Material
planning
Material
purchasing
Inventory
control
Material
storing
Material
transporting
Disposal of
scrap
material
Material
handling
Waste
material
management
๏ƒ˜ To ensure the availability of material & services
required for construction.
๏ƒ˜ Increase profit by keeping capital constant.
๏ƒ˜ Reduced capital by keeping profit constant.
๏‚จ Vendor means network of supplier.
๏‚จ A project manager always try to set up such
network by which manger ensure continuous
supply of material on construction site.
๏‚จ The image of any construction firm is decided
by relationship between manager and seller
relationship.
๏‚จ If the firm is prominent enough for clearing the
bill of supplier ten it is very assured firm for
supplier.
Alphabetical system Numerical system
Decimal code
Alpha numerical
system
Material
codification
Demand for construction site
Origin of material supply
Composition of material
The percentage of total costing
required for for purchase of
material
๏‚จ Identification means to recognized the similar
material .
๏‚จ This is very initial stage in sorting of material.
๏‚จ In this stage each and every material is identify
with source of its supply in timely manner.
๏‚จ No material should left while performing this
part.
๏ƒผ Logistic means supply of material, services,
information etc.
๏ƒผ As effective working of construction site
completely depends on good supply of raw
materials & services provided to complete the
work.
๏ƒผ Logistic management can be defined as, โ€œ to
achieve high degree customer satisfaction wit high
reliability , high degree of completeness in short
delivery time, a management of material & its
information is necessary.
๏ƒผ This management is logistic management.
๏ƒ˜ ERP means enterprise resource planning.
๏ƒ˜ This system is useful for collect, store, manage
& interpret the information.
๏ƒ˜ A data is initially maintained by database
software & this data is considered as main
source to produce only decision or to take any
action for managing material.
๏ƒ˜ This lead the use of computer based software
which are very much useful of maintaining the
material flow on site.
๏ƒ˜ One of the vital resources in the management of
construction sector is manpower.
๏ƒ˜ In other word it is referred as โ€œHuman Resourceโ€.
๏ƒ˜ As in India, construction industry is rising from few
decade the role of human resource management is
very vital.
๏ƒ˜ HRM major role is to convert most of the unskilled
workforce to skilled workforce.
๏ƒ˜ For this a detailed management is required which is
labelled as Human resource management.
Training &
development
Planning for
human resource
Need of manpower
Top
management
Appointment
of HR
manager
Auditing &
forecasting
for HR
HR planning
Recruitment
selection
,placement
Training
Evaluation &
performance
appraisal
๏ƒ˜ โ€œTo calculate worth of employee & thus worth of
construction firm the process is followed for
obtaining, storing , analyzing& recording which is
called as performance appraisal.โ€
๏ƒ˜ So, by doing this one can actually follows the
process of evaluating the workers performance
towards the objective or goal of the company.
๏ƒ˜ Performance appraisal gives perfect information of
companyโ€™s status.
๏ƒ˜ This is important to make sure that organisation is
paying right amount to its employee & employees
are doing work as per their responsibilities.
๏ƒผ Improve technical competency in employees.
๏ƒผ Improve behavioral among employees.
๏ƒผ Improve satisfaction of job and moral among
employees.
๏ƒผ Increase the capacity of organization to update
with new technology with target time.
๏ƒผ encouraging employee for achieving higher
qualification & innovation.
๏ƒผ To empower the employee for effective
functioning with current job position.
THANK YOU

More Related Content

What's hot

Material management control power point presentation
Material management control power point presentationMaterial management control power point presentation
Material management control power point presentationMuhammad Asif Khan Awan
ย 
Materials management
Materials managementMaterials management
Materials managementARUNAYESUDAS
ย 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
ย 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material ManagementPriya Ramaraj
ย 
Scope and functons of materals management
Scope and functons of materals managementScope and functons of materals management
Scope and functons of materals managementSunil kushwaha
ย 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteIRJET Journal
ย 
integrated material management
integrated material managementintegrated material management
integrated material managementReetu Manglani
ย 
Production Planning & Control
Production Planning & Control Production Planning & Control
Production Planning & Control NirajChaudhari23
ย 
Production Planning
Production Planning Production Planning
Production Planning NirajChaudhari23
ย 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource PlanningBiswajit Ghosh
ย 
A Simple Case Study of Material Requirement Planning
A Simple Case Study of Material Requirement PlanningA Simple Case Study of Material Requirement Planning
A Simple Case Study of Material Requirement PlanningIOSR Journals
ย 
Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysisDr. Sonal Mandhotra
ย 
Unit 1 materials management
Unit 1 materials managementUnit 1 materials management
Unit 1 materials managementGanesha Pandian
ย 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnetnimbalkarpranit
ย 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
ย 
5 steps to better construction materials tracking
5 steps to better construction materials tracking5 steps to better construction materials tracking
5 steps to better construction materials trackingVeera Huovinen
ย 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
ย 

