Nurek dam (Tadzhikistan)
The 300 m high Nurek dam across the Vaksh River is the highest rockfill dam in the world. Located in a
narrow gorge on the river, it forms a reservoir with a gross capacity of 10.9 cubic km, of which 4.5 cubic km
аre used for storage. The main objective of the project is generation of hydropower, for which it has installed
capacity of 2700 MW.
Geology
The rocks at the dam site consist of intercalating sandstones and siltstones having a uniform monoclinal dip
of 30 grades to 40 grades towards the upstream while the right bank jointing of the sandstones and silt stones
is weak and developed along the bedding planes. Joints of tectonic origin extend normally to the bedding
planes. All joints are partially or completely filled with sandy loam and clay.
General layout
The general layout of the dam and ancillary structures is shown in Fig. 1. The axis of the dam is straight.
The hydropower plant (HPP) of open type, having 9 units of 300 MW each, is located on the right bank near
the toe of the dam and is supplied by 3 headrace tunnels with separate intakes, each tunnel feeding 3
penstocks. 2 spillway tunnels on the left bank are provided to take care of any extraordinary flood.
Fig. 1. General layout of Nurek dam, HPP and ancillary structures
1 - headrace tunnels; 2 - temporary headrace tunnel; 3 - penstocks; 4 - construction tunnels; 5 - superflood spillways; 6 -
gully tailrace tunnel; 7 - freight tunnels; 8, 9 - road transport tunnels; 10 - freight and ventilation shaft; 11 - ventilation
shaft; 12 - dam core; 13 - HPP; 14 - shoreline at normal pool level; 15 -water surface contours; 16 - drainage tunnel in
penstock area.
Dam design
The dam section has a central core with slopes of 0.25:1 protected by filters on both sides. The outer
pervious zones or shells are composed of coarse gravel & pebble. Oversize rockfill surcharge stones are
provided on slope surfaces on both sides (Fig. 2). At the base of the dam core in the river section a concrete
block 157 m long, 30 to 60 m wide with a total volume of 149000 cubic m has been provided.
Fig. 2. Cross-section of 300 m high Nurek rockfill dam with central clay core:
1 – sandy loam core; 2 – shells of coarse gravel & pebble; 3 - filters (d=0-5 mm & d=0-50 mm); 4 – oversize rockfill
surcharge stones on upstream slope (20-40 m thickness), downstream slope (5-10 mthickness) & downstreamcofferdam;
5 – downstream cofferdam of oversize rockfill; 6 – upstream cofferdam; 7 - concrete block; 8 – consolidation grout &
grout curtain; 9 – anti-seismic belts; 10 – control gallery 2x2 m; 11- control gallery 4x4 m on dam crest; 12 – contour of
first-stage dam construction; 13 – temporary clay blanket of first-stage dam construction
The concrete block fills the narrowest bottom portion of the valley, in which placement and compaction
would have been difficult and expensive. What is more important, it provides a plane surface for core contact,
free from hollows and protuberances, so that a tight junction has been obtained. Further, it accommodates 3
interconnected grouting galleries. A special feature of the dam is 3 control and grouting galleries provided
through the dam core.
The core material consists of sandy loam with a minimum of 50% material finer than 5 mm. The filter
adjacent to the core has a size range from 0.1 to 10 mm with sizes smaller than 5 mm constituting not less than
60%. As there was considerable variation in the properties of the core material procured from designated
borrow areas, homogenisation and moisture adjustment to the optimum requirement of 10 to 12% had to be
carried out for about 8 millions cubic m of soil. This was done by placing the excavated soil in stockpiles,
wetting it and later re-excavating it through vertical cuts.
As the gorge section has fairly steep slopes the possibility of tensile stresses resulting in cracking or
hydraulic fracturing of the core had to be guarded against. The technique of centrifuge model testing was
employed for this purpose. The tests indicated tensile zones in the upper part of the core, adjacent to the
canyon walls. Cracking was found to occur at a tensile strain of 7 x 10 (power -5) or more. The cracks in the
model were located at a distance of 0.2 to 0.3 m of the crest length from the abutments and were 45 to 50 mm
deep, which would represent 9 to 10 m in the prototype. As remedial measures more deformable soil with a
lower modulus was placed in the susceptible zone adjacent to the abutments and a larger surcharge of soil was
placed on the core. Subject to these precautions, studies indicated that the compressive stress in the core
would exceed the hydrostatic pressure by 20 to 30% over most of the core height, and by about 10% at its
contact with the concrete block at the base.
Foundation Treatment
Besides the three grouting galleries in the concrete block, a number of galleries were provided at different
elevations to enable grouting of the abutments. Consolidation grouting to a depth of 20 m was done under the
contact surface of the base block. A deep grout curtain penetrating jointed rocks of relatively high
permeability and connecting to tight rock has been provided both in the foundation as well as in the
abutments. Multilevel drainage tunnels were also provided on the left abutment.
Compaction
Self-propelled rubber-tyred rollers on 30cm thick layers were used for compaction of the core.
Photo. Downstream view of 300 m high Nurek rockfill dam with HPP (2700 MW) & outdoor switch yard

