Ground Floor
Beams
Beam to Beam connection C/7-8
Ground Floor SCALE 1: 200
Beam to column connection
A-E/ 8
Ground floor SCALE 1: 200
ARCHITECTURAL PLAN
Ground floor SCALE 1:150
Roof SCALE 1:150
FOUNDATION PLAN
Foundation plan SCALE 1:100
STRUCTURAL PLANS
Ground plan SCALE 1:200
First floor plan SCALE 1:200
LOAD DISTRUBUTION PLANS
Ground floor plan SCALE 1:250 First floor plan SCALE 1:250
Roof plan SCALE 1:250
First floor SCALE 1:150
Ground floor SCALE 1:100
First floor SCALE 1:100
Roof SCALE 1:100
Column load distribution plans
Scale: NTS
BUILDING STRUCTURE
BLD61003
ANALYSIS OF BANGALOW
Name: poh weng chuan
Student id: 0319951
Project; analysis of bungalow
Tutor: Mr rizal
Dead load
Beam self-weight=1.5KN/m
Beam(C/7-8) 0.25m X 0.25m
X RC beam 24KN/m³
Two way slab of (a-e/ 7-8)
(a-c/7-8)
3.6KN/m²X (4.2m/2)
=7.56KN/m
(a-e/7-8)
3.6KN/m²X (4.2m/2)
=7.56KN/m
Total dead load on slab (a-e/ 7-8)
1.5 KN/m+7.56kn/m+7.56KN/m
=16.62KN/m
Live Load
Live load on slab (a-e/7-8)
(a-c/7-8)
1.5KN/m²X (4.2m/2)
=3.15 KN/m
(a-e/7-8)
1.5KN/m²X (4.2m/2)
=3.15KN/m
Total live loadof slabs (a-e/7-8)
=3.15KN/m+3.15KN/m
=6.3KN/m
Ultimate Load
Total ultimatedead load
=16.62KN/m X 1.4
=23.268KN/m
Total ultimatelive load
=6.3KN/m X 1.6
=10.08KN/m
Total ultimateload
=23.268+10.08=33.348KN/m
1.5KN/m³
87
7.56KN/m
7.56KN/m
16.62KN/m
3.15KN/m
3.15KN/m
6.3KN/m
33.348KN/m
Reaction Force
Load diagram
Σm=0
= (Ra X 4.2m)- (140.062 X 2.1m)
- (140.0616)(2.1) = (Ra X 4.2m)
-294.129=4.2Ra
Ra=70.03kN
ΣFy=0
70.03KN-(33.348X 4.2m)+ Rb=0
70.03Kn-140.06+Rb=0
Rb=70.03kN
Shearforce diagram
70.03-(33.348X 4.2) =-70.03
Ra
=70.03 X 2.1 X ½=73.531
Rb
=-70.03 X 2.1 X ½=-73.531
Positive area= negative area
(73.531-73.531)KN/m=0
87
140.062KN
Ra=70.03Kn Rb=70.03Kn
Ra70.03kN
Rb-70.03kN73.531KN
0KN 0KN
Dead load
Beam self-weight=1.5KN/m
Beam(C/7-8) 0.25m X 0.25m
X RC beam 24KN/m³
Brick wall weight=18.81KN/m
6.6m X 0.15m X 19KN/m³
(a-c/8-8)
3.6KN/m²X (3.6m/2)X 2/3
=3.6KN/m²X 1.8 X 2/3
=4.32KN/m
(c-e/8-8)
3.6KN/m²X (3m/2)X 2/3
=3.6KN/m²X 1.5 X 2/3
=3.6KN/m
Dead load on slab (a-e/7-8)
=7.92KN/m
Total dead load (a-e/8-8)
For (a-c)
=1.5 KN/m+18.81KN/m+4.32KN/m
+7.92KN/m=32.55KN/m
For (a-e)
=1.5 KN/m+18.81KN/m+3.6KN/m
+7.92KN/m=31.83KN/m
Live Load
Live load on slab (a-e/7-8)
(a-c/8-8)
[1.5KN/m²X (3.6m/2)]X 2/3
=2.7KN/m X 2/3
=1.8KN/m
a e
1.5KN/m
c
18.81KN/m
4.32KN/m
3.6KN/m
7.92KN/m
32.55KN/m 31.83KN/m
1.8KN/m
(c-e/8-8)
[1.5KN/m²X (3m/2)]X 2/3
=2.25KN/m X 2/3
=1.5KN/m
Live load on slab (a-e/7-8)
=3.3KN/m
Total live loadon slabs (a-e/7-8)
= For (a-c)
1.8KN/m+3.3KN/m=5.1KN/m
=For (c-e)
1.5KN/m+3.3KN/m=4.8KN/m
Ultimate Load
Total ultimatedead load
= For (a-c) 32.55KN/m X 1.4
=45.57KN/m
For (a-e) 31.83KN/m X 1.4
=44.562KN/m
Total ultimatelive load
= For (a-c) 5.1KN/m X 1.6
