19 YEARS: E&CS Engineer for Polysilicon, mining and metals, chemicals, microelectronics,
pharmaceutical, foods, paper, soap and paint industries. Lead engineer and engineering team
leader on projects for Ma’aden, Ivanhoe Mining, ALCOA, LDK Polysilicon, BASF, IBM, Procter &
Gamble, Eli Lilly. On site startup experience for LDK Polysilicon and Procter & Gamble Papermaking
Project. Construction Management for Eli Lilly pharmaceutical manufacturing facilities.
PMC Lead Engineer for large distributed-execution projects.
E D U CATI O N BS University of Pennsylvania, 1996 (Electrical Engineering)
PRO F E S S I O N A L LI C E N S E Professional Engineer, Ohio, 2004-Present
S I G N I FI CA N T E XPE RI E N C E FLUOR (1996 - Present)
Umm Wu’al Phosphate Project Umm Wu’al, Saudi Arabia (March 2013-Present)
Project Management Consultancy lead automation engineer. Client engineering
representative for the controls and instrumentation front end engineering and detailed design.
Prepared tender package and performed bid evaluation for Main Automation Contractor (MAC)
(Yokogawa). Oversaw development of the program-wide standard designs for the MAC. Managed
Main Automation Contractor during detailed design and testing of control systems for 8 Engineering
Procurement and Construction Contractors.
Simandou Iron Mine, Guinea, West Africa (June 2012 – January 2013)
Project Management Consultancy Lead for Electrical, Control Systems and Telecomms engineering.
Managed completion of front end design specifications. Coordinated area lead engineers.
Oversaw development of Main Automation Vendor tender package. Led technical evaluation of
Main Electrical Vendor technical evaluation.
Alcoa Automotive Expansion Project (January 2012 – May 2012)
Electrical and Control Systems site project engineer. Create project equipment and design specifica-
tions. Coordinate engineering between Greenville engineering office, equipment vendors and client.
LDK Polysilicon Manufacturing Project, Xinyu, Jiangxi, PRC
(February 2008 – December 2011)
Control system lead engineer for world’s largest Polysilicon plant. Coordinated control systems
and instrument design between the China, Philippines, and US design centers and the project MAV
(Emerson PM). Site responsibilities included supervising additional control systems engineering, startup
and checkout of MAV equipment and packaged unit control systems, and assisting the client in setting
up maintenance and operations procedures.
1/3
EMAIL: ward.miller@fluor.com • PHONE: 646-480-0328
WILLIAM WH MILLER
ELECTRICAL AND CONTROL SYSTEMS ENGINEER
Oyu Tolgoi Mining Project, Ivanhoe Mines Ltd., Oyu Tolgoi, Mongolia (May 2006-February 2008)
Infrastructure electrical, controls and communications lead engineer on green-field copper and gold
mine in South-central Mongolia. Supervised/contracted engineering for 250MW 220kV and 35kV
power reticulation including on-site and bore field transmission lines and substations, 24 MW diesel
power station; control systems for infrastructure facilities; site-wide communication backbone,
DTR system, security and fire alarm system and LAN/telephone system. Supervised electrical and
auxiliary systems design for camp facilities and boiler. Assisted in coordination of E&CS engineering
between design centers in China, Mongolia and Canada including selection of the Main Electrical
Vendor (MEV) and creation of project electrical equipment catalogue.
Integrated Isocyanates Project, BASF/HUNTSMAN, Caojing, China (August 2004- May 2006)
Supervised control and instrumentation design by Chinese Design Institutes. Coordinated DCS
hardware design with Emerson Process Management(MAV). Coordinated design between Shanghai
Taiwan and Korean design centers. Lead on-site controls and instrumentation engineer. Coordinated
loop checking by MAV and construction contractors.
PR05 Humalog Production Facility, Eli Lilly, Carolina, Puerto Rico (January 2004-July 2004)
Supervised the work of fire alarm, telecommunications, security and HVAC control systems sub-
contractors. Directed the work of the Fluor Daniel electrical and controls craft on the last phase of
construction. Negotiated and awarded new contracts for remaining electrical and controls scope and
