands
An action plan vision -- marketing propensities for ivorysandsAn action plan vision -- marketing propensities for ivorysands
An action plan vision -- marketing propensities for ivorysandsJayakumar Subramaniam
 

Similar to Location of a plant (20)

location planning and analysis
location planning and analysislocation planning and analysis
location planning and analysis
 
Types of layouts
Types of layoutsTypes of layouts
Types of layouts
 
Plant layout & its objectives
Plant layout & its objectivesPlant layout & its objectives
Plant layout & its objectives
 
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
Valerie Bonebrake from Tompkins Associates; Outsourcing Logistics Success: A ...
 
Plant Location and Plant Layout
Plant Location and Plant LayoutPlant Location and Plant Layout
Plant Location and Plant Layout
 
MATHESON SelectPRO QuickView
MATHESON SelectPRO QuickViewMATHESON SelectPRO QuickView
MATHESON SelectPRO QuickView
 
Total quality management (tqm)
Total quality management (tqm)Total quality management (tqm)
Total quality management (tqm)
 
Module 6 comepensation !
Module 6 comepensation !Module 6 comepensation !
Module 6 comepensation !
 
Module 6 comepensation !!!!!!
Module 6 comepensation !!!!!!Module 6 comepensation !!!!!!
Module 6 comepensation !!!!!!
 
Man org session 1_intro_28th june 2012
Man org session 1_intro_28th june 2012Man org session 1_intro_28th june 2012
Man org session 1_intro_28th june 2012
 
"Enterprise Mobile", Marco Nielsen
"Enterprise Mobile", Marco Nielsen"Enterprise Mobile", Marco Nielsen
"Enterprise Mobile", Marco Nielsen
 
Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...
Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...
Welcome to the New Procurement: Scenarios and Strategies to Ride the Services...
 
Techniques of buying 01
Techniques of buying 01Techniques of buying 01
Techniques of buying 01
 
Introduction to production management
Introduction to production managementIntroduction to production management
Introduction to production management
 
uTest STPCon 2011 Presentation
uTest STPCon 2011 PresentationuTest STPCon 2011 Presentation
uTest STPCon 2011 Presentation
 
Nazdar Top Ten Mistakes Webinar
Nazdar Top Ten Mistakes WebinarNazdar Top Ten Mistakes Webinar
Nazdar Top Ten Mistakes Webinar
 
Assessing the Procurement Function
Assessing the Procurement FunctionAssessing the Procurement Function
Assessing the Procurement Function
 
Assessing the procurement function
Assessing the procurement functionAssessing the procurement function
Assessing the procurement function
 
Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...Business Case Strategies For Integrating Comissioning With Construction And P...
Business Case Strategies For Integrating Comissioning With Construction And P...
 
An action plan vision -- marketing propensities for ivorysands
An action plan vision -- marketing propensities for ivorysandsAn action plan vision -- marketing propensities for ivorysands
An action plan vision -- marketing propensities for ivorysands
 

More from Anupam Kumar

Supply Chain Management vs Logistics Management
Supply Chain Management vs Logistics ManagementSupply Chain Management vs Logistics Management
Supply Chain Management vs Logistics ManagementAnupam Kumar
 
Socio Economic Analysis
Socio Economic AnalysisSocio Economic Analysis
Socio Economic AnalysisAnupam Kumar
 
Analyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A FrameworkAnalyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A FrameworkAnupam Kumar
 
Strategy development patterns and process
Strategy development patterns and processStrategy development patterns and process
Strategy development patterns and processAnupam Kumar
 
Strategic management in different business context
Strategic management in different business contextStrategic management in different business context
Strategic management in different business contextAnupam Kumar
 
Strategic fit and stretch
Strategic fit and stretchStrategic fit and stretch
Strategic fit and stretchAnupam Kumar
 
Strategic management model
Strategic management modelStrategic management model
Strategic management modelAnupam Kumar
 
Concept of corporate planning
Concept of corporate planningConcept of corporate planning
Concept of corporate planningAnupam Kumar
 
Vision & mission statement
Vision & mission statementVision & mission statement
Vision & mission statementAnupam Kumar
 
Foundation of strategic management
Foundation of strategic managementFoundation of strategic management
Foundation of strategic managementAnupam Kumar
 
Dynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital GoodsDynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital GoodsAnupam Kumar
 
Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?Anupam Kumar
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality controlAnupam Kumar
 
Quality and quality control
Quality and quality controlQuality and quality control
Quality and quality controlAnupam Kumar
 
Inventory management & control
Inventory management & controlInventory management & control
Inventory management & controlAnupam Kumar
 
Programme evaluation and review technique (pert)
Programme evaluation and review technique (pert)Programme evaluation and review technique (pert)
Programme evaluation and review technique (pert)Anupam Kumar
 