=8.16KN/m
= For (c-e) 4.8KN/m X 1.6
=7.68KN/m
Total ultimatedead load
Ultimate loadfrom a-c=
45.57KN/m+8.16KN/m=53.73KN/m
Ultimate loadfrom c-e=
44.562KN/m+7.68KN/m=52.242KN/m
1.5KN/m
3.3KN/m
5.1KN/m 4.8KN/m
53.73KN/m 52.242KN/m
Load diagram
(Ra X 6.6m)-(53.73 X 3.6m)4.8
- (70.03kN)(3m)-(52.242 X 3m) 5.1
=6.6Ra -928.4544-210.09-799.302
6.6Ra=1937.846
Ra=293.613
ΣFy=0
=293.613KN-(53.73Kn/m X 3.6)
- (70.03)-(52.242X 3m) =0
Rb=212.058Kn
Shearforce diagram
126.571-193.428=-66.857
-66.857-70.03=-136.887
136.887-156.726=-293.613Kn
-293.613+ 293.613Kn=0
Bending momentdiagram
208.126Kn-(193.428)
=14.698
=14.698-(70.03)
=-55.332
=-55.332-(156.726)=-212.058
Positive area
[0.5(293.613+193.428)(2)
+ [0.5(30.155)(0.576)]
=0.5 X 974.082+[0.5(30.155)(0.576)]
=487.041+8.684
=410.238
Negative area
0.5(-126.571)(3-0.576)
=153.404
53.73KN/m 52.242KN/m
70.03Kn
3.6m 3m
6.6m
293.613KN 126.571KN
293.613-
193.428=100.185
100.185-
70.03Kn=30.155
30.155-156.726
=-126.571
Columns
Intermediate column
G-6
Edge column
J-10
First floor Ground floor
Roof
Dead load on column g-6
Roof
Roof beam forcolumn g-6
= (3.15m+2.75)X 1.5 KN/m
=8.85kn
Firstfloor
Column self-weight
(0.25 X 0.25 X 24Kn/m³)
X 3m=4.5Kn
Concrete slab
(3.15m X 2.75)(3.6Kn/m²)
=31.185Kn
Beam self-weight
= (3.15m+2.75)X 1.5 KN/m
=8.85kn
Brick wall self-weight
=(2m + 2.1m +0.6m)
X 19kn/m³=89.3kn
Ground floor
Column self-weight
(0.25 X 0.25 X 24Kn/m³)
X 3m=4.5Kn
Concrete slab
(3.15m X 2.75)(3.6Kn/m²)
=31.185Kn
Beam self-weight
= (3.15m+2.75)X 1.5 KN/m
=8.85kn
Brick wall self-weight
= (2m + 1m)
X 19kn/m³=57Kn
Total dead load=235.37kn
235.37 X 1.4 dead load factor
=329.518Kn
Live load on columng-6
FirstFloor
Concrete slab
= 2.75m X 3.15m X 1.5Kn/m²
=12.993Kn
Ground Floor
Concrete slab
= 2.75m X 3.15m X 1.5Kn/m²
=12.993Kn
Total live load= 25.986Kn
25.986 X 1.6 live load factor
=41.5776Kn
Total ultimateload for
Dead load + live load
=329.518 + 41.5776
=371.095Kn
Dead load on column J-10
Roof
Roof beam forcolumn J-10
= (1.3m+0.67)X 1.5 KN/m
=2.955Kn
Firstfloor
Column self-weight
(0.25 X 0.25 X 24Kn/m³)
X 3m=4.5Kn
Concrete slab
(1.3m X 0.67)(3.6Kn/m²)
=3.1356Kn
Beam self-weight
= (1.3m+0.67)X 1.5 KN/m
=2.955kn
Brick wall self-weight
= (1.3m+0.67m)
X 19kn/m³=37.43Kn
Ground floor
Column self-weight
(0.25 X 0.25 X 24Kn/m³)
X 3m=4.5Kn
Concrete slab
(1.3m X 0.67)(3.6Kn/m²)
=3.1356Kn
Beam self-weight
= (1.3m+0.67)X 1.5 KN/m
=2.955kn
Brick wall self-weight
= (1.3m+0.67m)
X 19kn/m³=37.43Kn
Total dead load=98.996kn
98.996 X 1.4 dead load factor
=98.996Kn
Live load on columnJ-10
FirstFloor
Concrete slab
= 1.3m X 0.67m X 1.5Kn/m²
=1.3065Kn
Ground Floor
Concrete slab
= 1.3m X 0.67m X 1.5Kn/m²
=1.3065Kn
Total live load= 2.613Kn
2.613 X 1.6 live loadfactor
=4.181Kn
structure analysis

