Al Jad
Enabl
 
Lead De
Project 
Main Co
 
 
 
 
 
CONT
JULY‐2
 
 
 
 
 
 
 
 
 
 
 
 
Client
 
ly‐2013 
daf Devel
ing Work
esign Consu
Manageme
ontractor: B
TRACTOR
2013 
t: 
lopments
ks for Al 
ultant: Archi
ent Consulta
Bauer Intern
R’S WEEK
 
s 
Jadaf De
itecture & P
ant: Conflue
national FZE
KLY PROG
evelopme
Planning Gr
ence 
E 
GRESS RE
 
 
 
 
 
ent 
roup 
EPORT 
Weekly Report No. 19 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Weekly Progress Report No.19 
(04‐July‐2013) 
 
Weekly Report No. 19 
Table of Contents
 
Sr. No.  Description Page No.
     
1  Weekly Tracker Sheet 4
     
2  Level 03 Program  6
     
3  Two Weeks Look Ahead Program 31
     
4  Longest Path  35
     
5  Program Log  37
     
6  Minutes of Meeting Progress  54 
     
7  Project Progress Summary 59
     
8  Key Performance Indices 63
     
9  Inspection Request Log 64
     
10  Progress Layouts & Photos 80
     
     
   
 
 
 
Weekly Report No. 19 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Section 01 – Weekly Tracker Sheet 
(04‐July‐2013) 
 
 
Programming Weekly Tracker Sheet – Enabling Works for Al Jadaf Development
Statistics
Data Date: 4-July-13 Previous Update On: 27-Jun-13
Baseline Finish 21-Aug-13 Last update forecast finish 10-Nov-13
Rev. Contract Finish N/A This update forecast finish 16-Nov-13
Delay This Period (In Days): - Cumu. Delay (Contract): 77 days
Planned % Complete 71.3 % Last update Actual % Complete 20.08 %
This update Actual % Complete 23.6 %
Key Activity / Milestones Comparison (This Reporting Period)
Sr. No. Activity
Baseline This Update
Delay/Ahead Comments
Start Finish Start Finish*
1 Installation of fence and sign boards (S3) 2-March-13 20-March-13 14-March-13 On going
2
Obtain Approval from DEWA for shop drawing & material
submittal ( 11 Kv cable ) ( PLOT R1 & H3 ) 14-March-13 28-March-13 26-March-13 On going
3
Obtain Approval from DEWA for shop drawing &
material submittal (132 Kv ) 14-March-13 28-March-13 26-March-13 On going
4 Construction of secant pile wall in plot R1 7-May-13 4-Jun-13 11-May-13 22-Jun-13 Completed
5 Construction of guide wall in plot H3 30-Apr-13 22-May-13 22-Jun-13 30-July-13 Completed
6 Construction of secant pile wall in plot H3 8-May-13 28-May-13 27-Jun-13 On going
7 Construction of guide wall in plot S2 16-May-13 3-Jun-13 1-July-13 2-July-13 Completed
8 Construction of secant pile wall in plot S2 25-May-13 15-Jun-13 2-July-13 On going
9 Construction of secant pile wall in plot S3 8-May-13 25-May-13 25-May-13 On going
ENGINEERING
RTA Construction NOC for Plot S2 15-May-13 6-Jun-13 Completed
Obtaining shoring permitfor Plot S2 13-May-13 27-Jun-13 Completed
Obtaining shoring permitfor Plot S1 14-May-13 23-Jun-13 Completed
RTA Construction NOC for Plot H1 12-May-13 23-Jun-13 Completed
* - Dates are derived from the updated program
Project Milestones
Sr. No. Milestone
Baseline Last Update This Update
Comments
Finish Start Finish Start Finish
1 Contract Commencement Date 22-Jan-13 22-Jan-13 22-Jan-13 completed
2 Start of Mobilization Works 4-Feb-13 22-Jan-13 22-Jan-13 completed
8 Project Completion 21-Aug-13 16-Nov-13 Forecast Date
Narrative
This Week:
- Plot S3: Secant Pile Wall in Progress.
- Obtaining shoring permits for plot H2
- Start of Guide wall and secant pile wall in Plot H3
- Start of Guide wall in Plot S1 and H1.
Next week:
- Obtaining Permit for Plot H2 By APG and start construction of guide wall.
- Continue the Construction of Secant Pile Wall in Plots H3 and S2
- Start construction of secant pile wall in plot S1
- Completion of Shoring Works in Plot S3
Modifications to Logic, Links, Durations and Relationships
1 A Baseline Program was submitted and under review
External Dependency Factors
- Authorities Approvals
Weekly Report No. 19 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Section 02 – Level 03 Program 
(04‐July‐2013) 
Awaiting Approval 
 