More Related Content

What's hot

BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEsrinivas cnu
 
Unconsolidated Undrained Test
Unconsolidated Undrained TestUnconsolidated Undrained Test
Unconsolidated Undrained TestPsyful Bappi
 
Dokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pileDokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pileDariYanto2
 
Perhitungan Beton Bertulang
Perhitungan Beton BertulangPerhitungan Beton Bertulang
Perhitungan Beton BertulangAsep Nuroni
 
9 soil compaction
9  soil compaction9  soil compaction
9 soil compactionMarvin Ken
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methodsHalim Rahman
 
Iv.flexural design of prestressed concrete elements
Iv.flexural design of prestressed concrete elementsIv.flexural design of prestressed concrete elements
Iv.flexural design of prestressed concrete elementsChhay Teng
 
Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...
Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...
Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...Debora Elluisa Manurung
 
Teknologi peredam gempa
Teknologi peredam gempaTeknologi peredam gempa
Teknologi peredam gempaTiara Arianti
 
Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.
Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.
Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.Farhan Hussain
 
Analisa struktur bangunan air
Analisa struktur bangunan airAnalisa struktur bangunan air
Analisa struktur bangunan airinfosanitasi
 
5 presentasi kelompok (atap kayu)
5   presentasi kelompok (atap kayu)5   presentasi kelompok (atap kayu)
5 presentasi kelompok (atap kayu)GondarCool
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And MethodologiesIr. Abdul Aziz Abas
 
metode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.pptmetode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.pptdarmadi ir,mm
 

What's hot (20)

Tiang Pancang I
Tiang Pancang ITiang Pancang I
Tiang Pancang I
 
Box culvert
Box culvertBox culvert
Box culvert
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Unconsolidated Undrained Test
Unconsolidated Undrained TestUnconsolidated Undrained Test
Unconsolidated Undrained Test
 
Dokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pileDokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pile
 
Tutorial MHD
Tutorial MHDTutorial MHD
Tutorial MHD
 
Perhitungan Beton Bertulang
Perhitungan Beton BertulangPerhitungan Beton Bertulang
Perhitungan Beton Bertulang
 
9 soil compaction
9  soil compaction9  soil compaction
9 soil compaction
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
 
Bs8110 design notes
Bs8110 design notesBs8110 design notes
Bs8110 design notes
 
Iv.flexural design of prestressed concrete elements
Iv.flexural design of prestressed concrete elementsIv.flexural design of prestressed concrete elements
Iv.flexural design of prestressed concrete elements
 
Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...
Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...
Analisa Perbandingan Beberapa Metode Perkerasan Beton Semen untuk Jalan Akses...
 
Pemahaman kak
Pemahaman kakPemahaman kak
Pemahaman kak
 
Teknologi peredam gempa
Teknologi peredam gempaTeknologi peredam gempa
Teknologi peredam gempa
 
Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.
Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.
Analysis of Bund to avoid breach in Irrigation system of Sindh, Pakistan.
 
Analisa struktur bangunan air
Analisa struktur bangunan airAnalisa struktur bangunan air
Analisa struktur bangunan air
 
5 presentasi kelompok (atap kayu)
5   presentasi kelompok (atap kayu)5   presentasi kelompok (atap kayu)
5 presentasi kelompok (atap kayu)
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And Methodologies
 
metode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.pptmetode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
metode-xx kerja-pelaksanaan-perkerasan-kaku.ppt
 

Similar to Nurek rockfill dam (300 m). dam design (tadjikistan, 3 p.)

