What is a technical feasibility study ?
The Technical Feasibility Study assesses the details of how
you will deliver a product or service (i.e., materials, labor,
transportation, where your business will be located,
technology needed, etc.).
Think of the technical feasibility study as the logistical or
tactical plan of how your business will produce, store, deliver,
and track its products or services.
Technical Feasibility Study
Preparing an Outline for Writing Technical Feasibility Study
Materials and Supplies
Location, Site and Environment
Engineering and Technology
Human Resources
Technical Feasibility Study answers the following questions
Are enough raw materials available of the correct quality
when needed for year-round production?
Is the cost of the raw materials satisfactory?
Is the correct size and type of equipment available for the
expected production level and at a reasonable cost?
Are maintenance and repair costs affordable?
Technical Feasibility Study answers the following questions
Are distribution procedures to retailers or other sellers
established?
Is a suitable building available and what modifications are
needed?
Are services (fuel, water, electricity etc.) available?
Are trained workers available and are their salaries
affordable?
Row material and Supplies
1. Characteristics of raw materials and factory supplies
Specify list sources of materials and inputs, classified into
raw materials,
Processed industrial materials, components, auxiliary
materials, factory supplies and utilities)
2. Supply program, you have to study the following:
Specify list sources of materials and inputs, classified into raw
materials,
1. Material inputs (approximate input requirements, their
present and potential supply positions, and a rough
estimate of annual costs of local and foreign material
inputs):
 Raw materials
 Processed industrial materials
 Components
 Factory supplies (Auxiliary materials, utilities (especially
power and energy requirements)
Row material and Supplies
Row material and Supplies
Supply program:
Quantitative supply program, seasonal variations, subdivided into
a program for the entire plant, project components, and cost centers
Development of supplies, seasonal restrictions
Possible substitutes
Organization of supplies (purchase, transport etc.)
Prices
Annual cost of supplies, seasonal variations
Inventory of materials and inputs in terms of quantities and
seasonal
variations, as well as book and market value of inventories
Location, site and environment, includes the following
 re-selection, including, if appropriate, an estimate of the cost
of land
Preliminary environmental impact assessment
Location, site and environment:
Location
Describe the location of the plant and show it on appropriate maps
Give country, district, town
Show connections to existing infrastructure (traffic, electricity,
water, population etc.)
Describe socio-economic environment, nearness to market etc.
Location, site and environment:
Site
State town, street, number
Show situation and size on geodetic maps
Existing rights of way, easements etc.
Value of land
Annual costs of rights of way, rents, taxes, payments to neighbors
etc.
Local conditions and environment
Describe impacts of project on population, infrastructure,
landscape, etc.
Evaluate the tendency of impacts (positive or negative)
Assessment of environmental impacts, public and corporate
policies, conflicts, costs and environmental forecast
 Technology and equipment, includes the following:
A. Technologies and processes that can be adopted,
B. Technology description and forecast
C. Environmental impacts of technologies
D. Rough estimate of costs of local and foreign technology
E. Rough layout of proposed equipment (major components):
E.1. Production equipment
E.2. Auxiliary equipment
E.3. Service equipment
E.4. Spare parts, wear and tear parts, tools
Rough estimate of investment cost of equipment
classified as above.
Engineering and Technology
Engineering and Technology
Production programme
Production programme of products and by-products: quality
specifications, quantities produced, time schedule of production
(seasonal variations),
percentage of spoilage and waste
Plant capacity
Installed nominal maximum capacity
Feasible nominal plant capacity of entire plant, main
departments, major equipment units
Plant layouts and charts (show existing structure of plant on
physical layouts and on functional charts and layouts)
Scope of enterprise (show scope of enterprise on layout
drawings, and divide it into project components and cost centres)
Engineering and Technology
Technology
List and describe technologies used, historic development
Sources of technology
Type of acquisition: licensing, purchase, joint venture
Experiences (positive or negative)
Technology forecast
Annual costs of technologies (royalties, fixed payments)
Engineering and Technology
Equipment:
List and specify equipment, classify into production, auxiliary
and service equipment
Show equipment on plant layouts
Describe sources, age, type (automatic, semi-automatic etc.)
State capacity, condition (up-to-date, obsolete etc.)
Value of installed equipment
Annual depreciation and repair costs
Estimated life and replacement costs
 Civil engineering works, includes the following:
A. Rough layout of civil engineering works,
B. Arrangement of buildings,
C. Short description of construction materials to be used,
D. Site preparation and development
E. Buildings and special civil works
F. Outdoor works
Rough estimate of investment cost of civil engineering works (local
and foreign), classified as above.
Engineering and Technology
 Estimated human resource requirements
 Estimated annual human resource costs
Human resources:
Labor
List and describe labour force
Describe skill and availability
State annual cost of labour at nominal feasible capacity, subdivide
into production labour (variable) and non-production labour (fixed)
Staff
List and describe staff, show structure on manning tables
State annual staff cost
Capital expenditures (CAPEX)
Capital expenditures (CAPEX) are expenditures
creating future benefits. A capital expenditure is
incurred when a business spends money either to buy
fixed assets or to add to the value of an existing fixed
asset with a useful life extending beyond the taxable
year.
Capital expenditures (CAPEX) are expenditures
creating future benefits. A capital expenditure is
incurred when a business spends money either to buy
fixed assets or to add to the value of an existing fixed
asset with a useful life extending beyond the taxable
year.
Costs
Capital expenditures include:
 acquiring fixed, and in some cases, intangible assets
 repairing an existing asset so as to improve its useful life
 upgrading an existing asset
 preparing an asset to be used in business
 starting or acquiring a new business
Operational expenditures (OPEX)
Operational expenditure (OPEX) OPEX is an
ongoing cost for running a product, business, or
system.
Operational expenditure (OPEX) OPEX is an
ongoing cost for running a product, business, or
system.
Operational expenditures include:
License fees
maintenance and repairs
advertising
office expenses
Supplies
legal fees
utilities, such as telephone
Insurance
property taxes
travel and vehicle expenses

