SlideShare a Scribd company logo
1 of 3
Download to read offline
William A. Quimby
541 Verhagan Road Tallulah, Louisiana 71282
318-341-0517
bill.spot.quimby@gmail.com
OBJECTIVE
Seeking a challenging Field Engineering role where I can utilize my experience, unique skills and energy to
deliver high levels of technical know-how, support and service to benefit a professional organization or
project
CAREER PROFILE
 Extensive expertise with over 38 years experience in the industrial piping field within construction
 Well versed in Isometric drawings (SOs), Pipe and Instrument Drawings (P&IDs), Piping Specifications
(SPECs) and detailed sheets for support and piping documents
 Excelled in research and making critical decisions on projects
 Strong technical knowledge
CORE COMPETENCIES
 Skilled in communicating with all discipline levels from designers to engineers
 Expertise in resource management, with overseas project experience
 Possesses excellent organizational, multi-tasking skills, planning and problem-solving capabilities
ACHIEVEMENTS
 NCCER Core Curriculum & Pipe Instructor
 ACE Program (Achieving Craft Excellence)
 Fluor Corp – 5 year service award
 BE&K/KBR – 5 year service award
 Marathon Letourneau – 5 year service award
EMPLOYMENT HISTORY
Jacobs, Geismar, LA Jun 2014 – Feb 2015
Pipe General Foreman – Assisting Piping Field Engineers
Key Responsibilities
 Researched RFI’s i.e. went into the field and discussed issues with craft supervision, this entailed
taking detailed photographs and notes of the issues
 Compiled pertinent information via ISOs, P&Ids, vendor drawings, model shots, Laser Scans,
applicable emails and other relevant information
 Contacted Mechanical, Design, Process and Stress Engineers for additional information
 Formatted and made suggestions to the RFI once resolved, then submitted RFI to Technical Services
Manager for approval
 Generated personal spreadsheet to maintain record of RFs
KBR-Pascagoula PBOP, Pascagoula, MS Nov 2012 – Feb 2014
Completions & Systems Turn Over
Key Responsibilities
 Assembled Hydro Test Packages
 Maintained package tracking spreadsheet and assisted with weld mapping and logging of NDE
information on the tracking reports
 Ensured spec and system boundaries were maintained
 Assisted and researched technical issues, process production deviation notice
 Built, scanned and page turned dossiers
William A. Quimby
541 Verhagan Road Tallulah, Louisiana 71282
318-341-0517
bill.spot.quimby@gmail.com
Robins & Mortin, Charleston, TN Aug 2011 – Sep 2012
Piping Foreman (Assisting Piping Design Engineers)
Key Responsibilities
 Assembled system turnover packages and walked them down
 Generated a punch list and distributed to the field
 Verified completion of punch list and presented them to client for approval
 Built vendor overlay and cut-sheet books and updated them, built tie-in and drain packages
 Performed audits on P&ID boos and worked revisions
 ISO takeoffs
 Assembled ISO line books, ISO overlay books; supported overlay books, P&ID books
KBR Scrubber Project, LaGrange, Texas, USA Sep 2009 – Oct 2010
Pipe Fitter Foreman 2
Key Responsibilities
 Supervised a crew (8-14 pipefitters, welders and assistants) to install piping spools, supports and
other various components i.e. valves, flow elements, check valves and other inline items
 As each crew was split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to
their assigned task and to checked constantly to resolve any issues and assess progress
 Coordinated the daily plan of work
 Managing coordination with each craft in order to achieve completion
 Produced written progress reports, weld reports, sign in sheets and other required information
BE&K Ergon Ethanol Plant, Vicksburg, Mississippi, USA 2008 – 2009
Pipe Fitter Foreman
Key Responsibilities
 Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and
other various components i.e. valves, flow elements, check valves and other inline items
 As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to
their assigned task and to check constantly to resolve any issues and assess progress
 Managed coordination with each craft in order to achieve completion
 Produced written progress reports, weld reports, sign in sheets and other required information
BE&K-KBR Ergon Refinery, Vicksburg, Mississippi, USA Aug 2008 – Sep 2009
Pipe Fitter Foreman 2
Key Responsibilities
 Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and
other various components i.e. valves, flow elements, check valves and other inline items
 As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to
their assigned task and to check constantly to resolve any issues and assess progress
 Coordinated daily plan of work
 Managed coordination with each craft in order to achieve completion
 Produced written progress reports, weld reports, sign in sheets and other required information
BE&K, Mississippi, USA Jan 2003 – Aug 2003
Pipe Fitter Foreman
Key Responsibilities
 Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and
other various components i.e. valves, flow elements, check valves and other inline items
 As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to
their assigned task and to check constantly to resolve any issues and assess progress
 Managed coordination with each craft in order to achieve completion
 Produced written progress reports, weld reports, sign in sheets and other required information
William A. Quimby
541 Verhagan Road Tallulah, Louisiana 71282
318-341-0517
bill.spot.quimby@gmail.com
Fluor Corp., Jackson MS, Malvern ARK, Forney TX Sep 1999 – Jan 2003
Pipe Fitter Foreman
Key Responsibilities
 Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and
other various components i.e. valves, flow elements, check valves and other inline items
 As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to
their assigned task and to check constantly to resolve any issues and assess progress
 Managed coordination with each craft in order to achieve completion
 Produced written progress reports, weld reports, sign in sheets and other required information
EDUCATION
 KBR University, 2013
IT User Security Awareness
QL-KBR Integrated Management System Awareness
LG-KBR 2013 Ethics Training, 20
Accessing Exchange Remotely and Using Forms in Outlook 2010, 90
KBR FCPA and Anti-Corruption Training
Implementing Security with Outlook 2010, 80
 Mechanical Drafting, Welding, Business Law, Warren Central High School, 1976
PROFESSIONAL CERTIFICATIONS
 NCCER Piping Instructor
 ACE Program
OTHER
 Proficient in Microsoft Office Applications, Excel, Word, Outlook, Bluebeam Revu, Smart Plant
Review, Navisworks, Prologue and Laser Scan
 Proficient in English & Moderate Spanish