oversaw the scope completion by sub-contractors.
Humalog Capacity Integration Project, Eli Lilly, Indianapolis, Indiana (July 2003 – January 2004)
Superintendant for the construction of the electrical, control, life safety, and security systems in
new Humalog production area with 30 electricians and foremen. Provided on-site engineering
support. Developed quality plan and oversaw the completion of construction quality assurance
documentation.
Quality Upgrade Projects, Eli Lilly, Indianapolis, Indiana (May 2002 – June 2003)
Lead electrical and controls engineer on projects to bring existing production building into
compliance with FDA cleanliness protocols and GMP regulations. Developed and presented
to the client a new airlock scheme to be incorporated site-wide.
Rate Increase Project, ICI Paint, Commerce, California (January 2002-May 2002)
Designed electrical and control systems to more than double output capacity of existing plant without
interrupting production. Interfaced with vendors for security system and motor control center packages.
Developed single lines, elementaries, and equipment specifications. Performed field audit of electrical
and control systems. Assisted power study of existing power distribution system.
Ivorydale Soap Plant, Procter & Gamble, Cincinnati, OH (July 2001-December 2001)
Retrofitted 100 year old manufacturing building with new Allen Bradley ControlLogix control
system. Upgraded electrical and controls for dust control and airvey systems. Provided
construction support and coordinated startup activities for soap making line.
2/3
EMAIL: ward.miller@fluor.com • PHONE: 646-481-2603
WILLIAM WH MILLER
ELECTRICAL AND CONTROL SYSTEMS ENGINEER
B6 Pilot Facility, Genentech, So. San Francisco, California. (May-July 2001)
Power Distribution and lighting design for world’s largest bio-pharmaceutical research facility.
Developed lighting plan in accordance with California Title 24 efficiency standards. Provided
detailed power plan including UPS and 100% emergency backup power system.
Fabrication Facility, Intel, Hudson, Massachusetts (Feb.-April 2001)
Construction support for controls and life safety systems. Oversaw construction for new microchip
fabrication facility. Provided construction support as required. Verified contractor installation.
Fabrication Upgrade Projects, IBM, Burlington, Vermont (2000 – 2001)
Lead controls engineer on the design and construction of manufacturing and testing cleanroom
areas. Participated as controls lead in the focus process for new 30MM chip testing facility. Designed
controls for clean room air handling and particle monitoring systems. Developed scheme for IBM main
lobby security system. Responsible for design of life safety installations and upgrades including the
life safety notification, site monitoring, CCTV, fire alarm, and tool monitoring systems. Upgraded voice
and data telecommunications for chip fabrication area.
New Site Paper Project, Procter & Gamble, Cape Girardeau, Missouri (1998 - 2000)
Controls engineer for electrical checkout and startup of product recycling system. Performed
electrical checkout and startup of two burner systems controlled by Triconex PLC. Established
communication between Triconex , Honeywell , Modicon, and Allen Bradley control systems.
Developed logic and programmed Modicon PLC for product recycling and chemical additives.
Pringles Global One Project, Procter & Gamble, Jackson Tennessee (1997 - 1998)
Responsible for specification of instrumentation on global Pringles design. Performed studies
for motor safety verification on global electrical design. Managed Access database containing
instrument and electrical information for several manufacturing lines.
6A Paper Project, Procter & Gamble, Cincinnati, Ohio (1996 - 1997)
Responsible for instrument specification and procurement. Developed Logic and programmed
Modicon PLC for new air threading system. Designed panel for testing of Modicon control
program. Assisted in development of standard instrument database design for all projects
within the operating company.
GMP ASSOCIATES Honolulu HI (Summers, 1993 - 1996)
Engineering Intern
3/3
EMAIL: ward.miller@fluor.com • PHONE: 646-481-2603
WILLIAM WH MILLER
ELECTRICAL AND CONTROL SYSTEMS ENGINEER

