1. MIDLAND OIL COMPANY / BAGHDAD / IRAQ
CURRICULUM VITAE
PERSONAL DATA :
NAME : ENG. ZAINAB A. HADI
DATE OF BIRTH : JANUARY 7th , 1981
JOB POSITION : NDT Specialist
WORKING ACTIVITIES : NDT Inspections on sites.
Third party inspector
EDUCATION :
1999- 2003 Bs. c in material engineering / al mustansyria university /
baghdad /iraq
QUALIFICATION : NON -DESTRUCTIVE TESTING:
RADIOGRAPHIC TESTING (RT) LEVEL III
( ACCORDING TO ISO 9712)
VISUAL TESTING (VT ) LEVEL III
( ACCORDING TO ISO 9712)
PENETRATING TESTING LEVEL II
( ACCORDING TO ISO9712)
RADIOGRAPHIC TESTING (RT) Level III
(according to SNT-TC-1A) { under processing }
CODES & STANDARDS : ASME , API , ISO
Main specialties:
Materials engineering, welding, welded and steel structures,
NDT RT, PT ,VT, mechanical testing of materials, pressure vessels,
pipes, tubes, piping, ,quality control activities, expediting and pre-shipment activities.
2. MIDLAND OIL COMPANY / BAGHDAD / IRAQ
SUMMARY OF CAREAER :
since 2010 till now
1. midland oil company / east baghdad oil field belongs to ministry of oil in Baghdad
( PRODUCTION OF12,000 BARREL PER DAY) which was founded by (snaprojetti engineering &
contracting) : -
quality control engineer for the mechanical and inspection
activities of new train project ( CPF (CENTRAL PROCESS FACILITY
) additional train of produing crude oil in east Baghdad field
which belongs to midland oil company / ministry of oil in Iraq.
sharing in committee of approving design of NEW TRAIN in CPF
(which is done by (PEG engineering &contracting ) .
member of resident engineer committee of new train project (
which is done by (PEG engineering &contracting )
internal auditing of inspection in the oil CPF (CENTRAL PROCESS
FACILITY ) of east baghdad oil field ( documentation , defining
specification for required devises & making approval) to the
inservice piping (api 570 ).
hydrostatic test to vessel & piping (ASME 31.3 ).
Inspection of pre-commissioning & commissioning of system
including third stage separator ( API SP 12J ) with piping .
Sharing in maintenance of an oil tank (replacing bottom ) in east
Baghdad oil field ( API 653 ) .
approving specifications of pipes according to MDOC
requirements which are supplied by international manufacturer
like (interpipe ,innerserve ….
detection surface defect
interpretation of codes ,comparing and judgement with
acceptance criteria .
sharing in committee responsible for material selection and
design calculations of piping and pipes .
2. AL –AHDAB OIL FIELD / KUT / IRAQ (PRODUCTION OF 200,000 BARREL PER DAY ) EXPLOITED
BY CNPEC (CHINIES COMPANY ):
Supervisor of hydrostatic test to sections of al ahdab – to al zubaidia
station oil pipeline.
3. BADRA OIL & GAS FIELD / KUT /IRAQ ( PRODUCTION OF 200,000 BARREL PER DAY )EXPLOITED
BY GAS PROM NIFT BADRA :
Supervisor of hydrostatic test to sections of badrah – garraf LPG
pipeline.
since 2007- 2010
auditing of specification , selecting , and approval of inspection &
measuring instrunments & devices in general system company / Baghdad
/ Iraq.
3. MIDLAND OIL COMPANY / BAGHDAD / IRAQ
Since 2006 - 2007
maintenance engineer of software & hardware parts of computers in
general company of electrical industries / Baghdad / Iraq .
mail Address: daemoma@yahoo.com
zainabndt@gmail.com
Cell phone no. : 009647732066736
009647834114201
Baghdad, april,2016
ZAINAB A. HADI