Critical path method
Critical path methodCritical path method
Critical path methodAnupam Kumar
 
Basic concepts of network analysis
Basic concepts of network analysisBasic concepts of network analysis
Basic concepts of network analysisAnupam Kumar
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementAnupam Kumar
 

More from Anupam Kumar (20)

Supply Chain Management vs Logistics Management
Supply Chain Management vs Logistics ManagementSupply Chain Management vs Logistics Management
Supply Chain Management vs Logistics Management
 
Socio Economic Analysis
Socio Economic AnalysisSocio Economic Analysis
Socio Economic Analysis
 
Analyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A FrameworkAnalyzing Tourism through the 4-A Framework
Analyzing Tourism through the 4-A Framework
 
Strategy development patterns and process
Strategy development patterns and processStrategy development patterns and process
Strategy development patterns and process
 
Strategic management in different business context
Strategic management in different business contextStrategic management in different business context
Strategic management in different business context
 
Strategic fit and stretch
Strategic fit and stretchStrategic fit and stretch
Strategic fit and stretch
 
Strategic management model
Strategic management modelStrategic management model
Strategic management model
 
Concept of corporate planning
Concept of corporate planningConcept of corporate planning
Concept of corporate planning
 
Vision & mission statement
Vision & mission statementVision & mission statement
Vision & mission statement
 
Foundation of strategic management
Foundation of strategic managementFoundation of strategic management
Foundation of strategic management
 
Dynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital GoodsDynamics and Dimensions Pertaining to the Purchase of Capital Goods
Dynamics and Dimensions Pertaining to the Purchase of Capital Goods
 
Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?Indian Furniture Industry: Is It Time to Commoditize?
Indian Furniture Industry: Is It Time to Commoditize?
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Statistical quality control
Statistical quality controlStatistical quality control
Statistical quality control
 
Quality and quality control
Quality and quality controlQuality and quality control
Quality and quality control
 
Inventory management & control
Inventory management & controlInventory management & control
Inventory management & control
 
Programme evaluation and review technique (pert)
Programme evaluation and review technique (pert)Programme evaluation and review technique (pert)
Programme evaluation and review technique (pert)
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Basic concepts of network analysis
Basic concepts of network analysisBasic concepts of network analysis
Basic concepts of network analysis
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 