What's hot (20)

Material management control power point presentation
Material management control power point presentationMaterial management control power point presentation
Material management control power point presentation
ย 
Materials management
Materials managementMaterials management
Materials management
ย 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
ย 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
ย 
Scope and functons of materals management
Scope and functons of materals managementScope and functons of materals management
Scope and functons of materals management
ย 
Materials management
Materials managementMaterials management
Materials management
ย 
Demand forecasting
Demand forecastingDemand forecasting
Demand forecasting
ย 
Factors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction SiteFactors Affecting Material Management on Construction Site
Factors Affecting Material Management on Construction Site
ย 
integrated material management
integrated material managementintegrated material management
integrated material management
ย 
Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :- 8 material management
ย 
Production Planning & Control
Production Planning & Control Production Planning & Control
Production Planning & Control
ย 
Production Planning
Production Planning Production Planning
Production Planning
ย 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
ย 
A Simple Case Study of Material Requirement Planning
A Simple Case Study of Material Requirement PlanningA Simple Case Study of Material Requirement Planning
A Simple Case Study of Material Requirement Planning
ย 
Material Management and ABC analysis
Material Management and ABC analysisMaterial Management and ABC analysis
Material Management and ABC analysis
ย 
Unit 1 materials management
Unit 1 materials managementUnit 1 materials management
Unit 1 materials management
ย 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnet
ย 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
ย 
5 steps to better construction materials tracking
5 steps to better construction materials tracking5 steps to better construction materials tracking
5 steps to better construction materials tracking
ย 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
ย 

Similar to MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT

Mastering workforce through hrmis
Mastering workforce through hrmisMastering workforce through hrmis
Mastering workforce through hrmisranjanshetty
ย 
Automating your Manufacturing Workforce with Mobility
Automating your Manufacturing Workforce with Mobility Automating your Manufacturing Workforce with Mobility
Automating your Manufacturing Workforce with Mobility Catavolt, Inc.
ย 
Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11Piyush Kumar Chowhan
ย 
Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11Piyush Kumar Chowhan
ย 
Human resource management introduction power point
Human resource management introduction power pointHuman resource management introduction power point
Human resource management introduction power pointsreekanthkonnipati
ย 
Shared services - A Strategic Cost Management Platform
Shared services - A Strategic Cost Management PlatformShared services - A Strategic Cost Management Platform
Shared services - A Strategic Cost Management PlatformSanjay Chaudhuri
ย 
Kaizer Workshop on Quality Tools and Effective Facility Manangement
Kaizer Workshop on Quality Tools and Effective Facility ManangementKaizer Workshop on Quality Tools and Effective Facility Manangement
Kaizer Workshop on Quality Tools and Effective Facility ManangementMitaT
ย 
Gaurav Gupta Resume
Gaurav Gupta ResumeGaurav Gupta Resume
Gaurav Gupta ResumeGaurav Gupta
ย 
Enterprise Resource planning Unit 3 ERP implementation
Enterprise Resource planning Unit 3 ERP implementationEnterprise Resource planning Unit 3 ERP implementation
Enterprise Resource planning Unit 3 ERP implementationGanesha Pandian
ย 
Cv shekhar jha
Cv shekhar jhaCv shekhar jha
Cv shekhar jhaShekhar Jha
ย 
Summer Training Report on recruitment channels evaluation
Summer Training Report on recruitment channels evaluationSummer Training Report on recruitment channels evaluation
Summer Training Report on recruitment channels evaluationsunil pandey
ย 
Jcradcliff 2010
Jcradcliff 2010Jcradcliff 2010
Jcradcliff 2010jimmychuck
ย 
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENTOPERATIONS MANAGEMENT
OPERATIONS MANAGEMENTANITHA THOMAS
ย 
My Resume-VijayaShankar
My Resume-VijayaShankarMy Resume-VijayaShankar
My Resume-VijayaShankarVijayaShankar H
ย 
steps of implementation of HRIS
steps of implementation of HRISsteps of implementation of HRIS
steps of implementation of HRISSwejal Keshri
ย 