More Related Content

What's hot

ROBERT PINSON resume inspector
ROBERT PINSON resume inspectorROBERT PINSON resume inspector
ROBERT PINSON resume inspectorBob Pinson
 
res_jordan_price (1)
res_jordan_price (1)res_jordan_price (1)
res_jordan_price (1)Jordan Price
 
Michael Platt_CV_2016
Michael Platt_CV_2016Michael Platt_CV_2016
Michael Platt_CV_2016mike platt
 
Balkar Latest CV 2016
Balkar Latest CV 2016Balkar Latest CV 2016
Balkar Latest CV 2016Balkar Singh
 
Nick curran resume 2015
Nick curran resume 2015Nick curran resume 2015
Nick curran resume 2015Nick Curran
 
Joe Roberts Resume 2015
Joe Roberts Resume 2015Joe Roberts Resume 2015
Joe Roberts Resume 2015Joe Roberts
 
MJWilliams_Resume_15_WO
MJWilliams_Resume_15_WOMJWilliams_Resume_15_WO
MJWilliams_Resume_15_WOJim Williams
 
Jvs resume' word chronological format r5tasks
Jvs  resume' word chronological format r5tasksJvs  resume' word chronological format r5tasks
Jvs resume' word chronological format r5tasksJohn V. Sandbothe
 
Eva Harding Resume_2015
Eva Harding Resume_2015Eva Harding Resume_2015
Eva Harding Resume_2015Eva Harding
 
Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016Dale F. Gabauer
 

What's hot (20)

ROBERT PINSON resume inspector
ROBERT PINSON resume inspectorROBERT PINSON resume inspector
ROBERT PINSON resume inspector
 
res_jordan_price (1)
res_jordan_price (1)res_jordan_price (1)
res_jordan_price (1)
 
Experienced Engineer
Experienced EngineerExperienced Engineer
Experienced Engineer
 
Michael Platt_CV_2016
Michael Platt_CV_2016Michael Platt_CV_2016
Michael Platt_CV_2016
 
Abernathy-CV_2016June
Abernathy-CV_2016JuneAbernathy-CV_2016June
Abernathy-CV_2016June
 
Dereque D.w-ref
Dereque D.w-refDereque D.w-ref
Dereque D.w-ref
 
Balkar Latest CV 2016
Balkar Latest CV 2016Balkar Latest CV 2016
Balkar Latest CV 2016
 
Project List 1
Project List 1Project List 1
Project List 1
 
Nick curran resume 2015
Nick curran resume 2015Nick curran resume 2015
Nick curran resume 2015
 
Joe Roberts Resume 2015
Joe Roberts Resume 2015Joe Roberts Resume 2015
Joe Roberts Resume 2015
 
MJWilliams_Resume_15_WO
MJWilliams_Resume_15_WOMJWilliams_Resume_15_WO
MJWilliams_Resume_15_WO
 