Location of a plant

  • 1. Need for Locating a Plant • It arises when: – The business in newly started Locating a Plant – The expansion to the existing plant is not possible – A firm wants to establish new branches Presented By: – The landlord does not renew the existing lease Anupam Kumar – Economic or social reasons like: Reader SMS Varanasi • Inadequate power supply E mail: anupamkr@gmail.com • Government regulations, etc. © Copyright 2013 Anupam Kumar 1 © Copyright 2013 Anupam Kumar 2 Importance of the Right Location Importance of the Right Location • Location Decision is a long term decision • The location of plant fixes the cost structure. • Location Decision is difficult to revise or – It affects the fixed and variable costs. reverse – At times transportation costs are almost 25% of the price of product. • The location of plant fixes the production • Location of a facility affects the company’s technology. ability to serve its customers quickly and – Options between labour intensive or capital / conveniently. machine intensive production technologies. • Location determines the nature and size of the business © Copyright 2013 Anupam Kumar 3 © Copyright 2013 Anupam Kumar 4 Factors Affecting Location Decisions Factors Affecting Plant Location • Market Proximity • Availability of Services • Controllable Factors • Uncontrollable Factors • Integration with other • Suitability of Land and – Market – Government Policy parts of the organization Climate – Supply of Raw Material – Climatic Conditions • Availability of Labour and • Regional Regulations – Transport – Supporting Industries Skills • Room for Expansion – Infrastructure – Community • Site Cost • Safety Requirements Availability – Social Network • Availability of Amenities • Political Cultural and – Labour and Wages • Availability of Transport Economic Situations Facilities • Regional Taxes, Special • Availability of Inputs Grants and Import / Export Barriers. © Copyright 2013 Anupam Kumar 5 © Copyright 2013 Anupam Kumar 6 © Copyright 2013 Anupam Kumar 1
  • 2. Need for Locating a Plant Location Evaluation Methods • The need for locating a plant can broadly be divided • There are various methods for evaluating the into 2 types. ideal Location for a Plant. – Location Choice for Existing Organization • Plants Manufacturing Distinct Products • Some of them are: • Plants Supplying to a Specific Market Area – Factor Rating Method • Plants Based on the Process or Stage of Manufacturing – Point Rating Method • Plant Emphasizing Flexibility (Increase in Operations) – Location Choice for New Organizations – Locational Break-Even Analysis • Identification of Region – Center of Gravity Method • Choice of Site with a region – Transportation Model • Selecting a Site © Copyright 2013 Anupam Kumar 7 © Copyright 2013 Anupam Kumar 8 Factor Rating Method Factor Rating – Selection Criteria • Labor costs; including • State and local government • Most widely used location technique – wages, fiscal policies; including – unionization, – incentives, • Useful for service & industrial locations – productivity – taxes, • Rates locations using factors • Labor availability; including – unemployment compensation – attitudes, • Utilities; including – Intangible (qualitative) factors – age, – fuel, • Example: Education quality, labor skills – distribution and – electricity, – skills – Water costs – Tangible (quantitative) factors • Proximity to raw materials • Site costs; including and suppliers – land, • Example: Short-run & long-run costs – expansion, • Proximity to markets – parking, – drainage © Copyright 2013 Anupam Kumar 9 © Copyright 2013 Anupam Kumar 10 Factor Rating – Selection Criteria Factor Rating Method • Quality-of-life issues; • Transportation availability; • List relevant factors including including – all levels of education, – rail, • Assign importance weight to each factor (0 - 5) – cost of living, – air, – health care, – water and • Develop scale for each factor (1 - 10) – sports, – interstate roads – cultural activities, • Quality of government; • Score each location using factor scale – transportation, including • Multiply scores by weights for each factor & – housing, – stability, – entertainment, – honesty, total – religious facilities – attitudes toward new business - whether overseas • Select location with maximum total score • Foreign exchange; including or local – rates and stability © Copyright 2013 Anupam Kumar 11 © Copyright 2013 Anupam Kumar 12 © Copyright 2013 Anupam Kumar 2
  • 3. Factor Rating Method - Illustration Point Rating Method Factor Factor Location Location • While selecting a location, companies have several Rating A B objectives, Tax Advantage 4 8 6 – But not all are of equal importance Suitability of labour Skill 3 2 3 • To overcome this issue, in Factor Rating Method, Proximity to customers 3 6 5 – each objective is given a Factor Rating depending upon – the mutual importance of the various objectives. Adequacy of Water 1 3 3 • The Point Rating Method takes into consideration a Receptivity of community 5 4 3 hypothetical ideal location and tries to fix the Quality of Education System 4 1 6 maximum points for each of the objectives. Access to rail and Air transport 3 10 8 • Now all the available locations are given points after considering the maximum possible points as per the Suitability of climate 2 7 9 ideal site. Availability of Power 2 6 4 © Copyright 2013 Anupam Kumar 139 14013 © Copyright 2013 Anupam Kumar 14 Point Rating Method - Illustration Point Rating Method Factor Rated Maximum Location Location Possible Points X Y • The drawback of this method is that Future Availability of Fuel 300 200 290 – high score in any factor can overcome a low score Transportation, Flexibility & 250 200 95 in other factor. Growth • To overcome such extreme deviations, Adequacy of Water Supply 150 100 140 – any site which does not have at least a specified Labour Availability 250 210 200 number of points for those essential factors are Pollution Regulations 300 250 280 – excluded from further consideration. Site Topography 50 40 30 Living Conditions 150 100 135 © Copyright 2013 Anupam Kumar 1100 1130 15 © Copyright 2013 Anupam Kumar 16 Point Rating Method - Illustration Point Rating Method Factor Rated Maximum Location Location • Point Rating Method helps in comparing the Possible Points X Y tangible factors with the intangible factors. Future Availability of Fuel 300 200 290 Transportation, Flexibility & 250 200 95 • Points are assigned only to the intangible Growth factors. Adequacy of Water Supply 150 100 140 • Evaluation is made to determine whether Labour Availability 250 210 200 – the difference between the intangible scores is Pollution Regulations 300 250 280 worth Site Topography 50 40 30 – the difference between the tangible costs (if any) Living Conditions 150 100 135 of the competing locations. © Copyright 2013 Anupam Kumar 1100 1130 17 © Copyright 2013 Anupam Kumar 18 © Copyright 2013 Anupam Kumar 3