More Related Content

What's hot (20)

Resume
ResumeResume
Resume
 
Emad haliem resume
Emad haliem resumeEmad haliem resume
Emad haliem resume
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
Resume
ResumeResume
Resume
 
Resume Andres Chairez 2015 REV 000
Resume Andres Chairez 2015 REV 000Resume Andres Chairez 2015 REV 000
Resume Andres Chairez 2015 REV 000
 
Up-to-Date Leonel resume
Up-to-Date Leonel resumeUp-to-Date Leonel resume
Up-to-Date Leonel resume
 
EHHResume062815
EHHResume062815EHHResume062815
EHHResume062815
 
Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1Brad_Bridgers-_I&E1
Brad_Bridgers-_I&E1
 
C.V 2017
C.V 2017C.V 2017
C.V 2017
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
 
engineer asif resume
engineer asif resumeengineer asif resume
engineer asif resume
 
Leonardo Milian Present Resume
Leonardo Milian Present ResumeLeonardo Milian Present Resume
Leonardo Milian Present Resume
 
RWH Resume 2015-07-13
RWH Resume 2015-07-13RWH Resume 2015-07-13
RWH Resume 2015-07-13
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
Amruta shinde resume
Amruta shinde resumeAmruta shinde resume
Amruta shinde resume
 
Revised Brady Resume 04292015
Revised Brady Resume 04292015Revised Brady Resume 04292015
Revised Brady Resume 04292015
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
resume4
resume4resume4
resume4
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
EUROSOL_Brochure_2015.02
EUROSOL_Brochure_2015.02EUROSOL_Brochure_2015.02
EUROSOL_Brochure_2015.02
 

Viewers also liked

Belfort, Karla Resume
Belfort, Karla ResumeBelfort, Karla Resume
Belfort, Karla ResumeKarla Belfort
 
Physiology of bacteria
Physiology of bacteria Physiology of bacteria
Physiology of bacteria shahbaz husain
 
ChristinaMin_thefoodiemagazine
ChristinaMin_thefoodiemagazineChristinaMin_thefoodiemagazine
ChristinaMin_thefoodiemagazineChristina Min
 
Mohan Kumar MG CV
Mohan Kumar MG CVMohan Kumar MG CV
Mohan Kumar MG CVMohan Mg
 
To David - Resume
To David - ResumeTo David - Resume
To David - ResumeDavid To
 
05 Service Oriented Architecture Series - Preparing for SOA
05 Service Oriented Architecture Series - Preparing for SOA05 Service Oriented Architecture Series - Preparing for SOA
05 Service Oriented Architecture Series - Preparing for SOAPouria Ghatrenabi
 
Alphorm.com Formation Dreamweaver CC pour les débutants
Alphorm.com Formation Dreamweaver CC pour les débutantsAlphorm.com Formation Dreamweaver CC pour les débutants
Alphorm.com Formation Dreamweaver CC pour les débutantsAlphorm
 
Alphorm.com Support Formation SCOM 2012 R2, les fondamentaux
Alphorm.com Support Formation SCOM 2012 R2, les fondamentauxAlphorm.com Support Formation SCOM 2012 R2, les fondamentaux
Alphorm.com Support Formation SCOM 2012 R2, les fondamentauxAlphorm
 

Viewers also liked (13)

Shahbaz husain
Shahbaz husainShahbaz husain
Shahbaz husain
 
Belfort, Karla Resume
Belfort, Karla ResumeBelfort, Karla Resume
Belfort, Karla Resume
 
Physiology of bacteria
Physiology of bacteria Physiology of bacteria
Physiology of bacteria
 
ChristinaMin_thefoodiemagazine
ChristinaMin_thefoodiemagazineChristinaMin_thefoodiemagazine
ChristinaMin_thefoodiemagazine
 
Mohan Kumar MG CV
Mohan Kumar MG CVMohan Kumar MG CV
Mohan Kumar MG CV
 
Slide deck for assist 2016
Slide deck for assist 2016Slide deck for assist 2016
Slide deck for assist 2016
 
