SlideShare a Scribd company logo
1 of 10
Download to read offline
CEE-311
Structural Analysis-I
(3.0 credit)
Lecture:11
Bijit Kumar Banik
Assistant Professor, CEE, SUST
Room No.: 115 (“C” building)
bijit_sustbd@yahoo.com
Department of Civil and Environmental Engineering
Reactions due to moving concentrated loads (S&V; pp-112)
Condition-1: (No wheels comes on the span during movement)
1
1.
P
L
dP
R −=∆
∑
Where, R = change of reactions due to moving from one load
over the reaction to the next
P1 = the wheel which was over the reaction & is moved
off the span
d1 = the distance between P1 and the following wheel
∑P = the summation of all loads which are on the span
& stay during movement
Reactions due to moving concentrated loads (S&V; pp-112)
Condition-2: (Wheels comes on the span during movement)
Where, Pʹ = load which comes on during movement
e = distance which Pʹ moves on the span
1
1 ..
P
L
eP
L
dP
R −
′
+=∆
∑
If ∆R,
Positive → continue movement
Negative → stop movement
Reactions due to moving concentrated loads (S&V; pp-112)
Find maximum reaction at ‘A’ when wheels
move right to left.
RA
1
A B
60ʹ
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ
10k 10k 36k 36k 36k 36k
10k 10k 20k 20k 20k
20k 20k 20k
Reactions due to moving concentrated loads (S&V; pp-112)
A B
60ʹ
Position-1: wheel 1 at ‘A’
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ
10k 10k 36k 36k 36k 36k
10k 10k 20k 20k 20k
20k 20k 20k
Reactions due to moving concentrated loads (S&V; pp-112)
A B
60ʹ
Position-2: wheel 2 at ‘A’
5ʹ
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ
10k 10k 36k 36k 36k 36k
10k 10k 20k 20k 20k
20k 20k 20k
P = 234 k [No.2 to no.11]
kR 5.910
60
5*234
+=−=∆ continue
Condition-1
Reactions due to moving concentrated loads (S&V; pp-112)
A B
60ʹ
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ
10k 10k 36k 36k 36k 36k
10k 10k 20k 20k 20k
20k 20k 20k
Position-3: wheel 3 at ‘A’
1ʹ
P = 224 k [No.3 to no.11]
continue
Condition-2
kR 2.2010
60
1*20
60
8*224
+=−+=∆
Reactions due to moving concentrated loads (S&V; pp-112)
A B
60ʹ
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ
10k 10k 36k 36k 36k 36k
10k 10k 20k 20k 20k
20k 20k 20k
Position-4: wheel 4 at ‘A’
3ʹ
P = 208 k [No.4 to no.12]
Stop
Condition-2
kR 2.1436
60
3*20
60
6*208
−=−+=∆
Reactions due to moving concentrated loads (S&V; pp-112)
So, wheel 3 at A will produce maximum reaction
RA
1
A B
60ʹ
1 2 3 4 5 6 7 8 9 10 11 12 13 14
5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ
10k 10k 36k 36k 36k 36k
10k 10k 20k 20k 20k
20k 20k 20k
( )
60
1
*20
60
13
*20
60
17
*20
60
21
*20
60
30
*10
60
34
*10
60
42
*36
60
48
*36
60
54
*361*36max
+++++++++=AR
= 150.4 k
Cee311(11)

More Related Content

What's hot

Specific Speed of Turbine | Fluid Mechanics
Specific Speed of Turbine | Fluid MechanicsSpecific Speed of Turbine | Fluid Mechanics
Specific Speed of Turbine | Fluid MechanicsSatish Taji
 
Les 2 motion_11
Les 2 motion_11Les 2 motion_11
Les 2 motion_11sujameryll
 
Unit Quantities of Turbine | Fluid Mechanics
Unit Quantities of Turbine | Fluid MechanicsUnit Quantities of Turbine | Fluid Mechanics
Unit Quantities of Turbine | Fluid MechanicsSatish Taji
 
What is completion
What is completionWhat is completion
What is completionSuparna K
 
Basics of Turbine
Basics of TurbineBasics of Turbine
Basics of TurbineSatish Taji
 