More Related Content

What's hot

Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planning
Shankarjyoti Hazarika
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
Abhijeet Bhosale
 

What's hot (20)

Project development cycle
Project development cycleProject development cycle
Project development cycle
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection Methods
 
Financial feasibility
Financial feasibilityFinancial feasibility
Financial feasibility
 
Project monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoringProject monitoring and control & planning for monitoring
Project monitoring and control & planning for monitoring
 
Process selection and capacity planning
Process selection and capacity planningProcess selection and capacity planning
Process selection and capacity planning
 
Productivity and operation management
Productivity and operation managementProductivity and operation management
Productivity and operation management
 
Earned value analysis (1)
Earned value analysis (1)Earned value analysis (1)
Earned value analysis (1)
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
PROJECT LIFE CYCLE
PROJECT LIFE CYCLEPROJECT LIFE CYCLE
PROJECT LIFE CYCLE
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Technical analysis
Technical analysisTechnical analysis
Technical analysis
 
Facility planning
Facility planningFacility planning
Facility planning
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Project feasibility study report
Project feasibility study report Project feasibility study report
Project feasibility study report
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Introduction to IPSAS and conceptual framework
Introduction to IPSAS and conceptual frameworkIntroduction to IPSAS and conceptual framework
Introduction to IPSAS and conceptual framework
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
 
Project Planning
Project PlanningProject Planning
Project Planning
 

Similar to Ch5 technical feasibility study

SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
PANKAJ TIKEKAR
 
2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdf2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdf
estevao16
 
Layout
LayoutLayout
Layout
FNian
 
Handout 3 entrepreneurship - call of the day (1)
Handout 3   entrepreneurship - call of the day (1)Handout 3   entrepreneurship - call of the day (1)
Handout 3 entrepreneurship - call of the day (1)
Prashanth Karthikeyan
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.doc
selam49
 
Joe Ragusa Resume
Joe Ragusa Resume Joe Ragusa Resume
Joe Ragusa Resume
Joe Ragusa
 

Similar to Ch5 technical feasibility study (20)

Technical Analysis & Financial Analysis
Technical Analysis & Financial AnalysisTechnical Analysis & Financial Analysis
Technical Analysis & Financial Analysis
 
Feasibility studies
Feasibility studiesFeasibility studies
Feasibility studies
 
Preparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projectsPreparation of project reports and appraisal of projects
Preparation of project reports and appraisal of projects
 
SAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCESAP BASED PLANT MAINTENANCE
SAP BASED PLANT MAINTENANCE
 
U.S. Air Force White Paper Templates
U.S. Air Force White Paper TemplatesU.S. Air Force White Paper Templates
U.S. Air Force White Paper Templates
 