Alexander Sherman Resume
Alexander Sherman ResumeAlexander Sherman Resume
Alexander Sherman Resume
 
La Disciplina
La DisciplinaLa Disciplina
La Disciplina
 
To David - Resume
To David - ResumeTo David - Resume
To David - Resume
 
Slide pack for break out room
Slide pack for break out roomSlide pack for break out room
Slide pack for break out room
 
05 Service Oriented Architecture Series - Preparing for SOA
05 Service Oriented Architecture Series - Preparing for SOA05 Service Oriented Architecture Series - Preparing for SOA
05 Service Oriented Architecture Series - Preparing for SOA
 
Alphorm.com Formation Dreamweaver CC pour les débutants
Alphorm.com Formation Dreamweaver CC pour les débutantsAlphorm.com Formation Dreamweaver CC pour les débutants
Alphorm.com Formation Dreamweaver CC pour les débutants
 
Alphorm.com Support Formation SCOM 2012 R2, les fondamentaux
Alphorm.com Support Formation SCOM 2012 R2, les fondamentauxAlphorm.com Support Formation SCOM 2012 R2, les fondamentaux
Alphorm.com Support Formation SCOM 2012 R2, les fondamentaux
 

Similar to William Miller Resume Feb, 2016

gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015Gary Katz
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021Anthony Martini
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 
Bill Delano Resume
Bill Delano ResumeBill Delano Resume
Bill Delano ResumeBill Delano
 
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16Martin Royse
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque
 
CTFSystemEngineerResume2016
CTFSystemEngineerResume2016CTFSystemEngineerResume2016
CTFSystemEngineerResume2016Cynetra Ferguson
 
TBResume 2016 update
TBResume 2016 updateTBResume 2016 update
TBResume 2016 updateTary Burritt
 
Jimmy M Barker_Resume
Jimmy M Barker_ResumeJimmy M Barker_Resume
Jimmy M Barker_ResumeJimmy Barker
 
Jimmy Barker Resume
Jimmy Barker ResumeJimmy Barker Resume
Jimmy Barker ResumeJimmy Barker
 
Luis Vargas Resume
Luis Vargas ResumeLuis Vargas Resume
Luis Vargas ResumeLuis Vargas
 
N V Mani Resume April 2011
N V Mani  Resume  April  2011N V Mani  Resume  April  2011
N V Mani Resume April 2011nvmani2009
 

Similar to William Miller Resume Feb, 2016 (20)

gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015
 
anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021anthony-j.-martini-resume 20161021
anthony-j.-martini-resume 20161021
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Resume - 2016
Resume - 2016Resume - 2016
Resume - 2016
 
MAraziR-1 (1)
MAraziR-1 (1)MAraziR-1 (1)
MAraziR-1 (1)
 
Bill Delano Resume
Bill Delano ResumeBill Delano Resume
Bill Delano Resume
 
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)Khwaja Haque Resume(8-30-16)
Khwaja Haque Resume(8-30-16)
 
CTFSystemEngineerResume2016
CTFSystemEngineerResume2016CTFSystemEngineerResume2016
CTFSystemEngineerResume2016
 
TBResume 2016 update
TBResume 2016 updateTBResume 2016 update
TBResume 2016 update
 
Jimmy M Barker_Resume
Jimmy M Barker_ResumeJimmy M Barker_Resume
Jimmy M Barker_Resume
 
Jimmy Barker Resume
Jimmy Barker ResumeJimmy Barker Resume
Jimmy Barker Resume
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
Luis Vargas Resume
Luis Vargas ResumeLuis Vargas Resume
Luis Vargas Resume
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
N V Mani Resume April 2011
N V Mani  Resume  April  2011N V Mani  Resume  April  2011
N V Mani Resume April 2011
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
MichaelEmblincv
MichaelEmblincvMichaelEmblincv
MichaelEmblincv
 