Projectile motion
Projectile motionProjectile motion
Projectile motionTekZeno
 
Cee 312(3)
Cee 312(3)Cee 312(3)
Cee 312(3)apudgr8
 
Airfoil Analysis(NACA 0012 ) Ansys Fluent
Airfoil Analysis(NACA 0012 ) Ansys FluentAirfoil Analysis(NACA 0012 ) Ansys Fluent
Airfoil Analysis(NACA 0012 ) Ansys Fluentshivam choubey
 
Building planning
Building planningBuilding planning
Building planningVINAY MEHTA
 
Mechanic assignment (2)
Mechanic assignment (2)Mechanic assignment (2)
Mechanic assignment (2)Phearun Seng
 
Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)apudgr8
 
Parameter for pile design
Parameter for pile designParameter for pile design
Parameter for pile designRizwan Khurram
 
Parameter for pile deisgns
Parameter for pile deisgnsParameter for pile deisgns
Parameter for pile deisgnsRizwan Khurram
 
Lecture 05 Kinematics in Two Dimensions
Lecture 05 Kinematics in Two DimensionsLecture 05 Kinematics in Two Dimensions
Lecture 05 Kinematics in Two DimensionsDarwin Quinsaat
 

What's hot (20)

Francis Turbine
Francis TurbineFrancis Turbine
Francis Turbine
 
Specific Speed of Turbine | Fluid Mechanics
Specific Speed of Turbine | Fluid MechanicsSpecific Speed of Turbine | Fluid Mechanics
Specific Speed of Turbine | Fluid Mechanics
 
Les 2 motion_11
Les 2 motion_11Les 2 motion_11
Les 2 motion_11
 
Unit Quantities of Turbine | Fluid Mechanics
Unit Quantities of Turbine | Fluid MechanicsUnit Quantities of Turbine | Fluid Mechanics
Unit Quantities of Turbine | Fluid Mechanics
 
What is completion
What is completionWhat is completion
What is completion
 
Basics of Turbine
Basics of TurbineBasics of Turbine
Basics of Turbine
 
Projectile motion
Projectile motionProjectile motion
Projectile motion
 
Cee 312(3)
Cee 312(3)Cee 312(3)
Cee 312(3)
 
Projectile motion
Projectile motionProjectile motion
Projectile motion
 
Projectile motion (2)
Projectile motion (2)Projectile motion (2)
Projectile motion (2)
 
Airfoil Analysis(NACA 0012 ) Ansys Fluent
Airfoil Analysis(NACA 0012 ) Ansys FluentAirfoil Analysis(NACA 0012 ) Ansys Fluent
Airfoil Analysis(NACA 0012 ) Ansys Fluent
 
Projectile motion
Projectile motionProjectile motion
Projectile motion
 
Building planning
Building planningBuilding planning
Building planning
 
Projectile motion
Projectile motionProjectile motion
Projectile motion
 
Projectile motion
Projectile motionProjectile motion
Projectile motion
 
Mechanic assignment (2)
Mechanic assignment (2)Mechanic assignment (2)
Mechanic assignment (2)
 
Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)Cee 312(4)(structural analysis)
Cee 312(4)(structural analysis)
 
Parameter for pile design
Parameter for pile designParameter for pile design
Parameter for pile design
 
Parameter for pile deisgns
Parameter for pile deisgnsParameter for pile deisgns
Parameter for pile deisgns
 
Lecture 05 Kinematics in Two Dimensions
Lecture 05 Kinematics in Two DimensionsLecture 05 Kinematics in Two Dimensions
Lecture 05 Kinematics in Two Dimensions
 

Viewers also liked

Civil02 sheet-03[2012]
Civil02 sheet-03[2012]Civil02 sheet-03[2012]
Civil02 sheet-03[2012]tharwat sakr
 
Structural Analysis II Power Point Project
Structural Analysis II Power Point ProjectStructural Analysis II Power Point Project
Structural Analysis II Power Point ProjectSmgintert
 
Structural Analysis II
Structural Analysis IIStructural Analysis II
Structural Analysis IIguest271fed
 
solving statically indeterminate stucture using stiffnes method
solving statically indeterminate stucture using stiffnes methodsolving statically indeterminate stucture using stiffnes method
solving statically indeterminate stucture using stiffnes methodSyed Md Soikot
 
Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080
Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080
Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080Tawfiq_Rahman
 