Resume Eng
Resume EngResume Eng
Resume Eng
 
JWBRESUME
JWBRESUMEJWBRESUME
JWBRESUME
 
Resume' history
Resume' historyResume' history
Resume' history
 
Resume - Christopher Neil, PE
Resume - Christopher Neil, PEResume - Christopher Neil, PE
Resume - Christopher Neil, PE
 
Jvs resume' word chronological format r5tasks
Jvs  resume' word chronological format r5tasksJvs  resume' word chronological format r5tasks
Jvs resume' word chronological format r5tasks
 
Eva Harding Resume_2015
Eva Harding Resume_2015Eva Harding Resume_2015
Eva Harding Resume_2015
 
Mike Resume
Mike ResumeMike Resume
Mike Resume
 
JBP_Resume
JBP_ResumeJBP_Resume
JBP_Resume
 
Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016Gabauer.Dale_PROJECTS JAN2016
Gabauer.Dale_PROJECTS JAN2016
 

Viewers also liked

Viewers also liked (6)

piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Curriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPINGCurriculum VITA 2 COMPLETE PIPING
Curriculum VITA 2 COMPLETE PIPING
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
 

Similar to Bill Quimby Resume

Similar to Bill Quimby Resume (20)

Resume Rev 5 Dec 2015
Resume Rev 5 Dec 2015Resume Rev 5 Dec 2015
Resume Rev 5 Dec 2015
 
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015Cain, Donna L. Resume   Oil and Gas Professional - Aug. 2015
Cain, Donna L. Resume Oil and Gas Professional - Aug. 2015
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
Hagy Resume (New)
Hagy Resume (New)Hagy Resume (New)
Hagy Resume (New)
 
Phillip L French resume.V5.1
Phillip L French resume.V5.1Phillip L French resume.V5.1
Phillip L French resume.V5.1
 
Curtis Kaiser Resume
Curtis Kaiser ResumeCurtis Kaiser Resume
Curtis Kaiser Resume
 
Dylan Malbrough Resume 2:24:16
Dylan Malbrough Resume 2:24:16Dylan Malbrough Resume 2:24:16
Dylan Malbrough Resume 2:24:16
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 
Gregperfectresume2015
Gregperfectresume2015Gregperfectresume2015
Gregperfectresume2015
 
Jeffrey Rachuba resume (Autosaved)
Jeffrey Rachuba resume (Autosaved)Jeffrey Rachuba resume (Autosaved)
Jeffrey Rachuba resume (Autosaved)
 
Resume PCL
Resume PCLResume PCL
Resume PCL
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)
 
Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_
 
brown, peter (1)
brown, peter (1)brown, peter (1)
brown, peter (1)
 
Isker marlene frank 10 july2016-resume
Isker marlene frank 10 july2016-resumeIsker marlene frank 10 july2016-resume
Isker marlene frank 10 july2016-resume
 
Resume
ResumeResume
Resume
 
Corie Murrell resume
Corie Murrell resumeCorie Murrell resume
Corie Murrell resume
 