More Related Content

What's hot

Cee 312(1)
Cee 312(1)Cee 312(1)
Cee 312(1)apudgr8
 
Cee311(12&13)
Cee311(12&13)Cee311(12&13)
Cee311(12&13)apudgr8
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Ong Seng Peng Jeff
 
"Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo..."Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo...TRUSS ITN
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Hamza Waheed
 
Cee311(11)
Cee311(11)Cee311(11)
Cee311(11)apudgr8
 
CE 320 Steel Structures Design Sessional slides
CE 320 Steel Structures Design Sessional slidesCE 320 Steel Structures Design Sessional slides
CE 320 Steel Structures Design Sessional slidesnazifa tabassum
 
"Field characterization of location-specific dynamic amplification factors to...
"Field characterization of location-specific dynamic amplification factors to..."Field characterization of location-specific dynamic amplification factors to...
"Field characterization of location-specific dynamic amplification factors to...TRUSS ITN
 
Individual calculation
Individual calculation Individual calculation
Individual calculation Jamie Lee
 
Relative Velocity by UK Physics
Relative Velocity by UK PhysicsRelative Velocity by UK Physics
Relative Velocity by UK PhysicsUdayKhanal
 
Relative velocity
Relative velocityRelative velocity
Relative velocityindrasir
 
Presentation final
Presentation finalPresentation final
Presentation finalhemutaman
 
L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method Dr. OmPrakash
 
Design of Various Types of Industrial Buildings and Their Comparison
Design of Various Types of Industrial Buildings and Their ComparisonDesign of Various Types of Industrial Buildings and Their Comparison
Design of Various Types of Industrial Buildings and Their ComparisonIRJESJOURNAL
 
L16 : Slope Deflection Method for Analysis of Indeterminate Beams
L16 : Slope Deflection Method for Analysis of Indeterminate Beams L16 : Slope Deflection Method for Analysis of Indeterminate Beams
L16 : Slope Deflection Method for Analysis of Indeterminate Beams Dr. OmPrakash
 

What's hot (20)

Cee 312(1)
Cee 312(1)Cee 312(1)
Cee 312(1)
 
Cee311(12&13)
Cee311(12&13)Cee311(12&13)
Cee311(12&13)
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
"Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo..."Reduction of uncertainties associated to the dynamic response of a ship unlo...
"Reduction of uncertainties associated to the dynamic response of a ship unlo...
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
Cee311(11)
Cee311(11)Cee311(11)
Cee311(11)
 
CE 320 Steel Structures Design Sessional slides
CE 320 Steel Structures Design Sessional slidesCE 320 Steel Structures Design Sessional slides
CE 320 Steel Structures Design Sessional slides
 
"Field characterization of location-specific dynamic amplification factors to...
"Field characterization of location-specific dynamic amplification factors to..."Field characterization of location-specific dynamic amplification factors to...
"Field characterization of location-specific dynamic amplification factors to...
 