Engi6705 structural analysis-classnotes5 (1)
Engi6705 structural analysis-classnotes5 (1)Engi6705 structural analysis-classnotes5 (1)
Engi6705 structural analysis-classnotes5 (1)humayoun shah
 
INTRODUCTION TO FINITE ELEMENT ANALYSIS
INTRODUCTION TO FINITE ELEMENT ANALYSISINTRODUCTION TO FINITE ELEMENT ANALYSIS
INTRODUCTION TO FINITE ELEMENT ANALYSISAchyuth Peri
 
Module1 c - rajesh sir
Module1 c - rajesh sirModule1 c - rajesh sir
Module1 c - rajesh sirSHAMJITH KM
 
Module1 1 introduction-tomatrixms - rajesh sir
Module1 1 introduction-tomatrixms - rajesh sirModule1 1 introduction-tomatrixms - rajesh sir
Module1 1 introduction-tomatrixms - rajesh sirSHAMJITH KM
 
Solving indeterminate structures by using stiffness method. 10.01.03.130
Solving indeterminate structures by using stiffness method. 10.01.03.130Solving indeterminate structures by using stiffness method. 10.01.03.130
Solving indeterminate structures by using stiffness method. 10.01.03.130Juwairiyah Jahan
 
Ch 1 structural analysis stiffness method
Ch 1 structural analysis stiffness methodCh 1 structural analysis stiffness method
Ch 1 structural analysis stiffness method280632796
 

Viewers also liked (15)

Civil02 sheet-03[2012]
Civil02 sheet-03[2012]Civil02 sheet-03[2012]
Civil02 sheet-03[2012]
 
Structural Analysis II Power Point Project
Structural Analysis II Power Point ProjectStructural Analysis II Power Point Project
Structural Analysis II Power Point Project
 
Structural Analysis II
Structural Analysis IIStructural Analysis II
Structural Analysis II
 
solving statically indeterminate stucture using stiffnes method
solving statically indeterminate stucture using stiffnes methodsolving statically indeterminate stucture using stiffnes method
solving statically indeterminate stucture using stiffnes method
 
Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080
Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080
Solving Statically Indeterminate Structure: Stiffness Method 10.01.03.080
 
Engi6705 structural analysis-classnotes5 (1)
Engi6705 structural analysis-classnotes5 (1)Engi6705 structural analysis-classnotes5 (1)
Engi6705 structural analysis-classnotes5 (1)
 
M2l7
M2l7M2l7
M2l7
 
INTRODUCTION TO FINITE ELEMENT ANALYSIS
INTRODUCTION TO FINITE ELEMENT ANALYSISINTRODUCTION TO FINITE ELEMENT ANALYSIS
INTRODUCTION TO FINITE ELEMENT ANALYSIS
 
Module1 c - rajesh sir
Module1 c - rajesh sirModule1 c - rajesh sir
Module1 c - rajesh sir
 
Module1 1 introduction-tomatrixms - rajesh sir
Module1 1 introduction-tomatrixms - rajesh sirModule1 1 introduction-tomatrixms - rajesh sir
Module1 1 introduction-tomatrixms - rajesh sir
 
Solving indeterminate structures by using stiffness method. 10.01.03.130
Solving indeterminate structures by using stiffness method. 10.01.03.130Solving indeterminate structures by using stiffness method. 10.01.03.130
Solving indeterminate structures by using stiffness method. 10.01.03.130
 
Ch 1 structural analysis stiffness method
Ch 1 structural analysis stiffness methodCh 1 structural analysis stiffness method
Ch 1 structural analysis stiffness method
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
Finite Element Method
Finite Element MethodFinite Element Method
Finite Element Method
 
Cable stayed bridge
Cable stayed bridgeCable stayed bridge
Cable stayed bridge
 

Similar to Cee311(11)

Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]Muhammad Irfan
 
formula sheet.pdf
formula sheet.pdfformula sheet.pdf
formula sheet.pdfGARRYB4
 
Engineering_Mechanics_Dynamic_solution_c.pdf
Engineering_Mechanics_Dynamic_solution_c.pdfEngineering_Mechanics_Dynamic_solution_c.pdf
Engineering_Mechanics_Dynamic_solution_c.pdfanon120408
 
