SlideShare a Scribd company logo
1 of 19
Download to read offline
Technology
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Construction Technology III
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
POST-TENSIONING STRUCUTRAL ELEMENT
WHAT IS PRESTRESSED CONCRETE ?
The tendons are tensioned prior to
the concrete being cast.
A method in which compression
force is applied to the reinforced
concrete station.
POST-TENSIONING STRUCUTRAL ELEMENT
PRE-STRESSED = PRE-TENSIONED POST -TENSIONED
• Concrete is pre-stressed with
tendons before placing in
position.
• Preference : structural element is
small and easy to transport.
• Pre-stressing is done only after
the concrete attains sufficient
strength in other way after the
concrete has been casted.
• Preference: Structural element is
heavy.
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Primary function to place concrete
structure under compression in regions
where loads causes tensile stress.
Applies compressive stresses on the
material, balancing off tensile stress on
the concrete.
All construction joints and
crack control joints could
be eliminated because the
slab was poured
monolithically.
Provide sufficient pre-
compression on the slab.
Introduction + Function )
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Slabs on grade (office
buildings, multi-storey car
parks, warehouses etc.)
Floor slabs Bridge
Main beams
Cantilevered
Structures
Foundation Slabs
(rafts)
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Single Strand
Bonded Post-Tensioning
Unbonded Post- Tensioning
Single Strand
Multi Strand Flat Duct
Multi Strands Round Duct
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
End
Cap
Grout
Valve
Pocket
Former
Strands
Grout Pipe
Wedges
Strands
Anchor
Head
Bearing Plate
Duct
Flat Duct Round Duct
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Floor System Reinforced with
Grouted Post-Tensioning System
Flat Duct
Post- Tensioned Mat Foundation
using grouted Tendons
Flat Duct
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Anchorage Assembly
Details of unbonded
post - tensioning
Stressing Jack
Tendon Tail
(Additional length will be cut off)
Wedges
Stressing
Anchor
Split Pocket Former with
Intermediate Anchor
Pocket Former
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Example of a Floor System using the
Unbonded Post-tensioning System
Fortaleza, Brazil.
MAT FOUNDATION USING UNBONDED
TENDONS
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
BONDED POST-TENSIONING UNBONDED POST-TENSIONING
 Develops higher flexural strength. Provides greater available level arm
Does not depend on anchorage after
grouting.
Simplifies pre-fabrications of tendons
Localize the effects of damages. Grouting not required
Simple technique for demolishing or
providing future opening in slab.
Can be constructed faster
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
2. Casting of concrete
Pouring of concrete. The
concrete must achieve
proper strength before the
tendons are tensioned. Then
tendons are placed after
casting of concrete.
There is grout valve
for it to fill the ducts
are filled with grout.
Ducts not grouted and
tendon is held by the
end anchorages.
BONDED
UNBONDED
3. Tensioning of tendons
Tensioning of tendons is applied by
a jack. The tensioning of tendons
and pre-compression of concrete
occur simultaneously .
4.Seating of wedges
After tensioning is done, they
will put on the wedges to hold
the tendons whereby the extra
length of tendons.
5. Cutting of tendons
Tendon tails will be cut off using
either oxyacetylene touch ,
hydraulic shear, plasma cutter,
abrasive wheel.
1. Placing of ducts
The ducts for the
tendons are placed
along with the
reinforcement before
the casting of concrete.
Placing
of
tendons
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Materials Savings
Increase in
Performance
Flexible in design
Quicker
Construction
Reduce lifetime
cost
Durable / Strong
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Accuracy
Poor workmanship
lead to accidents
Complexity of
work
Corrosion
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Honeycomb in
Concrete
Cracking WedgesSplicing of tendons
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
A glance of the project
Project Name: Morocco Mall
Project Value: US$253 million
Size: 165 000 𝑚2
Location: Casablanca, Africa
Timeline: Mid 2008 – October 2011
Large amounts of concrete were to
be used in the construction, which
would necessitate a large number
of expansion joints, and a large
numbers of precast slabs were to
be manufactured, at odds with the
tight construction timeless of
project.
CHALLENGE
SOLUTION
Replace the reinforced concrete
floor slabs and the precast panels
with post tensioned wall.
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Real Life Projects ( Oversea)
Process
1. Construction Site 2. Anchor Assembly 3. Stressing the strand 4. Grouting
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Real Life Projects (Local)
A glance at the project
Project Name: Klang Valley MRTV7
Project Value: RM800 million
Location: Kuala Lumpur, Malaysia
Developer: SPAD
 Comprise supply and installation of the external
post tension tendons to the erected segmental
boxed girders by using a 15.2 m multi-strand
system.
 HDPE smooth round ducts are used to house
tendons comprising of 19 strands each for piers
spanning from 30.00 to 39.50 Metres.
 Multi-strand tendons are then stressed with a
hydraulic jack that applies forces equivalent of
up to 400 tonnes.
The project comprises :
POST-TENSIONING STRUCUTRAL ELEMENT
TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
Thank You