the real resume
the real resumethe real resume
the real resume
 
2015 Resume
2015 Resume2015 Resume
2015 Resume
 

Bill Quimby Resume

  • 1. William A. Quimby 541 Verhagan Road Tallulah, Louisiana 71282 318-341-0517 bill.spot.quimby@gmail.com OBJECTIVE Seeking a challenging Field Engineering role where I can utilize my experience, unique skills and energy to deliver high levels of technical know-how, support and service to benefit a professional organization or project CAREER PROFILE  Extensive expertise with over 38 years experience in the industrial piping field within construction  Well versed in Isometric drawings (SOs), Pipe and Instrument Drawings (P&IDs), Piping Specifications (SPECs) and detailed sheets for support and piping documents  Excelled in research and making critical decisions on projects  Strong technical knowledge CORE COMPETENCIES  Skilled in communicating with all discipline levels from designers to engineers  Expertise in resource management, with overseas project experience  Possesses excellent organizational, multi-tasking skills, planning and problem-solving capabilities ACHIEVEMENTS  NCCER Core Curriculum & Pipe Instructor  ACE Program (Achieving Craft Excellence)  Fluor Corp – 5 year service award  BE&K/KBR – 5 year service award  Marathon Letourneau – 5 year service award EMPLOYMENT HISTORY Jacobs, Geismar, LA Jun 2014 – Feb 2015 Pipe General Foreman – Assisting Piping Field Engineers Key Responsibilities  Researched RFI’s i.e. went into the field and discussed issues with craft supervision, this entailed taking detailed photographs and notes of the issues  Compiled pertinent information via ISOs, P&Ids, vendor drawings, model shots, Laser Scans, applicable emails and other relevant information  Contacted Mechanical, Design, Process and Stress Engineers for additional information  Formatted and made suggestions to the RFI once resolved, then submitted RFI to Technical Services Manager for approval  Generated personal spreadsheet to maintain record of RFs KBR-Pascagoula PBOP, Pascagoula, MS Nov 2012 – Feb 2014 Completions & Systems Turn Over Key Responsibilities  Assembled Hydro Test Packages  Maintained package tracking spreadsheet and assisted with weld mapping and logging of NDE information on the tracking reports  Ensured spec and system boundaries were maintained  Assisted and researched technical issues, process production deviation notice  Built, scanned and page turned dossiers
  • 2. William A. Quimby 541 Verhagan Road Tallulah, Louisiana 71282 318-341-0517 bill.spot.quimby@gmail.com Robins & Mortin, Charleston, TN Aug 2011 – Sep 2012 Piping Foreman (Assisting Piping Design Engineers) Key Responsibilities  Assembled system turnover packages and walked them down  Generated a punch list and distributed to the field  Verified completion of punch list and presented them to client for approval  Built vendor overlay and cut-sheet books and updated them, built tie-in and drain packages  Performed audits on P&ID boos and worked revisions  ISO takeoffs  Assembled ISO line books, ISO overlay books; supported overlay books, P&ID books KBR Scrubber Project, LaGrange, Texas, USA Sep 2009 – Oct 2010 Pipe Fitter Foreman 2 Key Responsibilities  Supervised a crew (8-14 pipefitters, welders and assistants) to install piping spools, supports and other various components i.e. valves, flow elements, check valves and other inline items  As each crew was split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to their assigned task and to checked constantly to resolve any issues and assess progress  Coordinated the daily plan of work  Managing coordination with each craft in order to achieve completion  Produced written progress reports, weld reports, sign in sheets and other required information BE&K Ergon Ethanol Plant, Vicksburg, Mississippi, USA 2008 – 2009 Pipe Fitter Foreman Key Responsibilities  Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and other various components i.e. valves, flow elements, check valves and other inline items  As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to their assigned task and to check constantly to resolve any issues and assess progress  Managed coordination with each craft in order to achieve completion  Produced written progress reports, weld reports, sign in sheets and other required information BE&K-KBR Ergon Refinery, Vicksburg, Mississippi, USA Aug 2008 – Sep 2009 Pipe Fitter Foreman 2 Key Responsibilities  Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and other various components i.e. valves, flow elements, check valves and other inline items  As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to their assigned task and to check constantly to resolve any issues and assess progress  Coordinated daily plan of work  Managed coordination with each craft in order to achieve completion  Produced written progress reports, weld reports, sign in sheets and other required information BE&K, Mississippi, USA Jan 2003 – Aug 2003 Pipe Fitter Foreman Key Responsibilities  Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and other various components i.e. valves, flow elements, check valves and other inline items  As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to their assigned task and to check constantly to resolve any issues and assess progress  Managed coordination with each craft in order to achieve completion  Produced written progress reports, weld reports, sign in sheets and other required information
  • 3. William A. Quimby 541 Verhagan Road Tallulah, Louisiana 71282 318-341-0517 bill.spot.quimby@gmail.com Fluor Corp., Jackson MS, Malvern ARK, Forney TX Sep 1999 – Jan 2003 Pipe Fitter Foreman Key Responsibilities  Supervised a crew (8-14 pipefitters, welders and assistants) to install the piping spools, supports and other various components i.e. valves, flow elements, check valves and other inline items  As each crew is split into small groups of 2 or 3 and given information (ISOs & P&Ids), materials to their assigned task and to check constantly to resolve any issues and assess progress  Managed coordination with each craft in order to achieve completion  Produced written progress reports, weld reports, sign in sheets and other required information EDUCATION  KBR University, 2013 IT User Security Awareness QL-KBR Integrated Management System Awareness LG-KBR 2013 Ethics Training, 20 Accessing Exchange Remotely and Using Forms in Outlook 2010, 90 KBR FCPA and Anti-Corruption Training Implementing Security with Outlook 2010, 80  Mechanical Drafting, Welding, Business Law, Warren Central High School, 1976 PROFESSIONAL CERTIFICATIONS  NCCER Piping Instructor  ACE Program OTHER  Proficient in Microsoft Office Applications, Excel, Word, Outlook, Bluebeam Revu, Smart Plant Review, Navisworks, Prologue and Laser Scan  Proficient in English & Moderate Spanish