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
270 71.3% 23.6% 25-Dec-12 21-Aug-13 25-Dec-12 A 16-Nov-13 -70
Milestones
Milestones 270 0% 0% 25-Dec-12 21-Aug-13 25-Dec-12 A 16-Nov-13 -70
A1000 Award of contract 0 100% 100% 100% 25-Dec-12 25-Dec-12 A
A1020 Start of Mobilization 0 100% 100% 100% 04-Feb-13 22-Jan-13 A
A1010 Contract commencement date 0 100% 100% 100% 22-Jan-13 22-Jan-13 A
A1030 Project Completion 0 0% 0% 0% 21-Aug-13 16-Nov-13 -70
Plots
Plots 246 73.35% 24.28% 22-Jan-13 21-Aug-13 12-Jan-13 A 14-Nov-13 -69
Plot S3
Plot S3 220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49
Engineering
Engineering 77 100% 100% 30-Jan-13 29-Apr-13 23-Jan-13 A 22-May-13 A
A1040 Receive IFC drawings 0 100% 100% 100% 30-Jan-13 23-Jan-13 A
A1060 Submittal of Method Statement 5 100% 100% 100% 06-Feb-13 11-Feb-13 30-Jan-13 A 07-Feb-13 A
A1050 Submittal of Design and shop drawings 5 100% 100% 100% 06-Feb-13 11-Feb-13 31-Jan-13 A 31-Jan-13 A
A1090 Approval of method statement ( ByAPG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 02-Feb-13 A 07-Feb-13 A
A1070 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 10-Apr-13 11-Apr-13 03-Feb-13 A 13-Apr-13 A
A1080 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 10-Apr-13 25-Apr-13 14-Apr-13 A 28-Apr-13 A
A1230 Design NOC from APG 0 100% 100% 100% 11-Apr-13 15-Apr-13 A
A1270 RTA Construction NOC 0 100% 100% 100% 27-Apr-13 08-May-13 A
A1100 Obtaining shoring permit 0 100% 100% 100% 29-Apr-13 22-May-13 A
Authorities Approvals
Authorities Approvals 154 100% 94.27% 30-Jan-13 05-May-13 22-Jan-13 A 29-Jul-13 -5
Fencing /Hoarding and sign board
Fencing /Hoarding and sign board 34 100% 92.5% 10-Feb-13 20-Mar-13 29-Jan-13 A 08-Jul-13 13
A1110 Submittal of fence and sign board drawings 3 100% 100% 100% 10-Feb-13 12-Feb-13 29-Jan-13 A 31-Jan-13 A
A1120 Approval of drawings ( APG) 2 100% 100% 100% 13-Feb-13 14-Feb-13 02-Feb-13 A 11-Feb-13 A
A1140 Obtaining fencing and Hoarding permit 0 100% 100% 100% 28-Feb-13 06-Feb-13 A
A1130 Approval of drawings ( by DM ) 14 100% 100% 100% 13-Feb-13 28-Feb-13 12-Feb-13 A 04-Mar-13 A
A1150 Installation of fence and sign boards 17 85% 100% 85% 02-Mar-13 20-Mar-13 14-Mar-13 A 08-Jul-13 13
Temporary site office
Temporary site office 77 0% 0% 30-Jan-13 29-Apr-13 29-Jan-13 A 12-May-13 A
A1160 Submittal of site offices drawings 6 100% 100% 100% 30-Jan-13 05-Feb-13 29-Jan-13 A 29-Jan-13 A
A1170 Approval of site offices drawings 10 100% 100% 100% 10-Apr-13 21-Apr-13 01-Apr-13 A 30-Apr-13 A
A1180 Obtaining permit 0 100% 100% 100% 21-Apr-13 07-May-13 A
A1190 Installation of temporary site offices 7 100% 100% 100% 22-Apr-13 29-Apr-13 08-May-13 A 12-May-13 A
Permanent office
Permanent office 145 0% 0% 10-Feb-13 05-May-13 11-Feb-13 A 29-Jul-13 -12
A1200 Submit a proposal of permanent offices 2 100% 100% 100% 10-Feb-13 11-Feb-13 11-Feb-13 A 11-Feb-13 A
A1210 Approval of proposal ( APG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 12-Feb-13 A 04-Jul-13 -12
A1360 Approval of proposal ( DM ) 12 0% 100% 0% 10-Apr-13 23-Apr-13 04-Jul-13 17-Jul-13 -12
A1370 Obtaining permit 0 0% 100% 0% 23-Apr-13 17-Jul-13 -12
A1380 Installation of permanent offices 10 0% 100% 0% 24-Apr-13 05-May-13 18-Jul-13 29-Jul-13 -12
Site visit demarcation
Site visit demarcation 0 0% 0% 03-Feb-13 03-Feb-13 22-Jan-13 A 22-Jan-13 A
A1220 Obtaining site visit demarcation 0 100% 100% 100% 03-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 03-Feb-13 17-Feb-13 22-Jan-13 A 04-Feb-13 A
A1250 Obtaining NOC for trial trenching 0 100% 100% 100% 03-Feb-13 22-Jan-13 A
A1260 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 04-Feb-13 17-Feb-13 02-Feb-13 A 04-Feb-13 A
Mobilization permit
Mobilization permit 0 0% 0% 28-Feb-13 28-Feb-13 25-Feb-13 A 25-Feb-13 A
F M A M J J A S O N D
16-Nov-13,...
16-Nov-13,...
Award of c...
Start of M...
Contract c...
Project Co...
14-Nov-13,...
21-Oct-13,...
22-May-13 ...
Receive IF...
Submittal ...
Submittal ...
Approval o...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
29-Jul-13,...
08-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Approval o...
Installati...
12-May-13 ...
Submittal ...
Approval o...
Obtaining ...
Installati...
29-Jul-13,...
Submit a p...
Approval o...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
04-Feb-13 ...
Obtaining ...
starting t...
25-Feb-13 ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A1350 Obtaining mobilization permit 0 100% 100% 100% 28-Feb-13 25-Feb-13 A
Construction Demarcation
Construction Demarcation 0 0% 0% 25-Apr-13 25-Apr-13 08-May-13 A 08-May-13 A
A1340 Obtaining Construction demarcation 0 100% 100% 100% 25-Apr-13 08-May-13 A
Mobilization
Mobilization 15 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A
A1390 Mobilization of tools and equipments 15 100% 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A
Construction
Construction 143 98.28% 43.13% 30-Apr-13 21-Aug-13 14-May-13 A 21-Oct-13 -49
A1400 Construction of guide wall 14 100% 100% 100% 30-Apr-13 15-May-13 14-May-13 A 27-May-13 A
A1410 Construction of secant pile wall 15 91% 100% 91% 08-May-13 25-May-13 25-May-13 A 06-Jul-13 2
A1420 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49
A1430 Construction of capping beam 17 0% 100% 0% 14-May-13 02-Jun-13 04-Jul-13 23-Jul-13 -4
A1500 Instruction to Excavate 0 0% 100% 0% 25-May-13 06-Jul-13 2
A1450 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49
A1440 Excavation up to anchors level 20 0% 100% 0% 25-May-13 17-Jun-13 13-Jul-13 04-Aug-13 -4
A1460 Installation of anchors 19 0% 100% 0% 02-Jun-13 24-Jun-13 30-Jul-13 22-Aug-13 -12
A1470 Excavation up to final level 18 0% 100% 0% 11-Jun-13 01-Jul-13 07-Aug-13 29-Aug-13 -12
Plot R1
Plot R1 245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68
Engineering
Engineering 206 100% 100% 22-Jan-13 02-Jul-13 12-Jan-13 A 23-Sep-13 -70
A1480 Receive IFC drawings 0 100% 100% 100% 22-Jan-13 12-Jan-13 A
A1490 Submittal of Design and shop drawings 5 100% 100% 100% 22-Jan-13 28-Jan-13 16-Jan-13 A 16-Jan-13 A
A1510 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 29-Jan-13 30-Jan-13 17-Jan-13 A 13-Apr-13 A
A7050 Design NOC from APG 0 100% 100% 100% 10-Apr-13 10-Apr-13 A
A1520 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 11-Apr-13 27-Apr-13 14-Apr-13 A 21-Apr-13 A
A1550 Obtaining Partial shoring permit 0 100% 100% 100% 27-Apr-13 22-Apr-13 A
A7060 RTA Construction NOC 0 100% 100% 100% 30-Apr-13 08-May-13 A
A1540 Obtaining shoring permit 0 0% 100% 0% 02-Jul-13 23-Sep-13 -70
Authorities Approvals
Authorities Approvals 192 100% 57.16% 07-Feb-13 30-Jun-13 16-Jan-13 A 23-Sep-13 -55
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 35 100% 100% 13-Feb-13 25-Mar-13 16-Jan-13 A 25-Feb-13 A
A3650 Submittal of fencing and sign board drawings 4 100% 100% 100% 13-Feb-13 17-Feb-13 16-Jan-13 A 29-Jan-13 A
A3660 Approval of drawings ( APG) 2 100% 100% 100% 18-Feb-13 19-Feb-13 30-Jan-13 A 31-Jan-13 A
A3670 Approval of drawings ( by DM ) 14 100% 100% 100% 18-Feb-13 05-Mar-13 02-Feb-13 A 14-Feb-13 A
A3680 Obtaining fencing and Hoarding permit 0 100% 100% 100% 05-Mar-13 19-Feb-13 A
A3690 Installation of fence and sign boards 17 100% 100% 100% 06-Mar-13 25-Mar-13 23-Feb-13 A 25-Feb-13 A
Temporary site office
Temporary site office 58 0% 0% 18-Feb-13 25-Apr-13 29-Jan-13 A 29-Apr-13 A
A3700 Submittal of site offices drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 29-Jan-13 A 29-Jan-13 A
A3710 Approval of site offices drawings 14 100% 100% 100% 24-Feb-13 11-Mar-13 30-Jan-13 A 27-Apr-13 A
A3720 Obtaining permit 0 100% 100% 100% 17-Apr-13 28-Apr-13 A
A3730 Installation of temporary site offices 7 100% 100% 100% 18-Apr-13 25-Apr-13 28-Apr-13 A 29-Apr-13 A
Site visit demarcation
Site visit demarcation 0 0% 0% 07-Feb-13 07-Feb-13 22-Jan-13 A 22-Jan-13 A
A3760 Obtaining site visit demarcation 0 100% 100% 100% 07-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 07-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A
A3780 Obtaining NOC for trial trenching 0 100% 100% 100% 07-Feb-13 22-Jan-13 A
A3790 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 09-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A
Utilities Relocation
Utilities Relocation 192 100% 17.39% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70
F M A M J J A S O N D
Obtaining ...
08-May-13 ...
Obtaining ...
28-May-13 ...
Mobilizati...
21-Oct-13,...
Constructi...
Constructi...
Installati...
Constructi...
Instructio...
Running of...
Excavation...
Installati...
Excavation...
13-Nov-13,...
23-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Design NOC...
Approval o...
Obtaining ...
RTA Constr...
Obtaining ...
23-Sep-13,...
25-Feb-13 ...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
29-Apr-13 ...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
23-Jan-13 ...
Obtaining ...
starting t...
23-Sep-13,...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Electricity network relocation ( 11 KV relocation works )
Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 25-Jun-13 27-Feb-13 A 08-Sep-13 -63
A3920 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A
A3930 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A
A3940 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -63
A3950 11kv cable exstock delivery at site 7 0% 100% 0% 29-Apr-13 06-May-13 11-Jul-13 18-Jul-13 -63
A3990 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 30-Apr-13 14-May-13 13-Jul-13 27-Jul-13 -63
A3970 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 30-Apr-13 27-May-13 13-Jul-13 11-Aug-13 -51
A3960 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 15-May-13 11-Jun-13 28-Jul-13 25-Aug-13 -63
A3980 Shut down and jointing 12 0% 100% 0% 12-Jun-13 25-Jun-13 26-Aug-13 08-Sep-13 -63
Telephone Network Relocation
Telephone Network Relocation 192 100% 0% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70
A6320 Trial pit NOC 16 100% 100% 100% 09-Feb-13 26-Feb-13 10-Feb-13 A 20-Feb-13 A
A6330 Trial pit and shop drawing preparation 7 28.57% 100% 28.57% 10-Apr-13 17-Apr-13 01-Apr-13 A 09-Jul-13 -70
A6350 Placement of order and recipt of material at site 18 0% 100% 0% 10-Apr-13 30-Apr-13 04-Jul-13 24-Jul-13 -70
A6340 Approval from Etisalat 12 0% 100% 0% 18-Apr-13 01-May-13 10-Jul-13 23-Jul-13 -69
A6360 Installation of new cable 40 0% 100% 0% 02-May-13 18-Jun-13 25-Jul-13 11-Sep-13 -70
A6370 Shutdown of existing system 5 0% 100% 0% 19-Jun-13 24-Jun-13 12-Sep-13 17-Sep-13 -70
A6380 Re-connection 5 0% 100% 0% 25-Jun-13 30-Jun-13 18-Sep-13 23-Sep-13 -70
Construction Demarcation
Construction Demarcation 0 0% 0% 29-Apr-13 29-Apr-13 25-Apr-13 A 25-Apr-13 A
A3870 Obtaining Construction demarcation 0 100% 100% 100% 29-Apr-13 25-Apr-13 A
Construction
Construction 161 51.72% 32.25% 01-May-13 20-Aug-13 08-May-13 A 13-Nov-13 -68
A1840 Construction of guide wall 23 100% 100% 100% 01-May-13 27-May-13 08-May-13 A 08-Jun-13 A
A1850 Construction of secant pile wall 25 100% 100% 100% 09-May-13 08-Jun-13 11-May-13 A 22-Jun-13 A
A1860 Installation of dewatering system 6 0% 100% 0% 09-May-13 15-May-13 04-Jul-13 10-Jul-13 -47
A1870 Construction of capping beam 23 0% 100% 0% 20-May-13 16-Jun-13 04-Jul-13 30-Jul-13 -2
A1890 Running of dewatering system 80 0% 51.25% 0% 16-May-13 20-Aug-13 11-Jul-13 19-Oct-13 -47
A6990 Instruction to Excavate 0 0% 0% 0% 15-Jul-13 06-Oct-13 -70
A1880 Excavation up to anchors level 20 0% 0% 0% 15-Jul-13 06-Aug-13 06-Oct-13 02-Nov-13 -70
A1900 Installation of anchors 20 0% 0% 0% 21-Jul-13 14-Aug-13 12-Oct-13 09-Nov-13 -70
A1910 Excavation up to final level 19 0% 0% 0% 27-Jul-13 19-Aug-13 22-Oct-13 13-Nov-13 -70
Area with Utilities
Area with Utilities 20 2.41% 0% 03-Jul-13 25-Jul-13 24-Sep-13 21-Oct-13 -66
A1930 Construction of guide wall 7 0% 14.29% 0% 03-Jul-13 10-Jul-13 24-Sep-13 01-Oct-13 -70
A1920 Construction of secant pile wall ( services area ) 10 0% 0% 0% 07-Jul-13 17-Jul-13 28-Sep-13 08-Oct-13 -70
A1940 Construction of capping beam 7 0% 0% 0% 18-Jul-13 25-Jul-13 09-Oct-13 21-Oct-13 -66
Plot H3
Plot H3 222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61
Engineering
Engineering 181 100% 100% 10-Feb-13 01-Jul-13 06-Feb-13 A 12-Sep-13 -61
A4000 Receive IFC drawings 0 100% 100% 100% 10-Feb-13 06-Feb-13 A
A4010 Submittal of Design and shop drawings 5 100% 100% 100% 11-Feb-13 16-Feb-13 26-Feb-13 A 26-Feb-13 A
A4020 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 17-Feb-13 18-Feb-13 28-Feb-13 A 13-Apr-13 A
A4030 Approval of Design and shop drawings ( by DM ) 7 100% 100% 100% 10-Apr-13 25-Apr-13 15-Apr-13 A 16-Jun-13 A
A7070 Design NOC from APG 0 100% 100% 100% 11-Apr-13 18-Apr-13 A
A7080 RTA Construction NOC 0 100% 100% 100% 29-Apr-13 23-May-13 A
A6790 Obtaining Partial shoring permit 0 100% 100% 100% 25-Apr-13 17-Jun-13 A
A4040 Obtaining shoring permit 0 0% 100% 0% 01-Jul-13 12-Sep-13 -61
F M A M J J A S O N D
08-Sep-13,...
Trial pit ...
Investegat...
Obtain App...
11kv cable...
11KV Cable...
Civil Work...
Dispatch c...
Shut down ...
23-Sep-13,...
Trial pit ...
Trial pit ...
Placement ...
Approval f...
Installati...
Shutdown o...
Re-connect...
25-Apr-13 ...
Obtaining ...
13-Nov-13,...
Constructi...
Constructi...
Installati...
Constructi...
Running of...
Instructio...
Excavation...
Installati...
Excavation...
21-Oct-13,...
Constructi...
Constructi...
Constructi...
05-Nov-13,...
12-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 3 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Authorities Approvals
Authorities Approvals 172 100% 59.85% 16-Feb-13 26-Jun-13 22-Jan-13 A 08-Sep-13 -43
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 35 100% 100% 18-Feb-13 30-Mar-13 29-Jan-13 A 13-Mar-13 A
A4130 Submittal of fence and sign board drawings 4 100% 100% 100% 18-Feb-13 21-Feb-13 29-Jan-13 A 05-Feb-13 A
A4140 Approval of drawings ( APG) 2 100% 100% 100% 23-Feb-13 24-Feb-13 06-Feb-13 A 11-Feb-13 A
A4150 Approval of drawings ( by DM ) 14 100% 100% 100% 23-Feb-13 10-Mar-13 12-Feb-13 A 04-Mar-13 A
A4160 Obtaining fencing and Hoarding permit 0 100% 100% 100% 10-Mar-13 06-Mar-13 A
A4170 Installation of fence and sign boards 17 100% 100% 100% 11-Mar-13 30-Mar-13 10-Mar-13 A 13-Mar-13 A
Temporary site office
Temporary site office 122 0% 0% 23-Feb-13 29-Apr-13 29-Jan-13 A 15-Jul-13 2
A4180 Submittal of site offices drawings 6 100% 100% 100% 23-Feb-13 28-Feb-13 29-Jan-13 A 29-Jan-13 A
A4190 Approval of site offices drawings 10 100% 100% 100% 02-Mar-13 12-Mar-13 27-Feb-13 A 04-Jun-13 A
A4200 Obtaining permit 0 0% 100% 0% 17-Apr-13 04-Jul-13 2
A4210 Installation of temporary site offices 10 0% 100% 0% 18-Apr-13 29-Apr-13 04-Jul-13 15-Jul-13 2
Site visit demarcation
Site visit demarcation 0 0% 0% 16-Feb-13 16-Feb-13 22-Jan-13 A 22-Jan-13 A
A4240 Obtaining site visit demarcation 0 100% 100% 100% 16-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 16-Feb-13 02-Mar-13 23-Jan-13 A 24-Feb-13 A
A4250 Obtaining NOC for trial trenching 0 100% 100% 100% 16-Feb-13 23-Jan-13 A
A4260 starting trial trenches at site for water, Ettisalat and sewerage 12 100% 100% 100% 17-Feb-13 02-Mar-13 12-Feb-13 A 24-Feb-13 A
Utilities Relocation
Utilities Relocation 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61
Electricity network relocation ( 11 KV relocation works )
Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61
A6450 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A
A6390 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A
A6400 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -61
A6410 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 11-Jul-13 18-Jul-13 -61
A6430 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 01-May-13 28-May-13 13-Jul-13 11-Aug-13 -49
A6460 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 13-Jul-13 27-Jul-13 -61
A6420 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 16-May-13 12-Jun-13 28-Jul-13 25-Aug-13 -61
A6440 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 26-Aug-13 08-Sep-13 -61
Construction Demarcation
Construction Demarcation 0 0% 0% 28-Apr-13 28-Apr-13 22-Jun-13 A 22-Jun-13 A
A4340 Obtaining Construction demarcation 0 100% 100% 100% 28-Apr-13 22-Jun-13 A
Construction
Construction 110 58.79% 23.85% 30-Apr-13 21-Aug-13 22-Jun-13 A 05-Nov-13 -61
A4050 Construction of guide wall 20 100% 100% 100% 30-Apr-13 22-May-13 22-Jun-13 A 30-Jun-13 A
A4060 Construction of secant pile wall 18 50.8% 100% 50.8% 08-May-13 28-May-13 27-Jun-13 A 13-Jul-13 -49
A4070 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49
A4080 Construction of capping beam 25 0% 100% 0% 08-May-13 05-Jun-13 04-Jul-13 01-Aug-13 -6
A4100 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49
A7000 Instruction to Excavate 0 0% 0% 0% 17-Jul-13 29-Sep-13 -61
A4220 Excavation up to anchors level 15 0% 0% 0% 17-Jul-13 03-Aug-13 29-Sep-13 20-Oct-13 -61
A4110 Installation of anchors 20 0% 0% 0% 18-Jul-13 12-Aug-13 30-Sep-13 27-Oct-13 -61
A4120 Excavation up to final level 20 0% 0% 0% 27-Jul-13 20-Aug-13 08-Oct-13 05-Nov-13 -61
Area with Utilities
Area with Utilities 20 4.82% 0% 02-Jul-13 24-Jul-13 14-Sep-13 06-Oct-13 -60
A6850 Construction of guide wall 7 0% 28.57% 0% 02-Jul-13 09-Jul-13 14-Sep-13 21-Sep-13 -61
A6840 Construction of secant pile wall ( services area ) 10 0% 0% 0% 06-Jul-13 16-Jul-13 17-Sep-13 28-Sep-13 -61
A6860 Construction of capping beam 7 0% 0% 0% 17-Jul-13 24-Jul-13 29-Sep-13 06-Oct-13 -60
F M A M J J A S O N D
08-Sep-13,...
13-Mar-13 ...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
15-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
24-Feb-13 ...
Obtaining ...
starting t...
08-Sep-13,...
08-Sep-13,...
Trial pit ...
Investegat...
Obtain App...
11kv cable...
Civil Work...
11KV Cable...
Dispatch c...
Shut down ...
22-Jun-13 ...
Obtaining ...
05-Nov-13,...
Constructi...
Constructi...
Installati...
Constructi...
Running of...
Instructio...
Excavation...
Installati...
Excavation...
06-Oct-13,...
Constructi...
Constructi...
Constructi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 4 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Plot H1
Plot H1 224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69
Engineering
Engineering 180 100% 87.1% 17-Feb-13 30-Jun-13 11-Feb-13 A 18-Sep-13 -65
A4450 Receive IFC drawings 0 100% 100% 100% 17-Feb-13 11-Feb-13 A
A4460 Submittal of Design and shop drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 12-Mar-13 A 14-Mar-13 A
A4470 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 24-Feb-13 25-Feb-13 16-Mar-13 A 14-Apr-13 A
A4480 Approval of Design and shop drawings ( by DM ) 14 28.57% 100% 28.57% 10-Apr-13 25-Apr-13 18-Apr-13 A 15-Jul-13 -69
A7090 Design NOC from APG 0 100% 100% 100% 25-Apr-13 06-May-13 A
A7100 RTA Construction NOC 0 100% 100% 100% 12-May-13 23-Jun-13 A
A6800 Obtaining Partial shoring permit 0 0% 100% 0% 09-May-13 29-Jul-13 -69
A4490 Obtaining shoring permit 0 0% 100% 0% 30-Jun-13 18-Sep-13 -65
Authorities Approvals
Authorities Approvals 177 100% 61.31% 18-Feb-13 26-Jun-13 22-Jan-13 A 15-Sep-13 -48
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 38 100% 100% 23-Feb-13 07-Apr-13 29-Jan-13 A 09-Mar-13 A
A4580 Submittal of fence and sign board drawings 4 100% 100% 100% 23-Feb-13 26-Feb-13 29-Jan-13 A 05-Feb-13 A
A4590 Approval of drawings ( APG) 2 100% 100% 100% 27-Feb-13 28-Feb-13 06-Feb-13 A 11-Feb-13 A
A4600 Approval of drawings ( by DM ) 14 100% 100% 100% 27-Feb-13 14-Mar-13 12-Feb-13 A 04-Mar-13 A
A4610 Obtaining fencing and hoarding permit 0 100% 100% 100% 14-Mar-13 06-Mar-13 A
A4620 Installation of fence and sign boards 20 100% 100% 100% 16-Mar-13 07-Apr-13 06-Mar-13 A 09-Mar-13 A
Temporary site office
Temporary site office 63 0% 0% 27-Feb-13 11-May-13 29-Jan-13 A 02-May-13 A
A4630 Submittal of site offices drawings 6 100% 100% 100% 27-Feb-13 05-Mar-13 29-Jan-13 A 05-Mar-13 A
A4640 Approval of site offices drawings 10 100% 100% 100% 06-Mar-13 17-Mar-13 27-Feb-13 A 30-Apr-13 A
A4650 Obtaining permit 0 100% 100% 100% 17-Apr-13 30-Apr-13 A
A4660 Installation of temporary site offices 20 100% 100% 100% 18-Apr-13 11-May-13 01-May-13 A 02-May-13 A
Site visit demarcation
Site visit demarcation 0 0% 0% 18-Feb-13 18-Feb-13 22-Jan-13 A 22-Jan-13 A
A4690 Obtaining site visit demarcation 0 100% 100% 100% 18-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 18-Feb-13 03-Mar-13 23-Jan-13 A 28-Feb-13 A
A4700 Obtaining NOC for trial trenching 0 100% 100% 100% 18-Feb-13 23-Jan-13 A
A4710 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 18-Feb-13 03-Mar-13 20-Feb-13 A 28-Feb-13 A
Utilities Relocation
Utilities Relocation 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65
Electricity network relocation ( 11 KV relocation works )
Electricity network relocation ( 11 KV relocation works ) 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65
A6770 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A
A6710 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 10-Apr-13 16-Apr-13 23-Mar-13 A 24-Mar-13 A
A6720 Obtain Approval from DEWA for shop drawing & material submittal 13 0% 100% 0% 16-Apr-13 30-Apr-13 04-Jul-13 18-Jul-13 -65
A6730 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 18-Jul-13 25-Jul-13 -65
A6750 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 01-May-13 28-May-13 20-Jul-13 18-Aug-13 -53
A6780 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 20-Jul-13 03-Aug-13 -65
A6740 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 16-May-13 12-Jun-13 04-Aug-13 01-Sep-13 -65
A6760 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 02-Sep-13 15-Sep-13 -65
Construction Demarcation
Construction Demarcation 0 0% 0% 12-May-13 12-May-13 25-Jun-13 A 25-Jun-13 A
A4790 Obtaining Construction demarcation 0 100% 100% 100% 12-May-13 25-Jun-13 A
Construction
Construction 84 46.86% 0% 13-May-13 21-Aug-13 01-Aug-13 14-Nov-13 -69
A4500 Construction of guide wall 20 0% 100% 0% 13-May-13 04-Jun-13 01-Aug-13 26-Aug-13 -69
A4510 Construction of secant pile wall 21 0% 100% 0% 21-May-13 15-Jun-13 12-Aug-13 04-Sep-13 -69
A4520 Installation of dewatering system 6 0% 100% 0% 21-May-13 27-May-13 12-Aug-13 18-Aug-13 -69
F M A M J J A S O N D
14-Nov-13,...
18-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
15-Sep-13,...
09-Mar-13 ...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
02-May-13 ...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
28-Feb-13 ...
Obtaining ...
starting t...
15-Sep-13,...
15-Sep-13,...
Trial pit ...
Investegat...
Obtain App...
11kv cable...
Civil Work...
11KV Cable...
Dispatch c...
Shut down ...
25-Jun-13 ...
Obtaining ...
14-Nov-13,...
Constructi...
Constructi...
Installati...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 5 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A4550 Running of dewatering system 71 0% 43.66% 0% 28-May-13 21-Aug-13 19-Aug-13 14-Nov-13 -69
A4530 Construction of capping beam 20 0% 100% 0% 30-May-13 23-Jun-13 21-Aug-13 12-Sep-13 -43
A7010 Instruction to Excavate 0 0% 100% 0% 16-Jun-13 05-Sep-13 -49
A4540 Excavation up to anchors level 22 0% 0% 0% 06-Jul-13 30-Jul-13 24-Sep-13 23-Oct-13 -65
A4560 Installation of anchors 19 0% 0% 0% 17-Jul-13 07-Aug-13 06-Oct-13 31-Oct-13 -65
A4570 Excavation up to final level 20 0% 0% 0% 24-Jul-13 18-Aug-13 13-Oct-13 10-Nov-13 -65
Area with Utilities
Area with Utilities 20 7.24% 0% 01-Jul-13 23-Jul-13 19-Sep-13 12-Oct-13 -65
A6880 Construction of guide wall 7 0% 42.86% 0% 01-Jul-13 08-Jul-13 19-Sep-13 26-Sep-13 -65
A6870 Construction of secant pile wall ( services area ) 10 0% 0% 0% 04-Jul-13 15-Jul-13 23-Sep-13 03-Oct-13 -65
A6890 Construction of capping beam 7 0% 0% 0% 16-Jul-13 23-Jul-13 05-Oct-13 12-Oct-13 -65
Plot S2
Plot S2 197 85.1% 20.6% 24-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48
Engineering
Engineering 160 100% 100% 24-Feb-13 08-Jun-13 11-Feb-13 A 02-Sep-13 -48
A4900 Receive IFC drawings 0 100% 100% 100% 24-Feb-13 11-Feb-13 A
A4910 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 24-Apr-13 A 24-Apr-13 A
A4920 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 25-Apr-13 A 05-Jun-13 A
A4930 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 16-Apr-13 01-May-13 19-May-13 A 06-Jun-13 A
A7110 Design NOC from APG 0 100% 100% 100% 17-Apr-13 23-May-13 A
A7120 RTA Construction NOC 0 100% 100% 100% 15-May-13 06-Jun-13 A
A6810 Obtaining Partial shoring permit 0 100% 100% 100% 13-May-13 27-Jun-13 A
A4940 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -48
Authorities Approvals
Authorities Approvals 154 100% 57.91% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -25
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 34 100% 92.5% 03-Mar-13 10-Apr-13 29-Jan-13 A 07-Jul-13 -41
A5030 Submittal of fence and sign board drawings 4 100% 100% 100% 03-Mar-13 06-Mar-13 29-Jan-13 A 05-Feb-13 A
A5040 Approval of drawings ( APG) 2 100% 100% 100% 07-Mar-13 09-Mar-13 06-Feb-13 A 11-Feb-13 A
A5050 Approval of drawings ( by DM ) 10 100% 100% 100% 07-Mar-13 18-Mar-13 12-Feb-13 A 04-Mar-13 A
A5060 Obtaining fencing and hoarding permit 0 100% 100% 100% 18-Mar-13 06-Mar-13 A
A5070 Installation of fence and sign boards 20 85% 100% 85% 19-Mar-13 10-Apr-13 14-Mar-13 A 07-Jul-13 -41
Temporary site office
Temporary site office 121 0% 0% 07-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -1
A5080 Submittal of site offices drawings 6 100% 100% 100% 07-Mar-13 13-Mar-13 29-Jan-13 A 29-Jan-13 A
A5090 Approval of site offices drawings 10 100% 100% 100% 14-Mar-13 25-Mar-13 05-Mar-13 A 04-Jun-13 A
A5100 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -1
A5110 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -1
Site visit demarcation
Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A
A5140 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 04-Feb-13 A
A5150 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A
A5160 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 02-Feb-13 A 04-Feb-13 A
Utilities Relocation
Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48
Electricity network relocation ( 132 KV relocation works )
Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48
A6530 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 23-Jan-13 A 29-Jan-13 A
A6470 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A
A6480 Obtain Approval from DEWA for shop drawing & material submittal 0 0% 100% 0% 10-Apr-13 10-Apr-13 27-Jun-13 A 04-Jul-13 -47
A6490 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -48
F M A M J J A S O N D
Running of...
Constructi...
Instructio...
Excavation...
Installati...
Excavation...
12-Oct-13,...
Constructi...
Constructi...
Constructi...
20-Oct-13,...
02-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
26-Aug-13,...
07-Jul-13,...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
27-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
04-Feb-13 ...
Obtaining ...
starting t...
26-Aug-13,...
26-Aug-13,...
Trial pit ...
Investegat...
Obtain App...
132kv cabl...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 6 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A6510 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -36
A6540 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -48
A6500 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -48
A6520 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -48