02 UNIT-2 (WORK & ENERGY) .pptx
02 UNIT-2 (WORK & ENERGY) .pptx02 UNIT-2 (WORK & ENERGY) .pptx
02 UNIT-2 (WORK & ENERGY) .pptxFatimaAfzal56
 
Kinetics of particles work and energy
Kinetics of particles work and energyKinetics of particles work and energy
Kinetics of particles work and energyGrace Palermo
 
3.2 KINEMATIC ANALYSIS ON GEAR TRAIN
3.2 KINEMATIC ANALYSIS ON GEAR TRAIN3.2 KINEMATIC ANALYSIS ON GEAR TRAIN
3.2 KINEMATIC ANALYSIS ON GEAR TRAINKiran Wakchaure
 

Similar to Cee311(11) (14)

Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
Geotechnical Engineering-II [Lec #25: Coulomb EP Theory - Numericals]
 
Unit 5 rigid body dynamics
Unit 5 rigid body dynamicsUnit 5 rigid body dynamics
Unit 5 rigid body dynamics
 
formula sheet.pdf
formula sheet.pdfformula sheet.pdf
formula sheet.pdf
 
Problem and solution a ph o 6
Problem and solution a ph o 6Problem and solution a ph o 6
Problem and solution a ph o 6
 
Friction murali
Friction muraliFriction murali
Friction murali
 
Gyroscopic couple
Gyroscopic coupleGyroscopic couple
Gyroscopic couple
 
Capítulo 11 (5th edition)rewrweerww
Capítulo 11 (5th edition)rewrweerwwCapítulo 11 (5th edition)rewrweerww
Capítulo 11 (5th edition)rewrweerww
 
Relative motion and relative speed
Relative motion and relative speedRelative motion and relative speed
Relative motion and relative speed
 
Engineering_Mechanics_Dynamic_solution_c.pdf
Engineering_Mechanics_Dynamic_solution_c.pdfEngineering_Mechanics_Dynamic_solution_c.pdf
Engineering_Mechanics_Dynamic_solution_c.pdf
 
02 UNIT-2 (WORK & ENERGY) .pptx
02 UNIT-2 (WORK & ENERGY) .pptx02 UNIT-2 (WORK & ENERGY) .pptx
02 UNIT-2 (WORK & ENERGY) .pptx
 
R 1
R 1R 1
R 1
 
Kinetics of particles work and energy
Kinetics of particles work and energyKinetics of particles work and energy
Kinetics of particles work and energy
 
Nota fizik c5
Nota fizik c5Nota fizik c5
Nota fizik c5
 
3.2 KINEMATIC ANALYSIS ON GEAR TRAIN
3.2 KINEMATIC ANALYSIS ON GEAR TRAIN3.2 KINEMATIC ANALYSIS ON GEAR TRAIN
3.2 KINEMATIC ANALYSIS ON GEAR TRAIN
 

More from apudgr8

Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)apudgr8
 
Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)apudgr8
 
Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)apudgr8
 
Cee 312(5)(structural analysis)
Cee 312(5)(structural analysis)Cee 312(5)(structural analysis)
Cee 312(5)(structural analysis)apudgr8
 
Cee 312(2)
Cee 312(2)Cee 312(2)
Cee 312(2)apudgr8
 
Cee 312(1)
Cee 312(1)Cee 312(1)
Cee 312(1)apudgr8
 
Cee 311(6)
Cee 311(6)Cee 311(6)
Cee 311(6)apudgr8
 
Cee 311(3)
Cee 311(3)Cee 311(3)
Cee 311(3)apudgr8
 
Cee 311(2)
Cee 311(2)Cee 311(2)
Cee 311(2)apudgr8
 
Cee 311(1)
Cee 311(1)Cee 311(1)
Cee 311(1)apudgr8
 
Assignment 1 (bijit sir)
Assignment 1 (bijit sir)Assignment 1 (bijit sir)
Assignment 1 (bijit sir)apudgr8
 

More from apudgr8 (11)

Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)Cee 317 (1)(structural analysis)
Cee 317 (1)(structural analysis)
 
Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)Cee 312(7 & 8)(structural analysis)
Cee 312(7 & 8)(structural analysis)
 
Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)Cee 312(6)(structural analysis)
Cee 312(6)(structural analysis)
 