More Related Content

What's hot

PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteParag Pal
 
Torsion force in CE 416
Torsion force in CE 416Torsion force in CE 416
Torsion force in CE 416dhuttt
 
POST-TENSIONING SYSTEM
POST-TENSIONING SYSTEMPOST-TENSIONING SYSTEM
POST-TENSIONING SYSTEMis_web
 
Construction of post tension slab
Construction of post tension slabConstruction of post tension slab
Construction of post tension slabArvind Vishwakarma
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
Construction of prestressed concrete structures
Construction of prestressed concrete structuresConstruction of prestressed concrete structures
Construction of prestressed concrete structuressanmilan
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteMAHFUZUR RAHMAN
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRahul
 
Introduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete TechnologyIntroduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete TechnologyEngr Shah Farooq
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential buildinggovt.poly kalamassery
 
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.Rais Uddin
 
Unit 1 anchorage systems
Unit 1   anchorage systemsUnit 1   anchorage systems
Unit 1 anchorage systemsHaripriya Kumar
 
A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction" A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction" Debankur Baruah
 
Prestressed concrete&metrorail 22-11-12
Prestressed concrete&metrorail 22-11-12Prestressed concrete&metrorail 22-11-12
Prestressed concrete&metrorail 22-11-12hlksd
 

What's hot (20)

PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Prestress concrete
Prestress concretePrestress concrete
Prestress concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Torsion force in CE 416
Torsion force in CE 416Torsion force in CE 416
Torsion force in CE 416
 
Prestressed construction
Prestressed constructionPrestressed construction
Prestressed construction
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
POST-TENSIONING SYSTEM
POST-TENSIONING SYSTEMPOST-TENSIONING SYSTEM
POST-TENSIONING SYSTEM
 
Construction of post tension slab
Construction of post tension slabConstruction of post tension slab
Construction of post tension slab
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Construction of prestressed concrete structures
Construction of prestressed concrete structuresConstruction of prestressed concrete structures
Construction of prestressed concrete structures
 
Shear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concreteShear, bond bearing,camber & deflection in prestressed concrete
Shear, bond bearing,camber & deflection in prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestress loss
Prestress lossPrestress loss
Prestress loss
 
Introduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete TechnologyIntroduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete Technology
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential building
 
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
Presentation on Retrofittion of broken pile Reinforcement at Pile Cut off Level.
 
Unit 1 anchorage systems
Unit 1   anchorage systemsUnit 1   anchorage systems
Unit 1 anchorage systems
 
Final thesis presentation.
Final thesis presentation.Final thesis presentation.
Final thesis presentation.
 
A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction" A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction"
 
Prestressed concrete&metrorail 22-11-12
Prestressed concrete&metrorail 22-11-12Prestressed concrete&metrorail 22-11-12
Prestressed concrete&metrorail 22-11-12
 

Similar to CT 3 Group Assignment Presentation Slide

Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete aishwaryasanap
 
Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Wan Nee
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
 
PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE524001
 
Pre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technologyPre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technologyAnjith Augustine
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete BridgeShubham Das
 
Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Prasanth Dasu
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs632k18BilalAhmad
 
Stress ribbon bridge
Stress ribbon bridgeStress ribbon bridge
Stress ribbon bridgeBishnu prasad
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 

Similar to CT 3 Group Assignment Presentation Slide (20)

Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete
 
Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
STRESS RIBBON BRIDGE
STRESS RIBBON BRIDGESTRESS RIBBON BRIDGE
STRESS RIBBON BRIDGE
 
PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE
 
Prestress concrete
Prestress concretePrestress concrete
Prestress concrete
 
Pre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technologyPre stressed concrete- modular construction technology
Pre stressed concrete- modular construction technology
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete Bridge
 