Construction Demarcation
Construction Demarcation 0 0% 0% 14-May-13 14-May-13 23-Jun-13 A 23-Jun-13 A
A5240 Obtaining Construction demarcation 0 100% 100% 100% 14-May-13 23-Jun-13 A
Construction
Construction 80 82.32% 10.5% 16-May-13 20-Aug-13 01-Jul-13 A 20-Oct-13 -48
A4950 Construction of guide wall 16 100% 100% 100% 16-May-13 03-Jun-13 01-Jul-13 A 02-Jul-13 A
A4960 Construction of secant pile wall 18 3.4% 100% 3.4% 25-May-13 15-Jun-13 02-Jul-13 A 31-Jul-13 -41
A4970 Installation of dewatering system 6 0% 100% 0% 25-May-13 30-May-13 13-Jul-13 18-Jul-13 -41
A5000 Running of dewatering system 67 0% 41.79% 0% 01-Jun-13 20-Aug-13 20-Jul-13 07-Oct-13 -41
A4980 Construction of capping beam 17 0% 100% 0% 03-Jun-13 23-Jun-13 21-Jul-13 11-Aug-13 -8
A7020 Instruction to Excavate 0 0% 100% 0% 22-Jun-13 16-Sep-13 -48
A4990 Excavation up to anchors level 17 0% 64.71% 0% 22-Jun-13 10-Jul-13 16-Sep-13 05-Oct-13 -48
A5010 Installation of anchors 14 0% 35.71% 0% 29-Jun-13 14-Jul-13 23-Sep-13 08-Oct-13 -48
A5020 Excavation up to final level 15 0% 0% 0% 04-Jul-13 21-Jul-13 29-Sep-13 20-Oct-13 -48
Area with Utilities
Area with Utilities 18 100% 0% 09-Jun-13 29-Jun-13 03-Sep-13 23-Sep-13 -44
A6910 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -48
A6900 Construction of secant pile wall ( services area ) 8 0% 100% 0% 12-Jun-13 20-Jun-13 07-Sep-13 15-Sep-13 -48
A6920 Construction of capping beam 7 0% 100% 0% 22-Jun-13 29-Jun-13 16-Sep-13 23-Sep-13 -44
Plot S1
Plot S1 201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52
Engineering
Engineering 155 100% 100% 03-Mar-13 09-Jun-13 11-Feb-13 A 03-Sep-13 -52
A5360 Receive IFC drawings 0 100% 100% 100% 03-Mar-13 11-Feb-13 A
A5370 Submittal of Design and shop drawings 4 100% 100% 100% 10-Apr-13 14-Apr-13 30-Apr-13 A 30-Apr-13 A
A5380 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 15-Apr-13 16-Apr-13 30-Apr-13 A 02-May-13 A
A5390 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 15-Apr-13 30-Apr-13 19-May-13 A 23-Jun-13 A
A7130 Design NOC from APG 0 100% 100% 100% 02-May-13 23-May-13 A
A7140 RTA Construction NOC 0 100% 100% 100% 16-May-13 12-Jun-13 A
A6820 Obtaining Partial shoring permit 0 100% 100% 100% 14-May-13 23-Jun-13 A
A5400 Obtaining shoring permits 0 0% 100% 0% 09-Jun-13 03-Sep-13 -52
Authorities Approvals
Authorities Approvals 154 100% 57.71% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -28
Hoarding and sign board
Hoarding and sign board 32 100% 92.5% 10-Mar-13 15-Apr-13 29-Jan-13 A 07-Jul-13 -39
A5490 Submittal of fence and sign board drawings 4 100% 100% 100% 10-Mar-13 13-Mar-13 29-Jan-13 A 05-Feb-13 A
A5500 Approval of drawings ( APG) 2 100% 100% 100% 14-Mar-13 16-Mar-13 06-Feb-13 A 11-Feb-13 A
A5510 Approval of drawings ( DM ) 6 100% 100% 100% 17-Mar-13 23-Mar-13 12-Feb-13 A 04-Mar-13 A
A5520 Obtaining Fencing and Hoarding permit 0 100% 100% 100% 23-Mar-13 06-Mar-13 A
A5530 Installation of fence and sign boards 20 85% 100% 85% 24-Mar-13 15-Apr-13 14-Mar-13 A 07-Jul-13 -39
Temporary site office
Temporary site office 115 0% 0% 14-Mar-13 19-May-13 29-Jan-13 A 27-Jul-13 -4
A5540 Submittal of site offices drawings 6 100% 100% 100% 14-Mar-13 20-Mar-13 29-Jan-13 A 29-Jan-13 A
A5550 Approval of site offices drawings 7 100% 100% 100% 15-Apr-13 25-Apr-13 01-May-13 A 04-Jun-13 A
A5560 Obtaining Permit 0 0% 100% 0% 25-Apr-13 04-Jul-13 -4
A5570 Installation of temporary site offices 20 0% 100% 0% 27-Apr-13 19-May-13 04-Jul-13 27-Jul-13 -4
Site visit demarcation
Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A
F M A M J J A S O N D
Civil Work...
132KV Cabl...
Dispatch c...
Shut down ...
23-Jun-13 ...
Obtaining ...
20-Oct-13,...
Constructi...
Constructi...
Installati...
Running of...
Constructi...
Instructio...
Excavation...
Installati...
Excavation...
23-Sep-13,...
Constructi...
Constructi...
Constructi...
24-Oct-13,...
03-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
26-Aug-13,...
07-Jul-13,...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
27-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 7 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A5600 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 10-Feb-13 A
A5610 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A
A5620 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 05-Feb-13 A 10-Feb-13 A
Utilities Relocation
Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52
Electricity network relocation ( 132 KV relocation works )
Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52
A6610 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A
A6550 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A
A6560 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 04-Jul-13 -51
A6570 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -52
A6590 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -40
A6620 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -52
A6580 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -52
A6600 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -52
Construction Demarcation
Construction Demarcation 0 0% 0% 16-May-13 16-May-13 23-Jun-13 A 23-Jun-13 A
A5700 Obtaining Construction demarcation 0 100% 100% 100% 16-May-13 23-Jun-13 A
Construction
Construction 84 78.18% 1.84% 18-May-13 19-Aug-13 01-Jul-13 A 24-Oct-13 -52
A5410 Construction of guide wall 14 16% 100% 16% 18-May-13 02-Jun-13 01-Jul-13 A 23-Jul-13 -39
A5420 Construction of secant pile wall 19 0% 100% 0% 26-May-13 17-Jun-13 13-Jul-13 03-Aug-13 -39
A5430 Installation of dewatering system 6 0% 100% 0% 26-May-13 01-Jun-13 13-Jul-13 18-Jul-13 -39
A5440 Construction of capping beam 24 0% 100% 0% 28-May-13 25-Jun-13 15-Jul-13 13-Aug-13 -11
A5460 Running of dewatering system 65 0% 41.54% 0% 02-Jun-13 19-Aug-13 20-Jul-13 05-Oct-13 -39
A7030 Instruction to Excavate 0 0% 100% 0% 20-Jun-13 15-Sep-13 -52
A5450 Excavation up to anchors level 20 0% 60% 0% 20-Jun-13 13-Jul-13 15-Sep-13 07-Oct-13 -52
A5470 Installation of anchors 16 0% 25% 0% 30-Jun-13 17-Jul-13 24-Sep-13 12-Oct-13 -52
A5480 Excavation up to final level 17 0% 0% 0% 07-Jul-13 25-Jul-13 01-Oct-13 24-Oct-13 -52
Area with Utilities
Area with Utilities 16 100% 0% 10-Jun-13 27-Jun-13 04-Sep-13 22-Sep-13 -45
A6940 Construction of guide wall 7 0% 100% 0% 10-Jun-13 17-Jun-13 04-Sep-13 11-Sep-13 -52
A6930 Construction of secant pile wall ( services area ) 6 0% 100% 0% 13-Jun-13 19-Jun-13 08-Sep-13 14-Sep-13 -52
A6950 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -45
Plot H2
Plot H2 201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52
Engineering
Engineering 122 100% 89.94% 10-Apr-13 08-Jun-13 08-May-13 A 02-Sep-13 -54
A5820 Receive IFC drawings 0 100% 100% 100% 10-Apr-13 08-May-13 A
A5830 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 21-May-13 A 21-May-13 A
A5840 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 22-May-13 A 12-Jun-13 A
A5850 Approval of Design and shop drawings ( by DM ) 14 50% 100% 50% 16-Apr-13 01-May-13 12-Jun-13 A 11-Jul-13 -17
A7150 Design NOC from APG 0 100% 100% 100% 08-May-13 13-Jun-13 A
A7160 RTA Construction NOC 0 100% 100% 100% 27-May-13 24-Jun-13 A
A6830 Obtaining Partial shoring permit 0 0% 100% 0% 23-May-13 04-Jul-13 -34
A5860 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -54
Authorities Approvals
Authorities Approvals 154 100% 52.62% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -30
Fencing/ Hoarding and sign board
Fencing/ Hoarding and sign board 38 100% 100% 17-Mar-13 29-Apr-13 29-Jan-13 A 13-Mar-13 A
A5950 Submittal of fence and sign board drawings 4 100% 100% 100% 17-Mar-13 20-Mar-13 29-Jan-13 A 05-Feb-13 A
F M A M J J A S O N D
Obtaining ...
10-Feb-13 ...
Obtaining ...
starting t...
26-Aug-13,...
26-Aug-13,...
Trial pit ...
Investegat...
Obtain App...
132kv cabl...
Civil Work...
132KV Cabl...
Dispatch c...
Shut down ...
23-Jun-13 ...
Obtaining ...
24-Oct-13,...
Constructi...
Constructi...
Installati...
Constructi...
Running of...
Instructio...
Excavation...
Installati...
Excavation...
22-Sep-13,...
Constructi...
Constructi...
Constructi...
24-Oct-13,...
02-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
26-Aug-13,...
13-Mar-13 ...
Submittal ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 8 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A5960 Approval of drawings ( APG) 2 100% 100% 100% 21-Mar-13 23-Mar-13 06-Feb-13 A 27-Feb-13 A
A5970 Approval of drawings ( by DM ) 14 100% 100% 100% 21-Mar-13 06-Apr-13 27-Feb-13 A 03-Mar-13 A
A5980 Obtaining fencing and hoarding permit 0 100% 100% 100% 06-Apr-13 06-Mar-13 A
A5990 Installation of fence and sign boards 20 100% 100% 100% 07-Apr-13 29-Apr-13 12-Mar-13 A 13-Mar-13 A
Temporary site office
Temporary site office 109 0% 0% 21-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -6
A6000 Submittal of site offices drawings 6 100% 100% 100% 21-Mar-13 27-Mar-13 29-Jan-13 A 29-Jan-13 A
A6010 Approval of site offices drawings 10 100% 100% 100% 16-Apr-13 27-Apr-13 01-May-13 A 04-Jun-13 A
A6020 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -6
A6030 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -6
Site visit demarcation
Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A
A6060 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 12-Mar-13 A
A6070 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A
A6080 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 10-Feb-13 A 12-Mar-13 A
Utilities Relocation
Utilities Relocation 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54
Electricity network relocation ( 132 KV relocation works )
Electricity network relocation ( 132 KV relocation works ) 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54
A6690 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A
A6630 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 50% 100% 50% 09-Mar-13 14-Mar-13 10-Mar-13 A 07-Jul-13 -54
A6640 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 07-Jul-13 -54
A6650 132kv cable exstock delivery at site 7 0% 100% 0% 11-Apr-13 18-Apr-13 06-Jul-13 13-Jul-13 -54
A6670 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 13-Apr-13 09-May-13 07-Jul-13 03-Aug-13 -42
A6700 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 13-Apr-13 27-Apr-13 07-Jul-13 21-Jul-13 -54
A6660 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 28-Apr-13 23-May-13 22-Jul-13 19-Aug-13 -54
A6680 Shut down and jointing 6 0% 100% 0% 25-May-13 30-May-13 20-Aug-13 26-Aug-13 -54
Construction Demarcation
Construction Demarcation 0 0% 0% 26-May-13 26-May-13 06-Jul-13 06-Jul-13 -34
A6160 Obtaining Construction demarcation 0 0% 100% 0% 26-May-13 06-Jul-13 -34
Construction
Construction 88 74.81% 0% 28-May-13 20-Aug-13 08-Jul-13 24-Oct-13 -52
A5870 Construction of guide wall 15 0% 100% 0% 28-May-13 15-Jun-13 08-Jul-13 24-Jul-13 -34
A5880 Construction of secant pile wall 21 0% 100% 0% 05-Jun-13 22-Jun-13 16-Jul-13 11-Aug-13 -34
A5890 Installation of dewatering system 6 0% 100% 0% 05-Jun-13 12-Jun-13 16-Jul-13 22-Jul-13 -34
A5920 Running of dewatering system 57 0% 31.58% 0% 13-Jun-13 20-Aug-13 23-Jul-13 29-Sep-13 -34
A5900 Construction of capping beam 20 0% 100% 0% 08-Jun-13 30-Jun-13 25-Jul-13 19-Aug-13 -19
A7040 Instruction to Excavate 0 0% 100% 0% 23-Jun-13 15-Sep-13 -54
A5910 Excavation up to anchors level 18 0% 55.56% 0% 23-Jun-13 13-Jul-13 15-Sep-13 05-Oct-13 -54
A5930 Installation of anchors 16 0% 12.5% 0% 02-Jul-13 20-Jul-13 24-Sep-13 12-Oct-13 -54
A5940 Excavation up to final level 16 0% 0% 0% 10-Jul-13 28-Jul-13 02-Oct-13 24-Oct-13 -52
Area with Utilities
Area with Utilities 17 100% 0% 09-Jun-13 27-Jun-13 03-Sep-13 22-Sep-13 -49
A6970 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -54
A6960 Construction of secant pile wall ( services area ) 7 0% 100% 0% 12-Jun-13 19-Jun-13 07-Sep-13 14-Sep-13 -54
A6980 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -49
Project Close-out
Project Close-out 26 0% 0% 21-Jul-13 21-Aug-13 12-Oct-13 16-Nov-13 -70
A6280 Submittal of As-built drawings 10 0% 0% 0% 21-Jul-13 31-Jul-13 12-Oct-13 27-Oct-13 -62
A6290 Approval of As-built drawings 12 0% 0% 0% 28-Jul-13 12-Aug-13 23-Oct-13 06-Nov-13 -62
F M A M J J A S O N D
Approval o...
Approval o...
Obtaining ...
Installati...
27-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
12-Mar-13 ...
Obtaining ...
starting t...
26-Aug-13,...
26-Aug-13,...
Trial pit ...
Investegat...
Obtain App...
132kv cabl...
Civil Work...
132KV Cabl...
Dispatch c...
Shut down ...
06-Jul-13,...
Obtaining ...
24-Oct-13,...
Constructi...
Constructi...
Installati...
Running of...
Constructi...
Instructio...
Excavation...
Installati...
Excavation...
22-Sep-13,...
Constructi...
Constructi...
Constructi...
16-Nov-13,...
Submittal ...
Approval o...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 9 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A6300 Demobilization of all plant , equipments and facilities 4 0% 0% 0% 18-Aug-13 21-Aug-13 12-Nov-13 16-Nov-13 -70
A6310 Site handing over 0 0% 0% 0% 21-Aug-13 16-Nov-13 -70
F M A M J J A S O N D
Demobiliza...
Site handi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 10 of 10  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69
Plots
Plots 224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69
Plot H1
Plot H1 224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69
Engineering
Engineering 180 100% 87.1% 17-Feb-13 30-Jun-13 11-Feb-13 A 18-Sep-13 -65
A4450 Receive IFC drawings 0 100% 100% 100% 17-Feb-13 11-Feb-13 A
A4460 Submittal of Design and shop drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 12-Mar-13 A 14-Mar-13 A
A4470 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 24-Feb-13 25-Feb-13 16-Mar-13 A 14-Apr-13 A
A4480 Approval of Design and shop drawings ( by DM ) 14 28.57% 100% 28.57% 10-Apr-13 25-Apr-13 18-Apr-13 A 15-Jul-13 -69
A7090 Design NOC from APG 0 100% 100% 100% 25-Apr-13 06-May-13 A
A7100 RTA Construction NOC 0 100% 100% 100% 12-May-13 23-Jun-13 A
A6800 Obtaining Partial shoring permit 0 0% 100% 0% 09-May-13 29-Jul-13 -69
A4490 Obtaining shoring permit 0 0% 100% 0% 30-Jun-13 18-Sep-13 -65
Authorities Approvals
Authorities Approvals 177 100% 61.31% 18-Feb-13 26-Jun-13 22-Jan-13 A 15-Sep-13 -48
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 38 100% 100% 23-Feb-13 07-Apr-13 29-Jan-13 A 09-Mar-13 A
A4580 Submittal of fence and sign board drawings 4 100% 100% 100% 23-Feb-13 26-Feb-13 29-Jan-13 A 05-Feb-13 A
A4590 Approval of drawings ( APG) 2 100% 100% 100% 27-Feb-13 28-Feb-13 06-Feb-13 A 11-Feb-13 A
A4600 Approval of drawings ( by DM ) 14 100% 100% 100% 27-Feb-13 14-Mar-13 12-Feb-13 A 04-Mar-13 A
A4610 Obtaining fencing and hoarding permit 0 100% 100% 100% 14-Mar-13 06-Mar-13 A
A4620 Installation of fence and sign boards 20 100% 100% 100% 16-Mar-13 07-Apr-13 06-Mar-13 A 09-Mar-13 A
Temporary site office
Temporary site office 63 0% 0% 27-Feb-13 11-May-13 29-Jan-13 A 02-May-13 A
A4630 Submittal of site offices drawings 6 100% 100% 100% 27-Feb-13 05-Mar-13 29-Jan-13 A 05-Mar-13 A
A4640 Approval of site offices drawings 10 100% 100% 100% 06-Mar-13 17-Mar-13 27-Feb-13 A 30-Apr-13 A
A4650 Obtaining permit 0 100% 100% 100% 17-Apr-13 30-Apr-13 A
A4660 Installation of temporary site offices 20 100% 100% 100% 18-Apr-13 11-May-13 01-May-13 A 02-May-13 A
Site visit demarcation
Site visit demarcation 0 0% 0% 18-Feb-13 18-Feb-13 22-Jan-13 A 22-Jan-13 A
A4690 Obtaining site visit demarcation 0 100% 100% 100% 18-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 18-Feb-13 03-Mar-13 23-Jan-13 A 28-Feb-13 A
A4700 Obtaining NOC for trial trenching 0 100% 100% 100% 18-Feb-13 23-Jan-13 A
A4710 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 18-Feb-13 03-Mar-13 20-Feb-13 A 28-Feb-13 A
Utilities Relocation
Utilities Relocation 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65
Electricity network relocation ( 11 KV relocation works )
Electricity network relocation ( 11 KV relocation works ) 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65
A6770 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A
A6710 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 10-Apr-13 16-Apr-13 23-Mar-13 A 24-Mar-13 A
A6720 Obtain Approval from DEWA for shop drawing & material submittal 13 0% 100% 0% 16-Apr-13 30-Apr-13 04-Jul-13 18-Jul-13 -65
A6730 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 18-Jul-13 25-Jul-13 -65
A6750 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 01-May-13 28-May-13 20-Jul-13 18-Aug-13 -53
A6780 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 20-Jul-13 03-Aug-13 -65
A6740 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 16-May-13 12-Jun-13 04-Aug-13 01-Sep-13 -65
A6760 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 02-Sep-13 15-Sep-13 -65
Construction Demarcation
Construction Demarcation 0 0% 0% 12-May-13 12-May-13 25-Jun-13 A 25-Jun-13 A
A4790 Obtaining Construction demarcation 0 100% 100% 100% 12-May-13 25-Jun-13 A
Construction
Construction 84 46.86% 0% 13-May-13 21-Aug-13 01-Aug-13 14-Nov-13 -69
J F M A M J J A S O N
18-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
15-Sep-13,...
09-Mar-13 ...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
02-May-13 ...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
28-Feb-13 ...
Obtaining ...
starting t...
15-Sep-13,...
15-Sep-13,...
Trial pit ...
Investegat...
Obtain App...
11kv cable...
Civil Work...
11KV Cable...
Dispatch c...
Shut down ...
25-Jun-13 ...
Obtaining ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H1
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A4500 Construction of guide wall 20 0% 100% 0% 13-May-13 04-Jun-13 01-Aug-13 26-Aug-13 -69
A4510 Construction of secant pile wall 21 0% 100% 0% 21-May-13 15-Jun-13 12-Aug-13 04-Sep-13 -69
A4520 Installation of dewatering system 6 0% 100% 0% 21-May-13 27-May-13 12-Aug-13 18-Aug-13 -69
A4550 Running of dewatering system 71 0% 43.66% 0% 28-May-13 21-Aug-13 19-Aug-13 14-Nov-13 -69
A4530 Construction of capping beam 20 0% 100% 0% 30-May-13 23-Jun-13 21-Aug-13 12-Sep-13 -43
A7010 Instruction to Excavate 0 0% 100% 0% 16-Jun-13 05-Sep-13 -49
A4540 Excavation up to anchors level 22 0% 0% 0% 06-Jul-13 30-Jul-13 24-Sep-13 23-Oct-13 -65
A4560 Installation of anchors 19 0% 0% 0% 17-Jul-13 07-Aug-13 06-Oct-13 31-Oct-13 -65
A4570 Excavation up to final level 20 0% 0% 0% 24-Jul-13 18-Aug-13 13-Oct-13 10-Nov-13 -65
Area with Utilities
Area with Utilities 20 7.24% 0% 01-Jul-13 23-Jul-13 19-Sep-13 12-Oct-13 -65
A6880 Construction of guide wall 7 0% 42.86% 0% 01-Jul-13 08-Jul-13 19-Sep-13 26-Sep-13 -65
A6870 Construction of secant pile wall ( services area ) 10 0% 0% 0% 04-Jul-13 15-Jul-13 23-Sep-13 03-Oct-13 -65
A6890 Construction of capping beam 7 0% 0% 0% 16-Jul-13 23-Jul-13 05-Oct-13 12-Oct-13 -65
J F M A M J J A S O N
Constructi...
Constructi...
Installati...
Constructi...
Instructio...
Excavation...
Installati...
12-Oct-13,...
Constructi...
Constructi...
Constructi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H1
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52
Plots
Plots 201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52
Plot H2
Plot H2 201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52
Engineering
Engineering 122 100% 89.94% 10-Apr-13 08-Jun-13 08-May-13 A 02-Sep-13 -54
A5820 Receive IFC drawings 0 100% 100% 100% 10-Apr-13 08-May-13 A
A5830 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 21-May-13 A 21-May-13 A
A5840 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 22-May-13 A 12-Jun-13 A
A5850 Approval of Design and shop drawings ( by DM ) 14 50% 100% 50% 16-Apr-13 01-May-13 12-Jun-13 A 11-Jul-13 -17
A7150 Design NOC from APG 0 100% 100% 100% 08-May-13 13-Jun-13 A
A7160 RTA Construction NOC 0 100% 100% 100% 27-May-13 24-Jun-13 A
A6830 Obtaining Partial shoring permit 0 0% 100% 0% 23-May-13 04-Jul-13 -34
A5860 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -54
Authorities Approvals
Authorities Approvals 154 100% 52.62% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -30
Fencing/ Hoarding and sign board
Fencing/ Hoarding and sign board 38 100% 100% 17-Mar-13 29-Apr-13 29-Jan-13 A 13-Mar-13 A
A5950 Submittal of fence and sign board drawings 4 100% 100% 100% 17-Mar-13 20-Mar-13 29-Jan-13 A 05-Feb-13 A
A5960 Approval of drawings ( APG) 2 100% 100% 100% 21-Mar-13 23-Mar-13 06-Feb-13 A 27-Feb-13 A
A5970 Approval of drawings ( by DM ) 14 100% 100% 100% 21-Mar-13 06-Apr-13 27-Feb-13 A 03-Mar-13 A
A5980 Obtaining fencing and hoarding permit 0 100% 100% 100% 06-Apr-13 06-Mar-13 A
A5990 Installation of fence and sign boards 20 100% 100% 100% 07-Apr-13 29-Apr-13 12-Mar-13 A 13-Mar-13 A
Temporary site office
Temporary site office 109 0% 0% 21-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -6
A6000 Submittal of site offices drawings 6 100% 100% 100% 21-Mar-13 27-Mar-13 29-Jan-13 A 29-Jan-13 A
A6010 Approval of site offices drawings 10 100% 100% 100% 16-Apr-13 27-Apr-13 01-May-13 A 04-Jun-13 A
A6020 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -6
A6030 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -6
Site visit demarcation
Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A
A6060 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 12-Mar-13 A
A6070 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A
A6080 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 10-Feb-13 A 12-Mar-13 A
Utilities Relocation
Utilities Relocation 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54
Electricity network relocation ( 132 KV relocation works )
Electricity network relocation ( 132 KV relocation works ) 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54
A6690 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A
A6630 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 50% 100% 50% 09-Mar-13 14-Mar-13 10-Mar-13 A 07-Jul-13 -54
A6640 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 07-Jul-13 -54
A6650 132kv cable exstock delivery at site 7 0% 100% 0% 11-Apr-13 18-Apr-13 06-Jul-13 13-Jul-13 -54
A6670 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 13-Apr-13 09-May-13 07-Jul-13 03-Aug-13 -42
A6700 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 13-Apr-13 27-Apr-13 07-Jul-13 21-Jul-13 -54
A6660 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 28-Apr-13 23-May-13 22-Jul-13 19-Aug-13 -54
A6680 Shut down and jointing 6 0% 100% 0% 25-May-13 30-May-13 20-Aug-13 26-Aug-13 -54
Construction Demarcation
Construction Demarcation 0 0% 0% 26-May-13 26-May-13 06-Jul-13 06-Jul-13 -34
A6160 Obtaining Construction demarcation 0 0% 100% 0% 26-May-13 06-Jul-13 -34
Construction
Construction 88 74.81% 0% 28-May-13 20-Aug-13 08-Jul-13 24-Oct-13 -52
J F M A M J J A S O N
24-Oct-13,...
24-Oct-13,...
24-Oct-13,...
02-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
26-Aug-13,...
13-Mar-13 ...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
27-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
12-Mar-13 ...
Obtaining ...
starting t...
26-Aug-13,...
26-Aug-13,...
Trial pit ...
Investegat...
Obtain App...
132kv cabl...
Civil Work...
132KV Cabl...
Dispatch c...
Shut down ...
06-Jul-13,...
Obtaining ...
24-Oct-13,...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H2
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A5870 Construction of guide wall 15 0% 100% 0% 28-May-13 15-Jun-13 08-Jul-13 24-Jul-13 -34
A5880 Construction of secant pile wall 21 0% 100% 0% 05-Jun-13 22-Jun-13 16-Jul-13 11-Aug-13 -34
A5890 Installation of dewatering system 6 0% 100% 0% 05-Jun-13 12-Jun-13 16-Jul-13 22-Jul-13 -34
A5920 Running of dewatering system 57 0% 31.58% 0% 13-Jun-13 20-Aug-13 23-Jul-13 29-Sep-13 -34
A5900 Construction of capping beam 20 0% 100% 0% 08-Jun-13 30-Jun-13 25-Jul-13 19-Aug-13 -19
A7040 Instruction to Excavate 0 0% 100% 0% 23-Jun-13 15-Sep-13 -54
A5910 Excavation up to anchors level 18 0% 55.56% 0% 23-Jun-13 13-Jul-13 15-Sep-13 05-Oct-13 -54
A5930 Installation of anchors 16 0% 12.5% 0% 02-Jul-13 20-Jul-13 24-Sep-13 12-Oct-13 -54
A5940 Excavation up to final level 16 0% 0% 0% 10-Jul-13 28-Jul-13 02-Oct-13 24-Oct-13 -52
Area with Utilities
Area with Utilities 17 100% 0% 09-Jun-13 27-Jun-13 03-Sep-13 22-Sep-13 -49
A6970 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -54
A6960 Construction of secant pile wall ( services area ) 7 0% 100% 0% 12-Jun-13 19-Jun-13 07-Sep-13 14-Sep-13 -54
A6980 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -49
J F M A M J J A S O N
Constructi...
Constructi...
Installati...
Running of...
Constructi...
Instructio...
Excavation...
Installati...
Excavation...
22-Sep-13,...
Constructi...
Constructi...
Constructi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H2
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61
Plots
Plots 222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61
Plot H3
Plot H3 222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61
Engineering
Engineering 181 100% 100% 10-Feb-13 01-Jul-13 06-Feb-13 A 12-Sep-13 -61
A4000 Receive IFC drawings 0 100% 100% 100% 10-Feb-13 06-Feb-13 A
A4010 Submittal of Design and shop drawings 5 100% 100% 100% 11-Feb-13 16-Feb-13 26-Feb-13 A 26-Feb-13 A
A4020 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 17-Feb-13 18-Feb-13 28-Feb-13 A 13-Apr-13 A
A4030 Approval of Design and shop drawings ( by DM ) 7 100% 100% 100% 10-Apr-13 25-Apr-13 15-Apr-13 A 16-Jun-13 A
A7070 Design NOC from APG 0 100% 100% 100% 11-Apr-13 18-Apr-13 A
A7080 RTA Construction NOC 0 100% 100% 100% 29-Apr-13 23-May-13 A
A6790 Obtaining Partial shoring permit 0 100% 100% 100% 25-Apr-13 17-Jun-13 A
A4040 Obtaining shoring permit 0 0% 100% 0% 01-Jul-13 12-Sep-13 -61
Authorities Approvals
Authorities Approvals 172 100% 59.85% 16-Feb-13 26-Jun-13 22-Jan-13 A 08-Sep-13 -43
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 35 100% 100% 18-Feb-13 30-Mar-13 29-Jan-13 A 13-Mar-13 A
A4130 Submittal of fence and sign board drawings 4 100% 100% 100% 18-Feb-13 21-Feb-13 29-Jan-13 A 05-Feb-13 A
A4140 Approval of drawings ( APG) 2 100% 100% 100% 23-Feb-13 24-Feb-13 06-Feb-13 A 11-Feb-13 A
A4150 Approval of drawings ( by DM ) 14 100% 100% 100% 23-Feb-13 10-Mar-13 12-Feb-13 A 04-Mar-13 A
A4160 Obtaining fencing and Hoarding permit 0 100% 100% 100% 10-Mar-13 06-Mar-13 A
A4170 Installation of fence and sign boards 17 100% 100% 100% 11-Mar-13 30-Mar-13 10-Mar-13 A 13-Mar-13 A
Temporary site office
Temporary site office 122 0% 0% 23-Feb-13 29-Apr-13 29-Jan-13 A 15-Jul-13 2
A4180 Submittal of site offices drawings 6 100% 100% 100% 23-Feb-13 28-Feb-13 29-Jan-13 A 29-Jan-13 A
A4190 Approval of site offices drawings 10 100% 100% 100% 02-Mar-13 12-Mar-13 27-Feb-13 A 04-Jun-13 A
A4200 Obtaining permit 0 0% 100% 0% 17-Apr-13 04-Jul-13 2
A4210 Installation of temporary site offices 10 0% 100% 0% 18-Apr-13 29-Apr-13 04-Jul-13 15-Jul-13 2
Site visit demarcation
Site visit demarcation 0 0% 0% 16-Feb-13 16-Feb-13 22-Jan-13 A 22-Jan-13 A
A4240 Obtaining site visit demarcation 0 100% 100% 100% 16-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 16-Feb-13 02-Mar-13 23-Jan-13 A 24-Feb-13 A
A4250 Obtaining NOC for trial trenching 0 100% 100% 100% 16-Feb-13 23-Jan-13 A
A4260 starting trial trenches at site for water, Ettisalat and sewerage 12 100% 100% 100% 17-Feb-13 02-Mar-13 12-Feb-13 A 24-Feb-13 A
Utilities Relocation