Project report of a business
Project report of a businessProject report of a business
Project report of a business
 
Layout
LayoutLayout
Layout
 
2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdf2-Format for Submission of Full Proposal-IPHEE.pdf
2-Format for Submission of Full Proposal-IPHEE.pdf
 
Layout
LayoutLayout
Layout
 
Triple/S Dynamics Presentation - Belt Conveyor vs. Horizontal Motion Conveyor
Triple/S Dynamics Presentation - Belt Conveyor vs. Horizontal Motion ConveyorTriple/S Dynamics Presentation - Belt Conveyor vs. Horizontal Motion Conveyor
Triple/S Dynamics Presentation - Belt Conveyor vs. Horizontal Motion Conveyor
 
Jan Verbeek, ADSE
Jan Verbeek, ADSEJan Verbeek, ADSE
Jan Verbeek, ADSE
 
Telecom product cost models development approach
Telecom product cost models development approachTelecom product cost models development approach
Telecom product cost models development approach
 
Handout 3 entrepreneurship - call of the day (1)
Handout 3   entrepreneurship - call of the day (1)Handout 3   entrepreneurship - call of the day (1)
Handout 3 entrepreneurship - call of the day (1)
 
Deepening cost analysis for Onshore Wind Technology
Deepening cost analysis for Onshore Wind TechnologyDeepening cost analysis for Onshore Wind Technology
Deepening cost analysis for Onshore Wind Technology
 
eecappt-200418083340.pdf
eecappt-200418083340.pdfeecappt-200418083340.pdf
eecappt-200418083340.pdf
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.doc
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.doc
 
Bauernfeind, Resume12 SMET
Bauernfeind, Resume12 SMETBauernfeind, Resume12 SMET
Bauernfeind, Resume12 SMET
 
Engineering Economics and Cost Estimation
Engineering Economics and Cost EstimationEngineering Economics and Cost Estimation
Engineering Economics and Cost Estimation
 
Joe Ragusa Resume
Joe Ragusa Resume Joe Ragusa Resume
Joe Ragusa Resume
 

More from Abd ELRahman ALFar

More from Abd ELRahman ALFar (20)

Scholarships induction day
Scholarships induction day Scholarships induction day
Scholarships induction day
 
Chapter 7 Economic Feasibility Study
Chapter 7 Economic Feasibility StudyChapter 7 Economic Feasibility Study
Chapter 7 Economic Feasibility Study
 
Chapter 4 Market feasibility study
Chapter 4 Market feasibility studyChapter 4 Market feasibility study
Chapter 4 Market feasibility study
 
Feasibility Study Chapter 3
Feasibility Study Chapter 3Feasibility Study Chapter 3
Feasibility Study Chapter 3
 
Feasibility Study Chapter 2
Feasibility Study Chapter 2Feasibility Study Chapter 2
Feasibility Study Chapter 2
 
Feasibility Study Chapter 2
Feasibility Study Chapter 2Feasibility Study Chapter 2
Feasibility Study Chapter 2
 
Feasibility study Chapter 1
Feasibility study Chapter 1Feasibility study Chapter 1
Feasibility study Chapter 1
 
Aggregate demand ii
Aggregate demand iiAggregate demand ii
Aggregate demand ii
 
Aggregate demand i
Aggregate demand iAggregate demand i
Aggregate demand i
 
Public Budget
Public BudgetPublic Budget
Public Budget
 
Tax incidence-supply-demand-diagrams
Tax incidence-supply-demand-diagramsTax incidence-supply-demand-diagrams
Tax incidence-supply-demand-diagrams
 
Public Finance Mid exam
Public Finance Mid examPublic Finance Mid exam
Public Finance Mid exam
 
introduction to public finance
introduction to public finance introduction to public finance
introduction to public finance
 
Economic feasibility study Chapter 7
Economic feasibility study Chapter 7Economic feasibility study Chapter 7
Economic feasibility study Chapter 7
 
Mankiew chapter 7 Consumers, Producers, and the Efficiency of Markets
Mankiew chapter 7 Consumers, Producers, and the Efficiency of MarketsMankiew chapter 7 Consumers, Producers, and the Efficiency of Markets
Mankiew chapter 7 Consumers, Producers, and the Efficiency of Markets
 
Ch6 finance feasibility study
Ch6 finance feasibility studyCh6 finance feasibility study
Ch6 finance feasibility study
 
feasibility study Chapter 4
feasibility study Chapter 4feasibility study Chapter 4
feasibility study Chapter 4
 
palestine stock exchange market PSE
palestine stock exchange market PSEpalestine stock exchange market PSE
palestine stock exchange market PSE
 
Feasiability Study The legal & investment environmental Feasibility study Ch...
Feasiability Study The legal & investment environmental  Feasibility study Ch...Feasiability Study The legal & investment environmental  Feasibility study Ch...
Feasiability Study The legal & investment environmental Feasibility study Ch...
 