Tony
TonyTony
Tony
 
Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3
 
Stress ribbon-bridges
Stress ribbon-bridgesStress ribbon-bridges
Stress ribbon-bridges
 
Prestressing ppt
Prestressing pptPrestressing ppt
Prestressing ppt
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Acm Unit 1
Acm Unit 1Acm Unit 1
Acm Unit 1
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs
 
Stress ribbon bridge
Stress ribbon bridgeStress ribbon bridge
Stress ribbon bridge
 
Special structure
Special structureSpecial structure
Special structure
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Ppt
PptPpt
Ppt
 

More from Wan Nee

Presentation 7-pp-final
Presentation 7-pp-finalPresentation 7-pp-final
Presentation 7-pp-finalWan Nee
 
Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Wan Nee
 
Structures final 20th june
Structures final 20th juneStructures final 20th june
Structures final 20th juneWan Nee
 
Eca presentation slide (group a)
Eca presentation slide (group a)Eca presentation slide (group a)
Eca presentation slide (group a)Wan Nee
 
Estimating final
Estimating  final Estimating  final
Estimating final Wan Nee
 
Seminar question
Seminar questionSeminar question
Seminar questionWan Nee
 
Estimating presentation
Estimating presentation Estimating presentation
Estimating presentation Wan Nee
 
Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Wan Nee
 
Estimating Assignment Brief
Estimating Assignment BriefEstimating Assignment Brief
Estimating Assignment BriefWan Nee
 
Estimating Assignment
Estimating AssignmentEstimating Assignment
Estimating AssignmentWan Nee
 
Supply Chain
Supply Chain Supply Chain
Supply Chain Wan Nee
 
Supply chain
Supply chain  Supply chain
Supply chain Wan Nee
 
Supply chain
Supply chainSupply chain
Supply chainWan Nee
 
Management Science
Management Science Management Science
Management Science Wan Nee
 
Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Wan Nee
 
BS 2 PRESENTATION
BS 2 PRESENTATION BS 2 PRESENTATION
BS 2 PRESENTATION Wan Nee
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment ReportWan Nee
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORTWan Nee
 
INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MWan Nee
 
Measurement Assignment 2
Measurement Assignment 2 Measurement Assignment 2
Measurement Assignment 2 Wan Nee
 

More from Wan Nee (20)

Presentation 7-pp-final
Presentation 7-pp-finalPresentation 7-pp-final
Presentation 7-pp-final
 
Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)
 
Structures final 20th june
Structures final 20th juneStructures final 20th june
Structures final 20th june
 
Eca presentation slide (group a)
Eca presentation slide (group a)Eca presentation slide (group a)
Eca presentation slide (group a)
 
Estimating final
Estimating  final Estimating  final
Estimating final
 
Seminar question
Seminar questionSeminar question
Seminar question
 
Estimating presentation
Estimating presentation Estimating presentation
Estimating presentation
 
Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)
 
Estimating Assignment Brief
Estimating Assignment BriefEstimating Assignment Brief
Estimating Assignment Brief
 
Estimating Assignment
Estimating AssignmentEstimating Assignment
Estimating Assignment
 
Supply Chain
Supply Chain Supply Chain
Supply Chain
 
Supply chain
Supply chain  Supply chain
Supply chain
 
Supply chain
Supply chainSupply chain
Supply chain
 
Management Science
Management Science Management Science
Management Science
 
Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Qsb 2413 group project august 2017
Qsb 2413 group project august 2017
 
BS 2 PRESENTATION
BS 2 PRESENTATION BS 2 PRESENTATION
BS 2 PRESENTATION
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment Report
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
INTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM MINTEGRATED ASSIGNMENT - CT BM M
INTEGRATED ASSIGNMENT - CT BM M
 
Measurement Assignment 2
Measurement Assignment 2 Measurement Assignment 2
Measurement Assignment 2
 

Recently uploaded

Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 

Recently uploaded (20)

Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 

CT 3 Group Assignment Presentation Slide

  • 1. Technology TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Construction Technology III
  • 2. TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 POST-TENSIONING STRUCUTRAL ELEMENT WHAT IS PRESTRESSED CONCRETE ? The tendons are tensioned prior to the concrete being cast. A method in which compression force is applied to the reinforced concrete station.
  • 3. POST-TENSIONING STRUCUTRAL ELEMENT PRE-STRESSED = PRE-TENSIONED POST -TENSIONED • Concrete is pre-stressed with tendons before placing in position. • Preference : structural element is small and easy to transport. • Pre-stressing is done only after the concrete attains sufficient strength in other way after the concrete has been casted. • Preference: Structural element is heavy. TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161
  • 4. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Primary function to place concrete structure under compression in regions where loads causes tensile stress. Applies compressive stresses on the material, balancing off tensile stress on the concrete. All construction joints and crack control joints could be eliminated because the slab was poured monolithically. Provide sufficient pre- compression on the slab. Introduction + Function )
  • 5. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Slabs on grade (office buildings, multi-storey car parks, warehouses etc.) Floor slabs Bridge Main beams Cantilevered Structures Foundation Slabs (rafts)
  • 6. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Single Strand Bonded Post-Tensioning Unbonded Post- Tensioning Single Strand Multi Strand Flat Duct Multi Strands Round Duct
  • 7. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 End Cap Grout Valve Pocket Former Strands Grout Pipe Wedges Strands Anchor Head Bearing Plate Duct Flat Duct Round Duct
  • 8. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Floor System Reinforced with Grouted Post-Tensioning System Flat Duct Post- Tensioned Mat Foundation using grouted Tendons Flat Duct
  • 9. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Anchorage Assembly Details of unbonded post - tensioning Stressing Jack Tendon Tail (Additional length will be cut off) Wedges Stressing Anchor Split Pocket Former with Intermediate Anchor Pocket Former
  • 10. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Example of a Floor System using the Unbonded Post-tensioning System Fortaleza, Brazil. MAT FOUNDATION USING UNBONDED TENDONS
  • 11. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 BONDED POST-TENSIONING UNBONDED POST-TENSIONING  Develops higher flexural strength. Provides greater available level arm Does not depend on anchorage after grouting. Simplifies pre-fabrications of tendons Localize the effects of damages. Grouting not required Simple technique for demolishing or providing future opening in slab. Can be constructed faster
  • 12. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 2. Casting of concrete Pouring of concrete. The concrete must achieve proper strength before the tendons are tensioned. Then tendons are placed after casting of concrete. There is grout valve for it to fill the ducts are filled with grout. Ducts not grouted and tendon is held by the end anchorages. BONDED UNBONDED 3. Tensioning of tendons Tensioning of tendons is applied by a jack. The tensioning of tendons and pre-compression of concrete occur simultaneously . 4.Seating of wedges After tensioning is done, they will put on the wedges to hold the tendons whereby the extra length of tendons. 5. Cutting of tendons Tendon tails will be cut off using either oxyacetylene touch , hydraulic shear, plasma cutter, abrasive wheel. 1. Placing of ducts The ducts for the tendons are placed along with the reinforcement before the casting of concrete. Placing of tendons
  • 13. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Materials Savings Increase in Performance Flexible in design Quicker Construction Reduce lifetime cost Durable / Strong
  • 14. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Accuracy Poor workmanship lead to accidents Complexity of work Corrosion
  • 15. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Honeycomb in Concrete Cracking WedgesSplicing of tendons
  • 16. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 A glance of the project Project Name: Morocco Mall Project Value: US$253 million Size: 165 000 𝑚2 Location: Casablanca, Africa Timeline: Mid 2008 – October 2011 Large amounts of concrete were to be used in the construction, which would necessitate a large number of expansion joints, and a large numbers of precast slabs were to be manufactured, at odds with the tight construction timeless of project. CHALLENGE SOLUTION Replace the reinforced concrete floor slabs and the precast panels with post tensioned wall.
  • 17. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Real Life Projects ( Oversea) Process 1. Construction Site 2. Anchor Assembly 3. Stressing the strand 4. Grouting
  • 18. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Real Life Projects (Local) A glance at the project Project Name: Klang Valley MRTV7 Project Value: RM800 million Location: Kuala Lumpur, Malaysia Developer: SPAD  Comprise supply and installation of the external post tension tendons to the erected segmental boxed girders by using a 15.2 m multi-strand system.  HDPE smooth round ducts are used to house tendons comprising of 19 strands each for piers spanning from 30.00 to 39.50 Metres.  Multi-strand tendons are then stressed with a hydraulic jack that applies forces equivalent of up to 400 tonnes. The project comprises :
  • 19. POST-TENSIONING STRUCUTRAL ELEMENT TAN KAI XUAN 0325077 | TEE WAN NEE 0325074 | TANG LAM YU 0324966 | YAP CHOE HOONG 0323161 Thank You