(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...Michal Krzeminski
 
Geological factor for canal alignment
Geological factor for canal alignmentGeological factor for canal alignment
Geological factor for canal alignmentPramoda Raj
 
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...Sukesh Nayak
 
Subsurface drainage
Subsurface drainageSubsurface drainage
Subsurface drainageChethan B J
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasIEI GSC
 
Presentation to the International Workshop on Mosul Dam held in Stockholm . M...
Presentation to the International Workshop on Mosul Dam held in Stockholm . M...Presentation to the International Workshop on Mosul Dam held in Stockholm . M...
Presentation to the International Workshop on Mosul Dam held in Stockholm . M...Nasrat Adamo
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sectionsjuwes
 
Vanmeerten ea XVI-ECSMGE-Paper-Final version
Vanmeerten ea XVI-ECSMGE-Paper-Final versionVanmeerten ea XVI-ECSMGE-Paper-Final version
Vanmeerten ea XVI-ECSMGE-Paper-Final versionHans van Meerten
 
Dams and control works
Dams and control worksDams and control works
Dams and control worksjulian21323
 
Retrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scourRetrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scourSushil Dhungana
 

Similar to Nurek rockfill dam (300 m). dam design (tadjikistan, 3 p.) (20)

(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
 
Geological factor for canal alignment
Geological factor for canal alignmentGeological factor for canal alignment
Geological factor for canal alignment
 
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
 
Dewatering
DewateringDewatering
Dewatering
 
UNIT-2.pptx
UNIT-2.pptxUNIT-2.pptx
UNIT-2.pptx
 
Subsurface drainage
Subsurface drainageSubsurface drainage
Subsurface drainage
 
Dams
DamsDams
Dams
 
Dams
DamsDams
Dams
 
1115
11151115
1115
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areas
 
Presentation to the International Workshop on Mosul Dam held in Stockholm . M...
Presentation to the International Workshop on Mosul Dam held in Stockholm . M...Presentation to the International Workshop on Mosul Dam held in Stockholm . M...
Presentation to the International Workshop on Mosul Dam held in Stockholm . M...
 
EARTHERN DAM
EARTHERN DAMEARTHERN DAM
EARTHERN DAM
 
Earthen Dam
Earthen DamEarthen Dam
Earthen Dam
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Vanmeerten ea XVI-ECSMGE-Paper-Final version
Vanmeerten ea XVI-ECSMGE-Paper-Final versionVanmeerten ea XVI-ECSMGE-Paper-Final version
Vanmeerten ea XVI-ECSMGE-Paper-Final version
 
Dams and control works
Dams and control worksDams and control works
Dams and control works
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
Methods of Dewatering
Methods of DewateringMethods of Dewatering
Methods of Dewatering
 
Retrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scourRetrofitting the well foundation of a railway bridge subjected to scour
Retrofitting the well foundation of a railway bridge subjected to scour
 

More from Yury Lyapichev

Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Yury Lyapichev
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsYury Lyapichev
 
Soluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadSoluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadYury Lyapichev
 
Curso postgrado internacional
Curso postgrado internacionalCurso postgrado internacional
Curso postgrado internacionalYury Lyapichev
 
Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Yury Lyapichev
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Yury Lyapichev
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Yury Lyapichev
 
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Yury Lyapichev
 
ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС Yury Lyapichev
 
Lyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasLyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasYury Lyapichev
 
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Yury Lyapichev
 
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Yury Lyapichev
 
Guidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsGuidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsYury Lyapichev
 
Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Yury Lyapichev
 
Lyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDLyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDYury Lyapichev
 
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Yury Lyapichev
 
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Yury Lyapichev
 
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Yury Lyapichev
 
Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Yury Lyapichev
 

More from Yury Lyapichev (20)

Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
 
My abstracts
My abstractsMy abstracts
My abstracts
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDs
 
Soluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadSoluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidad
 
Curso postgrado internacional
Curso postgrado internacionalCurso postgrado internacional
Curso postgrado internacional
 
Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
 
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
 
ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС
 
Lyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasLyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicas
 
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
 
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
 
Guidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsGuidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDs
 
Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)
 
Lyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDLyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLD
 
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
 
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
 
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
 
Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин
 

Recently uploaded

Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 

Recently uploaded (20)

Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

Nurek rockfill dam (300 m). dam design (tadjikistan, 3 p.)