Similar to MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT (20)

Sharfuddeen - Resume HR
Sharfuddeen - Resume HRSharfuddeen - Resume HR
Sharfuddeen - Resume HR
ย 
Sharfuddeen - Resume HR
Sharfuddeen - Resume HRSharfuddeen - Resume HR
Sharfuddeen - Resume HR
ย 
Mastering workforce through hrmis
Mastering workforce through hrmisMastering workforce through hrmis
Mastering workforce through hrmis
ย 
Automating your Manufacturing Workforce with Mobility
Automating your Manufacturing Workforce with Mobility Automating your Manufacturing Workforce with Mobility
Automating your Manufacturing Workforce with Mobility
ย 
Ch03
Ch03Ch03
Ch03
ย 
Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11
ย 
Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11Piyush PMNetwork CloserLook article May11
Piyush PMNetwork CloserLook article May11
ย 
Human resource management introduction power point
Human resource management introduction power pointHuman resource management introduction power point
Human resource management introduction power point
ย 
Shared services - A Strategic Cost Management Platform
Shared services - A Strategic Cost Management PlatformShared services - A Strategic Cost Management Platform
Shared services - A Strategic Cost Management Platform
ย 
Kaizer Workshop on Quality Tools and Effective Facility Manangement
Kaizer Workshop on Quality Tools and Effective Facility ManangementKaizer Workshop on Quality Tools and Effective Facility Manangement
Kaizer Workshop on Quality Tools and Effective Facility Manangement
ย 
Gaurav Gupta Resume
Gaurav Gupta ResumeGaurav Gupta Resume
Gaurav Gupta Resume
ย 
Enterprise Resource planning Unit 3 ERP implementation
Enterprise Resource planning Unit 3 ERP implementationEnterprise Resource planning Unit 3 ERP implementation
Enterprise Resource planning Unit 3 ERP implementation
ย 
Cv shekhar jha
Cv shekhar jhaCv shekhar jha
Cv shekhar jha
ย 
Summer Training Report on recruitment channels evaluation
Summer Training Report on recruitment channels evaluationSummer Training Report on recruitment channels evaluation
Summer Training Report on recruitment channels evaluation
ย 
Jcradcliff 2010
Jcradcliff 2010Jcradcliff 2010
Jcradcliff 2010
ย 
Resume
ResumeResume
Resume
ย 
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENTOPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
ย 
My Resume-VijayaShankar
My Resume-VijayaShankarMy Resume-VijayaShankar
My Resume-VijayaShankar
ย 
Resume
ResumeResume
Resume
ย 
steps of implementation of HRIS
steps of implementation of HRISsteps of implementation of HRIS
steps of implementation of HRIS
ย 

More from Aishwarya Phalke

Hydroponic technology
Hydroponic technology Hydroponic technology
Hydroponic technology Aishwarya Phalke
ย 
SUMMER INTERSHIP REPORT
SUMMER INTERSHIP REPORTSUMMER INTERSHIP REPORT
SUMMER INTERSHIP REPORTAishwarya Phalke
ย 
Introduction to artificial intelligence technique
Introduction to artificial intelligence technique Introduction to artificial intelligence technique
Introduction to artificial intelligence technique Aishwarya Phalke
ย 
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERINGELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERINGAishwarya Phalke
ย 
LABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTSLABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTSAishwarya Phalke
ย 
Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Aishwarya Phalke
ย 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTAishwarya Phalke
ย 

More from Aishwarya Phalke (8)