  • 4. Point Rating Method Locational Break-Even Analysis • If two alternative locations are found to be • Method of cost-volume analysis used for equally attractive by comparing costs based industrial locations on tangible factors then • Steps • These two alternative potential locations may – Determine fixed & variable costs for each location further be evaluated, based on the intangible – Plot total cost for each location factors using the Point Rating Method. – Select location with lowest total cost for expected production volume • Must be above break-even © Copyright 2013 Anupam Kumar 19 © Copyright 2013 Anupam Kumar 20 Locational Break-Even Analysis - Locational Break-Even Analysis Illustration • You’re an analyst for ACC Cement. Sr. Place Fixed Cost Variable Total Cost Variable Cost No. (in INR) Cost (at 0 Unit ( at 2 Lac unit • You’re considering a new manufacturing plant in Aurangabad, ‘000s (in INR) production) production) Bhubaneswar, or Coimbatore. Fixed costs per year are Rs. ‘000s ‘000 s 11Cr., Rs. 6Cr., & Rs.3Cr. respectively. 1. Aurangabad 110000 250 110000 50000 2. Bhubaneswar 60000 450 60000 90000 • Variable costs per case are Rs. 250, Rs.450, & Rs.750 3. Coimbatore 30000 750 30000 150000 respectively. • The price per bag is Rs. 1200. Sr. Place Fixed Cost Variable Variable Cost Variable Cost No. (in INR) Cost (at 1 Lac Unit ( at 5 Lac unit • What is the best location for an expected volume of 200,000 ‘000s (in INR) production) production) bags per year? Back to Question ‘000s ‘000 s • Would your decision change if the expected volume is more 4. Aurangabad 110000 250 25000 125000 than 5 Lakh bags or less than 1 Lakh bags? 5. Bhubaneswar 60000 450 45000 225000 6. Coimbatore 30000 750 75000 375000 © Copyright 2013 Anupam Kumar 21 © Copyright 2013 Anupam Kumar 22 Locational Break-Even Analysis – Locational Break-Even Analysis Illustration Chart • Godavari Electricals Ltd. Wanted to set up its new plant for manufacturing 2000 of heaters. The management of Godavari identified three potential areas whose fixed and variable costs are as below. 1500 Annual Cost • The product is expected to be sold at Rs. 1050 per unit and the existing (in ‘00) demand in the market is likely to be 600 units per year. 1000 • Calculate the most profitable location for Godavari under the current conditions. 500 C lowest B lowest A • What is the minimum quantity that Godavari should target to break even cost cost lowest its costs in Hyderabad? cost 0 Location Fixed Cost / Year Variable Cost / Unit 0 5 10 15 20 25 30 Kakinada Rs. 2,00,000.00 325 Volume Vijayawada Rs. 2,50,000.00 285 (in ‘00) Hyderabad Rs. 3,00,000.00 265 © Copyright 2013 Anupam Kumar 23 © Copyright 2013 Anupam Kumar 24 © Copyright 2013 Anupam Kumar 4
  • 5. Center of Gravity Method Center of Gravity Method Steps • Finds location of single distribution center • Place existing locations on a coordinate grid serving several destinations – Grid has arbitrary origin & scale – Maintains relative distances • Used primarily for services • Considers • Calculate X & Y coordinates for ‘center of gravity’ – Location of existing destinations – Gives location of distribution center • Example: Markets, retailers etc. – Minimizes transportation cost – Volume to be shipped – Shipping distance (or cost) • Shipping cost/unit/mile is constant © Copyright 2013 Anupam Kumar 25 © Copyright 2013 Anupam Kumar 26 Center of Gravity Method Transportation Model • Finds amount to be shipped from several sources to several destinations • Used primarily for industrial locations • Type of linear programming model – Objective: Minimize total production & shipping costs – Constraints • Production capacity at source (factory) • Demand requirement at destination © Copyright 2013 Anupam Kumar 27 © Copyright 2013 Anupam Kumar 28 Bibliography • Buffa, E.S. and Sarin, R.K., “Modern Production/Operations Management,” Eighth Edition. Singapore: John Wiley & Sons (Asia). 1994. • Martinich, J.S., “Production and Operations Management: An Applied Approach”, Singapore: John Wiley & Sons (Asia), 2003. • Monks, J.G., “Theory and Problems of Operations Management”, Second Edition, New Delhi: Tata McGraw For further details … • Hill, 2004. Chary, S.N., “Productions and Operations Management,” Third Edition, New Delhi: Tata McGraw Hill, 2004 • Kumar, S.A., and Suresh, N., “Production and Operations Management”, Second Edition, New Delhi: New Age, 2008. • Goel, B.S., “Production Operations Management”, Twenty Second Edition, Meerut, U.P.: Pragati Prakashan, Contact 2010. Anupam Kumar • Kachru, U. “Production and Operations Management: Text and Cases,” New Delhi: Excel Books, 2007. • Rama Murthy, P., “Production and Operations Management,” New Delhi: New Age International, 2012. Reader • Chunawalla, S.A., and Patel, D.R., “Production and Operations Management,” Mumbai: Himalaya School of Management Sciences, Varanasi. Publishing House, 2006. Email: anupamkr@gmail.com • Jauhari, V. and Dutta, K., “Services: Marketing Operations and Management,” New Delhi: Oxford University Press, 2010. • Verma, H.V., “Services Marketing: Text and Cases,” New Delhi: Dorling Kindersley, Pearson Education, 2009 © Copyright 2013 Anupam Kumar 29 © Copyright 2013 Anupam Kumar 30 © Copyright 2013 Anupam Kumar 5