  • 1. Nurek dam (Tadzhikistan) The 300 m high Nurek dam across the Vaksh River is the highest rockfill dam in the world. Located in a narrow gorge on the river, it forms a reservoir with a gross capacity of 10.9 cubic km, of which 4.5 cubic km аre used for storage. The main objective of the project is generation of hydropower, for which it has installed capacity of 2700 MW. Geology The rocks at the dam site consist of intercalating sandstones and siltstones having a uniform monoclinal dip of 30 grades to 40 grades towards the upstream while the right bank jointing of the sandstones and silt stones is weak and developed along the bedding planes. Joints of tectonic origin extend normally to the bedding planes. All joints are partially or completely filled with sandy loam and clay. General layout The general layout of the dam and ancillary structures is shown in Fig. 1. The axis of the dam is straight. The hydropower plant (HPP) of open type, having 9 units of 300 MW each, is located on the right bank near the toe of the dam and is supplied by 3 headrace tunnels with separate intakes, each tunnel feeding 3 penstocks. 2 spillway tunnels on the left bank are provided to take care of any extraordinary flood. Fig. 1. General layout of Nurek dam, HPP and ancillary structures 1 - headrace tunnels; 2 - temporary headrace tunnel; 3 - penstocks; 4 - construction tunnels; 5 - superflood spillways; 6 - gully tailrace tunnel; 7 - freight tunnels; 8, 9 - road transport tunnels; 10 - freight and ventilation shaft; 11 - ventilation shaft; 12 - dam core; 13 - HPP; 14 - shoreline at normal pool level; 15 -water surface contours; 16 - drainage tunnel in penstock area. Dam design The dam section has a central core with slopes of 0.25:1 protected by filters on both sides. The outer pervious zones or shells are composed of coarse gravel & pebble. Oversize rockfill surcharge stones are provided on slope surfaces on both sides (Fig. 2). At the base of the dam core in the river section a concrete block 157 m long, 30 to 60 m wide with a total volume of 149000 cubic m has been provided.
  • 2. Fig. 2. Cross-section of 300 m high Nurek rockfill dam with central clay core: 1 – sandy loam core; 2 – shells of coarse gravel & pebble; 3 - filters (d=0-5 mm & d=0-50 mm); 4 – oversize rockfill surcharge stones on upstream slope (20-40 m thickness), downstream slope (5-10 mthickness) & downstreamcofferdam; 5 – downstream cofferdam of oversize rockfill; 6 – upstream cofferdam; 7 - concrete block; 8 – consolidation grout & grout curtain; 9 – anti-seismic belts; 10 – control gallery 2x2 m; 11- control gallery 4x4 m on dam crest; 12 – contour of first-stage dam construction; 13 – temporary clay blanket of first-stage dam construction The concrete block fills the narrowest bottom portion of the valley, in which placement and compaction would have been difficult and expensive. What is more important, it provides a plane surface for core contact, free from hollows and protuberances, so that a tight junction has been obtained. Further, it accommodates 3 interconnected grouting galleries. A special feature of the dam is 3 control and grouting galleries provided through the dam core. The core material consists of sandy loam with a minimum of 50% material finer than 5 mm. The filter adjacent to the core has a size range from 0.1 to 10 mm with sizes smaller than 5 mm constituting not less than 60%. As there was considerable variation in the properties of the core material procured from designated borrow areas, homogenisation and moisture adjustment to the optimum requirement of 10 to 12% had to be carried out for about 8 millions cubic m of soil. This was done by placing the excavated soil in stockpiles, wetting it and later re-excavating it through vertical cuts. As the gorge section has fairly steep slopes the possibility of tensile stresses resulting in cracking or hydraulic fracturing of the core had to be guarded against. The technique of centrifuge model testing was employed for this purpose. The tests indicated tensile zones in the upper part of the core, adjacent to the canyon walls. Cracking was found to occur at a tensile strain of 7 x 10 (power -5) or more. The cracks in the model were located at a distance of 0.2 to 0.3 m of the crest length from the abutments and were 45 to 50 mm deep, which would represent 9 to 10 m in the prototype. As remedial measures more deformable soil with a lower modulus was placed in the susceptible zone adjacent to the abutments and a larger surcharge of soil was placed on the core. Subject to these precautions, studies indicated that the compressive stress in the core would exceed the hydrostatic pressure by 20 to 30% over most of the core height, and by about 10% at its contact with the concrete block at the base. Foundation Treatment Besides the three grouting galleries in the concrete block, a number of galleries were provided at different elevations to enable grouting of the abutments. Consolidation grouting to a depth of 20 m was done under the contact surface of the base block. A deep grout curtain penetrating jointed rocks of relatively high permeability and connecting to tight rock has been provided both in the foundation as well as in the abutments. Multilevel drainage tunnels were also provided on the left abutment. Compaction Self-propelled rubber-tyred rollers on 30cm thick layers were used for compaction of the core.
  • 3. Photo. Downstream view of 300 m high Nurek rockfill dam with HPP (2700 MW) & outdoor switch yard