RobertKulick_2016
RobertKulick_2016RobertKulick_2016
RobertKulick_2016
 

William Miller Resume Feb, 2016

  • 1. OV E RV I E W 19 YEARS: E&CS Engineer for Polysilicon, mining and metals, chemicals, microelectronics, pharmaceutical, foods, paper, soap and paint industries. Lead engineer and engineering team leader on projects for Ma’aden, Ivanhoe Mining, ALCOA, LDK Polysilicon, BASF, IBM, Procter & Gamble, Eli Lilly. On site startup experience for LDK Polysilicon and Procter & Gamble Papermaking Project. Construction Management for Eli Lilly pharmaceutical manufacturing facilities. PMC Lead Engineer for large distributed-execution projects. E D U CATI O N BS University of Pennsylvania, 1996 (Electrical Engineering) PRO F E S S I O N A L LI C E N S E Professional Engineer, Ohio, 2004-Present S I G N I FI CA N T E XPE RI E N C E FLUOR (1996 - Present) Umm Wu’al Phosphate Project Umm Wu’al, Saudi Arabia (March 2013-Present) Project Management Consultancy lead automation engineer. Client engineering representative for the controls and instrumentation front end engineering and detailed design. Prepared tender package and performed bid evaluation for Main Automation Contractor (MAC) (Yokogawa). Oversaw development of the program-wide standard designs for the MAC. Managed Main Automation Contractor during detailed design and testing of control systems for 8 Engineering Procurement and Construction Contractors. Simandou Iron Mine, Guinea, West Africa (June 2012 – January 2013) Project Management Consultancy Lead for Electrical, Control Systems and Telecomms engineering. Managed completion of front end design specifications. Coordinated area lead engineers. Oversaw development of Main Automation Vendor tender package. Led technical evaluation of Main Electrical Vendor technical evaluation. Alcoa Automotive Expansion Project (January 2012 – May 2012) Electrical and Control Systems site project engineer. Create project equipment and design specifica- tions. Coordinate engineering between Greenville engineering office, equipment vendors and client. LDK Polysilicon Manufacturing Project, Xinyu, Jiangxi, PRC (February 2008 – December 2011) Control system lead engineer for world’s largest Polysilicon plant. Coordinated control systems and instrument design between the China, Philippines, and US design centers and the project MAV (Emerson PM). Site responsibilities included supervising additional control systems engineering, startup and checkout of MAV equipment and packaged unit control systems, and assisting the client in setting up maintenance and operations procedures. 1/3 EMAIL: ward.miller@fluor.com • PHONE: 646-480-0328 WILLIAM WH MILLER ELECTRICAL AND CONTROL SYSTEMS ENGINEER
  • 2. Oyu Tolgoi Mining Project, Ivanhoe Mines Ltd., Oyu Tolgoi, Mongolia (May 2006-February 2008) Infrastructure electrical, controls and communications lead engineer on green-field copper and gold mine in South-central Mongolia. Supervised/contracted engineering for 250MW 220kV and 35kV power reticulation including on-site and bore field transmission lines and substations, 24 MW diesel power station; control systems for infrastructure facilities; site-wide communication backbone, DTR system, security and fire alarm system and LAN/telephone system. Supervised electrical and auxiliary systems design for camp facilities and boiler. Assisted in coordination of E&CS engineering between design centers in China, Mongolia and Canada including selection of the Main Electrical Vendor (MEV) and creation of project electrical equipment catalogue. Integrated Isocyanates Project, BASF/HUNTSMAN, Caojing, China (August 2004- May 2006) Supervised control and instrumentation design by Chinese Design Institutes. Coordinated DCS hardware design with Emerson Process Management(MAV). Coordinated design between Shanghai Taiwan and Korean design centers. Lead on-site controls and instrumentation engineer. Coordinated loop checking by MAV and construction contractors. PR05 Humalog Production Facility, Eli Lilly, Carolina, Puerto Rico (January 2004-July 2004) Supervised the work of fire alarm, telecommunications, security and HVAC control systems sub- contractors. Directed the work of the Fluor Daniel electrical and controls craft on the last phase of construction. Negotiated and awarded new