Utilities Relocation 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61
Electricity network relocation ( 11 KV relocation works )
Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61
A6450 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A
A6390 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A
A6400 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -61
A6410 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 11-Jul-13 18-Jul-13 -61
A6430 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 01-May-13 28-May-13 13-Jul-13 11-Aug-13 -49
A6460 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 13-Jul-13 27-Jul-13 -61
A6420 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 16-May-13 12-Jun-13 28-Jul-13 25-Aug-13 -61
A6440 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 26-Aug-13 08-Sep-13 -61
Construction Demarcation
Construction Demarcation 0 0% 0% 28-Apr-13 28-Apr-13 22-Jun-13 A 22-Jun-13 A
A4340 Obtaining Construction demarcation 0 100% 100% 100% 28-Apr-13 22-Jun-13 A
Construction
Construction 110 58.79% 23.85% 30-Apr-13 21-Aug-13 22-Jun-13 A 05-Nov-13 -61
J F M A M J J A S O N
12-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
08-Sep-13,...
13-Mar-13 ...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
15-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
24-Feb-13 ...
Obtaining ...
starting t...
08-Sep-13,...
08-Sep-13,...
Trial pit ...
Investegat...
Obtain App...
11kv cable...
Civil Work...
11KV Cable...
Dispatch c...
Shut down ...
22-Jun-13 ...
Obtaining ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H3
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A4050 Construction of guide wall 20 100% 100% 100% 30-Apr-13 22-May-13 22-Jun-13 A 30-Jun-13 A
A4060 Construction of secant pile wall 18 50.8% 100% 50.8% 08-May-13 28-May-13 27-Jun-13 A 13-Jul-13 -49
A4070 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49
A4080 Construction of capping beam 25 0% 100% 0% 08-May-13 05-Jun-13 04-Jul-13 01-Aug-13 -6
A4100 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49
A7000 Instruction to Excavate 0 0% 0% 0% 17-Jul-13 29-Sep-13 -61
A4220 Excavation up to anchors level 15 0% 0% 0% 17-Jul-13 03-Aug-13 29-Sep-13 20-Oct-13 -61
A4110 Installation of anchors 20 0% 0% 0% 18-Jul-13 12-Aug-13 30-Sep-13 27-Oct-13 -61
A4120 Excavation up to final level 20 0% 0% 0% 27-Jul-13 20-Aug-13 08-Oct-13 05-Nov-13 -61
Area with Utilities
Area with Utilities 20 4.82% 0% 02-Jul-13 24-Jul-13 14-Sep-13 06-Oct-13 -60
A6850 Construction of guide wall 7 0% 28.57% 0% 02-Jul-13 09-Jul-13 14-Sep-13 21-Sep-13 -61
A6840 Construction of secant pile wall ( services area ) 10 0% 0% 0% 06-Jul-13 16-Jul-13 17-Sep-13 28-Sep-13 -61
A6860 Construction of capping beam 7 0% 0% 0% 17-Jul-13 24-Jul-13 29-Sep-13 06-Oct-13 -60
J F M A M J J A S O N
Constructi...
Constructi...
Installati...
Constructi...
Running of...
Instructio...
Excavation...
Installati...
06-Oct-13,...
Constructi...
Constructi...
Constructi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H3
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68
Plots
Plots 245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68
Plot R1
Plot R1 245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68
Engineering
Engineering 206 100% 100% 22-Jan-13 02-Jul-13 12-Jan-13 A 23-Sep-13 -70
A1480 Receive IFC drawings 0 100% 100% 100% 22-Jan-13 12-Jan-13 A
A1490 Submittal of Design and shop drawings 5 100% 100% 100% 22-Jan-13 28-Jan-13 16-Jan-13 A 16-Jan-13 A
A1510 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 29-Jan-13 30-Jan-13 17-Jan-13 A 13-Apr-13 A
A7050 Design NOC from APG 0 100% 100% 100% 10-Apr-13 10-Apr-13 A
A1520 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 11-Apr-13 27-Apr-13 14-Apr-13 A 21-Apr-13 A
A1550 Obtaining Partial shoring permit 0 100% 100% 100% 27-Apr-13 22-Apr-13 A
A7060 RTA Construction NOC 0 100% 100% 100% 30-Apr-13 08-May-13 A
A1540 Obtaining shoring permit 0 0% 100% 0% 02-Jul-13 23-Sep-13 -70
Authorities Approvals
Authorities Approvals 192 100% 57.16% 07-Feb-13 30-Jun-13 16-Jan-13 A 23-Sep-13 -55
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 35 100% 100% 13-Feb-13 25-Mar-13 16-Jan-13 A 25-Feb-13 A
A3650 Submittal of fencing and sign board drawings 4 100% 100% 100% 13-Feb-13 17-Feb-13 16-Jan-13 A 29-Jan-13 A
A3660 Approval of drawings ( APG) 2 100% 100% 100% 18-Feb-13 19-Feb-13 30-Jan-13 A 31-Jan-13 A
A3670 Approval of drawings ( by DM ) 14 100% 100% 100% 18-Feb-13 05-Mar-13 02-Feb-13 A 14-Feb-13 A
A3680 Obtaining fencing and Hoarding permit 0 100% 100% 100% 05-Mar-13 19-Feb-13 A
A3690 Installation of fence and sign boards 17 100% 100% 100% 06-Mar-13 25-Mar-13 23-Feb-13 A 25-Feb-13 A
Temporary site office
Temporary site office 58 0% 0% 18-Feb-13 25-Apr-13 29-Jan-13 A 29-Apr-13 A
A3700 Submittal of site offices drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 29-Jan-13 A 29-Jan-13 A
A3710 Approval of site offices drawings 14 100% 100% 100% 24-Feb-13 11-Mar-13 30-Jan-13 A 27-Apr-13 A
A3720 Obtaining permit 0 100% 100% 100% 17-Apr-13 28-Apr-13 A
A3730 Installation of temporary site offices 7 100% 100% 100% 18-Apr-13 25-Apr-13 28-Apr-13 A 29-Apr-13 A
Site visit demarcation
Site visit demarcation 0 0% 0% 07-Feb-13 07-Feb-13 22-Jan-13 A 22-Jan-13 A
A3760 Obtaining site visit demarcation 0 100% 100% 100% 07-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 07-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A
A3780 Obtaining NOC for trial trenching 0 100% 100% 100% 07-Feb-13 22-Jan-13 A
A3790 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 09-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A
Utilities Relocation
Utilities Relocation 192 100% 17.39% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70
Electricity network relocation ( 11 KV relocation works )
Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 25-Jun-13 27-Feb-13 A 08-Sep-13 -63
A3920 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A
A3930 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A
A3940 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -63
A3950 11kv cable exstock delivery at site 7 0% 100% 0% 29-Apr-13 06-May-13 11-Jul-13 18-Jul-13 -63
A3990 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 30-Apr-13 14-May-13 13-Jul-13 27-Jul-13 -63
A3970 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 30-Apr-13 27-May-13 13-Jul-13 11-Aug-13 -51
A3960 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 15-May-13 11-Jun-13 28-Jul-13 25-Aug-13 -63
A3980 Shut down and jointing 12 0% 100% 0% 12-Jun-13 25-Jun-13 26-Aug-13 08-Sep-13 -63
Telephone Network Relocation
Telephone Network Relocation 192 100% 0% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70
A6320 Trial pit NOC 16 100% 100% 100% 09-Feb-13 26-Feb-13 10-Feb-13 A 20-Feb-13 A
A6330 Trial pit and shop drawing preparation 7 28.57% 100% 28.57% 10-Apr-13 17-Apr-13 01-Apr-13 A 09-Jul-13 -70
J F M A M J J A S O N
23-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Design NOC...
Approval o...
Obtaining ...
RTA Constr...
Obtaining ...
23-Sep-13,...
25-Feb-13 ...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
29-Apr-13 ...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
23-Jan-13 ...
Obtaining ...
starting t...
23-Sep-13,...
08-Sep-13,...
Trial pit ...
Investegat...
Obtain App...
11kv cable...
11KV Cable...
Civil Work...
Dispatch c...
Shut down ...
23-Sep-13,...
Trial pit ...
Trial pit ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot R1
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A6350 Placement of order and recipt of material at site 18 0% 100% 0% 10-Apr-13 30-Apr-13 04-Jul-13 24-Jul-13 -70
A6340 Approval from Etisalat 12 0% 100% 0% 18-Apr-13 01-May-13 10-Jul-13 23-Jul-13 -69
A6360 Installation of new cable 40 0% 100% 0% 02-May-13 18-Jun-13 25-Jul-13 11-Sep-13 -70
A6370 Shutdown of existing system 5 0% 100% 0% 19-Jun-13 24-Jun-13 12-Sep-13 17-Sep-13 -70
A6380 Re-connection 5 0% 100% 0% 25-Jun-13 30-Jun-13 18-Sep-13 23-Sep-13 -70
Construction Demarcation
Construction Demarcation 0 0% 0% 29-Apr-13 29-Apr-13 25-Apr-13 A 25-Apr-13 A
A3870 Obtaining Construction demarcation 0 100% 100% 100% 29-Apr-13 25-Apr-13 A
Construction
Construction 161 51.72% 32.25% 01-May-13 20-Aug-13 08-May-13 A 13-Nov-13 -68
A1840 Construction of guide wall 23 100% 100% 100% 01-May-13 27-May-13 08-May-13 A 08-Jun-13 A
A1850 Construction of secant pile wall 25 100% 100% 100% 09-May-13 08-Jun-13 11-May-13 A 22-Jun-13 A
A1860 Installation of dewatering system 6 0% 100% 0% 09-May-13 15-May-13 04-Jul-13 10-Jul-13 -47
A1870 Construction of capping beam 23 0% 100% 0% 20-May-13 16-Jun-13 04-Jul-13 30-Jul-13 -2
A1890 Running of dewatering system 80 0% 51.25% 0% 16-May-13 20-Aug-13 11-Jul-13 19-Oct-13 -47
A6990 Instruction to Excavate 0 0% 0% 0% 15-Jul-13 06-Oct-13 -70
A1880 Excavation up to anchors level 20 0% 0% 0% 15-Jul-13 06-Aug-13 06-Oct-13 02-Nov-13 -70
A1900 Installation of anchors 20 0% 0% 0% 21-Jul-13 14-Aug-13 12-Oct-13 09-Nov-13 -70
A1910 Excavation up to final level 19 0% 0% 0% 27-Jul-13 19-Aug-13 22-Oct-13 13-Nov-13 -70
Area with Utilities
Area with Utilities 20 2.41% 0% 03-Jul-13 25-Jul-13 24-Sep-13 21-Oct-13 -66
A1930 Construction of guide wall 7 0% 14.29% 0% 03-Jul-13 10-Jul-13 24-Sep-13 01-Oct-13 -70
A1920 Construction of secant pile wall ( services area ) 10 0% 0% 0% 07-Jul-13 17-Jul-13 28-Sep-13 08-Oct-13 -70
A1940 Construction of capping beam 7 0% 0% 0% 18-Jul-13 25-Jul-13 09-Oct-13 21-Oct-13 -66
J F M A M J J A S O N
Placement ...
Approval f...
Installati...
Shutdown o...
Re-connect...
25-Apr-13 ...
Obtaining ...
Constructi...
Constructi...
Installati...
Constructi...
Running of...
Instructio...
21-Oct-13,...
Constructi...
Constructi...
Constructi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot R1
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52
Plots
Plots 201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52
Plot S1
Plot S1 201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52
Engineering
Engineering 155 100% 100% 03-Mar-13 09-Jun-13 11-Feb-13 A 03-Sep-13 -52
A5360 Receive IFC drawings 0 100% 100% 100% 03-Mar-13 11-Feb-13 A
A5370 Submittal of Design and shop drawings 4 100% 100% 100% 10-Apr-13 14-Apr-13 30-Apr-13 A 30-Apr-13 A
A5380 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 15-Apr-13 16-Apr-13 30-Apr-13 A 02-May-13 A
A5390 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 15-Apr-13 30-Apr-13 19-May-13 A 23-Jun-13 A
A7130 Design NOC from APG 0 100% 100% 100% 02-May-13 23-May-13 A
A7140 RTA Construction NOC 0 100% 100% 100% 16-May-13 12-Jun-13 A
A6820 Obtaining Partial shoring permit 0 100% 100% 100% 14-May-13 23-Jun-13 A
A5400 Obtaining shoring permits 0 0% 100% 0% 09-Jun-13 03-Sep-13 -52
Authorities Approvals
Authorities Approvals 154 100% 57.71% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -28
Hoarding and sign board
Hoarding and sign board 32 100% 92.5% 10-Mar-13 15-Apr-13 29-Jan-13 A 07-Jul-13 -39
A5490 Submittal of fence and sign board drawings 4 100% 100% 100% 10-Mar-13 13-Mar-13 29-Jan-13 A 05-Feb-13 A
A5500 Approval of drawings ( APG) 2 100% 100% 100% 14-Mar-13 16-Mar-13 06-Feb-13 A 11-Feb-13 A
A5510 Approval of drawings ( DM ) 6 100% 100% 100% 17-Mar-13 23-Mar-13 12-Feb-13 A 04-Mar-13 A
A5520 Obtaining Fencing and Hoarding permit 0 100% 100% 100% 23-Mar-13 06-Mar-13 A
A5530 Installation of fence and sign boards 20 85% 100% 85% 24-Mar-13 15-Apr-13 14-Mar-13 A 07-Jul-13 -39
Temporary site office
Temporary site office 115 0% 0% 14-Mar-13 19-May-13 29-Jan-13 A 27-Jul-13 -4
A5540 Submittal of site offices drawings 6 100% 100% 100% 14-Mar-13 20-Mar-13 29-Jan-13 A 29-Jan-13 A
A5550 Approval of site offices drawings 7 100% 100% 100% 15-Apr-13 25-Apr-13 01-May-13 A 04-Jun-13 A
A5560 Obtaining Permit 0 0% 100% 0% 25-Apr-13 04-Jul-13 -4
A5570 Installation of temporary site offices 20 0% 100% 0% 27-Apr-13 19-May-13 04-Jul-13 27-Jul-13 -4
Site visit demarcation
Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A
A5600 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 10-Feb-13 A
A5610 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A
A5620 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 05-Feb-13 A 10-Feb-13 A
Utilities Relocation
Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52
Electricity network relocation ( 132 KV relocation works )
Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52
A6610 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A
A6550 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A
A6560 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 04-Jul-13 -51
A6570 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -52
A6590 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -40
A6620 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -52
A6580 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -52
A6600 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -52
Construction Demarcation
Construction Demarcation 0 0% 0% 16-May-13 16-May-13 23-Jun-13 A 23-Jun-13 A
A5700 Obtaining Construction demarcation 0 100% 100% 100% 16-May-13 23-Jun-13 A
Construction
Construction 84 78.18% 1.84% 18-May-13 19-Aug-13 01-Jul-13 A 24-Oct-13 -52
J F M A M J J A S O N
24-Oct-13,...
24-Oct-13,...
24-Oct-13,...
03-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
26-Aug-13,...
07-Jul-13,...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
27-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
10-Feb-13 ...
Obtaining ...
starting t...
26-Aug-13,...
26-Aug-13,...
Trial pit ...
Investegat...
Obtain App...
132kv cabl...
Civil Work...
132KV Cabl...
Dispatch c...
Shut down ...
23-Jun-13 ...
Obtaining ...
24-Oct-13,...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S1
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
A5410 Construction of guide wall 14 16% 100% 16% 18-May-13 02-Jun-13 01-Jul-13 A 23-Jul-13 -39
A5420 Construction of secant pile wall 19 0% 100% 0% 26-May-13 17-Jun-13 13-Jul-13 03-Aug-13 -39
A5430 Installation of dewatering system 6 0% 100% 0% 26-May-13 01-Jun-13 13-Jul-13 18-Jul-13 -39
A5440 Construction of capping beam 24 0% 100% 0% 28-May-13 25-Jun-13 15-Jul-13 13-Aug-13 -11
A5460 Running of dewatering system 65 0% 41.54% 0% 02-Jun-13 19-Aug-13 20-Jul-13 05-Oct-13 -39
A7030 Instruction to Excavate 0 0% 100% 0% 20-Jun-13 15-Sep-13 -52
A5450 Excavation up to anchors level 20 0% 60% 0% 20-Jun-13 13-Jul-13 15-Sep-13 07-Oct-13 -52
A5470 Installation of anchors 16 0% 25% 0% 30-Jun-13 17-Jul-13 24-Sep-13 12-Oct-13 -52
A5480 Excavation up to final level 17 0% 0% 0% 07-Jul-13 25-Jul-13 01-Oct-13 24-Oct-13 -52
Area with Utilities
Area with Utilities 16 100% 0% 10-Jun-13 27-Jun-13 04-Sep-13 22-Sep-13 -45
A6940 Construction of guide wall 7 0% 100% 0% 10-Jun-13 17-Jun-13 04-Sep-13 11-Sep-13 -52
A6930 Construction of secant pile wall ( services area ) 6 0% 100% 0% 13-Jun-13 19-Jun-13 08-Sep-13 14-Sep-13 -52
A6950 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -45
J F M A M J J A S O N
Constructi...
Constructi...
Installati...
Constructi...
Running of...
Instructio...
Excavation...
Installati...
Excavation...
22-Sep-13,...
Constructi...
Constructi...
Constructi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S1
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
211 85.1% 20.6% 07-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48
Plots
Plots 211 85.1% 20.6% 07-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48
Plot R1
Plot R1 0 0% 0% 07-Feb-13 07-Feb-13 22-Jan-13 A 22-Jan-13 A
Plot S2
Plot S2 197 85.1% 20.6% 24-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48
Engineering
Engineering 160 100% 100% 24-Feb-13 08-Jun-13 11-Feb-13 A 02-Sep-13 -48
A4900 Receive IFC drawings 0 100% 100% 100% 24-Feb-13 11-Feb-13 A
A4910 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 24-Apr-13 A 24-Apr-13 A
A4920 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 25-Apr-13 A 05-Jun-13 A
A4930 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 16-Apr-13 01-May-13 19-May-13 A 06-Jun-13 A
A7110 Design NOC from APG 0 100% 100% 100% 17-Apr-13 23-May-13 A
A7120 RTA Construction NOC 0 100% 100% 100% 15-May-13 06-Jun-13 A
A6810 Obtaining Partial shoring permit 0 100% 100% 100% 13-May-13 27-Jun-13 A
A4940 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -48
Authorities Approvals
Authorities Approvals 154 100% 57.91% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -25
Fencing / Hoarding and sign board
Fencing / Hoarding and sign board 34 100% 92.5% 03-Mar-13 10-Apr-13 29-Jan-13 A 07-Jul-13 -41
A5030 Submittal of fence and sign board drawings 4 100% 100% 100% 03-Mar-13 06-Mar-13 29-Jan-13 A 05-Feb-13 A
A5040 Approval of drawings ( APG) 2 100% 100% 100% 07-Mar-13 09-Mar-13 06-Feb-13 A 11-Feb-13 A
A5050 Approval of drawings ( by DM ) 10 100% 100% 100% 07-Mar-13 18-Mar-13 12-Feb-13 A 04-Mar-13 A
A5060 Obtaining fencing and hoarding permit 0 100% 100% 100% 18-Mar-13 06-Mar-13 A
A5070 Installation of fence and sign boards 20 85% 100% 85% 19-Mar-13 10-Apr-13 14-Mar-13 A 07-Jul-13 -41
Temporary site office
Temporary site office 121 0% 0% 07-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -1
A5080 Submittal of site offices drawings 6 100% 100% 100% 07-Mar-13 13-Mar-13 29-Jan-13 A 29-Jan-13 A
A5090 Approval of site offices drawings 10 100% 100% 100% 14-Mar-13 25-Mar-13 05-Mar-13 A 04-Jun-13 A
A5100 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -1
A5110 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -1
Site visit demarcation
Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A
A5140 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 04-Feb-13 A
A5150 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A
A5160 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 02-Feb-13 A 04-Feb-13 A
Utilities Relocation
Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48
Electricity network relocation ( 132 KV relocation works )
Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48
A6530 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 23-Jan-13 A 29-Jan-13 A
A6470 Investegation , finding services ,Trial pit verification and shop drawing preparation
6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A
A6480 Obtain Approval from DEWA for shop drawing & material submittal 0 0% 100% 0% 10-Apr-13 10-Apr-13 27-Jun-13 A 04-Jul-13 -47
A6490 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -48
A6510 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests
24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -36
A6540 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -48
A6500 Dispatch clearance, Documentation & Transportation of metrial to reach in hand
23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -48
A6520 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -48
Construction Demarcation
Construction Demarcation 0 0% 0% 14-May-13 14-May-13 23-Jun-13 A 23-Jun-13 A
A5240 Obtaining Construction demarcation 0 100% 100% 100% 14-May-13 23-Jun-13 A
J F M A M J J A S O N
20-Oct-13,...
20-Oct-13,...
22-Jan-13 ...
20-Oct-13,...
02-Sep-13,...
Receive IF...
Submittal ...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
Obtaining ...
26-Aug-13,...
07-Jul-13,...
Submittal ...
Approval o...
Approval o...
Obtaining ...
Installati...
27-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
04-Feb-13 ...
Obtaining ...
starting t...
26-Aug-13,...
26-Aug-13,...
Trial pit ...
Investegat...
Obtain App...
132kv cabl...
Civil Work...
132KV Cabl...
Dispatch c...
Shut down ...
23-Jun-13 ...
Obtaining ...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S2
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Construction
Construction 80 82.32% 10.5% 16-May-13 20-Aug-13 01-Jul-13 A 20-Oct-13 -48
A4950 Construction of guide wall 16 100% 100% 100% 16-May-13 03-Jun-13 01-Jul-13 A 02-Jul-13 A
A4960 Construction of secant pile wall 18 3.4% 100% 3.4% 25-May-13 15-Jun-13 02-Jul-13 A 31-Jul-13 -41
A4970 Installation of dewatering system 6 0% 100% 0% 25-May-13 30-May-13 13-Jul-13 18-Jul-13 -41
A5000 Running of dewatering system 67 0% 41.79% 0% 01-Jun-13 20-Aug-13 20-Jul-13 07-Oct-13 -41
A4980 Construction of capping beam 17 0% 100% 0% 03-Jun-13 23-Jun-13 21-Jul-13 11-Aug-13 -8
A7020 Instruction to Excavate 0 0% 100% 0% 22-Jun-13 16-Sep-13 -48
A4990 Excavation up to anchors level 17 0% 64.71% 0% 22-Jun-13 10-Jul-13 16-Sep-13 05-Oct-13 -48
A5010 Installation of anchors 14 0% 35.71% 0% 29-Jun-13 14-Jul-13 23-Sep-13 08-Oct-13 -48
A5020 Excavation up to final level 15 0% 0% 0% 04-Jul-13 21-Jul-13 29-Sep-13 20-Oct-13 -48
Area with Utilities
Area with Utilities 18 100% 0% 09-Jun-13 29-Jun-13 03-Sep-13 23-Sep-13 -44
A6910 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -48
A6900 Construction of secant pile wall ( services area ) 8 0% 100% 0% 12-Jun-13 20-Jun-13 07-Sep-13 15-Sep-13 -48
A6920 Construction of capping beam 7 0% 100% 0% 22-Jun-13 29-Jun-13 16-Sep-13 23-Sep-13 -44
J F M A M J J A S O N
20-Oct-13,...
Constructi...
Constructi...
Installati...
Running of...
Constructi...
Instructio...
Excavation...
Installati...
Excavation...
23-Sep-13,...
Constructi...
Constructi...
Constructi...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S2
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013)
220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49
Plots
Plots 220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49
Plot S3
Plot S3 220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49
Engineering
Engineering 77 100% 100% 30-Jan-13 29-Apr-13 23-Jan-13 A 22-May-13 A
A1040 Receive IFC drawings 0 100% 100% 100% 30-Jan-13 23-Jan-13 A
A1060 Submittal of Method Statement 5 100% 100% 100% 06-Feb-13 11-Feb-13 30-Jan-13 A 07-Feb-13 A
A1050 Submittal of Design and shop drawings 5 100% 100% 100% 06-Feb-13 11-Feb-13 31-Jan-13 A 31-Jan-13 A
A1090 Approval of method statement ( ByAPG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 02-Feb-13 A 07-Feb-13 A
A1070 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 10-Apr-13 11-Apr-13 03-Feb-13 A 13-Apr-13 A
A1080 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 10-Apr-13 25-Apr-13 14-Apr-13 A 28-Apr-13 A
A1230 Design NOC from APG 0 100% 100% 100% 11-Apr-13 15-Apr-13 A
A1270 RTA Construction NOC 0 100% 100% 100% 27-Apr-13 08-May-13 A
A1100 Obtaining shoring permit 0 100% 100% 100% 29-Apr-13 22-May-13 A
Authorities Approvals
Authorities Approvals 154 100% 94.27% 30-Jan-13 05-May-13 22-Jan-13 A 29-Jul-13 -5
Fencing /Hoarding and sign board
Fencing /Hoarding and sign board 34 100% 92.5% 10-Feb-13 20-Mar-13 29-Jan-13 A 08-Jul-13 13
A1110 Submittal of fence and sign board drawings 3 100% 100% 100% 10-Feb-13 12-Feb-13 29-Jan-13 A 31-Jan-13 A
A1120 Approval of drawings ( APG) 2 100% 100% 100% 13-Feb-13 14-Feb-13 02-Feb-13 A 11-Feb-13 A
A1140 Obtaining fencing and Hoarding permit 0 100% 100% 100% 28-Feb-13 06-Feb-13 A
A1130 Approval of drawings ( by DM ) 14 100% 100% 100% 13-Feb-13 28-Feb-13 12-Feb-13 A 04-Mar-13 A
A1150 Installation of fence and sign boards 17 85% 100% 85% 02-Mar-13 20-Mar-13 14-Mar-13 A 08-Jul-13 13
Temporary site office
Temporary site office 77 0% 0% 30-Jan-13 29-Apr-13 29-Jan-13 A 12-May-13 A
A1160 Submittal of site offices drawings 6 100% 100% 100% 30-Jan-13 05-Feb-13 29-Jan-13 A 29-Jan-13 A
A1170 Approval of site offices drawings 10 100% 100% 100% 10-Apr-13 21-Apr-13 01-Apr-13 A 30-Apr-13 A
A1180 Obtaining permit 0 100% 100% 100% 21-Apr-13 07-May-13 A
A1190 Installation of temporary site offices 7 100% 100% 100% 22-Apr-13 29-Apr-13 08-May-13 A 12-May-13 A
Permanent office
Permanent office 145 0% 0% 10-Feb-13 05-May-13 11-Feb-13 A 29-Jul-13 -12
A1200 Submit a proposal of permanent offices 2 100% 100% 100% 10-Feb-13 11-Feb-13 11-Feb-13 A 11-Feb-13 A
A1210 Approval of proposal ( APG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 12-Feb-13 A 04-Jul-13 -12
A1360 Approval of proposal ( DM ) 12 0% 100% 0% 10-Apr-13 23-Apr-13 04-Jul-13 17-Jul-13 -12
A1370 Obtaining permit 0 0% 100% 0% 23-Apr-13 17-Jul-13 -12
A1380 Installation of permanent offices 10 0% 100% 0% 24-Apr-13 05-May-13 18-Jul-13 29-Jul-13 -12
Site visit demarcation
Site visit demarcation 0 0% 0% 03-Feb-13 03-Feb-13 22-Jan-13 A 22-Jan-13 A
A1220 Obtaining site visit demarcation 0 100% 100% 100% 03-Feb-13 22-Jan-13 A
NOC for trial trenches
NOC for trial trenches 12 100% 100% 03-Feb-13 17-Feb-13 22-Jan-13 A 04-Feb-13 A
A1250 Obtaining NOC for trial trenching 0 100% 100% 100% 03-Feb-13 22-Jan-13 A
A1260 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 04-Feb-13 17-Feb-13 02-Feb-13 A 04-Feb-13 A
Mobilization permit
Mobilization permit 0 0% 0% 28-Feb-13 28-Feb-13 25-Feb-13 A 25-Feb-13 A
A1350 Obtaining mobilization permit 0 100% 100% 100% 28-Feb-13 25-Feb-13 A
Construction Demarcation
Construction Demarcation 0 0% 0% 25-Apr-13 25-Apr-13 08-May-13 A 08-May-13 A
A1340 Obtaining Construction demarcation 0 100% 100% 100% 25-Apr-13 08-May-13 A
Mobilization
Mobilization 15 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A
A1390 Mobilization of tools and equipments 15 100% 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A
J F M A M J J A S O N
21-Oct-13,...
21-Oct-13,...
21-Oct-13,...
22-May-13 ...
Receive IF...
Submittal ...
Submittal ...
Approval o...
Approval o...
Approval o...
Design NOC...
RTA Constr...
Obtaining ...
29-Jul-13,...
08-Jul-13,...
Submittal ...
Approval o...
Obtaining ...
Approval o...
Installati...
12-May-13 ...
Submittal ...
Approval o...
Obtaining ...
Installati...
29-Jul-13,...
Submit a p...
Approval o...
Approval o...
Obtaining ...
Installati...
22-Jan-13 ...
Obtaining ...
04-Feb-13 ...
Obtaining ...
starting t...
25-Feb-13 ...
Obtaining ...
08-May-13 ...
Obtaining ...
28-May-13 ...
Mobilizati...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S3
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 1 of 2  
Activity ID Activity Name Original
Duration
Activity
%
Complete
Schedule
%
Complete
Performance
%
Complete
BL Project
Start
BL Project
Finish
Start Finish Total
Float
Construction
Construction 143 98.28% 43.13% 30-Apr-13 21-Aug-13 14-May-13 A 21-Oct-13 -49
A1400 Construction of guide wall 14 100% 100% 100% 30-Apr-13 15-May-13 14-May-13 A 27-May-13 A
A1410 Construction of secant pile wall 15 91% 100% 91% 08-May-13 25-May-13 25-May-13 A 06-Jul-13 2
A1420 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49
A1430 Construction of capping beam 17 0% 100% 0% 14-May-13 02-Jun-13 04-Jul-13 23-Jul-13 -4
A1500 Instruction to Excavate 0 0% 100% 0% 25-May-13 06-Jul-13 2
A1450 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49
A1440 Excavation up to anchors level 20 0% 100% 0% 25-May-13 17-Jun-13 13-Jul-13 04-Aug-13 -4
A1460 Installation of anchors 19 0% 100% 0% 02-Jun-13 24-Jun-13 30-Jul-13 22-Aug-13 -12
A1470 Excavation up to final level 18 0% 100% 0% 11-Jun-13 01-Jul-13 07-Aug-13 29-Aug-13 -12
J F M A M J J A S O N
21-Oct-13,...
Constructi...
Constructi...
Installati...
Constructi...
Instructio...
Running of...
Excavation...
Installati...
Excavation...
Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S3
Primary Baseline
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Summary
Page 2 of 2  
Weekly Report No. 19 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Section 04 – Two Weeks Look Ahead Program 
(04‐July‐2013) 
 