Roof truss design
Roof truss designRoof truss design
Roof truss design
 
L14
L14L14
L14
 
Individual calculation
Individual calculation Individual calculation
Individual calculation
 
Relative Velocity by UK Physics
Relative Velocity by UK PhysicsRelative Velocity by UK Physics
Relative Velocity by UK Physics
 
Class 5 me242
Class 5 me242Class 5 me242
Class 5 me242
 
Relative velocity
Relative velocityRelative velocity
Relative velocity
 
Presentation final
Presentation finalPresentation final
Presentation final
 
L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method L15: Analysis of Indeterminate Beams by Slope Deflection Method
L15: Analysis of Indeterminate Beams by Slope Deflection Method
 
Design of Various Types of Industrial Buildings and Their Comparison
Design of Various Types of Industrial Buildings and Their ComparisonDesign of Various Types of Industrial Buildings and Their Comparison
Design of Various Types of Industrial Buildings and Their Comparison
 
Ge6253 ENGINEERING MECHANICS
Ge6253 ENGINEERING MECHANICSGe6253 ENGINEERING MECHANICS
Ge6253 ENGINEERING MECHANICS
 
Relative motion and relative speed
Relative motion and relative speedRelative motion and relative speed
Relative motion and relative speed
 
L16 : Slope Deflection Method for Analysis of Indeterminate Beams
L16 : Slope Deflection Method for Analysis of Indeterminate Beams L16 : Slope Deflection Method for Analysis of Indeterminate Beams
L16 : Slope Deflection Method for Analysis of Indeterminate Beams
 

Similar to structure analysis

Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02Winnie Ang
 
B.structure report
B.structure reportB.structure report
B.structure reportjiuaN59
 
Building Structure
Building Structure Building Structure
Building Structure Nicole Foo
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Wen Yee
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowYee Len Wan
 
Building structures final
Building structures finalBuilding structures final
Building structures finalJamie Lee
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures ReportJoe Onn Lim
 
5b design of welded plate girder using EBS and IS
5b  design of welded plate girder using EBS and IS5b  design of welded plate girder using EBS and IS
5b design of welded plate girder using EBS and ISSudhir Gayake
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Patch Yuen
 
individual part
individual part individual part
individual part KC Wong
 
Lec 27 - Columns 3.pdf
Lec 27 - Columns 3.pdfLec 27 - Columns 3.pdf
Lec 27 - Columns 3.pdfMubasharHayat1
 
B structure
B structure B structure
B structure Andy Heng
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2 Ryan Kerry Jy
 
Individual Caluculation
Individual CaluculationIndividual Caluculation
Individual CaluculationPengeneee Peng
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Ivy Yee
 
Structural Steel Design Project.pdf
Structural Steel Design Project.pdfStructural Steel Design Project.pdf
Structural Steel Design Project.pdfdynamicchikku06
 

Similar to structure analysis (20)

Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Building Structure
Building Structure Building Structure
Building Structure
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
 
presentation1_28.pptx
presentation1_28.pptxpresentation1_28.pptx
presentation1_28.pptx
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
5b design of welded plate girder using EBS and IS
5b  design of welded plate girder using EBS and IS5b  design of welded plate girder using EBS and IS
5b design of welded plate girder using EBS and IS
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
gantry crane report
gantry crane reportgantry crane report
gantry crane report
 
individual part
individual part individual part
individual part
 
Lec 27 - Columns 3.pdf
Lec 27 - Columns 3.pdfLec 27 - Columns 3.pdf
Lec 27 - Columns 3.pdf
 