Hydroponic technology
Hydroponic technology Hydroponic technology
Hydroponic technology
ย 
Hdpe geomembrane
Hdpe geomembraneHdpe geomembrane
Hdpe geomembrane
ย 
SUMMER INTERSHIP REPORT
SUMMER INTERSHIP REPORTSUMMER INTERSHIP REPORT
SUMMER INTERSHIP REPORT
ย 
Introduction to artificial intelligence technique
Introduction to artificial intelligence technique Introduction to artificial intelligence technique
Introduction to artificial intelligence technique
ย 
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERINGELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ELEMENTS OF RISK MANAGEMENT AND VALUE ENGINEERING
ย 
LABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTSLABOUR LAWS AND FINACIAL ASPECTS
LABOUR LAWS AND FINACIAL ASPECTS
ย 
Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement Construction Scheduling, Work Study & Work Measurement
Construction Scheduling, Work Study & Work Measurement
ย 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
ย 

Recently uploaded

Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Call Girls in Nagpur High Profile
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsArindam Chakraborty, Ph.D., P.E. (CA, TX)
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
ย 

Recently uploaded (20)

Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 

MATERIAL MANAGEMENT AND HUMAN RESOURCE MANAGEMENT

  • 3. ๏ƒ˜ To ensure the availability of material & services required for construction. ๏ƒ˜ Increase profit by keeping capital constant. ๏ƒ˜ Reduced capital by keeping profit constant.
  • 4. ๏‚จ Vendor means network of supplier. ๏‚จ A project manager always try to set up such network by which manger ensure continuous supply of material on construction site. ๏‚จ The image of any construction firm is decided by relationship between manager and seller relationship. ๏‚จ If the firm is prominent enough for clearing the bill of supplier ten it is very assured firm for supplier.
  • 5. Alphabetical system Numerical system Decimal code Alpha numerical system Material codification
  • 6. Demand for construction site Origin of material supply Composition of material The percentage of total costing required for for purchase of material
  • 7. ๏‚จ Identification means to recognized the similar material . ๏‚จ This is very initial stage in sorting of material. ๏‚จ In this stage each and every material is identify with source of its supply in timely manner. ๏‚จ No material should left while performing this part.
  • 8. ๏ƒผ Logistic means supply of material, services, information etc. ๏ƒผ As effective working of construction site completely depends on good supply of raw materials & services provided to complete the work. ๏ƒผ Logistic management can be defined as, โ€œ to achieve high degree customer satisfaction wit high reliability , high degree of completeness in short delivery time, a management of material & its information is necessary. ๏ƒผ This management is logistic management.
  • 9. ๏ƒ˜ ERP means enterprise resource planning. ๏ƒ˜ This system is useful for collect, store, manage & interpret the information. ๏ƒ˜ A data is initially maintained by database software & this data is considered as main source to produce only decision or to take any action for managing material. ๏ƒ˜ This lead the use of computer based software which are very much useful of maintaining the material flow on site.
  • 10. ๏ƒ˜ One of the vital resources in the management of construction sector is manpower. ๏ƒ˜ In other word it is referred as โ€œHuman Resourceโ€. ๏ƒ˜ As in India, construction industry is rising from few decade the role of human resource management is very vital. ๏ƒ˜ HRM major role is to convert most of the unskilled workforce to skilled workforce. ๏ƒ˜ For this a detailed management is required which is labelled as Human resource management.
  • 11. Training & development Planning for human resource Need of manpower
  • 12. Top management Appointment of HR manager Auditing & forecasting for HR HR planning Recruitment selection ,placement Training Evaluation & performance appraisal
  • 13. ๏ƒ˜ โ€œTo calculate worth of employee & thus worth of construction firm the process is followed for obtaining, storing , analyzing& recording which is called as performance appraisal.โ€ ๏ƒ˜ So, by doing this one can actually follows the process of evaluating the workers performance towards the objective or goal of the company. ๏ƒ˜ Performance appraisal gives perfect information of companyโ€™s status. ๏ƒ˜ This is important to make sure that organisation is paying right amount to its employee & employees are doing work as per their responsibilities.
  • 14. ๏ƒผ Improve technical competency in employees. ๏ƒผ Improve behavioral among employees. ๏ƒผ Improve satisfaction of job and moral among employees. ๏ƒผ Increase the capacity of organization to update with new technology with target time. ๏ƒผ encouraging employee for achieving higher qualification & innovation. ๏ƒผ To empower the employee for effective functioning with current job position.