 
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19
Weekly report no 19

More Related Content

Similar to Weekly report no 19

Final Majarrah rev 0
Final Majarrah rev 0Final Majarrah rev 0
Final Majarrah rev 0Ahmed Mehrem
 
Presentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxPresentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxFaisalGulzar19
 
Bridge project
Bridge projectBridge project
Bridge projectVivek John
 
Torkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdfTorkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdfSajidMumtazGurmani
 
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2Arun Bharadwaj
 
Rig scheduling gantt chart
Rig scheduling gantt chartRig scheduling gantt chart
Rig scheduling gantt chartSuparna K
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityRoumik Mukherjee
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptxTalebAlfihan
 
Sunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptxSunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptxabirsengupta9
 
Offshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocolOffshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocolAllan Leyte
 
MPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptxMPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptxSuyogJungare
 
ABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.pptABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.pptKingHaroldDeLeon
 
CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6Abhishek Singh
 
SeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule finalSeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule finalAhmed Mehrem
 
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfZewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfAhmed Mehrem
 

Similar to Weekly report no 19 (20)

IHH Healthcare Tender Programme.pdf
IHH Healthcare Tender Programme.pdfIHH Healthcare Tender Programme.pdf
IHH Healthcare Tender Programme.pdf
 
Final Majarrah rev 0
Final Majarrah rev 0Final Majarrah rev 0
Final Majarrah rev 0
 
Presentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxPresentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptx
 
Bridge project
Bridge projectBridge project
Bridge project
 
Torkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdfTorkham Project Work Plan (18-Apr-2019).pdf
Torkham Project Work Plan (18-Apr-2019).pdf
 
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
Harmal Field Development Phase 1 and Phase 2 Final-10.10.2013-R2
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
 
Rig scheduling gantt chart
Rig scheduling gantt chartRig scheduling gantt chart
Rig scheduling gantt chart
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activity
 
ARB JANADREA 25.01.16 UPDATE PM
ARB JANADREA 25.01.16 UPDATE  PMARB JANADREA 25.01.16 UPDATE  PM
ARB JANADREA 25.01.16 UPDATE PM
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
Sunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptxSunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptx
 
Offshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocolOffshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocol
 
MPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptxMPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptx
 
Wreport
WreportWreport
Wreport
 
Project Schedule - Level IV Schedule
Project Schedule - Level IV ScheduleProject Schedule - Level IV Schedule
Project Schedule - Level IV Schedule
 
ABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.pptABC_2nd Progress Mtg Briefing_011214_final.ppt
ABC_2nd Progress Mtg Briefing_011214_final.ppt
 
CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6
 
SeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule finalSeconTowers MEP Time Schedule final
SeconTowers MEP Time Schedule final
 
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfZewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdf
 