B structure
B structure B structure
B structure
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2
 
Individual Caluculation
Individual CaluculationIndividual Caluculation
Individual Caluculation
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Structural Steel Design Project.pdf
Structural Steel Design Project.pdfStructural Steel Design Project.pdf
Structural Steel Design Project.pdf
 

More from Weng Chuan

Jake r esythesize board 2
Jake r esythesize board 2Jake r esythesize board 2
Jake r esythesize board 2Weng Chuan
 
Poh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1bPoh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1bWeng Chuan
 
the home environment affect work from home
 the home environment affect work from home the home environment affect work from home
the home environment affect work from homeWeng Chuan
 
Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...Weng Chuan
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project. Weng Chuan
 
Project management assignment 1
Project management assignment 1 Project management assignment 1
Project management assignment 1 Weng Chuan
 
Report b tech correct compressed
Report b tech correct compressedReport b tech correct compressed
Report b tech correct compressedWeng Chuan
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressedWeng Chuan
 
Urban theories
Urban theoriesUrban theories
Urban theoriesWeng Chuan
 
Building science ii presentation slide
Building science ii   presentation slideBuilding science ii   presentation slide
Building science ii presentation slideWeng Chuan
 
Building science ii report
Building science ii reportBuilding science ii report
Building science ii reportWeng Chuan
 
Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)Weng Chuan
 
building cons report
building cons report building cons report
building cons report Weng Chuan
 
Parliament building
Parliament buildingParliament building
Parliament buildingWeng Chuan
 

More from Weng Chuan (20)

Jake r esythesize board 2
Jake r esythesize board 2Jake r esythesize board 2
Jake r esythesize board 2
 
Poh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1bPoh weng chuan project 1a & 1b
Poh weng chuan project 1a & 1b
 
the home environment affect work from home
 the home environment affect work from home the home environment affect work from home
the home environment affect work from home
 
Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...Comprehensive design report 2 To create a Social Hub Center that reflect the ...
Comprehensive design report 2 To create a Social Hub Center that reflect the ...
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project.
 
Project management assignment 1
Project management assignment 1 Project management assignment 1
Project management assignment 1
 
Report b tech correct compressed
Report b tech correct compressedReport b tech correct compressed
Report b tech correct compressed
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressed
 
Urban theories
Urban theoriesUrban theories
Urban theories
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Building science ii presentation slide
Building science ii   presentation slideBuilding science ii   presentation slide
Building science ii presentation slide
 
Building science ii report
Building science ii reportBuilding science ii report
Building science ii report
 
Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)Topic & issue proposal 2018 template (2)
Topic & issue proposal 2018 template (2)
 
building cons report
building cons report building cons report
building cons report
 
Timeline
TimelineTimeline
Timeline
 
Parliament building
Parliament buildingParliament building
Parliament building
 
New model
New modelNew model
New model
 
New model
New modelNew model
New model
 

Recently uploaded

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,bhuyansuprit
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 