Feasiability Study Chapter 2
Feasiability Study Chapter 2Feasiability Study Chapter 2
Feasiability Study Chapter 2
 

Recently uploaded

abortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadh
abortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadhabortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadh
abortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadh
samsungultra782445
 
Economics Presentation-2.pdf xxjshshsjsjsjwjw
Economics Presentation-2.pdf xxjshshsjsjsjwjwEconomics Presentation-2.pdf xxjshshsjsjsjwjw
Economics Presentation-2.pdf xxjshshsjsjsjwjw
mordockmatt25
 
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdfMASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
Cocity Enterprises
 
QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.
QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.
QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.
hyt3577
 

Recently uploaded (20)

Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai MultipleDubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
 
abortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadh
abortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadhabortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadh
abortion pills in Jeddah Saudi Arabia (+919707899604)cytotec pills in Riyadh
 
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
Famous No1 Amil Baba Love marriage Astrologer Specialist Expert In Pakistan a...
 
7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options
 
Famous Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist i...
Famous Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist i...Famous Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist i...
Famous Kala Jadu, Black magic expert in Faisalabad and Kala ilam specialist i...
 
Economics Presentation-2.pdf xxjshshsjsjsjwjw
Economics Presentation-2.pdf xxjshshsjsjsjwjwEconomics Presentation-2.pdf xxjshshsjsjsjwjw
Economics Presentation-2.pdf xxjshshsjsjsjwjw
 
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdfSeeman_Fiintouch_LLP_Newsletter_May-2024.pdf
Seeman_Fiintouch_LLP_Newsletter_May-2024.pdf
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
 
Strategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationStrategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate Presentation
 
cost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptxcost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptx
 
Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdf
 
Pension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdfPension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdf
 
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdfMASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
MASTERING FOREX: STRATEGIES FOR SUCCESS.pdf
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
 
Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...
Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...
Famous Kala Jadu, Kala ilam specialist in USA and Bangali Amil baba in Saudi ...
 
QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.
QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.
QATAR Pills for Abortion -+971*55*85*39*980-in Dubai. Abu Dhabi.
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 