Recently uploaded

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Weekly report no 19

  • 3. Weekly Report No. 19  Table of Contents   Sr. No.  Description Page No.       1  Weekly Tracker Sheet 4       2  Level 03 Program  6       3  Two Weeks Look Ahead Program 31       4  Longest Path  35       5  Program Log  37       6  Minutes of Meeting Progress  54        7  Project Progress Summary 59       8  Key Performance Indices 63       9  Inspection Request Log 64       10  Progress Layouts & Photos 80                      
  • 5. Programming Weekly Tracker Sheet – Enabling Works for Al Jadaf Development Statistics Data Date: 4-July-13 Previous Update On: 27-Jun-13 Baseline Finish 21-Aug-13 Last update forecast finish 10-Nov-13 Rev. Contract Finish N/A This update forecast finish 16-Nov-13 Delay This Period (In Days): - Cumu. Delay (Contract): 77 days Planned % Complete 71.3 % Last update Actual % Complete 20.08 % This update Actual % Complete 23.6 % Key Activity / Milestones Comparison (This Reporting Period) Sr. No. Activity Baseline This Update Delay/Ahead Comments Start Finish Start Finish* 1 Installation of fence and sign boards (S3) 2-March-13 20-March-13 14-March-13 On going 2 Obtain Approval from DEWA for shop drawing & material submittal ( 11 Kv cable ) ( PLOT R1 & H3 ) 14-March-13 28-March-13 26-March-13 On going 3 Obtain Approval from DEWA for shop drawing & material submittal (132 Kv ) 14-March-13 28-March-13 26-March-13 On going 4 Construction of secant pile wall in plot R1 7-May-13 4-Jun-13 11-May-13 22-Jun-13 Completed 5 Construction of guide wall in plot H3 30-Apr-13 22-May-13 22-Jun-13 30-July-13 Completed 6 Construction of secant pile wall in plot H3 8-May-13 28-May-13 27-Jun-13 On going 7 Construction of guide wall in plot S2 16-May-13 3-Jun-13 1-July-13 2-July-13 Completed 8 Construction of secant pile wall in plot S2 25-May-13 15-Jun-13 2-July-13 On going 9 Construction of secant pile wall in plot S3 8-May-13 25-May-13 25-May-13 On going ENGINEERING RTA Construction NOC for Plot S2 15-May-13 6-Jun-13 Completed Obtaining shoring permitfor Plot S2 13-May-13 27-Jun-13 Completed Obtaining shoring permitfor Plot S1 14-May-13 23-Jun-13 Completed RTA Construction NOC for Plot H1 12-May-13 23-Jun-13 Completed * - Dates are derived from the updated program Project Milestones Sr. No. Milestone Baseline Last Update This Update Comments Finish Start Finish Start Finish 1 Contract Commencement Date 22-Jan-13 22-Jan-13 22-Jan-13 completed 2 Start of Mobilization Works 4-Feb-13 22-Jan-13 22-Jan-13 completed 8 Project Completion 21-Aug-13 16-Nov-13 Forecast Date Narrative This Week: - Plot S3: Secant Pile Wall in Progress. - Obtaining shoring permits for plot H2 - Start of Guide wall and secant pile wall in Plot H3 - Start of Guide wall in Plot S1 and H1. Next week: - Obtaining Permit for Plot H2 By APG and start construction of guide wall. - Continue the Construction of Secant Pile Wall in Plots H3 and S2 - Start construction of secant pile wall in plot S1 - Completion of Shoring Works in Plot S3 Modifications to Logic, Links, Durations and Relationships 1 A Baseline Program was submitted and under review External Dependency Factors - Authorities Approvals
  • 7. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 270 71.3% 23.6% 25-Dec-12 21-Aug-13 25-Dec-12 A 16-Nov-13 -70 Milestones Milestones 270 0% 0% 25-Dec-12 21-Aug-13 25-Dec-12 A 16-Nov-13 -70 A1000 Award of contract 0 100% 100% 100% 25-Dec-12 25-Dec-12 A A1020 Start of Mobilization 0 100% 100% 100% 04-Feb-13 22-Jan-13 A A1010 Contract commencement date 0 100% 100% 100% 22-Jan-13 22-Jan-13 A A1030 Project Completion 0 0% 0% 0% 21-Aug-13 16-Nov-13 -70 Plots Plots 246 73.35% 24.28% 22-Jan-13 21-Aug-13 12-Jan-13 A 14-Nov-13 -69 Plot S3 Plot S3 220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49 Engineering Engineering 77 100% 100% 30-Jan-13 29-Apr-13 23-Jan-13 A 22-May-13 A A1040 Receive IFC drawings 0 100% 100% 100% 30-Jan-13 23-Jan-13 A A1060 Submittal of Method Statement 5 100% 100% 100% 06-Feb-13 11-Feb-13 30-Jan-13 A 07-Feb-13 A A1050 Submittal of Design and shop drawings 5 100% 100% 100% 06-Feb-13 11-Feb-13 31-Jan-13 A 31-Jan-13 A A1090 Approval of method statement ( ByAPG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 02-Feb-13 A 07-Feb-13 A A1070 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 10-Apr-13 11-Apr-13 03-Feb-13 A 13-Apr-13 A A1080 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 10-Apr-13 25-Apr-13 14-Apr-13 A 28-Apr-13 A A1230 Design NOC from APG 0 100% 100% 100% 11-Apr-13 15-Apr-13 A A1270 RTA Construction NOC 0 100% 100% 100% 27-Apr-13 08-May-13 A A1100 Obtaining shoring permit 0 100% 100% 100% 29-Apr-13 22-May-13 A Authorities Approvals Authorities Approvals 154 100% 94.27% 30-Jan-13 05-May-13 22-Jan-13 A 29-Jul-13 -5 Fencing /Hoarding and sign board Fencing /Hoarding and sign board 34 100% 92.5% 10-Feb-13 20-Mar-13 29-Jan-13 A 08-Jul-13 13 A1110 Submittal of fence and sign board drawings 3 100% 100% 100% 10-Feb-13 12-Feb-13 29-Jan-13 A 31-Jan-13 A A1120 Approval of drawings ( APG) 2 100% 100% 100% 13-Feb-13 14-Feb-13 02-Feb-13 A 11-Feb-13 A A1140 Obtaining fencing and Hoarding permit 0 100% 100% 100% 28-Feb-13 06-Feb-13 A A1130 Approval of drawings ( by DM ) 14 100% 100% 100% 13-Feb-13 28-Feb-13 12-Feb-13 A 04-Mar-13 A A1150 Installation of fence and sign boards 17 85% 100% 85% 02-Mar-13 20-Mar-13 14-Mar-13 A 08-Jul-13 13 Temporary site office Temporary site office 77 0% 0% 30-Jan-13 29-Apr-13 29-Jan-13 A 12-May-13 A A1160 Submittal of site offices drawings 6 100% 100% 100% 30-Jan-13 05-Feb-13 29-Jan-13 A 29-Jan-13 A A1170 Approval of site offices drawings 10 100% 100% 100% 10-Apr-13 21-Apr-13 01-Apr-13 A 30-Apr-13 A A1180 Obtaining permit 0 100% 100% 100% 21-Apr-13 07-May-13 A A1190 Installation of temporary site offices 7 100% 100% 100% 22-Apr-13 29-Apr-13 08-May-13 A 12-May-13 A Permanent office Permanent office 145 0% 0% 10-Feb-13 05-May-13 11-Feb-13 A 29-Jul-13 -12 A1200 Submit a proposal of permanent offices 2 100% 100% 100% 10-Feb-13 11-Feb-13 11-Feb-13 A 11-Feb-13 A A1210 Approval of proposal ( APG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 12-Feb-13 A 04-Jul-13 -12 A1360 Approval of proposal ( DM ) 12 0% 100% 0% 10-Apr-13 23-Apr-13 04-Jul-13 17-Jul-13 -12 A1370 Obtaining permit 0 0% 100% 0% 23-Apr-13 17-Jul-13 -12 A1380 Installation of permanent offices 10 0% 100% 0% 24-Apr-13 05-May-13 18-Jul-13 29-Jul-13 -12 Site visit demarcation Site visit demarcation 0 0% 0% 03-Feb-13 03-Feb-13 22-Jan-13 A 22-Jan-13 A A1220 Obtaining site visit demarcation 0 100% 100% 100% 03-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 03-Feb-13 17-Feb-13 22-Jan-13 A 04-Feb-13 A A1250 Obtaining NOC for trial trenching 0 100% 100% 100% 03-Feb-13 22-Jan-13 A A1260 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 04-Feb-13 17-Feb-13 02-Feb-13 A 04-Feb-13 A Mobilization permit Mobilization permit 0 0% 0% 28-Feb-13 28-Feb-13 25-Feb-13 A 25-Feb-13 A F M A M J J A S O N D 16-Nov-13,... 16-Nov-13,... Award of c... Start of M... Contract c... Project Co... 14-Nov-13,... 21-Oct-13,... 22-May-13 ... Receive IF... Submittal ... Submittal ... Approval o... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... 29-Jul-13,... 08-Jul-13,... Submittal ... Approval o... Obtaining ... Approval o... Installati... 12-May-13 ... Submittal ... Approval o... Obtaining ... Installati... 29-Jul-13,... Submit a p... Approval o... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 04-Feb-13 ... Obtaining ... starting t... 25-Feb-13 ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 10  
  • 8. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A1350 Obtaining mobilization permit 0 100% 100% 100% 28-Feb-13 25-Feb-13 A Construction Demarcation Construction Demarcation 0 0% 0% 25-Apr-13 25-Apr-13 08-May-13 A 08-May-13 A A1340 Obtaining Construction demarcation 0 100% 100% 100% 25-Apr-13 08-May-13 A Mobilization Mobilization 15 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A A1390 Mobilization of tools and equipments 15 100% 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A Construction Construction 143 98.28% 43.13% 30-Apr-13 21-Aug-13 14-May-13 A 21-Oct-13 -49 A1400 Construction of guide wall 14 100% 100% 100% 30-Apr-13 15-May-13 14-May-13 A 27-May-13 A A1410 Construction of secant pile wall 15 91% 100% 91% 08-May-13 25-May-13 25-May-13 A 06-Jul-13 2 A1420 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49 A1430 Construction of capping beam 17 0% 100% 0% 14-May-13 02-Jun-13 04-Jul-13 23-Jul-13 -4 A1500 Instruction to Excavate 0 0% 100% 0% 25-May-13 06-Jul-13 2 A1450 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49 A1440 Excavation up to anchors level 20 0% 100% 0% 25-May-13 17-Jun-13 13-Jul-13 04-Aug-13 -4 A1460 Installation of anchors 19 0% 100% 0% 02-Jun-13 24-Jun-13 30-Jul-13 22-Aug-13 -12 A1470 Excavation up to final level 18 0% 100% 0% 11-Jun-13 01-Jul-13 07-Aug-13 29-Aug-13 -12 Plot R1 Plot R1 245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68 Engineering Engineering 206 100% 100% 22-Jan-13 02-Jul-13 12-Jan-13 A 23-Sep-13 -70 A1480 Receive IFC drawings 0 100% 100% 100% 22-Jan-13 12-Jan-13 A A1490 Submittal of Design and shop drawings 5 100% 100% 100% 22-Jan-13 28-Jan-13 16-Jan-13 A 16-Jan-13 A A1510 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 29-Jan-13 30-Jan-13 17-Jan-13 A 13-Apr-13 A A7050 Design NOC from APG 0 100% 100% 100% 10-Apr-13 10-Apr-13 A A1520 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 11-Apr-13 27-Apr-13 14-Apr-13 A 21-Apr-13 A A1550 Obtaining Partial shoring permit 0 100% 100% 100% 27-Apr-13 22-Apr-13 A A7060 RTA Construction NOC 0 100% 100% 100% 30-Apr-13 08-May-13 A A1540 Obtaining shoring permit 0 0% 100% 0% 02-Jul-13 23-Sep-13 -70 Authorities Approvals Authorities Approvals 192 100% 57.16% 07-Feb-13 30-Jun-13 16-Jan-13 A 23-Sep-13 -55 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 35 100% 100% 13-Feb-13 25-Mar-13 16-Jan-13 A 25-Feb-13 A A3650 Submittal of fencing and sign board drawings 4 100% 100% 100% 13-Feb-13 17-Feb-13 16-Jan-13 A 29-Jan-13 A A3660 Approval of drawings ( APG) 2 100% 100% 100% 18-Feb-13 19-Feb-13 30-Jan-13 A 31-Jan-13 A A3670 Approval of drawings ( by DM ) 14 100% 100% 100% 18-Feb-13 05-Mar-13 02-Feb-13 A 14-Feb-13 A A3680 Obtaining fencing and Hoarding permit 0 100% 100% 100% 05-Mar-13 19-Feb-13 A A3690 Installation of fence and sign boards 17 100% 100% 100% 06-Mar-13 25-Mar-13 23-Feb-13 A 25-Feb-13 A Temporary site office Temporary site office 58 0% 0% 18-Feb-13 25-Apr-13 29-Jan-13 A 29-Apr-13 A A3700 Submittal of site offices drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 29-Jan-13 A 29-Jan-13 A A3710 Approval of site offices drawings 14 100% 100% 100% 24-Feb-13 11-Mar-13 30-Jan-13 A 27-Apr-13 A A3720 Obtaining permit 0 100% 100% 100% 17-Apr-13 28-Apr-13 A A3730 Installation of temporary site offices 7 100% 100% 100% 18-Apr-13 25-Apr-13 28-Apr-13 A 29-Apr-13 A Site visit demarcation Site visit demarcation 0 0% 0% 07-Feb-13 07-Feb-13 22-Jan-13 A 22-Jan-13 A A3760 Obtaining site visit demarcation 0 100% 100% 100% 07-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 07-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A A3780 Obtaining NOC for trial trenching 0 100% 100% 100% 07-Feb-13 22-Jan-13 A A3790 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 09-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A Utilities Relocation Utilities Relocation 192 100% 17.39% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70 F M A M J J A S O N D Obtaining ... 08-May-13 ... Obtaining ... 28-May-13 ... Mobilizati... 21-Oct-13,... Constructi... Constructi... Installati... Constructi... Instructio... Running of... Excavation... Installati... Excavation... 13-Nov-13,... 23-Sep-13,... Receive IF... Submittal ... Approval o... Design NOC... Approval o... Obtaining ... RTA Constr... Obtaining ... 23-Sep-13,... 25-Feb-13 ... Submittal ... Approval o... Approval o... Obtaining ... Installati... 29-Apr-13 ... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 23-Jan-13 ... Obtaining ... starting t... 23-Sep-13,... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 10  
  • 9. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Electricity network relocation ( 11 KV relocation works ) Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 25-Jun-13 27-Feb-13 A 08-Sep-13 -63 A3920 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A A3930 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A A3940 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -63 A3950 11kv cable exstock delivery at site 7 0% 100% 0% 29-Apr-13 06-May-13 11-Jul-13 18-Jul-13 -63 A3990 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 30-Apr-13 14-May-13 13-Jul-13 27-Jul-13 -63 A3970 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 30-Apr-13 27-May-13 13-Jul-13 11-Aug-13 -51 A3960 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 15-May-13 11-Jun-13 28-Jul-13 25-Aug-13 -63 A3980 Shut down and jointing 12 0% 100% 0% 12-Jun-13 25-Jun-13 26-Aug-13 08-Sep-13 -63 Telephone Network Relocation Telephone Network Relocation 192 100% 0% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70 A6320 Trial pit NOC 16 100% 100% 100% 09-Feb-13 26-Feb-13 10-Feb-13 A 20-Feb-13 A A6330 Trial pit and shop drawing preparation 7 28.57% 100% 28.57% 10-Apr-13 17-Apr-13 01-Apr-13 A 09-Jul-13 -70 A6350 Placement of order and recipt of material at site 18 0% 100% 0% 10-Apr-13 30-Apr-13 04-Jul-13 24-Jul-13 -70 A6340 Approval from Etisalat 12 0% 100% 0% 18-Apr-13 01-May-13 10-Jul-13 23-Jul-13 -69 A6360 Installation of new cable 40 0% 100% 0% 02-May-13 18-Jun-13 25-Jul-13 11-Sep-13 -70 A6370 Shutdown of existing system 5 0% 100% 0% 19-Jun-13 24-Jun-13 12-Sep-13 17-Sep-13 -70 A6380 Re-connection 5 0% 100% 0% 25-Jun-13 30-Jun-13 18-Sep-13 23-Sep-13 -70 Construction Demarcation Construction Demarcation 0 0% 0% 29-Apr-13 29-Apr-13 25-Apr-13 A 25-Apr-13 A A3870 Obtaining Construction demarcation 0 100% 100% 100% 29-Apr-13 25-Apr-13 A Construction Construction 161 51.72% 32.25% 01-May-13 20-Aug-13 08-May-13 A 13-Nov-13 -68 A1840 Construction of guide wall 23 100% 100% 100% 01-May-13 27-May-13 08-May-13 A 08-Jun-13 A A1850 Construction of secant pile wall 25 100% 100% 100% 09-May-13 08-Jun-13 11-May-13 A 22-Jun-13 A A1860 Installation of dewatering system 6 0% 100% 0% 09-May-13 15-May-13 04-Jul-13 10-Jul-13 -47 A1870 Construction of capping beam 23 0% 100% 0% 20-May-13 16-Jun-13 04-Jul-13 30-Jul-13 -2 A1890 Running of dewatering system 80 0% 51.25% 0% 16-May-13 20-Aug-13 11-Jul-13 19-Oct-13 -47 A6990 Instruction to Excavate 0 0% 0% 0% 15-Jul-13 06-Oct-13 -70 A1880 Excavation up to anchors level 20 0% 0% 0% 15-Jul-13 06-Aug-13 06-Oct-13 02-Nov-13 -70 A1900 Installation of anchors 20 0% 0% 0% 21-Jul-13 14-Aug-13 12-Oct-13 09-Nov-13 -70 A1910 Excavation up to final level 19 0% 0% 0% 27-Jul-13 19-Aug-13 22-Oct-13 13-Nov-13 -70 Area with Utilities Area with Utilities 20 2.41% 0% 03-Jul-13 25-Jul-13 24-Sep-13 21-Oct-13 -66 A1930 Construction of guide wall 7 0% 14.29% 0% 03-Jul-13 10-Jul-13 24-Sep-13 01-Oct-13 -70 A1920 Construction of secant pile wall ( services area ) 10 0% 0% 0% 07-Jul-13 17-Jul-13 28-Sep-13 08-Oct-13 -70 A1940 Construction of capping beam 7 0% 0% 0% 18-Jul-13 25-Jul-13 09-Oct-13 21-Oct-13 -66 Plot H3 Plot H3 222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61 Engineering Engineering 181 100% 100% 10-Feb-13 01-Jul-13 06-Feb-13 A 12-Sep-13 -61 A4000 Receive IFC drawings 0 100% 100% 100% 10-Feb-13 06-Feb-13 A A4010 Submittal of Design and shop drawings 5 100% 100% 100% 11-Feb-13 16-Feb-13 26-Feb-13 A 26-Feb-13 A A4020 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 17-Feb-13 18-Feb-13 28-Feb-13 A 13-Apr-13 A A4030 Approval of Design and shop drawings ( by DM ) 7 100% 100% 100% 10-Apr-13 25-Apr-13 15-Apr-13 A 16-Jun-13 A A7070 Design NOC from APG 0 100% 100% 100% 11-Apr-13 18-Apr-13 A A7080 RTA Construction NOC 0 100% 100% 100% 29-Apr-13 23-May-13 A A6790 Obtaining Partial shoring permit 0 100% 100% 100% 25-Apr-13 17-Jun-13 A A4040 Obtaining shoring permit 0 0% 100% 0% 01-Jul-13 12-Sep-13 -61 F M A M J J A S O N D 08-Sep-13,... Trial pit ... Investegat... Obtain App... 11kv cable... 11KV Cable... Civil Work... Dispatch c... Shut down ... 23-Sep-13,... Trial pit ... Trial pit ... Placement ... Approval f... Installati... Shutdown o... Re-connect... 25-Apr-13 ... Obtaining ... 13-Nov-13,... Constructi... Constructi... Installati... Constructi... Running of... Instructio... Excavation... Installati... Excavation... 21-Oct-13,... Constructi... Constructi... Constructi... 05-Nov-13,... 12-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 3 of 10  
  • 10. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Authorities Approvals Authorities Approvals 172 100% 59.85% 16-Feb-13 26-Jun-13 22-Jan-13 A 08-Sep-13 -43 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 35 100% 100% 18-Feb-13 30-Mar-13 29-Jan-13 A 13-Mar-13 A A4130 Submittal of fence and sign board drawings 4 100% 100% 100% 18-Feb-13 21-Feb-13 29-Jan-13 A 05-Feb-13 A A4140 Approval of drawings ( APG) 2 100% 100% 100% 23-Feb-13 24-Feb-13 06-Feb-13 A 11-Feb-13 A A4150 Approval of drawings ( by DM ) 14 100% 100% 100% 23-Feb-13 10-Mar-13 12-Feb-13 A 04-Mar-13 A A4160 Obtaining fencing and Hoarding permit 0 100% 100% 100% 10-Mar-13 06-Mar-13 A A4170 Installation of fence and sign boards 17 100% 100% 100% 11-Mar-13 30-Mar-13 10-Mar-13 A 13-Mar-13 A Temporary site office Temporary site office 122 0% 0% 23-Feb-13 29-Apr-13 29-Jan-13 A 15-Jul-13 2 A4180 Submittal of site offices drawings 6 100% 100% 100% 23-Feb-13 28-Feb-13 29-Jan-13 A 29-Jan-13 A A4190 Approval of site offices drawings 10 100% 100% 100% 02-Mar-13 12-Mar-13 27-Feb-13 A 04-Jun-13 A A4200 Obtaining permit 0 0% 100% 0% 17-Apr-13 04-Jul-13 2 A4210 Installation of temporary site offices 10 0% 100% 0% 18-Apr-13 29-Apr-13 04-Jul-13 15-Jul-13 2 Site visit demarcation Site visit demarcation 0 0% 0% 16-Feb-13 16-Feb-13 22-Jan-13 A 22-Jan-13 A A4240 Obtaining site visit demarcation 0 100% 100% 100% 16-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 16-Feb-13 02-Mar-13 23-Jan-13 A 24-Feb-13 A A4250 Obtaining NOC for trial trenching 0 100% 100% 100% 16-Feb-13 23-Jan-13 A A4260 starting trial trenches at site for water, Ettisalat and sewerage 12 100% 100% 100% 17-Feb-13 02-Mar-13 12-Feb-13 A 24-Feb-13 A Utilities Relocation Utilities Relocation 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61 Electricity network relocation ( 11 KV relocation works ) Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61 A6450 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A A6390 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A A6400 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -61 A6410 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 11-Jul-13 18-Jul-13 -61 A6430 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 01-May-13 28-May-13 13-Jul-13 11-Aug-13 -49 A6460 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 13-Jul-13 27-Jul-13 -61 A6420 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 16-May-13 12-Jun-13 28-Jul-13 25-Aug-13 -61 A6440 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 26-Aug-13 08-Sep-13 -61 Construction Demarcation Construction Demarcation 0 0% 0% 28-Apr-13 28-Apr-13 22-Jun-13 A 22-Jun-13 A A4340 Obtaining Construction demarcation 0 100% 100% 100% 28-Apr-13 22-Jun-13 A Construction Construction 110 58.79% 23.85% 30-Apr-13 21-Aug-13 22-Jun-13 A 05-Nov-13 -61 A4050 Construction of guide wall 20 100% 100% 100% 30-Apr-13 22-May-13 22-Jun-13 A 30-Jun-13 A A4060 Construction of secant pile wall 18 50.8% 100% 50.8% 08-May-13 28-May-13 27-Jun-13 A 13-Jul-13 -49 A4070 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49 A4080 Construction of capping beam 25 0% 100% 0% 08-May-13 05-Jun-13 04-Jul-13 01-Aug-13 -6 A4100 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49 A7000 Instruction to Excavate 0 0% 0% 0% 17-Jul-13 29-Sep-13 -61 A4220 Excavation up to anchors level 15 0% 0% 0% 17-Jul-13 03-Aug-13 29-Sep-13 20-Oct-13 -61 A4110 Installation of anchors 20 0% 0% 0% 18-Jul-13 12-Aug-13 30-Sep-13 27-Oct-13 -61 A4120 Excavation up to final level 20 0% 0% 0% 27-Jul-13 20-Aug-13 08-Oct-13 05-Nov-13 -61 Area with Utilities Area with Utilities 20 4.82% 0% 02-Jul-13 24-Jul-13 14-Sep-13 06-Oct-13 -60 A6850 Construction of guide wall 7 0% 28.57% 0% 02-Jul-13 09-Jul-13 14-Sep-13 21-Sep-13 -61 A6840 Construction of secant pile wall ( services area ) 10 0% 0% 0% 06-Jul-13 16-Jul-13 17-Sep-13 28-Sep-13 -61 A6860 Construction of capping beam 7 0% 0% 0% 17-Jul-13 24-Jul-13 29-Sep-13 06-Oct-13 -60 F M A M J J A S O N D 08-Sep-13,... 13-Mar-13 ... Submittal ... Approval o... Approval o... Obtaining ... Installati... 15-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 24-Feb-13 ... Obtaining ... starting t... 08-Sep-13,... 08-Sep-13,... Trial pit ... Investegat... Obtain App... 11kv cable... Civil Work... 11KV Cable... Dispatch c... Shut down ... 22-Jun-13 ... Obtaining ... 05-Nov-13,... Constructi... Constructi... Installati... Constructi... Running of... Instructio... Excavation... Installati... Excavation... 06-Oct-13,... Constructi... Constructi... Constructi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 4 of 10  
  • 11. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Plot H1 Plot H1 224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69 Engineering Engineering 180 100% 87.1% 17-Feb-13 30-Jun-13 11-Feb-13 A 18-Sep-13 -65 A4450 Receive IFC drawings 0 100% 100% 100% 17-Feb-13 11-Feb-13 A A4460 Submittal of Design and shop drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 12-Mar-13 A 14-Mar-13 A A4470 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 24-Feb-13 25-Feb-13 16-Mar-13 A 14-Apr-13 A A4480 Approval of Design and shop drawings ( by DM ) 14 28.57% 100% 28.57% 10-Apr-13 25-Apr-13 18-Apr-13 A 15-Jul-13 -69 A7090 Design NOC from APG 0 100% 100% 100% 25-Apr-13 06-May-13 A A7100 RTA Construction NOC 0 100% 100% 100% 12-May-13 23-Jun-13 A A6800 Obtaining Partial shoring permit 0 0% 100% 0% 09-May-13 29-Jul-13 -69 A4490 Obtaining shoring permit 0 0% 100% 0% 30-Jun-13 18-Sep-13 -65 Authorities Approvals Authorities Approvals 177 100% 61.31% 18-Feb-13 26-Jun-13 22-Jan-13 A 15-Sep-13 -48 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 38 100% 100% 23-Feb-13 07-Apr-13 29-Jan-13 A 09-Mar-13 A A4580 Submittal of fence and sign board drawings 4 100% 100% 100% 23-Feb-13 26-Feb-13 29-Jan-13 A 05-Feb-13 A A4590 Approval of drawings ( APG) 2 100% 100% 100% 27-Feb-13 28-Feb-13 06-Feb-13 A 11-Feb-13 A A4600 Approval of drawings ( by DM ) 14 100% 100% 100% 27-Feb-13 14-Mar-13 12-Feb-13 A 04-Mar-13 A A4610 Obtaining fencing and hoarding permit 0 100% 100% 100% 14-Mar-13 06-Mar-13 A A4620 Installation of fence and sign boards 20 100% 100% 100% 16-Mar-13 07-Apr-13 06-Mar-13 A 09-Mar-13 A Temporary site office Temporary site office 63 0% 0% 27-Feb-13 11-May-13 29-Jan-13 A 02-May-13 A A4630 Submittal of site offices drawings 6 100% 100% 100% 27-Feb-13 05-Mar-13 29-Jan-13 A 05-Mar-13 A A4640 Approval of site offices drawings 10 100% 100% 100% 06-Mar-13 17-Mar-13 27-Feb-13 A 30-Apr-13 A A4650 Obtaining permit 0 100% 100% 100% 17-Apr-13 30-Apr-13 A A4660 Installation of temporary site offices 20 100% 100% 100% 18-Apr-13 11-May-13 01-May-13 A 02-May-13 A Site visit demarcation Site visit demarcation 0 0% 0% 18-Feb-13 18-Feb-13 22-Jan-13 A 22-Jan-13 A A4690 Obtaining site visit demarcation 0 100% 100% 100% 18-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 18-Feb-13 03-Mar-13 23-Jan-13 A 28-Feb-13 A A4700 Obtaining NOC for trial trenching 0 100% 100% 100% 18-Feb-13 23-Jan-13 A A4710 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 18-Feb-13 03-Mar-13 20-Feb-13 A 28-Feb-13 A Utilities Relocation Utilities Relocation 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65 Electricity network relocation ( 11 KV relocation works ) Electricity network relocation ( 11 KV relocation works ) 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65 A6770 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A A6710 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 10-Apr-13 16-Apr-13 23-Mar-13 A 24-Mar-13 A A6720 Obtain Approval from DEWA for shop drawing & material submittal 13 0% 100% 0% 16-Apr-13 30-Apr-13 04-Jul-13 18-Jul-13 -65 A6730 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 18-Jul-13 25-Jul-13 -65 A6750 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 01-May-13 28-May-13 20-Jul-13 18-Aug-13 -53 A6780 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 20-Jul-13 03-Aug-13 -65 A6740 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 16-May-13 12-Jun-13 04-Aug-13 01-Sep-13 -65 A6760 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 02-Sep-13 15-Sep-13 -65 Construction Demarcation Construction Demarcation 0 0% 0% 12-May-13 12-May-13 25-Jun-13 A 25-Jun-13 A A4790 Obtaining Construction demarcation 0 100% 100% 100% 12-May-13 25-Jun-13 A Construction Construction 84 46.86% 0% 13-May-13 21-Aug-13 01-Aug-13 14-Nov-13 -69 A4500 Construction of guide wall 20 0% 100% 0% 13-May-13 04-Jun-13 01-Aug-13 26-Aug-13 -69 A4510 Construction of secant pile wall 21 0% 100% 0% 21-May-13 15-Jun-13 12-Aug-13 04-Sep-13 -69 A4520 Installation of dewatering system 6 0% 100% 0% 21-May-13 27-May-13 12-Aug-13 18-Aug-13 -69 F M A M J J A S O N D 14-Nov-13,... 18-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 15-Sep-13,... 09-Mar-13 ... Submittal ... Approval o... Approval o... Obtaining ... Installati... 02-May-13 ... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 28-Feb-13 ... Obtaining ... starting t... 15-Sep-13,... 15-Sep-13,... Trial pit ... Investegat... Obtain App... 11kv cable... Civil Work... 11KV Cable... Dispatch c... Shut down ... 25-Jun-13 ... Obtaining ... 14-Nov-13,... Constructi... Constructi... Installati... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 5 of 10  
  • 12. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A4550 Running of dewatering system 71 0% 43.66% 0% 28-May-13 21-Aug-13 19-Aug-13 14-Nov-13 -69 A4530 Construction of capping beam 20 0% 100% 0% 30-May-13 23-Jun-13 21-Aug-13 12-Sep-13 -43 A7010 Instruction to Excavate 0 0% 100% 0% 16-Jun-13 05-Sep-13 -49 A4540 Excavation up to anchors level 22 0% 0% 0% 06-Jul-13 30-Jul-13 24-Sep-13 23-Oct-13 -65 A4560 Installation of anchors 19 0% 0% 0% 17-Jul-13 07-Aug-13 06-Oct-13 31-Oct-13 -65 A4570 Excavation up to final level 20 0% 0% 0% 24-Jul-13 18-Aug-13 13-Oct-13 10-Nov-13 -65 Area with Utilities Area with Utilities 20 7.24% 0% 01-Jul-13 23-Jul-13 19-Sep-13 12-Oct-13 -65 A6880 Construction of guide wall 7 0% 42.86% 0% 01-Jul-13 08-Jul-13 19-Sep-13 26-Sep-13 -65 A6870 Construction of secant pile wall ( services area ) 10 0% 0% 0% 04-Jul-13 15-Jul-13 23-Sep-13 03-Oct-13 -65 A6890 Construction of capping beam 7 0% 0% 0% 16-Jul-13 23-Jul-13 05-Oct-13 12-Oct-13 -65 Plot S2 Plot S2 197 85.1% 20.6% 24-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48 Engineering Engineering 160 100% 100% 24-Feb-13 08-Jun-13 11-Feb-13 A 02-Sep-13 -48 A4900 Receive IFC drawings 0 100% 100% 100% 24-Feb-13 11-Feb-13 A A4910 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 24-Apr-13 A 24-Apr-13 A A4920 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 25-Apr-13 A 05-Jun-13 A A4930 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 16-Apr-13 01-May-13 19-May-13 A 06-Jun-13 A A7110 Design NOC from APG 0 100% 100% 100% 17-Apr-13 23-May-13 A A7120 RTA Construction NOC 0 100% 100% 100% 15-May-13 06-Jun-13 A A6810 Obtaining Partial shoring permit 0 100% 100% 100% 13-May-13 27-Jun-13 A A4940 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -48 Authorities Approvals Authorities Approvals 154 100% 57.91% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -25 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 34 100% 92.5% 03-Mar-13 10-Apr-13 29-Jan-13 A 07-Jul-13 -41 A5030 Submittal of fence and sign board drawings 4 100% 100% 100% 03-Mar-13 06-Mar-13 29-Jan-13 A 05-Feb-13 A A5040 Approval of drawings ( APG) 2 100% 100% 100% 07-Mar-13 09-Mar-13 06-Feb-13 A 11-Feb-13 A A5050 Approval of drawings ( by DM ) 10 100% 100% 100% 07-Mar-13 18-Mar-13 12-Feb-13 A 04-Mar-13 A A5060 Obtaining fencing and hoarding permit 0 100% 100% 100% 18-Mar-13 06-Mar-13 A A5070 Installation of fence and sign boards 20 85% 100% 85% 19-Mar-13 10-Apr-13 14-Mar-13 A 07-Jul-13 -41 Temporary site office Temporary site office 121 0% 0% 07-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -1 A5080 Submittal of site offices drawings 6 100% 100% 100% 07-Mar-13 13-Mar-13 29-Jan-13 A 29-Jan-13 A A5090 Approval of site offices drawings 10 100% 100% 100% 14-Mar-13 25-Mar-13 05-Mar-13 A 04-Jun-13 A A5100 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -1 A5110 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -1 Site visit demarcation Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A A5140 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 04-Feb-13 A A5150 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A A5160 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 02-Feb-13 A 04-Feb-13 A Utilities Relocation Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48 Electricity network relocation ( 132 KV relocation works ) Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48 A6530 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 23-Jan-13 A 29-Jan-13 A A6470 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A A6480 Obtain Approval from DEWA for shop drawing & material submittal 0 0% 100% 0% 10-Apr-13 10-Apr-13 27-Jun-13 A 04-Jul-13 -47 A6490 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -48 F M A M J J A S O N D Running of... Constructi... Instructio... Excavation... Installati... Excavation... 12-Oct-13,... Constructi... Constructi... Constructi... 20-Oct-13,... 02-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 26-Aug-13,... 07-Jul-13,... Submittal ... Approval o... Approval o... Obtaining ... Installati... 27-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 04-Feb-13 ... Obtaining ... starting t... 26-Aug-13,... 26-Aug-13,... Trial pit ... Investegat... Obtain App... 132kv cabl... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 6 of 10  