contracts for remaining electrical and controls scope and oversaw the scope completion by sub-contractors. Humalog Capacity Integration Project, Eli Lilly, Indianapolis, Indiana (July 2003 – January 2004) Superintendant for the construction of the electrical, control, life safety, and security systems in new Humalog production area with 30 electricians and foremen. Provided on-site engineering support. Developed quality plan and oversaw the completion of construction quality assurance documentation. Quality Upgrade Projects, Eli Lilly, Indianapolis, Indiana (May 2002 – June 2003) Lead electrical and controls engineer on projects to bring existing production building into compliance with FDA cleanliness protocols and GMP regulations. Developed and presented to the client a new airlock scheme to be incorporated site-wide. Rate Increase Project, ICI Paint, Commerce, California (January 2002-May 2002) Designed electrical and control systems to more than double output capacity of existing plant without interrupting production. Interfaced with vendors for security system and motor control center packages. Developed single lines, elementaries, and equipment specifications. Performed field audit of electrical and control systems. Assisted power study of existing power distribution system. Ivorydale Soap Plant, Procter & Gamble, Cincinnati, OH (July 2001-December 2001) Retrofitted 100 year old manufacturing building with new Allen Bradley ControlLogix control system. Upgraded electrical and controls for dust control and airvey systems. Provided construction support and coordinated startup activities for soap making line. 2/3 EMAIL: ward.miller@fluor.com • PHONE: 646-481-2603 WILLIAM WH MILLER ELECTRICAL AND CONTROL SYSTEMS ENGINEER
  • 3. B6 Pilot Facility, Genentech, So. San Francisco, California. (May-July 2001) Power Distribution and lighting design for world’s largest bio-pharmaceutical research facility. Developed lighting plan in accordance with California Title 24 efficiency standards. Provided detailed power plan including UPS and 100% emergency backup power system. Fabrication Facility, Intel, Hudson, Massachusetts (Feb.-April 2001) Construction support for controls and life safety systems. Oversaw construction for new microchip fabrication facility. Provided construction support as required. Verified contractor installation. Fabrication Upgrade Projects, IBM, Burlington, Vermont (2000 – 2001) Lead controls engineer on the design and construction of manufacturing and testing cleanroom areas. Participated as controls lead in the focus process for new 30MM chip testing facility. Designed controls for clean room air handling and particle monitoring systems. Developed scheme for IBM main lobby security system. Responsible for design of life safety installations and upgrades including the life safety notification, site monitoring, CCTV, fire alarm, and tool monitoring systems. Upgraded voice and data telecommunications for chip fabrication area. New Site Paper Project, Procter & Gamble, Cape Girardeau, Missouri (1998 - 2000) Controls engineer for electrical checkout and startup of product recycling system. Performed electrical checkout and startup of two burner systems controlled by Triconex PLC. Established communication between Triconex , Honeywell , Modicon, and Allen Bradley control systems. Developed logic and programmed Modicon PLC for product recycling and chemical additives. Pringles Global One Project, Procter & Gamble, Jackson Tennessee (1997 - 1998) Responsible for specification of instrumentation on global Pringles design. Performed studies for motor safety verification on global electrical design. Managed Access database containing instrument and electrical information for several manufacturing lines. 6A Paper Project, Procter & Gamble, Cincinnati, Ohio (1996 - 1997) Responsible for instrument specification and procurement. Developed Logic and programmed Modicon PLC for new air threading system. Designed panel for testing of Modicon control program. Assisted in development of standard instrument database design for all projects within the operating company. GMP ASSOCIATES Honolulu HI (Summers, 1993 - 1996) Engineering Intern 3/3 EMAIL: ward.miller@fluor.com • PHONE: 646-481-2603 WILLIAM WH MILLER ELECTRICAL AND CONTROL SYSTEMS ENGINEER