structure analysis

  • 1. Ground Floor Beams Beam to Beam connection C/7-8 Ground Floor SCALE 1: 200
  • 2. Beam to column connection A-E/ 8 Ground floor SCALE 1: 200
  • 7. First floor plan SCALE 1:200
  • 8. LOAD DISTRUBUTION PLANS Ground floor plan SCALE 1:250 First floor plan SCALE 1:250 Roof plan SCALE 1:250
  • 13. Column load distribution plans Scale: NTS
  • 14.
  • 15. BUILDING STRUCTURE BLD61003 ANALYSIS OF BANGALOW Name: poh weng chuan Student id: 0319951 Project; analysis of bungalow Tutor: Mr rizal
  • 16. Dead load Beam self-weight=1.5KN/m Beam(C/7-8) 0.25m X 0.25m X RC beam 24KN/m³ Two way slab of (a-e/ 7-8) (a-c/7-8) 3.6KN/m²X (4.2m/2) =7.56KN/m (a-e/7-8) 3.6KN/m²X (4.2m/2) =7.56KN/m Total dead load on slab (a-e/ 7-8) 1.5 KN/m+7.56kn/m+7.56KN/m =16.62KN/m Live Load Live load on slab (a-e/7-8) (a-c/7-8) 1.5KN/m²X (4.2m/2) =3.15 KN/m (a-e/7-8) 1.5KN/m²X (4.2m/2) =3.15KN/m Total live loadof slabs (a-e/7-8) =3.15KN/m+3.15KN/m =6.3KN/m Ultimate Load Total ultimatedead load =16.62KN/m X 1.4 =23.268KN/m Total ultimatelive load =6.3KN/m X 1.6 =10.08KN/m Total ultimateload =23.268+10.08=33.348KN/m 1.5KN/m³ 87 7.56KN/m 7.56KN/m 16.62KN/m 3.15KN/m 3.15KN/m 6.3KN/m 33.348KN/m
  • 17. Reaction Force Load diagram Σm=0 = (Ra X 4.2m)- (140.062 X 2.1m) - (140.0616)(2.1) = (Ra X 4.2m) -294.129=4.2Ra Ra=70.03kN ΣFy=0 70.03KN-(33.348X 4.2m)+ Rb=0 70.03Kn-140.06+Rb=0 Rb=70.03kN Shearforce diagram 70.03-(33.348X 4.2) =-70.03 Ra =70.03 X 2.1 X ½=73.531 Rb =-70.03 X 2.1 X ½=-73.531 Positive area= negative area (73.531-73.531)KN/m=0 87 140.062KN Ra=70.03Kn Rb=70.03Kn Ra70.03kN Rb-70.03kN73.531KN 0KN 0KN
  • 18. Dead load Beam self-weight=1.5KN/m Beam(C/7-8) 0.25m X 0.25m X RC beam 24KN/m³ Brick wall weight=18.81KN/m 6.6m X 0.15m X 19KN/m³ (a-c/8-8) 3.6KN/m²X (3.6m/2)X 2/3 =3.6KN/m²X 1.8 X 2/3 =4.32KN/m (c-e/8-8) 3.6KN/m²X (3m/2)X 2/3 =3.6KN/m²X 1.5 X 2/3 =3.6KN/m Dead load on slab (a-e/7-8) =7.92KN/m Total dead load (a-e/8-8) For (a-c) =1.5 KN/m+18.81KN/m+4.32KN/m +7.92KN/m=32.55KN/m For (a-e) =1.5 KN/m+18.81KN/m+3.6KN/m +7.92KN/m=31.83KN/m Live Load Live load on slab (a-e/7-8) (a-c/8-8) [1.5KN/m²X (3.6m/2)]X 2/3 =2.7KN/m X 2/3 =1.8KN/m a e 1.5KN/m c 18.81KN/m 4.32KN/m 3.6KN/m 7.92KN/m 32.55KN/m 31.83KN/m 1.8KN/m
  • 19. (c-e/8-8) [1.5KN/m²X (3m/2)]X 2/3 =2.25KN/m X 2/3 =1.5KN/m Live load on slab (a-e/7-8) =3.3KN/m Total live loadon slabs (a-e/7-8) = For (a-c) 1.8KN/m+3.3KN/m=5.1KN/m =For (c-e) 1.5KN/m+3.3KN/m=4.8KN/m Ultimate Load Total ultimatedead load = For (a-c) 32.55KN/m X 1.4 =45.57KN/m For (a-e) 31.83KN/m X 1.4 =44.562KN/m Total ultimatelive load = For (a-c) 5.1KN/m X 1.6 =8.16KN/m = For (c-e) 4.8KN/m X 1.6 =7.68KN/m Total ultimatedead load Ultimate loadfrom a-c= 45.57KN/m+8.16KN/m=53.73KN/m Ultimate loadfrom c-e= 44.562KN/m+7.68KN/m=52.242KN/m 1.5KN/m 3.3KN/m 5.1KN/m 4.8KN/m 53.73KN/m 52.242KN/m