  • 13. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A6510 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -36 A6540 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -48 A6500 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -48 A6520 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -48 Construction Demarcation Construction Demarcation 0 0% 0% 14-May-13 14-May-13 23-Jun-13 A 23-Jun-13 A A5240 Obtaining Construction demarcation 0 100% 100% 100% 14-May-13 23-Jun-13 A Construction Construction 80 82.32% 10.5% 16-May-13 20-Aug-13 01-Jul-13 A 20-Oct-13 -48 A4950 Construction of guide wall 16 100% 100% 100% 16-May-13 03-Jun-13 01-Jul-13 A 02-Jul-13 A A4960 Construction of secant pile wall 18 3.4% 100% 3.4% 25-May-13 15-Jun-13 02-Jul-13 A 31-Jul-13 -41 A4970 Installation of dewatering system 6 0% 100% 0% 25-May-13 30-May-13 13-Jul-13 18-Jul-13 -41 A5000 Running of dewatering system 67 0% 41.79% 0% 01-Jun-13 20-Aug-13 20-Jul-13 07-Oct-13 -41 A4980 Construction of capping beam 17 0% 100% 0% 03-Jun-13 23-Jun-13 21-Jul-13 11-Aug-13 -8 A7020 Instruction to Excavate 0 0% 100% 0% 22-Jun-13 16-Sep-13 -48 A4990 Excavation up to anchors level 17 0% 64.71% 0% 22-Jun-13 10-Jul-13 16-Sep-13 05-Oct-13 -48 A5010 Installation of anchors 14 0% 35.71% 0% 29-Jun-13 14-Jul-13 23-Sep-13 08-Oct-13 -48 A5020 Excavation up to final level 15 0% 0% 0% 04-Jul-13 21-Jul-13 29-Sep-13 20-Oct-13 -48 Area with Utilities Area with Utilities 18 100% 0% 09-Jun-13 29-Jun-13 03-Sep-13 23-Sep-13 -44 A6910 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -48 A6900 Construction of secant pile wall ( services area ) 8 0% 100% 0% 12-Jun-13 20-Jun-13 07-Sep-13 15-Sep-13 -48 A6920 Construction of capping beam 7 0% 100% 0% 22-Jun-13 29-Jun-13 16-Sep-13 23-Sep-13 -44 Plot S1 Plot S1 201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52 Engineering Engineering 155 100% 100% 03-Mar-13 09-Jun-13 11-Feb-13 A 03-Sep-13 -52 A5360 Receive IFC drawings 0 100% 100% 100% 03-Mar-13 11-Feb-13 A A5370 Submittal of Design and shop drawings 4 100% 100% 100% 10-Apr-13 14-Apr-13 30-Apr-13 A 30-Apr-13 A A5380 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 15-Apr-13 16-Apr-13 30-Apr-13 A 02-May-13 A A5390 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 15-Apr-13 30-Apr-13 19-May-13 A 23-Jun-13 A A7130 Design NOC from APG 0 100% 100% 100% 02-May-13 23-May-13 A A7140 RTA Construction NOC 0 100% 100% 100% 16-May-13 12-Jun-13 A A6820 Obtaining Partial shoring permit 0 100% 100% 100% 14-May-13 23-Jun-13 A A5400 Obtaining shoring permits 0 0% 100% 0% 09-Jun-13 03-Sep-13 -52 Authorities Approvals Authorities Approvals 154 100% 57.71% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -28 Hoarding and sign board Hoarding and sign board 32 100% 92.5% 10-Mar-13 15-Apr-13 29-Jan-13 A 07-Jul-13 -39 A5490 Submittal of fence and sign board drawings 4 100% 100% 100% 10-Mar-13 13-Mar-13 29-Jan-13 A 05-Feb-13 A A5500 Approval of drawings ( APG) 2 100% 100% 100% 14-Mar-13 16-Mar-13 06-Feb-13 A 11-Feb-13 A A5510 Approval of drawings ( DM ) 6 100% 100% 100% 17-Mar-13 23-Mar-13 12-Feb-13 A 04-Mar-13 A A5520 Obtaining Fencing and Hoarding permit 0 100% 100% 100% 23-Mar-13 06-Mar-13 A A5530 Installation of fence and sign boards 20 85% 100% 85% 24-Mar-13 15-Apr-13 14-Mar-13 A 07-Jul-13 -39 Temporary site office Temporary site office 115 0% 0% 14-Mar-13 19-May-13 29-Jan-13 A 27-Jul-13 -4 A5540 Submittal of site offices drawings 6 100% 100% 100% 14-Mar-13 20-Mar-13 29-Jan-13 A 29-Jan-13 A A5550 Approval of site offices drawings 7 100% 100% 100% 15-Apr-13 25-Apr-13 01-May-13 A 04-Jun-13 A A5560 Obtaining Permit 0 0% 100% 0% 25-Apr-13 04-Jul-13 -4 A5570 Installation of temporary site offices 20 0% 100% 0% 27-Apr-13 19-May-13 04-Jul-13 27-Jul-13 -4 Site visit demarcation Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A F M A M J J A S O N D Civil Work... 132KV Cabl... Dispatch c... Shut down ... 23-Jun-13 ... Obtaining ... 20-Oct-13,... Constructi... Constructi... Installati... Running of... Constructi... Instructio... Excavation... Installati... Excavation... 23-Sep-13,... Constructi... Constructi... Constructi... 24-Oct-13,... 03-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 26-Aug-13,... 07-Jul-13,... Submittal ... Approval o... Approval o... Obtaining ... Installati... 27-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 7 of 10  
  • 14. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A5600 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 10-Feb-13 A A5610 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A A5620 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 05-Feb-13 A 10-Feb-13 A Utilities Relocation Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52 Electricity network relocation ( 132 KV relocation works ) Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52 A6610 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A A6550 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A A6560 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 04-Jul-13 -51 A6570 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -52 A6590 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -40 A6620 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -52 A6580 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -52 A6600 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -52 Construction Demarcation Construction Demarcation 0 0% 0% 16-May-13 16-May-13 23-Jun-13 A 23-Jun-13 A A5700 Obtaining Construction demarcation 0 100% 100% 100% 16-May-13 23-Jun-13 A Construction Construction 84 78.18% 1.84% 18-May-13 19-Aug-13 01-Jul-13 A 24-Oct-13 -52 A5410 Construction of guide wall 14 16% 100% 16% 18-May-13 02-Jun-13 01-Jul-13 A 23-Jul-13 -39 A5420 Construction of secant pile wall 19 0% 100% 0% 26-May-13 17-Jun-13 13-Jul-13 03-Aug-13 -39 A5430 Installation of dewatering system 6 0% 100% 0% 26-May-13 01-Jun-13 13-Jul-13 18-Jul-13 -39 A5440 Construction of capping beam 24 0% 100% 0% 28-May-13 25-Jun-13 15-Jul-13 13-Aug-13 -11 A5460 Running of dewatering system 65 0% 41.54% 0% 02-Jun-13 19-Aug-13 20-Jul-13 05-Oct-13 -39 A7030 Instruction to Excavate 0 0% 100% 0% 20-Jun-13 15-Sep-13 -52 A5450 Excavation up to anchors level 20 0% 60% 0% 20-Jun-13 13-Jul-13 15-Sep-13 07-Oct-13 -52 A5470 Installation of anchors 16 0% 25% 0% 30-Jun-13 17-Jul-13 24-Sep-13 12-Oct-13 -52 A5480 Excavation up to final level 17 0% 0% 0% 07-Jul-13 25-Jul-13 01-Oct-13 24-Oct-13 -52 Area with Utilities Area with Utilities 16 100% 0% 10-Jun-13 27-Jun-13 04-Sep-13 22-Sep-13 -45 A6940 Construction of guide wall 7 0% 100% 0% 10-Jun-13 17-Jun-13 04-Sep-13 11-Sep-13 -52 A6930 Construction of secant pile wall ( services area ) 6 0% 100% 0% 13-Jun-13 19-Jun-13 08-Sep-13 14-Sep-13 -52 A6950 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -45 Plot H2 Plot H2 201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52 Engineering Engineering 122 100% 89.94% 10-Apr-13 08-Jun-13 08-May-13 A 02-Sep-13 -54 A5820 Receive IFC drawings 0 100% 100% 100% 10-Apr-13 08-May-13 A A5830 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 21-May-13 A 21-May-13 A A5840 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 22-May-13 A 12-Jun-13 A A5850 Approval of Design and shop drawings ( by DM ) 14 50% 100% 50% 16-Apr-13 01-May-13 12-Jun-13 A 11-Jul-13 -17 A7150 Design NOC from APG 0 100% 100% 100% 08-May-13 13-Jun-13 A A7160 RTA Construction NOC 0 100% 100% 100% 27-May-13 24-Jun-13 A A6830 Obtaining Partial shoring permit 0 0% 100% 0% 23-May-13 04-Jul-13 -34 A5860 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -54 Authorities Approvals Authorities Approvals 154 100% 52.62% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -30 Fencing/ Hoarding and sign board Fencing/ Hoarding and sign board 38 100% 100% 17-Mar-13 29-Apr-13 29-Jan-13 A 13-Mar-13 A A5950 Submittal of fence and sign board drawings 4 100% 100% 100% 17-Mar-13 20-Mar-13 29-Jan-13 A 05-Feb-13 A F M A M J J A S O N D Obtaining ... 10-Feb-13 ... Obtaining ... starting t... 26-Aug-13,... 26-Aug-13,... Trial pit ... Investegat... Obtain App... 132kv cabl... Civil Work... 132KV Cabl... Dispatch c... Shut down ... 23-Jun-13 ... Obtaining ... 24-Oct-13,... Constructi... Constructi... Installati... Constructi... Running of... Instructio... Excavation... Installati... Excavation... 22-Sep-13,... Constructi... Constructi... Constructi... 24-Oct-13,... 02-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 26-Aug-13,... 13-Mar-13 ... Submittal ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 8 of 10  
  • 15. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A5960 Approval of drawings ( APG) 2 100% 100% 100% 21-Mar-13 23-Mar-13 06-Feb-13 A 27-Feb-13 A A5970 Approval of drawings ( by DM ) 14 100% 100% 100% 21-Mar-13 06-Apr-13 27-Feb-13 A 03-Mar-13 A A5980 Obtaining fencing and hoarding permit 0 100% 100% 100% 06-Apr-13 06-Mar-13 A A5990 Installation of fence and sign boards 20 100% 100% 100% 07-Apr-13 29-Apr-13 12-Mar-13 A 13-Mar-13 A Temporary site office Temporary site office 109 0% 0% 21-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -6 A6000 Submittal of site offices drawings 6 100% 100% 100% 21-Mar-13 27-Mar-13 29-Jan-13 A 29-Jan-13 A A6010 Approval of site offices drawings 10 100% 100% 100% 16-Apr-13 27-Apr-13 01-May-13 A 04-Jun-13 A A6020 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -6 A6030 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -6 Site visit demarcation Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A A6060 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 12-Mar-13 A A6070 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A A6080 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 10-Feb-13 A 12-Mar-13 A Utilities Relocation Utilities Relocation 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54 Electricity network relocation ( 132 KV relocation works ) Electricity network relocation ( 132 KV relocation works ) 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54 A6690 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A A6630 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 50% 100% 50% 09-Mar-13 14-Mar-13 10-Mar-13 A 07-Jul-13 -54 A6640 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 07-Jul-13 -54 A6650 132kv cable exstock delivery at site 7 0% 100% 0% 11-Apr-13 18-Apr-13 06-Jul-13 13-Jul-13 -54 A6670 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 13-Apr-13 09-May-13 07-Jul-13 03-Aug-13 -42 A6700 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 13-Apr-13 27-Apr-13 07-Jul-13 21-Jul-13 -54 A6660 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 28-Apr-13 23-May-13 22-Jul-13 19-Aug-13 -54 A6680 Shut down and jointing 6 0% 100% 0% 25-May-13 30-May-13 20-Aug-13 26-Aug-13 -54 Construction Demarcation Construction Demarcation 0 0% 0% 26-May-13 26-May-13 06-Jul-13 06-Jul-13 -34 A6160 Obtaining Construction demarcation 0 0% 100% 0% 26-May-13 06-Jul-13 -34 Construction Construction 88 74.81% 0% 28-May-13 20-Aug-13 08-Jul-13 24-Oct-13 -52 A5870 Construction of guide wall 15 0% 100% 0% 28-May-13 15-Jun-13 08-Jul-13 24-Jul-13 -34 A5880 Construction of secant pile wall 21 0% 100% 0% 05-Jun-13 22-Jun-13 16-Jul-13 11-Aug-13 -34 A5890 Installation of dewatering system 6 0% 100% 0% 05-Jun-13 12-Jun-13 16-Jul-13 22-Jul-13 -34 A5920 Running of dewatering system 57 0% 31.58% 0% 13-Jun-13 20-Aug-13 23-Jul-13 29-Sep-13 -34 A5900 Construction of capping beam 20 0% 100% 0% 08-Jun-13 30-Jun-13 25-Jul-13 19-Aug-13 -19 A7040 Instruction to Excavate 0 0% 100% 0% 23-Jun-13 15-Sep-13 -54 A5910 Excavation up to anchors level 18 0% 55.56% 0% 23-Jun-13 13-Jul-13 15-Sep-13 05-Oct-13 -54 A5930 Installation of anchors 16 0% 12.5% 0% 02-Jul-13 20-Jul-13 24-Sep-13 12-Oct-13 -54 A5940 Excavation up to final level 16 0% 0% 0% 10-Jul-13 28-Jul-13 02-Oct-13 24-Oct-13 -52 Area with Utilities Area with Utilities 17 100% 0% 09-Jun-13 27-Jun-13 03-Sep-13 22-Sep-13 -49 A6970 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -54 A6960 Construction of secant pile wall ( services area ) 7 0% 100% 0% 12-Jun-13 19-Jun-13 07-Sep-13 14-Sep-13 -54 A6980 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -49 Project Close-out Project Close-out 26 0% 0% 21-Jul-13 21-Aug-13 12-Oct-13 16-Nov-13 -70 A6280 Submittal of As-built drawings 10 0% 0% 0% 21-Jul-13 31-Jul-13 12-Oct-13 27-Oct-13 -62 A6290 Approval of As-built drawings 12 0% 0% 0% 28-Jul-13 12-Aug-13 23-Oct-13 06-Nov-13 -62 F M A M J J A S O N D Approval o... Approval o... Obtaining ... Installati... 27-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 12-Mar-13 ... Obtaining ... starting t... 26-Aug-13,... 26-Aug-13,... Trial pit ... Investegat... Obtain App... 132kv cabl... Civil Work... 132KV Cabl... Dispatch c... Shut down ... 06-Jul-13,... Obtaining ... 24-Oct-13,... Constructi... Constructi... Installati... Running of... Constructi... Instructio... Excavation... Installati... Excavation... 22-Sep-13,... Constructi... Constructi... Constructi... 16-Nov-13,... Submittal ... Approval o... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 9 of 10  
  • 16. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A6300 Demobilization of all plant , equipments and facilities 4 0% 0% 0% 18-Aug-13 21-Aug-13 12-Nov-13 16-Nov-13 -70 A6310 Site handing over 0 0% 0% 0% 21-Aug-13 16-Nov-13 -70 F M A M J J A S O N D Demobiliza... Site handi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Weekly Update Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 10 of 10  
  • 17. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69 Plots Plots 224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69 Plot H1 Plot H1 224 53.4% 8.96% 17-Feb-13 21-Aug-13 22-Jan-13 A 14-Nov-13 -69 Engineering Engineering 180 100% 87.1% 17-Feb-13 30-Jun-13 11-Feb-13 A 18-Sep-13 -65 A4450 Receive IFC drawings 0 100% 100% 100% 17-Feb-13 11-Feb-13 A A4460 Submittal of Design and shop drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 12-Mar-13 A 14-Mar-13 A A4470 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 24-Feb-13 25-Feb-13 16-Mar-13 A 14-Apr-13 A A4480 Approval of Design and shop drawings ( by DM ) 14 28.57% 100% 28.57% 10-Apr-13 25-Apr-13 18-Apr-13 A 15-Jul-13 -69 A7090 Design NOC from APG 0 100% 100% 100% 25-Apr-13 06-May-13 A A7100 RTA Construction NOC 0 100% 100% 100% 12-May-13 23-Jun-13 A A6800 Obtaining Partial shoring permit 0 0% 100% 0% 09-May-13 29-Jul-13 -69 A4490 Obtaining shoring permit 0 0% 100% 0% 30-Jun-13 18-Sep-13 -65 Authorities Approvals Authorities Approvals 177 100% 61.31% 18-Feb-13 26-Jun-13 22-Jan-13 A 15-Sep-13 -48 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 38 100% 100% 23-Feb-13 07-Apr-13 29-Jan-13 A 09-Mar-13 A A4580 Submittal of fence and sign board drawings 4 100% 100% 100% 23-Feb-13 26-Feb-13 29-Jan-13 A 05-Feb-13 A A4590 Approval of drawings ( APG) 2 100% 100% 100% 27-Feb-13 28-Feb-13 06-Feb-13 A 11-Feb-13 A A4600 Approval of drawings ( by DM ) 14 100% 100% 100% 27-Feb-13 14-Mar-13 12-Feb-13 A 04-Mar-13 A A4610 Obtaining fencing and hoarding permit 0 100% 100% 100% 14-Mar-13 06-Mar-13 A A4620 Installation of fence and sign boards 20 100% 100% 100% 16-Mar-13 07-Apr-13 06-Mar-13 A 09-Mar-13 A Temporary site office Temporary site office 63 0% 0% 27-Feb-13 11-May-13 29-Jan-13 A 02-May-13 A A4630 Submittal of site offices drawings 6 100% 100% 100% 27-Feb-13 05-Mar-13 29-Jan-13 A 05-Mar-13 A A4640 Approval of site offices drawings 10 100% 100% 100% 06-Mar-13 17-Mar-13 27-Feb-13 A 30-Apr-13 A A4650 Obtaining permit 0 100% 100% 100% 17-Apr-13 30-Apr-13 A A4660 Installation of temporary site offices 20 100% 100% 100% 18-Apr-13 11-May-13 01-May-13 A 02-May-13 A Site visit demarcation Site visit demarcation 0 0% 0% 18-Feb-13 18-Feb-13 22-Jan-13 A 22-Jan-13 A A4690 Obtaining site visit demarcation 0 100% 100% 100% 18-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 18-Feb-13 03-Mar-13 23-Jan-13 A 28-Feb-13 A A4700 Obtaining NOC for trial trenching 0 100% 100% 100% 18-Feb-13 23-Jan-13 A A4710 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 18-Feb-13 03-Mar-13 20-Feb-13 A 28-Feb-13 A Utilities Relocation Utilities Relocation 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65 Electricity network relocation ( 11 KV relocation works ) Electricity network relocation ( 11 KV relocation works ) 170 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 15-Sep-13 -65 A6770 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A A6710 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 10-Apr-13 16-Apr-13 23-Mar-13 A 24-Mar-13 A A6720 Obtain Approval from DEWA for shop drawing & material submittal 13 0% 100% 0% 16-Apr-13 30-Apr-13 04-Jul-13 18-Jul-13 -65 A6730 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 18-Jul-13 25-Jul-13 -65 A6750 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 01-May-13 28-May-13 20-Jul-13 18-Aug-13 -53 A6780 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 20-Jul-13 03-Aug-13 -65 A6740 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 16-May-13 12-Jun-13 04-Aug-13 01-Sep-13 -65 A6760 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 02-Sep-13 15-Sep-13 -65 Construction Demarcation Construction Demarcation 0 0% 0% 12-May-13 12-May-13 25-Jun-13 A 25-Jun-13 A A4790 Obtaining Construction demarcation 0 100% 100% 100% 12-May-13 25-Jun-13 A Construction Construction 84 46.86% 0% 13-May-13 21-Aug-13 01-Aug-13 14-Nov-13 -69 J F M A M J J A S O N 18-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 15-Sep-13,... 09-Mar-13 ... Submittal ... Approval o... Approval o... Obtaining ... Installati... 02-May-13 ... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 28-Feb-13 ... Obtaining ... starting t... 15-Sep-13,... 15-Sep-13,... Trial pit ... Investegat... Obtain App... 11kv cable... Civil Work... 11KV Cable... Dispatch c... Shut down ... 25-Jun-13 ... Obtaining ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H1 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 2  
  • 18. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A4500 Construction of guide wall 20 0% 100% 0% 13-May-13 04-Jun-13 01-Aug-13 26-Aug-13 -69 A4510 Construction of secant pile wall 21 0% 100% 0% 21-May-13 15-Jun-13 12-Aug-13 04-Sep-13 -69 A4520 Installation of dewatering system 6 0% 100% 0% 21-May-13 27-May-13 12-Aug-13 18-Aug-13 -69 A4550 Running of dewatering system 71 0% 43.66% 0% 28-May-13 21-Aug-13 19-Aug-13 14-Nov-13 -69 A4530 Construction of capping beam 20 0% 100% 0% 30-May-13 23-Jun-13 21-Aug-13 12-Sep-13 -43 A7010 Instruction to Excavate 0 0% 100% 0% 16-Jun-13 05-Sep-13 -49 A4540 Excavation up to anchors level 22 0% 0% 0% 06-Jul-13 30-Jul-13 24-Sep-13 23-Oct-13 -65 A4560 Installation of anchors 19 0% 0% 0% 17-Jul-13 07-Aug-13 06-Oct-13 31-Oct-13 -65 A4570 Excavation up to final level 20 0% 0% 0% 24-Jul-13 18-Aug-13 13-Oct-13 10-Nov-13 -65 Area with Utilities Area with Utilities 20 7.24% 0% 01-Jul-13 23-Jul-13 19-Sep-13 12-Oct-13 -65 A6880 Construction of guide wall 7 0% 42.86% 0% 01-Jul-13 08-Jul-13 19-Sep-13 26-Sep-13 -65 A6870 Construction of secant pile wall ( services area ) 10 0% 0% 0% 04-Jul-13 15-Jul-13 23-Sep-13 03-Oct-13 -65 A6890 Construction of capping beam 7 0% 0% 0% 16-Jul-13 23-Jul-13 05-Oct-13 12-Oct-13 -65 J F M A M J J A S O N Constructi... Constructi... Installati... Constructi... Instructio... Excavation... Installati... 12-Oct-13,... Constructi... Constructi... Constructi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H1 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 2  
  • 19. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52 Plots Plots 201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52 Plot H2 Plot H2 201 78.42% 9.69% 25-Feb-13 20-Aug-13 22-Jan-13 A 24-Oct-13 -52 Engineering Engineering 122 100% 89.94% 10-Apr-13 08-Jun-13 08-May-13 A 02-Sep-13 -54 A5820 Receive IFC drawings 0 100% 100% 100% 10-Apr-13 08-May-13 A A5830 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 21-May-13 A 21-May-13 A A5840 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 22-May-13 A 12-Jun-13 A A5850 Approval of Design and shop drawings ( by DM ) 14 50% 100% 50% 16-Apr-13 01-May-13 12-Jun-13 A 11-Jul-13 -17 A7150 Design NOC from APG 0 100% 100% 100% 08-May-13 13-Jun-13 A A7160 RTA Construction NOC 0 100% 100% 100% 27-May-13 24-Jun-13 A A6830 Obtaining Partial shoring permit 0 0% 100% 0% 23-May-13 04-Jul-13 -34 A5860 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -54 Authorities Approvals Authorities Approvals 154 100% 52.62% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -30 Fencing/ Hoarding and sign board Fencing/ Hoarding and sign board 38 100% 100% 17-Mar-13 29-Apr-13 29-Jan-13 A 13-Mar-13 A A5950 Submittal of fence and sign board drawings 4 100% 100% 100% 17-Mar-13 20-Mar-13 29-Jan-13 A 05-Feb-13 A A5960 Approval of drawings ( APG) 2 100% 100% 100% 21-Mar-13 23-Mar-13 06-Feb-13 A 27-Feb-13 A A5970 Approval of drawings ( by DM ) 14 100% 100% 100% 21-Mar-13 06-Apr-13 27-Feb-13 A 03-Mar-13 A A5980 Obtaining fencing and hoarding permit 0 100% 100% 100% 06-Apr-13 06-Mar-13 A A5990 Installation of fence and sign boards 20 100% 100% 100% 07-Apr-13 29-Apr-13 12-Mar-13 A 13-Mar-13 A Temporary site office Temporary site office 109 0% 0% 21-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -6 A6000 Submittal of site offices drawings 6 100% 100% 100% 21-Mar-13 27-Mar-13 29-Jan-13 A 29-Jan-13 A A6010 Approval of site offices drawings 10 100% 100% 100% 16-Apr-13 27-Apr-13 01-May-13 A 04-Jun-13 A A6020 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -6 A6030 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -6 Site visit demarcation Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A A6060 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 12-Mar-13 A A6070 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A A6080 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 10-Feb-13 A 12-Mar-13 A Utilities Relocation Utilities Relocation 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54 Electricity network relocation ( 132 KV relocation works ) Electricity network relocation ( 132 KV relocation works ) 153 100% 15% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -54 A6690 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A A6630 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 50% 100% 50% 09-Mar-13 14-Mar-13 10-Mar-13 A 07-Jul-13 -54 A6640 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 07-Jul-13 -54 A6650 132kv cable exstock delivery at site 7 0% 100% 0% 11-Apr-13 18-Apr-13 06-Jul-13 13-Jul-13 -54 A6670 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 13-Apr-13 09-May-13 07-Jul-13 03-Aug-13 -42 A6700 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 13-Apr-13 27-Apr-13 07-Jul-13 21-Jul-13 -54 A6660 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 28-Apr-13 23-May-13 22-Jul-13 19-Aug-13 -54 A6680 Shut down and jointing 6 0% 100% 0% 25-May-13 30-May-13 20-Aug-13 26-Aug-13 -54 Construction Demarcation Construction Demarcation 0 0% 0% 26-May-13 26-May-13 06-Jul-13 06-Jul-13 -34 A6160 Obtaining Construction demarcation 0 0% 100% 0% 26-May-13 06-Jul-13 -34 Construction Construction 88 74.81% 0% 28-May-13 20-Aug-13 08-Jul-13 24-Oct-13 -52 J F M A M J J A S O N 24-Oct-13,... 24-Oct-13,... 24-Oct-13,... 02-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 26-Aug-13,... 13-Mar-13 ... Submittal ... Approval o... Approval o... Obtaining ... Installati... 27-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 12-Mar-13 ... Obtaining ... starting t... 26-Aug-13,... 26-Aug-13,... Trial pit ... Investegat... Obtain App... 132kv cabl... Civil Work... 132KV Cabl... Dispatch c... Shut down ... 06-Jul-13,... Obtaining ... 24-Oct-13,... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H2 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 2  
  • 20. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A5870 Construction of guide wall 15 0% 100% 0% 28-May-13 15-Jun-13 08-Jul-13 24-Jul-13 -34 A5880 Construction of secant pile wall 21 0% 100% 0% 05-Jun-13 22-Jun-13 16-Jul-13 11-Aug-13 -34 A5890 Installation of dewatering system 6 0% 100% 0% 05-Jun-13 12-Jun-13 16-Jul-13 22-Jul-13 -34 A5920 Running of dewatering system 57 0% 31.58% 0% 13-Jun-13 20-Aug-13 23-Jul-13 29-Sep-13 -34 A5900 Construction of capping beam 20 0% 100% 0% 08-Jun-13 30-Jun-13 25-Jul-13 19-Aug-13 -19 A7040 Instruction to Excavate 0 0% 100% 0% 23-Jun-13 15-Sep-13 -54 A5910 Excavation up to anchors level 18 0% 55.56% 0% 23-Jun-13 13-Jul-13 15-Sep-13 05-Oct-13 -54 A5930 Installation of anchors 16 0% 12.5% 0% 02-Jul-13 20-Jul-13 24-Sep-13 12-Oct-13 -54 A5940 Excavation up to final level 16 0% 0% 0% 10-Jul-13 28-Jul-13 02-Oct-13 24-Oct-13 -52 Area with Utilities Area with Utilities 17 100% 0% 09-Jun-13 27-Jun-13 03-Sep-13 22-Sep-13 -49 A6970 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -54 A6960 Construction of secant pile wall ( services area ) 7 0% 100% 0% 12-Jun-13 19-Jun-13 07-Sep-13 14-Sep-13 -54 A6980 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -49 J F M A M J J A S O N Constructi... Constructi... Installati... Running of... Constructi... Instructio... Excavation... Installati... Excavation... 22-Sep-13,... Constructi... Constructi... Constructi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H2 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 2  
  • 21. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61 Plots Plots 222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61 Plot H3 Plot H3 222 65.47% 32.1% 10-Feb-13 21-Aug-13 22-Jan-13 A 05-Nov-13 -61 Engineering Engineering 181 100% 100% 10-Feb-13 01-Jul-13 06-Feb-13 A 12-Sep-13 -61 A4000 Receive IFC drawings 0 100% 100% 100% 10-Feb-13 06-Feb-13 A A4010 Submittal of Design and shop drawings 5 100% 100% 100% 11-Feb-13 16-Feb-13 26-Feb-13 A 26-Feb-13 A A4020 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 17-Feb-13 18-Feb-13 28-Feb-13 A 13-Apr-13 A A4030 Approval of Design and shop drawings ( by DM ) 7 100% 100% 100% 10-Apr-13 25-Apr-13 15-Apr-13 A 16-Jun-13 A A7070 Design NOC from APG 0 100% 100% 100% 11-Apr-13 18-Apr-13 A A7080 RTA Construction NOC 0 100% 100% 100% 29-Apr-13 23-May-13 A A6790 Obtaining Partial shoring permit 0 100% 100% 100% 25-Apr-13 17-Jun-13 A A4040 Obtaining shoring permit 0 0% 100% 0% 01-Jul-13 12-Sep-13 -61 Authorities Approvals Authorities Approvals 172 100% 59.85% 16-Feb-13 26-Jun-13 22-Jan-13 A 08-Sep-13 -43 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 35 100% 100% 18-Feb-13 30-Mar-13 29-Jan-13 A 13-Mar-13 A A4130 Submittal of fence and sign board drawings 4 100% 100% 100% 18-Feb-13 21-Feb-13 29-Jan-13 A 05-Feb-13 A A4140 Approval of drawings ( APG) 2 100% 100% 100% 23-Feb-13 24-Feb-13 06-Feb-13 A 11-Feb-13 A A4150 Approval of drawings ( by DM ) 14 100% 100% 100% 23-Feb-13 10-Mar-13 12-Feb-13 A 04-Mar-13 A A4160 Obtaining fencing and Hoarding permit 0 100% 100% 100% 10-Mar-13 06-Mar-13 A A4170 Installation of fence and sign boards 17 100% 100% 100% 11-Mar-13 30-Mar-13 10-Mar-13 A 13-Mar-13 A Temporary site office Temporary site office 122 0% 0% 23-Feb-13 29-Apr-13 29-Jan-13 A 15-Jul-13 2 A4180 Submittal of site offices drawings 6 100% 100% 100% 23-Feb-13 28-Feb-13 29-Jan-13 A 29-Jan-13 A A4190 Approval of site offices drawings 10 100% 100% 100% 02-Mar-13 12-Mar-13 27-Feb-13 A 04-Jun-13 A A4200 Obtaining permit 0 0% 100% 0% 17-Apr-13 04-Jul-13 2 A4210 Installation of temporary site offices 10 0% 100% 0% 18-Apr-13 29-Apr-13 04-Jul-13 15-Jul-13 2 Site visit demarcation Site visit demarcation 0 0% 0% 16-Feb-13 16-Feb-13 22-Jan-13 A 22-Jan-13 A A4240 Obtaining site visit demarcation 0 100% 100% 100% 16-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 16-Feb-13 02-Mar-13 23-Jan-13 A 24-Feb-13 A A4250 Obtaining NOC for trial trenching 0 100% 100% 100% 16-Feb-13 23-Jan-13 A A4260 starting trial trenches at site for water, Ettisalat and sewerage 12 100% 100% 100% 17-Feb-13 02-Mar-13 12-Feb-13 A 24-Feb-13 A Utilities Relocation Utilities Relocation 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61 Electricity network relocation ( 11 KV relocation works ) Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 26-Jun-13 27-Feb-13 A 08-Sep-13 -61 A6450 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A A6390 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A A6400 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -61 A6410 11kv cable exstock delivery at site 7 0% 100% 0% 30-Apr-13 07-May-13 11-Jul-13 18-Jul-13 -61 A6430 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 01-May-13 28-May-13 13-Jul-13 11-Aug-13 -49 A6460 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 01-May-13 15-May-13 13-Jul-13 27-Jul-13 -61 A6420 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 16-May-13 12-Jun-13 28-Jul-13 25-Aug-13 -61 A6440 Shut down and jointing 12 0% 100% 0% 13-Jun-13 26-Jun-13 26-Aug-13 08-Sep-13 -61 Construction Demarcation Construction Demarcation 0 0% 0% 28-Apr-13 28-Apr-13 22-Jun-13 A 22-Jun-13 A A4340 Obtaining Construction demarcation 0 100% 100% 100% 28-Apr-13 22-Jun-13 A Construction Construction 110 58.79% 23.85% 30-Apr-13 21-Aug-13 22-Jun-13 A 05-Nov-13 -61 J F M A M J J A S O N 12-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 08-Sep-13,... 13-Mar-13 ... Submittal ... Approval o... Approval o... Obtaining ... Installati... 15-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 24-Feb-13 ... Obtaining ... starting t... 08-Sep-13,... 08-Sep-13,... Trial pit ... Investegat... Obtain App... 11kv cable... Civil Work... 11KV Cable... Dispatch c... Shut down ... 22-Jun-13 ... Obtaining ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H3 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 2  