Ch5 technical feasibility study

  • 2. Technical Feasibility Study What is a technical feasibility study ? The Technical Feasibility Study assesses the details of how you will deliver a product or service (i.e., materials, labor, transportation, where your business will be located, technology needed, etc.). Think of the technical feasibility study as the logistical or tactical plan of how your business will produce, store, deliver, and track its products or services.
  • 3. Technical Feasibility Study Preparing an Outline for Writing Technical Feasibility Study Materials and Supplies Location, Site and Environment Engineering and Technology Human Resources
  • 4. Technical Feasibility Study answers the following questions Are enough raw materials available of the correct quality when needed for year-round production? Is the cost of the raw materials satisfactory? Is the correct size and type of equipment available for the expected production level and at a reasonable cost? Are maintenance and repair costs affordable?
  • 5. Technical Feasibility Study answers the following questions Are distribution procedures to retailers or other sellers established? Is a suitable building available and what modifications are needed? Are services (fuel, water, electricity etc.) available? Are trained workers available and are their salaries affordable?
  • 6. Row material and Supplies 1. Characteristics of raw materials and factory supplies Specify list sources of materials and inputs, classified into raw materials, Processed industrial materials, components, auxiliary materials, factory supplies and utilities) 2. Supply program, you have to study the following: Specify list sources of materials and inputs, classified into raw materials,
  • 7. 1. Material inputs (approximate input requirements, their present and potential supply positions, and a rough estimate of annual costs of local and foreign material inputs):  Raw materials  Processed industrial materials  Components  Factory supplies (Auxiliary materials, utilities (especially power and energy requirements) Row material and Supplies
  • 8. Row material and Supplies Supply program: Quantitative supply program, seasonal variations, subdivided into a program for the entire plant, project components, and cost centers Development of supplies, seasonal restrictions Possible substitutes Organization of supplies (purchase, transport etc.) Prices Annual cost of supplies, seasonal variations Inventory of materials and inputs in terms of quantities and seasonal variations, as well as book and market value of inventories
  • 9. Location, site and environment, includes the following  re-selection, including, if appropriate, an estimate of the cost of land Preliminary environmental impact assessment Location, site and environment: Location Describe the location of the plant and show it on appropriate maps Give country, district, town Show connections to existing infrastructure (traffic, electricity, water, population etc.) Describe socio-economic environment, nearness to market etc.
  • 10. Location, site and environment: Site State town, street, number Show situation and size on geodetic maps Existing rights of way, easements etc. Value of land Annual costs of rights of way, rents, taxes, payments to neighbors etc. Local conditions and environment Describe impacts of project on population, infrastructure, landscape, etc. Evaluate the tendency of impacts (positive or negative) Assessment of environmental impacts, public and corporate policies, conflicts, costs and environmental forecast
  • 11.  Technology and equipment, includes the following: A. Technologies and processes that can be adopted, B. Technology description and forecast C. Environmental impacts of technologies D. Rough estimate of costs of local and foreign technology E. Rough layout of proposed equipment (major components): E.1. Production equipment E.2. Auxiliary equipment E.3. Service equipment E.4. Spare parts, wear and tear parts, tools Rough estimate of investment cost of equipment classified as above. Engineering and Technology
  • 12. Engineering and Technology Production programme Production programme of products and by-products: quality specifications, quantities produced, time schedule of production (seasonal variations), percentage of spoilage and waste Plant capacity Installed nominal maximum capacity Feasible nominal plant capacity of entire plant, main departments, major equipment units Plant layouts and charts (show existing structure of plant on physical layouts and on functional charts and layouts) Scope of enterprise (show scope of enterprise on layout drawings, and divide it into project components and cost centres)
  • 13. Engineering and Technology Technology List and describe technologies used, historic development Sources of technology Type of acquisition: licensing, purchase, joint venture Experiences (positive or negative) Technology forecast Annual costs of technologies (royalties, fixed payments)
  • 14. Engineering and Technology Equipment: List and specify equipment, classify into production, auxiliary and service equipment Show equipment on plant layouts Describe sources, age, type (automatic, semi-automatic etc.) State capacity, condition (up-to-date, obsolete etc.) Value of installed equipment Annual depreciation and repair costs Estimated life and replacement costs
  • 15.  Civil engineering works, includes the following: A. Rough layout of civil engineering works, B. Arrangement of buildings, C. Short description of construction materials to be used, D. Site preparation and development E. Buildings and special civil works F. Outdoor works Rough estimate of investment cost of civil engineering works (local and foreign), classified as above. Engineering and Technology
  • 16.  Estimated human resource requirements  Estimated annual human resource costs Human resources: Labor List and describe labour force Describe skill and availability State annual cost of labour at nominal feasible capacity, subdivide into production labour (variable) and non-production labour (fixed) Staff List and describe staff, show structure on manning tables State annual staff cost
  • 17. Capital expenditures (CAPEX) Capital expenditures (CAPEX) are expenditures creating future benefits. A capital expenditure is incurred when a business spends money either to buy fixed assets or to add to the value of an existing fixed asset with a useful life extending beyond the taxable year. Capital expenditures (CAPEX) are expenditures creating future benefits. A capital expenditure is incurred when a business spends money either to buy fixed assets or to add to the value of an existing fixed asset with a useful life extending beyond the taxable year. Costs
  • 18. Capital expenditures include:  acquiring fixed, and in some cases, intangible assets  repairing an existing asset so as to improve its useful life  upgrading an existing asset  preparing an asset to be used in business  starting or acquiring a new business
  • 19. Operational expenditures (OPEX) Operational expenditure (OPEX) OPEX is an ongoing cost for running a product, business, or system. Operational expenditure (OPEX) OPEX is an ongoing cost for running a product, business, or system.
  • 20. Operational expenditures include: License fees maintenance and repairs advertising office expenses Supplies legal fees utilities, such as telephone Insurance property taxes travel and vehicle expenses