  • 20. Load diagram (Ra X 6.6m)-(53.73 X 3.6m)4.8 - (70.03kN)(3m)-(52.242 X 3m) 5.1 =6.6Ra -928.4544-210.09-799.302 6.6Ra=1937.846 Ra=293.613 ΣFy=0 =293.613KN-(53.73Kn/m X 3.6) - (70.03)-(52.242X 3m) =0 Rb=212.058Kn Shearforce diagram 126.571-193.428=-66.857 -66.857-70.03=-136.887 136.887-156.726=-293.613Kn -293.613+ 293.613Kn=0 Bending momentdiagram 208.126Kn-(193.428) =14.698 =14.698-(70.03) =-55.332 =-55.332-(156.726)=-212.058 Positive area [0.5(293.613+193.428)(2) + [0.5(30.155)(0.576)] =0.5 X 974.082+[0.5(30.155)(0.576)] =487.041+8.684 =410.238 Negative area 0.5(-126.571)(3-0.576) =153.404 53.73KN/m 52.242KN/m 70.03Kn 3.6m 3m 6.6m 293.613KN 126.571KN 293.613- 193.428=100.185 100.185- 70.03Kn=30.155 30.155-156.726 =-126.571
  • 22. Dead load on column g-6 Roof Roof beam forcolumn g-6 = (3.15m+2.75)X 1.5 KN/m =8.85kn Firstfloor Column self-weight (0.25 X 0.25 X 24Kn/m³) X 3m=4.5Kn Concrete slab (3.15m X 2.75)(3.6Kn/m²) =31.185Kn Beam self-weight = (3.15m+2.75)X 1.5 KN/m =8.85kn Brick wall self-weight =(2m + 2.1m +0.6m) X 19kn/m³=89.3kn Ground floor Column self-weight (0.25 X 0.25 X 24Kn/m³) X 3m=4.5Kn Concrete slab (3.15m X 2.75)(3.6Kn/m²) =31.185Kn Beam self-weight = (3.15m+2.75)X 1.5 KN/m =8.85kn
  • 23. Brick wall self-weight = (2m + 1m) X 19kn/m³=57Kn Total dead load=235.37kn 235.37 X 1.4 dead load factor =329.518Kn Live load on columng-6 FirstFloor Concrete slab = 2.75m X 3.15m X 1.5Kn/m² =12.993Kn Ground Floor Concrete slab = 2.75m X 3.15m X 1.5Kn/m² =12.993Kn Total live load= 25.986Kn 25.986 X 1.6 live load factor =41.5776Kn Total ultimateload for Dead load + live load =329.518 + 41.5776 =371.095Kn
  • 24. Dead load on column J-10 Roof Roof beam forcolumn J-10 = (1.3m+0.67)X 1.5 KN/m =2.955Kn Firstfloor Column self-weight (0.25 X 0.25 X 24Kn/m³) X 3m=4.5Kn Concrete slab (1.3m X 0.67)(3.6Kn/m²) =3.1356Kn Beam self-weight = (1.3m+0.67)X 1.5 KN/m =2.955kn Brick wall self-weight = (1.3m+0.67m) X 19kn/m³=37.43Kn Ground floor Column self-weight (0.25 X 0.25 X 24Kn/m³) X 3m=4.5Kn Concrete slab (1.3m X 0.67)(3.6Kn/m²) =3.1356Kn Beam self-weight = (1.3m+0.67)X 1.5 KN/m =2.955kn
  • 25. Brick wall self-weight = (1.3m+0.67m) X 19kn/m³=37.43Kn Total dead load=98.996kn 98.996 X 1.4 dead load factor =98.996Kn Live load on columnJ-10 FirstFloor Concrete slab = 1.3m X 0.67m X 1.5Kn/m² =1.3065Kn Ground Floor Concrete slab = 1.3m X 0.67m X 1.5Kn/m² =1.3065Kn Total live load= 2.613Kn 2.613 X 1.6 live loadfactor =4.181Kn