  • 22. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A4050 Construction of guide wall 20 100% 100% 100% 30-Apr-13 22-May-13 22-Jun-13 A 30-Jun-13 A A4060 Construction of secant pile wall 18 50.8% 100% 50.8% 08-May-13 28-May-13 27-Jun-13 A 13-Jul-13 -49 A4070 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49 A4080 Construction of capping beam 25 0% 100% 0% 08-May-13 05-Jun-13 04-Jul-13 01-Aug-13 -6 A4100 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49 A7000 Instruction to Excavate 0 0% 0% 0% 17-Jul-13 29-Sep-13 -61 A4220 Excavation up to anchors level 15 0% 0% 0% 17-Jul-13 03-Aug-13 29-Sep-13 20-Oct-13 -61 A4110 Installation of anchors 20 0% 0% 0% 18-Jul-13 12-Aug-13 30-Sep-13 27-Oct-13 -61 A4120 Excavation up to final level 20 0% 0% 0% 27-Jul-13 20-Aug-13 08-Oct-13 05-Nov-13 -61 Area with Utilities Area with Utilities 20 4.82% 0% 02-Jul-13 24-Jul-13 14-Sep-13 06-Oct-13 -60 A6850 Construction of guide wall 7 0% 28.57% 0% 02-Jul-13 09-Jul-13 14-Sep-13 21-Sep-13 -61 A6840 Construction of secant pile wall ( services area ) 10 0% 0% 0% 06-Jul-13 16-Jul-13 17-Sep-13 28-Sep-13 -61 A6860 Construction of capping beam 7 0% 0% 0% 17-Jul-13 24-Jul-13 29-Sep-13 06-Oct-13 -60 J F M A M J J A S O N Constructi... Constructi... Installati... Constructi... Running of... Instructio... Excavation... Installati... 06-Oct-13,... Constructi... Constructi... Constructi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot H3 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 2  
  • 23. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68 Plots Plots 245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68 Plot R1 Plot R1 245 59.74% 38.92% 22-Jan-13 20-Aug-13 12-Jan-13 A 13-Nov-13 -68 Engineering Engineering 206 100% 100% 22-Jan-13 02-Jul-13 12-Jan-13 A 23-Sep-13 -70 A1480 Receive IFC drawings 0 100% 100% 100% 22-Jan-13 12-Jan-13 A A1490 Submittal of Design and shop drawings 5 100% 100% 100% 22-Jan-13 28-Jan-13 16-Jan-13 A 16-Jan-13 A A1510 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 29-Jan-13 30-Jan-13 17-Jan-13 A 13-Apr-13 A A7050 Design NOC from APG 0 100% 100% 100% 10-Apr-13 10-Apr-13 A A1520 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 11-Apr-13 27-Apr-13 14-Apr-13 A 21-Apr-13 A A1550 Obtaining Partial shoring permit 0 100% 100% 100% 27-Apr-13 22-Apr-13 A A7060 RTA Construction NOC 0 100% 100% 100% 30-Apr-13 08-May-13 A A1540 Obtaining shoring permit 0 0% 100% 0% 02-Jul-13 23-Sep-13 -70 Authorities Approvals Authorities Approvals 192 100% 57.16% 07-Feb-13 30-Jun-13 16-Jan-13 A 23-Sep-13 -55 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 35 100% 100% 13-Feb-13 25-Mar-13 16-Jan-13 A 25-Feb-13 A A3650 Submittal of fencing and sign board drawings 4 100% 100% 100% 13-Feb-13 17-Feb-13 16-Jan-13 A 29-Jan-13 A A3660 Approval of drawings ( APG) 2 100% 100% 100% 18-Feb-13 19-Feb-13 30-Jan-13 A 31-Jan-13 A A3670 Approval of drawings ( by DM ) 14 100% 100% 100% 18-Feb-13 05-Mar-13 02-Feb-13 A 14-Feb-13 A A3680 Obtaining fencing and Hoarding permit 0 100% 100% 100% 05-Mar-13 19-Feb-13 A A3690 Installation of fence and sign boards 17 100% 100% 100% 06-Mar-13 25-Mar-13 23-Feb-13 A 25-Feb-13 A Temporary site office Temporary site office 58 0% 0% 18-Feb-13 25-Apr-13 29-Jan-13 A 29-Apr-13 A A3700 Submittal of site offices drawings 5 100% 100% 100% 18-Feb-13 23-Feb-13 29-Jan-13 A 29-Jan-13 A A3710 Approval of site offices drawings 14 100% 100% 100% 24-Feb-13 11-Mar-13 30-Jan-13 A 27-Apr-13 A A3720 Obtaining permit 0 100% 100% 100% 17-Apr-13 28-Apr-13 A A3730 Installation of temporary site offices 7 100% 100% 100% 18-Apr-13 25-Apr-13 28-Apr-13 A 29-Apr-13 A Site visit demarcation Site visit demarcation 0 0% 0% 07-Feb-13 07-Feb-13 22-Jan-13 A 22-Jan-13 A A3760 Obtaining site visit demarcation 0 100% 100% 100% 07-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 07-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A A3780 Obtaining NOC for trial trenching 0 100% 100% 100% 07-Feb-13 22-Jan-13 A A3790 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 09-Feb-13 21-Feb-13 22-Jan-13 A 23-Jan-13 A Utilities Relocation Utilities Relocation 192 100% 17.39% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70 Electricity network relocation ( 11 KV relocation works ) Electricity network relocation ( 11 KV relocation works ) 164 100% 20% 26-Feb-13 25-Jun-13 27-Feb-13 A 08-Sep-13 -63 A3920 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 27-Feb-13 A 04-Mar-13 A A3930 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 23-Mar-13 A 24-Mar-13 A A3940 Obtain Approval from DEWA for shop drawing & material submittal 13 46.15% 100% 46.15% 14-Mar-13 28-Mar-13 26-Mar-13 A 11-Jul-13 -63 A3950 11kv cable exstock delivery at site 7 0% 100% 0% 29-Apr-13 06-May-13 11-Jul-13 18-Jul-13 -63 A3990 11KV Cable Joint production & DEWA FAT Inspection and all tests 13 0% 100% 0% 30-Apr-13 14-May-13 13-Jul-13 27-Jul-13 -63 A3970 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 30-Apr-13 27-May-13 13-Jul-13 11-Aug-13 -51 A3960 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 15-May-13 11-Jun-13 28-Jul-13 25-Aug-13 -63 A3980 Shut down and jointing 12 0% 100% 0% 12-Jun-13 25-Jun-13 26-Aug-13 08-Sep-13 -63 Telephone Network Relocation Telephone Network Relocation 192 100% 0% 09-Feb-13 30-Jun-13 10-Feb-13 A 23-Sep-13 -70 A6320 Trial pit NOC 16 100% 100% 100% 09-Feb-13 26-Feb-13 10-Feb-13 A 20-Feb-13 A A6330 Trial pit and shop drawing preparation 7 28.57% 100% 28.57% 10-Apr-13 17-Apr-13 01-Apr-13 A 09-Jul-13 -70 J F M A M J J A S O N 23-Sep-13,... Receive IF... Submittal ... Approval o... Design NOC... Approval o... Obtaining ... RTA Constr... Obtaining ... 23-Sep-13,... 25-Feb-13 ... Submittal ... Approval o... Approval o... Obtaining ... Installati... 29-Apr-13 ... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 23-Jan-13 ... Obtaining ... starting t... 23-Sep-13,... 08-Sep-13,... Trial pit ... Investegat... Obtain App... 11kv cable... 11KV Cable... Civil Work... Dispatch c... Shut down ... 23-Sep-13,... Trial pit ... Trial pit ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot R1 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 2  
  • 24. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A6350 Placement of order and recipt of material at site 18 0% 100% 0% 10-Apr-13 30-Apr-13 04-Jul-13 24-Jul-13 -70 A6340 Approval from Etisalat 12 0% 100% 0% 18-Apr-13 01-May-13 10-Jul-13 23-Jul-13 -69 A6360 Installation of new cable 40 0% 100% 0% 02-May-13 18-Jun-13 25-Jul-13 11-Sep-13 -70 A6370 Shutdown of existing system 5 0% 100% 0% 19-Jun-13 24-Jun-13 12-Sep-13 17-Sep-13 -70 A6380 Re-connection 5 0% 100% 0% 25-Jun-13 30-Jun-13 18-Sep-13 23-Sep-13 -70 Construction Demarcation Construction Demarcation 0 0% 0% 29-Apr-13 29-Apr-13 25-Apr-13 A 25-Apr-13 A A3870 Obtaining Construction demarcation 0 100% 100% 100% 29-Apr-13 25-Apr-13 A Construction Construction 161 51.72% 32.25% 01-May-13 20-Aug-13 08-May-13 A 13-Nov-13 -68 A1840 Construction of guide wall 23 100% 100% 100% 01-May-13 27-May-13 08-May-13 A 08-Jun-13 A A1850 Construction of secant pile wall 25 100% 100% 100% 09-May-13 08-Jun-13 11-May-13 A 22-Jun-13 A A1860 Installation of dewatering system 6 0% 100% 0% 09-May-13 15-May-13 04-Jul-13 10-Jul-13 -47 A1870 Construction of capping beam 23 0% 100% 0% 20-May-13 16-Jun-13 04-Jul-13 30-Jul-13 -2 A1890 Running of dewatering system 80 0% 51.25% 0% 16-May-13 20-Aug-13 11-Jul-13 19-Oct-13 -47 A6990 Instruction to Excavate 0 0% 0% 0% 15-Jul-13 06-Oct-13 -70 A1880 Excavation up to anchors level 20 0% 0% 0% 15-Jul-13 06-Aug-13 06-Oct-13 02-Nov-13 -70 A1900 Installation of anchors 20 0% 0% 0% 21-Jul-13 14-Aug-13 12-Oct-13 09-Nov-13 -70 A1910 Excavation up to final level 19 0% 0% 0% 27-Jul-13 19-Aug-13 22-Oct-13 13-Nov-13 -70 Area with Utilities Area with Utilities 20 2.41% 0% 03-Jul-13 25-Jul-13 24-Sep-13 21-Oct-13 -66 A1930 Construction of guide wall 7 0% 14.29% 0% 03-Jul-13 10-Jul-13 24-Sep-13 01-Oct-13 -70 A1920 Construction of secant pile wall ( services area ) 10 0% 0% 0% 07-Jul-13 17-Jul-13 28-Sep-13 08-Oct-13 -70 A1940 Construction of capping beam 7 0% 0% 0% 18-Jul-13 25-Jul-13 09-Oct-13 21-Oct-13 -66 J F M A M J J A S O N Placement ... Approval f... Installati... Shutdown o... Re-connect... 25-Apr-13 ... Obtaining ... Constructi... Constructi... Installati... Constructi... Running of... Instructio... 21-Oct-13,... Constructi... Constructi... Constructi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot R1 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 2  
  • 25. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52 Plots Plots 201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52 Plot S1 Plot S1 201 81.44% 12.69% 25-Feb-13 19-Aug-13 22-Jan-13 A 24-Oct-13 -52 Engineering Engineering 155 100% 100% 03-Mar-13 09-Jun-13 11-Feb-13 A 03-Sep-13 -52 A5360 Receive IFC drawings 0 100% 100% 100% 03-Mar-13 11-Feb-13 A A5370 Submittal of Design and shop drawings 4 100% 100% 100% 10-Apr-13 14-Apr-13 30-Apr-13 A 30-Apr-13 A A5380 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 15-Apr-13 16-Apr-13 30-Apr-13 A 02-May-13 A A5390 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 15-Apr-13 30-Apr-13 19-May-13 A 23-Jun-13 A A7130 Design NOC from APG 0 100% 100% 100% 02-May-13 23-May-13 A A7140 RTA Construction NOC 0 100% 100% 100% 16-May-13 12-Jun-13 A A6820 Obtaining Partial shoring permit 0 100% 100% 100% 14-May-13 23-Jun-13 A A5400 Obtaining shoring permits 0 0% 100% 0% 09-Jun-13 03-Sep-13 -52 Authorities Approvals Authorities Approvals 154 100% 57.71% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -28 Hoarding and sign board Hoarding and sign board 32 100% 92.5% 10-Mar-13 15-Apr-13 29-Jan-13 A 07-Jul-13 -39 A5490 Submittal of fence and sign board drawings 4 100% 100% 100% 10-Mar-13 13-Mar-13 29-Jan-13 A 05-Feb-13 A A5500 Approval of drawings ( APG) 2 100% 100% 100% 14-Mar-13 16-Mar-13 06-Feb-13 A 11-Feb-13 A A5510 Approval of drawings ( DM ) 6 100% 100% 100% 17-Mar-13 23-Mar-13 12-Feb-13 A 04-Mar-13 A A5520 Obtaining Fencing and Hoarding permit 0 100% 100% 100% 23-Mar-13 06-Mar-13 A A5530 Installation of fence and sign boards 20 85% 100% 85% 24-Mar-13 15-Apr-13 14-Mar-13 A 07-Jul-13 -39 Temporary site office Temporary site office 115 0% 0% 14-Mar-13 19-May-13 29-Jan-13 A 27-Jul-13 -4 A5540 Submittal of site offices drawings 6 100% 100% 100% 14-Mar-13 20-Mar-13 29-Jan-13 A 29-Jan-13 A A5550 Approval of site offices drawings 7 100% 100% 100% 15-Apr-13 25-Apr-13 01-May-13 A 04-Jun-13 A A5560 Obtaining Permit 0 0% 100% 0% 25-Apr-13 04-Jul-13 -4 A5570 Installation of temporary site offices 20 0% 100% 0% 27-Apr-13 19-May-13 04-Jul-13 27-Jul-13 -4 Site visit demarcation Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A A5600 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 10-Feb-13 A A5610 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A A5620 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 05-Feb-13 A 10-Feb-13 A Utilities Relocation Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52 Electricity network relocation ( 132 KV relocation works ) Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 04-Mar-13 A 26-Aug-13 -52 A6610 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 04-Mar-13 A 04-Mar-13 A A6550 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A A6560 Obtain Approval from DEWA for shop drawing & material submittal 13 100% 100% 100% 14-Mar-13 28-Mar-13 26-Mar-13 A 04-Jul-13 -51 A6570 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -52 A6590 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -40 A6620 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -52 A6580 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -52 A6600 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -52 Construction Demarcation Construction Demarcation 0 0% 0% 16-May-13 16-May-13 23-Jun-13 A 23-Jun-13 A A5700 Obtaining Construction demarcation 0 100% 100% 100% 16-May-13 23-Jun-13 A Construction Construction 84 78.18% 1.84% 18-May-13 19-Aug-13 01-Jul-13 A 24-Oct-13 -52 J F M A M J J A S O N 24-Oct-13,... 24-Oct-13,... 24-Oct-13,... 03-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 26-Aug-13,... 07-Jul-13,... Submittal ... Approval o... Approval o... Obtaining ... Installati... 27-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 10-Feb-13 ... Obtaining ... starting t... 26-Aug-13,... 26-Aug-13,... Trial pit ... Investegat... Obtain App... 132kv cabl... Civil Work... 132KV Cabl... Dispatch c... Shut down ... 23-Jun-13 ... Obtaining ... 24-Oct-13,... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S1 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 2  
  • 26. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float A5410 Construction of guide wall 14 16% 100% 16% 18-May-13 02-Jun-13 01-Jul-13 A 23-Jul-13 -39 A5420 Construction of secant pile wall 19 0% 100% 0% 26-May-13 17-Jun-13 13-Jul-13 03-Aug-13 -39 A5430 Installation of dewatering system 6 0% 100% 0% 26-May-13 01-Jun-13 13-Jul-13 18-Jul-13 -39 A5440 Construction of capping beam 24 0% 100% 0% 28-May-13 25-Jun-13 15-Jul-13 13-Aug-13 -11 A5460 Running of dewatering system 65 0% 41.54% 0% 02-Jun-13 19-Aug-13 20-Jul-13 05-Oct-13 -39 A7030 Instruction to Excavate 0 0% 100% 0% 20-Jun-13 15-Sep-13 -52 A5450 Excavation up to anchors level 20 0% 60% 0% 20-Jun-13 13-Jul-13 15-Sep-13 07-Oct-13 -52 A5470 Installation of anchors 16 0% 25% 0% 30-Jun-13 17-Jul-13 24-Sep-13 12-Oct-13 -52 A5480 Excavation up to final level 17 0% 0% 0% 07-Jul-13 25-Jul-13 01-Oct-13 24-Oct-13 -52 Area with Utilities Area with Utilities 16 100% 0% 10-Jun-13 27-Jun-13 04-Sep-13 22-Sep-13 -45 A6940 Construction of guide wall 7 0% 100% 0% 10-Jun-13 17-Jun-13 04-Sep-13 11-Sep-13 -52 A6930 Construction of secant pile wall ( services area ) 6 0% 100% 0% 13-Jun-13 19-Jun-13 08-Sep-13 14-Sep-13 -52 A6950 Construction of capping beam 7 0% 100% 0% 20-Jun-13 27-Jun-13 15-Sep-13 22-Sep-13 -45 J F M A M J J A S O N Constructi... Constructi... Installati... Constructi... Running of... Instructio... Excavation... Installati... Excavation... 22-Sep-13,... Constructi... Constructi... Constructi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S1 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 2  
  • 27. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 211 85.1% 20.6% 07-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48 Plots Plots 211 85.1% 20.6% 07-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48 Plot R1 Plot R1 0 0% 0% 07-Feb-13 07-Feb-13 22-Jan-13 A 22-Jan-13 A Plot S2 Plot S2 197 85.1% 20.6% 24-Feb-13 20-Aug-13 22-Jan-13 A 20-Oct-13 -48 Engineering Engineering 160 100% 100% 24-Feb-13 08-Jun-13 11-Feb-13 A 02-Sep-13 -48 A4900 Receive IFC drawings 0 100% 100% 100% 24-Feb-13 11-Feb-13 A A4910 Submittal of Design and shop drawings 5 100% 100% 100% 10-Apr-13 15-Apr-13 24-Apr-13 A 24-Apr-13 A A4920 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 16-Apr-13 17-Apr-13 25-Apr-13 A 05-Jun-13 A A4930 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 16-Apr-13 01-May-13 19-May-13 A 06-Jun-13 A A7110 Design NOC from APG 0 100% 100% 100% 17-Apr-13 23-May-13 A A7120 RTA Construction NOC 0 100% 100% 100% 15-May-13 06-Jun-13 A A6810 Obtaining Partial shoring permit 0 100% 100% 100% 13-May-13 27-Jun-13 A A4940 Obtaining shoring permit 0 0% 100% 0% 08-Jun-13 02-Sep-13 -48 Authorities Approvals Authorities Approvals 154 100% 57.91% 25-Feb-13 30-May-13 22-Jan-13 A 26-Aug-13 -25 Fencing / Hoarding and sign board Fencing / Hoarding and sign board 34 100% 92.5% 03-Mar-13 10-Apr-13 29-Jan-13 A 07-Jul-13 -41 A5030 Submittal of fence and sign board drawings 4 100% 100% 100% 03-Mar-13 06-Mar-13 29-Jan-13 A 05-Feb-13 A A5040 Approval of drawings ( APG) 2 100% 100% 100% 07-Mar-13 09-Mar-13 06-Feb-13 A 11-Feb-13 A A5050 Approval of drawings ( by DM ) 10 100% 100% 100% 07-Mar-13 18-Mar-13 12-Feb-13 A 04-Mar-13 A A5060 Obtaining fencing and hoarding permit 0 100% 100% 100% 18-Mar-13 06-Mar-13 A A5070 Installation of fence and sign boards 20 85% 100% 85% 19-Mar-13 10-Apr-13 14-Mar-13 A 07-Jul-13 -41 Temporary site office Temporary site office 121 0% 0% 07-Mar-13 20-May-13 29-Jan-13 A 27-Jul-13 -1 A5080 Submittal of site offices drawings 6 100% 100% 100% 07-Mar-13 13-Mar-13 29-Jan-13 A 29-Jan-13 A A5090 Approval of site offices drawings 10 100% 100% 100% 14-Mar-13 25-Mar-13 05-Mar-13 A 04-Jun-13 A A5100 Obtaining permit 0 0% 100% 0% 27-Apr-13 04-Jul-13 -1 A5110 Installation of temporary site offices 20 0% 100% 0% 28-Apr-13 20-May-13 04-Jul-13 27-Jul-13 -1 Site visit demarcation Site visit demarcation 0 0% 0% 25-Feb-13 25-Feb-13 22-Jan-13 A 22-Jan-13 A A5140 Obtaining site visit demarcation 0 100% 100% 100% 25-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 25-Feb-13 10-Mar-13 23-Jan-13 A 04-Feb-13 A A5150 Obtaining NOC for trial trenching 0 100% 100% 100% 25-Feb-13 23-Jan-13 A A5160 starting trial trenches at site for water , Ettisalat and sewerage 12 100% 100% 100% 25-Feb-13 10-Mar-13 02-Feb-13 A 04-Feb-13 A Utilities Relocation Utilities Relocation 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48 Electricity network relocation ( 132 KV relocation works ) Electricity network relocation ( 132 KV relocation works ) 153 100% 20% 26-Feb-13 30-May-13 23-Jan-13 A 26-Aug-13 -48 A6530 Trial pit NOC 9 100% 100% 100% 26-Feb-13 07-Mar-13 23-Jan-13 A 29-Jan-13 A A6470 Investegation , finding services ,Trial pit verification and shop drawing preparation 6 100% 100% 100% 09-Mar-13 14-Mar-13 10-Mar-13 A 01-Apr-13 A A6480 Obtain Approval from DEWA for shop drawing & material submittal 0 0% 100% 0% 10-Apr-13 10-Apr-13 27-Jun-13 A 04-Jul-13 -47 A6490 132kv cable exstock delivery at site 7 0% 100% 0% 10-Apr-13 17-Apr-13 04-Jul-13 11-Jul-13 -48 A6510 Civil Works - Excavation, Concrete trough installation, Cable laying, cover placing, backfilling and HV Tests 24 0% 100% 0% 11-Apr-13 08-May-13 06-Jul-13 01-Aug-13 -36 A6540 132KV Cable Joint production & DEWAFAT Inspection and all tests 13 0% 100% 0% 11-Apr-13 25-Apr-13 06-Jul-13 20-Jul-13 -48 A6500 Dispatch clearance, Documentation & Transportation of metrial to reach in hand 23 0% 100% 0% 27-Apr-13 22-May-13 21-Jul-13 18-Aug-13 -48 A6520 Shut down and jointing 7 0% 100% 0% 23-May-13 30-May-13 19-Aug-13 26-Aug-13 -48 Construction Demarcation Construction Demarcation 0 0% 0% 14-May-13 14-May-13 23-Jun-13 A 23-Jun-13 A A5240 Obtaining Construction demarcation 0 100% 100% 100% 14-May-13 23-Jun-13 A J F M A M J J A S O N 20-Oct-13,... 20-Oct-13,... 22-Jan-13 ... 20-Oct-13,... 02-Sep-13,... Receive IF... Submittal ... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... Obtaining ... 26-Aug-13,... 07-Jul-13,... Submittal ... Approval o... Approval o... Obtaining ... Installati... 27-Jul-13,... Submittal ... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 04-Feb-13 ... Obtaining ... starting t... 26-Aug-13,... 26-Aug-13,... Trial pit ... Investegat... Obtain App... 132kv cabl... Civil Work... 132KV Cabl... Dispatch c... Shut down ... 23-Jun-13 ... Obtaining ... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S2 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 2  
  • 28. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Construction Construction 80 82.32% 10.5% 16-May-13 20-Aug-13 01-Jul-13 A 20-Oct-13 -48 A4950 Construction of guide wall 16 100% 100% 100% 16-May-13 03-Jun-13 01-Jul-13 A 02-Jul-13 A A4960 Construction of secant pile wall 18 3.4% 100% 3.4% 25-May-13 15-Jun-13 02-Jul-13 A 31-Jul-13 -41 A4970 Installation of dewatering system 6 0% 100% 0% 25-May-13 30-May-13 13-Jul-13 18-Jul-13 -41 A5000 Running of dewatering system 67 0% 41.79% 0% 01-Jun-13 20-Aug-13 20-Jul-13 07-Oct-13 -41 A4980 Construction of capping beam 17 0% 100% 0% 03-Jun-13 23-Jun-13 21-Jul-13 11-Aug-13 -8 A7020 Instruction to Excavate 0 0% 100% 0% 22-Jun-13 16-Sep-13 -48 A4990 Excavation up to anchors level 17 0% 64.71% 0% 22-Jun-13 10-Jul-13 16-Sep-13 05-Oct-13 -48 A5010 Installation of anchors 14 0% 35.71% 0% 29-Jun-13 14-Jul-13 23-Sep-13 08-Oct-13 -48 A5020 Excavation up to final level 15 0% 0% 0% 04-Jul-13 21-Jul-13 29-Sep-13 20-Oct-13 -48 Area with Utilities Area with Utilities 18 100% 0% 09-Jun-13 29-Jun-13 03-Sep-13 23-Sep-13 -44 A6910 Construction of guide wall 7 0% 100% 0% 09-Jun-13 16-Jun-13 03-Sep-13 10-Sep-13 -48 A6900 Construction of secant pile wall ( services area ) 8 0% 100% 0% 12-Jun-13 20-Jun-13 07-Sep-13 15-Sep-13 -48 A6920 Construction of capping beam 7 0% 100% 0% 22-Jun-13 29-Jun-13 16-Sep-13 23-Sep-13 -44 J F M A M J J A S O N 20-Oct-13,... Constructi... Constructi... Installati... Running of... Constructi... Instructio... Excavation... Installati... Excavation... 23-Sep-13,... Constructi... Constructi... Constructi... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S2 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 2  
  • 29. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) 220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49 Plots Plots 220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49 Plot S3 Plot S3 220 98.82% 60.89% 30-Jan-13 21-Aug-13 22-Jan-13 A 21-Oct-13 -49 Engineering Engineering 77 100% 100% 30-Jan-13 29-Apr-13 23-Jan-13 A 22-May-13 A A1040 Receive IFC drawings 0 100% 100% 100% 30-Jan-13 23-Jan-13 A A1060 Submittal of Method Statement 5 100% 100% 100% 06-Feb-13 11-Feb-13 30-Jan-13 A 07-Feb-13 A A1050 Submittal of Design and shop drawings 5 100% 100% 100% 06-Feb-13 11-Feb-13 31-Jan-13 A 31-Jan-13 A A1090 Approval of method statement ( ByAPG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 02-Feb-13 A 07-Feb-13 A A1070 Approval of Design and shop drawings ( byAPG ) 2 100% 100% 100% 10-Apr-13 11-Apr-13 03-Feb-13 A 13-Apr-13 A A1080 Approval of Design and shop drawings ( by DM ) 14 100% 100% 100% 10-Apr-13 25-Apr-13 14-Apr-13 A 28-Apr-13 A A1230 Design NOC from APG 0 100% 100% 100% 11-Apr-13 15-Apr-13 A A1270 RTA Construction NOC 0 100% 100% 100% 27-Apr-13 08-May-13 A A1100 Obtaining shoring permit 0 100% 100% 100% 29-Apr-13 22-May-13 A Authorities Approvals Authorities Approvals 154 100% 94.27% 30-Jan-13 05-May-13 22-Jan-13 A 29-Jul-13 -5 Fencing /Hoarding and sign board Fencing /Hoarding and sign board 34 100% 92.5% 10-Feb-13 20-Mar-13 29-Jan-13 A 08-Jul-13 13 A1110 Submittal of fence and sign board drawings 3 100% 100% 100% 10-Feb-13 12-Feb-13 29-Jan-13 A 31-Jan-13 A A1120 Approval of drawings ( APG) 2 100% 100% 100% 13-Feb-13 14-Feb-13 02-Feb-13 A 11-Feb-13 A A1140 Obtaining fencing and Hoarding permit 0 100% 100% 100% 28-Feb-13 06-Feb-13 A A1130 Approval of drawings ( by DM ) 14 100% 100% 100% 13-Feb-13 28-Feb-13 12-Feb-13 A 04-Mar-13 A A1150 Installation of fence and sign boards 17 85% 100% 85% 02-Mar-13 20-Mar-13 14-Mar-13 A 08-Jul-13 13 Temporary site office Temporary site office 77 0% 0% 30-Jan-13 29-Apr-13 29-Jan-13 A 12-May-13 A A1160 Submittal of site offices drawings 6 100% 100% 100% 30-Jan-13 05-Feb-13 29-Jan-13 A 29-Jan-13 A A1170 Approval of site offices drawings 10 100% 100% 100% 10-Apr-13 21-Apr-13 01-Apr-13 A 30-Apr-13 A A1180 Obtaining permit 0 100% 100% 100% 21-Apr-13 07-May-13 A A1190 Installation of temporary site offices 7 100% 100% 100% 22-Apr-13 29-Apr-13 08-May-13 A 12-May-13 A Permanent office Permanent office 145 0% 0% 10-Feb-13 05-May-13 11-Feb-13 A 29-Jul-13 -12 A1200 Submit a proposal of permanent offices 2 100% 100% 100% 10-Feb-13 11-Feb-13 11-Feb-13 A 11-Feb-13 A A1210 Approval of proposal ( APG ) 2 100% 100% 100% 12-Feb-13 13-Feb-13 12-Feb-13 A 04-Jul-13 -12 A1360 Approval of proposal ( DM ) 12 0% 100% 0% 10-Apr-13 23-Apr-13 04-Jul-13 17-Jul-13 -12 A1370 Obtaining permit 0 0% 100% 0% 23-Apr-13 17-Jul-13 -12 A1380 Installation of permanent offices 10 0% 100% 0% 24-Apr-13 05-May-13 18-Jul-13 29-Jul-13 -12 Site visit demarcation Site visit demarcation 0 0% 0% 03-Feb-13 03-Feb-13 22-Jan-13 A 22-Jan-13 A A1220 Obtaining site visit demarcation 0 100% 100% 100% 03-Feb-13 22-Jan-13 A NOC for trial trenches NOC for trial trenches 12 100% 100% 03-Feb-13 17-Feb-13 22-Jan-13 A 04-Feb-13 A A1250 Obtaining NOC for trial trenching 0 100% 100% 100% 03-Feb-13 22-Jan-13 A A1260 starting trial trenches at site for water , ettisalat and sewerage 12 100% 100% 100% 04-Feb-13 17-Feb-13 02-Feb-13 A 04-Feb-13 A Mobilization permit Mobilization permit 0 0% 0% 28-Feb-13 28-Feb-13 25-Feb-13 A 25-Feb-13 A A1350 Obtaining mobilization permit 0 100% 100% 100% 28-Feb-13 25-Feb-13 A Construction Demarcation Construction Demarcation 0 0% 0% 25-Apr-13 25-Apr-13 08-May-13 A 08-May-13 A A1340 Obtaining Construction demarcation 0 100% 100% 100% 25-Apr-13 08-May-13 A Mobilization Mobilization 15 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A A1390 Mobilization of tools and equipments 15 100% 100% 100% 02-Mar-13 18-Mar-13 26-Feb-13 A 28-May-13 A J F M A M J J A S O N 21-Oct-13,... 21-Oct-13,... 21-Oct-13,... 22-May-13 ... Receive IF... Submittal ... Submittal ... Approval o... Approval o... Approval o... Design NOC... RTA Constr... Obtaining ... 29-Jul-13,... 08-Jul-13,... Submittal ... Approval o... Obtaining ... Approval o... Installati... 12-May-13 ... Submittal ... Approval o... Obtaining ... Installati... 29-Jul-13,... Submit a p... Approval o... Approval o... Obtaining ... Installati... 22-Jan-13 ... Obtaining ... 04-Feb-13 ... Obtaining ... starting t... 25-Feb-13 ... Obtaining ... 08-May-13 ... Obtaining ... 28-May-13 ... Mobilizati... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S3 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 2  
  • 30. Activity ID Activity Name Original Duration Activity % Complete Schedule % Complete Performance % Complete BL Project Start BL Project Finish Start Finish Total Float Construction Construction 143 98.28% 43.13% 30-Apr-13 21-Aug-13 14-May-13 A 21-Oct-13 -49 A1400 Construction of guide wall 14 100% 100% 100% 30-Apr-13 15-May-13 14-May-13 A 27-May-13 A A1410 Construction of secant pile wall 15 91% 100% 91% 08-May-13 25-May-13 25-May-13 A 06-Jul-13 2 A1420 Installation of dewatering system 6 0% 100% 0% 08-May-13 14-May-13 04-Jul-13 10-Jul-13 -49 A1430 Construction of capping beam 17 0% 100% 0% 14-May-13 02-Jun-13 04-Jul-13 23-Jul-13 -4 A1500 Instruction to Excavate 0 0% 100% 0% 25-May-13 06-Jul-13 2 A1450 Running of dewatering system 82 0% 51.22% 0% 15-May-13 21-Aug-13 11-Jul-13 21-Oct-13 -49 A1440 Excavation up to anchors level 20 0% 100% 0% 25-May-13 17-Jun-13 13-Jul-13 04-Aug-13 -4 A1460 Installation of anchors 19 0% 100% 0% 02-Jun-13 24-Jun-13 30-Jul-13 22-Aug-13 -12 A1470 Excavation up to final level 18 0% 100% 0% 11-Jun-13 01-Jul-13 07-Aug-13 29-Aug-13 -12 J F M A M J J A S O N 21-Oct-13,... Constructi... Constructi... Installati... Constructi... Instructio... Running of... Excavation... Installati... Excavation... Al Jaddaf Hotels and Apartments- Dubai - Shoring Works- (4.7.2013) Plot S3 Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 2