Cee 312(5)(structural analysis)
Cee 312(5)(structural analysis)Cee 312(5)(structural analysis)
Cee 312(5)(structural analysis)
 
Cee 312(2)
Cee 312(2)Cee 312(2)
Cee 312(2)
 
Cee 312(1)
Cee 312(1)Cee 312(1)
Cee 312(1)
 
Cee 311(6)
Cee 311(6)Cee 311(6)
Cee 311(6)
 
Cee 311(3)
Cee 311(3)Cee 311(3)
Cee 311(3)
 
Cee 311(2)
Cee 311(2)Cee 311(2)
Cee 311(2)
 
Cee 311(1)
Cee 311(1)Cee 311(1)
Cee 311(1)
 
Assignment 1 (bijit sir)
Assignment 1 (bijit sir)Assignment 1 (bijit sir)
Assignment 1 (bijit sir)
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 

Cee311(11)

  • 1. CEE-311 Structural Analysis-I (3.0 credit) Lecture:11 Bijit Kumar Banik Assistant Professor, CEE, SUST Room No.: 115 (“C” building) bijit_sustbd@yahoo.com Department of Civil and Environmental Engineering
  • 2. Reactions due to moving concentrated loads (S&V; pp-112) Condition-1: (No wheels comes on the span during movement) 1 1. P L dP R −=∆ ∑ Where, R = change of reactions due to moving from one load over the reaction to the next P1 = the wheel which was over the reaction & is moved off the span d1 = the distance between P1 and the following wheel ∑P = the summation of all loads which are on the span & stay during movement
  • 3. Reactions due to moving concentrated loads (S&V; pp-112) Condition-2: (Wheels comes on the span during movement) Where, Pʹ = load which comes on during movement e = distance which Pʹ moves on the span 1 1 .. P L eP L dP R − ′ +=∆ ∑ If ∆R, Positive → continue movement Negative → stop movement
  • 4. Reactions due to moving concentrated loads (S&V; pp-112) Find maximum reaction at ‘A’ when wheels move right to left. RA 1 A B 60ʹ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ 10k 10k 36k 36k 36k 36k 10k 10k 20k 20k 20k 20k 20k 20k
  • 5. Reactions due to moving concentrated loads (S&V; pp-112) A B 60ʹ Position-1: wheel 1 at ‘A’ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ 10k 10k 36k 36k 36k 36k 10k 10k 20k 20k 20k 20k 20k 20k
  • 6. Reactions due to moving concentrated loads (S&V; pp-112) A B 60ʹ Position-2: wheel 2 at ‘A’ 5ʹ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ 10k 10k 36k 36k 36k 36k 10k 10k 20k 20k 20k 20k 20k 20k P = 234 k [No.2 to no.11] kR 5.910 60 5*234 +=−=∆ continue Condition-1
  • 7. Reactions due to moving concentrated loads (S&V; pp-112) A B 60ʹ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ 10k 10k 36k 36k 36k 36k 10k 10k 20k 20k 20k 20k 20k 20k Position-3: wheel 3 at ‘A’ 1ʹ P = 224 k [No.3 to no.11] continue Condition-2 kR 2.2010 60 1*20 60 8*224 +=−+=∆
  • 8. Reactions due to moving concentrated loads (S&V; pp-112) A B 60ʹ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ 10k 10k 36k 36k 36k 36k 10k 10k 20k 20k 20k 20k 20k 20k Position-4: wheel 4 at ‘A’ 3ʹ P = 208 k [No.4 to no.12] Stop Condition-2 kR 2.1436 60 3*20 60 6*208 −=−+=∆
  • 9. Reactions due to moving concentrated loads (S&V; pp-112) So, wheel 3 at A will produce maximum reaction RA 1 A B 60ʹ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 5ʹ 8ʹ 6ʹ 6ʹ 6ʹ 8ʹ 4ʹ 9ʹ 4ʹ 4ʹ 12ʹ 4ʹ 4ʹ 10k 10k 36k 36k 36k 36k 10k 10k 20k 20k 20k 20k 20k 20k ( ) 60 1 *20 60 13 *20 60 17 *20 60 21 *20 60 30 *10 60 34 *10 60 42 *36 60 48 *36 60 54 *361*36max +++++++++=AR = 150.4 k